Status of the Active and Passive Radiation Monitoring Systems

Federico Ravotti (PH/TOT)TOTEM Collaboration Meeting

18 March 2009

Page 2: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 2

Contents

• Active RadMon SystemDedicated electronics and cabling integrated into the DCS

– Review and Implantation in the experiment;

– Status of the system components;

– Results of the Pilot System (Sep.-Nov. 2008);

– Control Software and Integration in IP5;

• Passive RadMon SystemSet of samples which do not need readout electronics

– Review of passive dosimeters used in TOTEM;

– Passive RadMon units;

– Implantation and Bill of Materials;

• ConclusionsTOTEM CM – 18 March 2009

Page 3: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 3

Active RadMon

TOTEM CM – 18 March 2009

IRAD

IFET

RRADRRL

p-JFET

124

ELMB-DAC PatchPanel

RadMonSensor

VRAD

VRL

ELMB

dose/fluence/temp.

read. current

ELMBRadMon Box

Page 4: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 4

Active RadMon Implantation

TOTEM CM – 18 March 2009

Co

un

ting

roo

m (U

SC

55

)C

ave

rnT

un

ne

l

ELMBRadMon

ELMBvacuum

ELMBT SiD

ELMBT cooling

ELMBT CSC

ELMBT GEM

ELMBRadMon

ELMBRadMon

ELMBothers

ELMBothers

<PCname>

PVSS IIPVSS II

sysWORXX

ELMB OPCserver

OPC client

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

PS 12V

R-PPR-PP R-PP

PS 30V

PS 5V

HV-PP

UPS pow er CMS pow er

T1Roman Pots T2

ISC PT-100

humiditypressure

ISC

8

PT-100

humiditypressure

ISC

24

vacuum PT-100 PT-1000

168

56 28

ELMB readout

P-PP H-PP P-PP H-PP

PS 30V

PS 5V

PS 5V

bus08 bus04

bus12

T1 T2Pressure

RadMon DAC

PS 30V

RadMon

RP

4R-DAC R-DACR-DAC

4

2

1

8

8

4

42

2

1 ELMB + 2 DAC + 2 PP = 6 ISC

Page 5: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 5

RadMon ISCs & ELMBs

TOTEM CM – 18 March 2009

• 7 ELMBs for RadMon within the

batch of the DCS (Fernando);

• ELMBs configured for “non-

standard” CAN-bus data transfer

mechanism: on-demand SDO

(usually: synchronized PDO).

• 2 RadFETs (TID); 2 p-i-n diodes (Feq); NTC:

RadFETs: ~ 100mA x 1000 ms

p-i-n diodes: 1mA x 700 ms

• All 36 ISCs produced & characterized at the end of 2008 by PH/DT;

• 2 in RPs @ 220 mt, 1 in T2 ¼ so far;

• PH/DT manages the stock of spares for LHC experiments.

Page 6: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 6

ELMB-DACs

TOTEM CM – 18 March 2009

11V diode replaced

with5V diode

• NIKHEF Project (2002), ATLAS (2006)

• New production TOTEM/LHCb (2008)

• 2 Prototypes with wrong Zener diode

• 40 DACs produced and tested

• 34 OK (3 damaged & repaired) – 6 BAD

• 14 + 6 spares for TOTEM + left PCBs ...

• Each of 16 ch./DAC individually calibrated

with test bench in lab. 555 running PVSS

and data analysis program (William)

VE = 30V

Page 7: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 7

ELMB-DACs Testing

TOTEM CM – 18 March 2009

I-V curves in the range 0-20 mA for the 12 sensor Ch. each of the 4 switch Ch.

ISC 1 ISC 2

ISC 3

NTC currents are not perturbated during DAC operation

Load

1.3

kW

to s

tay

with

in th

e V

rang

e <

30 V

Page 8: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 8

PatchPanel (PP) boards

TOTEM CM – 18 March 2009

• ATLAS PP for 6 ISCs hosting 2 rad. sensors +

NTC (2005)

• Design of TOTEM/LHCb PP for 3 ISC hosting

4 radiation sensors + NTC (2008)

• 2 Prototypes + 36 Produced (Johan)

• Production inspected and tested (Josef)

• 35 OK (few scratches on signal lines t.b.r.)

• 1 Discarded (big blisters on PCB surface)

• 14 + 4 spares ready for TOTEM

ISC 1 ISC 2 ISC3 Spares

Page 9: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 9

RadMon Pilot Setup Sep. 2008

TOTEM CM – 18 March 2009

Rack S2B02ELMB+DAC+PP

Final PSs chosen for RadMon and all DCS

CAN Bus

Rack S2B19Laptop with PVSS & CAN-USB

• Practice made on ATLAS-Ljubljana prototype in Lab. 555 (Nov. 2007-Sep. 2008)

• Pilot setup of our readout installed in USC55 from Sep. 8th to Nov. 2008

Page 10: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 10TOTEM CM – 18 March 2009

PMIL 5314 (RAMSES)TOTEM RadMon 50

PMIL 5312 (RAMSES)

PMIL 5714 (RAMSES)TOTEM RadMon 51

PMIL 5712 (RAMSES)

B1

B2

Monitors layout in the Tunnel

RAMSES monitors also integrated into DCS

RadMon 51 (POT2)

Ramses

~ 5 mt.

Page 11: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 11

Radiation @ TOTEM “week 1”

TOTEM CM – 18 March 2009

Page 12: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 12

Result RadMon Pilot Setup

TOTEM CM – 18 March 2009

We could reproduce the Tc of all sensors @ 300 mt. (here Tc = ~ 25 mV/C)

Page 13: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 13

What else did we learn ?

TOTEM CM – 18 March 2009

I Max = 18kA

• CMS mField does not induce noticable changes (after proper grounding);

• Test and debug the PVSS control function with > 35‘000 readout cycles.

• Grounding of the Power Supplies;

• Temp. behaviour on the RPMB in function of cooling conditions (det. OFF: T~13C while T(Si) =-35C)

Page 14: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 14

RadMon Control Software

TOTEM CM – 18 March 2009

• RadMon ELMBs use different data handling;

• Prototype of PVSS ctr. function developed & tested:

now used in the RPMB Test Panel of Lab. 555 (Ivan)

• Sizable work for the DCS team (D2-to-D5);

• Sequential readout of 3 ISCs (1 PP board) in ~ 30s.ISC1

SW OFF NTC SW ON READ sens. & curr. SW OFF

ISC2

SW OFF NTC ...

• Needs to be integrated in the global DCS structure;

• Proper logic to be fully defined and implemented.

Page 15: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 15

HW Integration in IP5

• Cabling:– USC55:

• RPs: all OK, 1 connector/ISC (Antoine);

• T1/T2: all OK with SUB-D’s Adaptation needed

– Missing: Connectors and “short cables” @ RP 147 mt.

• DCS Rack:– RPs: “ELMB Box” is being assembled and cabled (Johan);

– T1/T2: mechanics ready, “ELMB Box” to be assembled.

TOTEM CM – 18 March 2009

Page 16: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 16

Passive RadMon

• Complementary/Redundant Radiation Measurements;• Passive sensors needs to be removed for readout;• WG started as common project for LHC Experiments (2004);• Since then …

– ATLAS: samples from different institutes;– ALICE: ?– CMS/ATLAS-ALFA: samples from DESY;– LHCb: exploited the WG outcome.

TOTEM CM – 18 March 2009

TLD PAD (Alanine)

RPL BPW

Dose Range

10 mGy to 100 Gy

10Gy to 1MGy

100mGy to 100 kGy

2x1012cm-2 to 4x1014cm-2

Readouttechnique

Heating; Light emission

ESR UV; Light emission

Voltage measurement

TOTEM

RadFET TLD Alanine RPL1E-04

1E-02

1E+00

1E+02

1E+04

1E+06

1E+08

Dosimeter typeD

ose

(G

y)

Page 17: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 17

Passive RadMon Unit

TOTEM CM – 18 March 2009

MTS -N natLiF:Mg,Ti

MCP-7 7LiF:Mg,Cu,P

MTS -7 7LiF:Mg,Ti

MCP-7 7LiF:Mg,Cu,P

Courtesy: Ch. Ilgner (LHCb) PE box

p-i-n diode BPW

TLDs

INB: xxxx00010132000xxxx

Sensitive to different spectrum components

Page 18: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 18

Location and Bill of Materials

TOTEM CM – 18 March 2009

• 50 PE housing produced by the Dortmund TU obtained via LHCb;

• 40 TLDs out from the agreement LHCb-IJF, Krakow, Poland (includes readout).– 40 units destined to TOTEM: “fresh” samples for 2009 run on the way for replacement;

• 36 p-i-n diodes from PH/DT;

• > 100 Alanine & > 70 RPL from CERN DG/SCR2 mounted on RPs. All the rest under assembly (Antoine);

readout/replacement instructions, INB numbering, ... TOTEM-RAD-002.

Page 19: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 19

Documentation

TOTEM CM – 18 March 2009

Page 20: Status of the Active and Passive Radiation Monitoring Systems Federico Ravotti (PH/TOT) TOTEM Collaboration Meeting 18 March 2009

F. Ravotti-Status of Active/Passive RadMon 20

Conclusions

• Active RadMon System– All components were procured/produced;– Pilot Setup validate the design/allowed extensive tests;– Control Software needs to be integrated in the DCS;– Final HW needs to be integrated in IP5;

• Passive RadMon System– All sensors were procured for experiment startup;– All passive units are available for installation.