Status of the BMBF project
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
BMBF- Joint Project 05P2018 – R&D BESCHLEUNIGER (DIAGNOSE)
July 2018 – June 2021
(1) 05P18SJRB1 (2.5 FTE) Prof. T. Stöhlker / Prof. Schmidl
„Innovative Kryo-Stromkomparatoren (CCC) für FAIR”
(2) 05P18RDRB1 (0.5 FTE) Prof. H. De Gersem
„Quenchsimulation für Supraleitende Magnete “
Associated partners: GSI Darmstadt, CERN Genf
(3) Uni Frankfurt
(4) Uni Mainz
Interim report 2018/III&IV + 2019/I&II
Status BMBF 2019/II Milestone 1
M1
return
stop
forward
parties agree to
continue with the
project as foreseen
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Arbeitsplan 2 0 1 8 2 0 1 9
III IV I II III
Meilensteine J A S O N D J F M A M J J A
M1 Designphase abgeschlosseno
M2 Inbetriebnahme Laborteststand
M3 Herstellung und Labortests der
Demonstratoren abgeschlossen
M4 Strahltests des CCC-Komplett-
systems abgeschl. u. dokumentiert
M1: design phase completed
Milestone 1 Task 1
1.1.1 Geometry & Adaptation: on time
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
AP1 Steigerung der Leistungsfähigkeit der Kryo-Stromkomparatoren (Prof. Schmidl)
AP1.1 Kern-Verbesserungen,
neue Materialien
AP1.1.1 Geometrie und
Anpassung
AP1.1.2 Kernlos Geometrie
AP1.2 Verbesserung Slew
rate / Dynamik
AP1.3 Verbesserung
Schirmfaktor
AP1.4 Referenzsensoren
AP1.5 Signalaufbereitung
M1
Milestone 1 Task 2
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
AP2 Entwicklung eines robusten Demonstrators (Prof. Stöhlker)
AP2.1 Kostengünstige SL-
Technologie
AP2.2 robuste Auslese
AP2.3 Simul. Mechanik,
Schwingungsunterdrückung
AP2.4 Ausbau UHV-Fähigkeit
AP2.5 Optimierung /
Entstörung Rückverflüssiger
M1
2.1 Inexpensive sc-technology: on time
AP3 Durchführung von Testmessungen (Prof. Schmidl + Prof. Stöhlker)
AP3.1 Aufbau CCC-System-
Testplatz
AP3.2 Einbau Kryostat
AP3.3 Optimierung Kryostat
und CCC
AP3.4 Testmessungen
AP3.5 Analyse der Daten
Milestone 1 Task 3
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
M1
3.2 Installation CCC in cryostat: not on timenot part of M1: „design phase completed“
Publications
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Status BMBF 2019/II
1x Paper (IPHT)
IBIC 2018
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
2x Poster +
proceedings
(GSI, FSU)
Status BMBF 2019/II
PublicationsWorkshop 'Kryoelektronische Bauelemente 2018' (Kryo 2018), Kloster Schöntal
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Status BMBF 2019/II
2x Poster
(HI-Jena, FSU-Jena)
IPAC 2019
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
1x Talk + proceedings
1x Poster + proceedings
Status BMBF 2019/II
PublicationsMT Meeting 2018 Berlin & 2019 Jena
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
1x Poster & speed talk (HI-Jena) 2x Poster (HI-Jena, FSU-Jena)
3x Lab tour (Cryo Detector Lab)
Status BMBF 2019/II
Proposal
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Status Helmholtz-DDL
Start: MT Meeting June 2018, Berlin
Helmholtz Distributed Detector Laboratory (DDL)
Proposal for a large investment (> EUR 15 million)
Now: Proposal ready, supported by GSI management
Jena (HI-Jena, FSU-Jena, Leibniz-IPHT) < 5 EUR million
located at FSU-Jena: Cryo Detector Lab
Cryo Detector Lab
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Status Helmholtz-DDL
Cryogenic service
TiefTemperaturService
annual production is over 60,000 liters LHe
Magnetically & acoustically
shielded chamber
LHe-wide-neck bath cryostat (380 mm max. sample diameter) with a
dual-diaphragm condenser microphone (2 Hz – 20 kHz) in the
acoustically and magnetically shielded chamber at the Institute of
Solid State Physics (IFK).
Cryo Detector Lab
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Status Helmholtz-DDL
Cryogenic x-ray spectrometer imaging– SQUID-based Metallic Magnetic Calorimeter
– coming up, Helmholtzweg 5, Room K010
[SPARC Technical Design Report 2014, A. Fleischmann]
CCCs– Helmholtzweg 5, Room K021, TTS
– in progress
Cryo Detector Lab
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Status Helmholtz-DDL
PurchasedAntivibration
up to 800 kg loadMagnetic field room
generation /
compensation
Superfluidity
Strong He-pump, 65 m3/h
Rapid CCC prototyping
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Measurements with dummy Pb-Core-CCCs
Core GSI328plus GSI328plus Mf106
Measurementsdummy Pb-CCC
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Measurements:
- Current noise desity
* White noise 1 kHz - 10 kHz
* Low Frequency 50 mHz – 1 Hz
* Long time jumps
- Thermal drifts
- Slew rate
- Small pulses
- Transfer function
meander skipping
GSI-Nb-CCC-XD vs. dummy-Pb-CCC-XD-3b
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Full GSI328 plus core (3 bands)1 pickup coil, 80 µH @ 4.2 K, 1 kHz
Measurements:
- Current noise desity
* White noise 1 kHz - 10 kHz
* Low Frequency 50 mHz – 1 Hz
* Long time jumps
- Thermal drifts
- Slew rate
- Small pulses
- Transfer function
dummy Pb-CCC Measurements
meander skipping
GSI-Nb-CCC-XD vs. dummy-Pb-CCC-XD-3b
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Measurements:
- Current noise desity
* White noise 1 kHz - 10 kHz
* Low Frequency 50 mHz – 1 Hz
* Long time jumps
- Thermal drifts
- Slew rate
- Small pulses
- Transfer function
100m 1 10 100 1k 10k 100k 1M
100f
1p
10p
100p
1n
Cu
rre
nt
no
ise
de
nsity (
A/
Hz)
Frequency (Hz)
Dummy-Pb-CCC-XD direct version
GSI-Nb-CCC-XD balanced version
dummy Pb-CCC Measurements
dummy-Pb-CCC-XD-3b
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
100m 1 10 100 1k 10k 100k
1p
10p
100p
1n
Curr
ent nois
e d
ensity (
A/
Hz)
Frequency (Hz)
49,0 49,2 49,4 49,6 49,8 50,0 50,2 50,4
1p
10p
100p
1n
Curr
ent nois
e d
ensity (
A/
Hz)
Frequency (Hz)
Current noise density
Measurements
GSI328plus core: 3 bands vs. 1 band
Making
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
dummy-Pb-CCC-XD-1b
GSI328plus core 1 band: dummy-Pb-CCC-XD-1band
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
1 core band shielded dummy Pb-CCCPickup coil
dummy-Pb-CCC-XD-1b Making
dummy-Pb-CCC-XD-3b vs. dummy-Pb-CCC-XD-1b
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Measurements:
- Current noise desity
* White noise 1 kHz - 10 kHz
* Low Frequency 50 mHz – 1 Hz
* Long time jumps
- Thermal drifts
- Slew rate
- Small pulses
- Transfer function
100m 1 10 100 1k 10k 100k
1p
10p
100p
1n
Cu
rre
nt
no
ise
de
nsity (
A/
Hz)
Frequency (Hz)
1/3 GSI328plus
3/3 GSI328plus
dummy-Pb-CCC-XD Measurements
dummy-Pb-CCC-XD-3/3 vs. dummy-Pb-CCC-XD-1/3
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Measurements:
- Current noise desity
* White noise 1 kHz - 10 kHz
* Low Frequency 50 mHz – 1 Hz
* Long time jumps
- Thermal drifts
- Slew rate
- Small pulses
- Transfer function
2k 4k 6k 8k 10k
2,0p
2,5p
3,0p
3,5p
4,0p
4,5p
5,0p
5,5p
6,0p
Cu
rre
nt
no
ise
de
nsity (
A/
Hz)
Frequency (Hz)
1/3 GSI328plus
3/3 GSI328plus
x 1.7 (≈√3)
dummy-Pb-CCC-XD Measurements
SPICE Simulation
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
dummy-Pb-CCC-XD-3b vs. dummy-Pb-CCC-XD-1b
1 A 0.99 A0.97 A
27 µH 27 µH
dummy-Pb-CCC-XD
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Pb-CCC-XD-3c
1 A 2.7 A
80 µH 9 µH => Max Stapelfeld
Predicted white noise:
3 pA / 2.7 => 1.1 pA/√Hz
dummy-Pb-CCC-XD SPICE Simulation
dummy-Pb-CCC-XD-1b
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Measurements:
- Current noise desity
* White noise 1 kHz - 10 kHz
* Low Frequency 50 mHz – 1 Hz
* Long time jumps
- Thermal drifts
- Slew rate
- Small pulses
- Transfer function
0 60 120 180 240 300 360
-1µ
-900n
-800n
-700n
-600n
-500n
-400n
-300n
-200n
-100n
0
100n
200n
Cu
rre
nt
(A)
Time (min)
day 3 (Fri 15:00)
day 5 (Sun 06:00)
day 6 (Mon 15:00) + Grd + Ferrite
day 7 (Tue 16:00) + Grd + 2xFerrite
Sheath current filter !
dummy-Pb-CCC-XD Measurements
Sheath current filter
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Power supply SQUID signal
dummy-Pb-CCC-XD Measurements
Long time jumps
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
CERN-Nb-CCC
before low passing
100m 1 10 100 1k 10k 100k 1M
100f
1p
10p
100p
1n
Cu
rre
nt
no
ise
de
nsity (
A/
Hz)
Frequency (Hz)
Dummy-Pb-CCC-XD direct version
GSI-Nb-CCC-XD balanced version
GSI-Nb-CCC-DX
0.1 1 Hz
500 80 450 150 pA/√Hz
500 pA/√Hz @ 100 mHz
0.1 1 Hz
Nb-CCCs Measurements
other core materialRapid prototyping
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Manifer 106
Initial permeability: 2 000
Mf 106 sample: Ferritkern RK
(120x70x30) mm, AL 5.6 µH
MnaZn(1-a)Fe2O4
70 mm
Manganese-zinc ferrite
100m 1 10 100 1k 10k 100k 1M
1p
10p
100p
1n
10n
100n
dummy Mf106-CCC
Input curr
ent density (
Arm
s/
Hz)
Frequency (Hz)
Current noise density
dummy Pb-CCC-Mf106
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
100m 1 10 100 1k 10k 100k 1M
1p
10p
100p
1n
10n
100n
dummy Mf106-CCC
GSI-Nb-CCC-XD
Inpu
t cu
rren
t d
en
sity (
Arm
s/
Hz)
Frequency (Hz)
100x
10x
Mf106 core + 1 µH SQUID
Measurements
10 100 1k 10k 100k 1M
10n
100n
1µ
10µ
One-t
urn
loop inducta
nce L
s (
H)
Frequency (Hz)
300K
4.2 K
Inductance Ls=f(frequency)
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
1/60
Mf106 core + 6 turns
Measurementsdummy Pb-CCC-Mf106
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
50 100 150 200 250 300
0,0
1,0µ
2,0µ
3,0µ
4,0µ
5,0µ
6,0µ
One-t
urn
loop inducta
nce L
s (
H)
Temperature (K)
100 Hz
1 kHz
10 kHz
100 kHz
200 kHz
Mf106 core + 6 turns
dummy Pb-CCC-Mf106
Inductance Ls=f(temperature)
Measurements
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
50 100 150 200 250 300
0,0
1,0µ
2,0µ
3,0µ
4,0µ
5,0µ
6,0µ
One-t
urn
loop inducta
nce L
s (
H)
Temperature (K)
100 Hz
1 kHz
10 kHz
100 kHz
200 kHz
10 100
0,0
1,0µ
2,0µ
3,0µ
4,0µ
5,0µ
6,0µ
One-t
urn
loop inducta
nce L
s (
H)
Temperature (K)
100 Hz
1 kHz
10 kHz
100 kHz
200 kHz
dummy Pb-CCC-Mf106 Measurements
Inductance Ls=f(temperature)
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
10 100
0,0
1,0µ
2,0µ
3,0µ
4,0µ
5,0µ
6,0µ
One-t
urn
loop inducta
nce L
s (
H)
Temperature (K)
100 Hz
1 kHz
10 kHz
100 kHz
200 kHz
10 100
100n
1µ
10µ
One-t
urn
loop inducta
nce L
s (
H)
Temperature (K)
100 Hz
1 kHz
10 kHz
100 kHz
200 kHz
dummy Pb-CCC-Mf106 Measurements
Inductance Ls=f(temperature)
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
10 100
100n
1µ
10µ
One-t
urn
loop inducta
nce L
s (
H)
Temperature (K)
100 Hz
1 kHz
10 kHz
100 kHz
200 kHz
10 100
100µ
1m
10m
100m
1
One-t
urn
loop r
ests
tance R
s (W
)
Temperature (K)
100 Hz
1 kHz
10 kHz
100 kHz
200 kHz
dummy Pb-CCC-Mf106 Measurements
Inductance Ls=f(temperature) Resistance Ls=f(temperature)
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Small inductance
1 A 0.09 A
100 nH 100 nH
Mismatch => insensitivity
dummy Pb-CCC-Mf106 SPICE Simulation
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
1 A 0.75 A
300 nH 300 nH 100 nH
=> Factor 8.3x (+ √3x noise reduction)
dummy Pb-CCC-Mf106
Small inductance
SPICE Simulation
100m 1 10 100 1k 10k 100k 1M
1p
10p
100p
1n
10n
100n
dummy Mf106-CCC
GSI-Nb-CCC-XD
Input curr
ent density (
Arm
s/
Hz)
Frequency (Hz)
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
10x
3x Mf106 cores + 100 nH SQUID
Only prediction,
was not measured yet!
OK
dummy Pb-CCC-Mf106
Small inductance
SPICE Simulation
Pulse
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Mf106 cores + 1 µH SQUID
GBP: 7.2 GHz
1µs-pulse: 400 nApp
-1,0µ -500,0n 0,0 500,0n 1,0µ 1,5µ 2,0µ
-400n
-200n
0
200n
400n
Cu
rre
nt
(A)
Time (s)
CCC
Input
Delay: 100 ns
Time-resolution: 100 ns
dummy Pb-CCC-Mf106 Measurements
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Mf106 cores + 1 µH SQUID
GBP: 0.55 GHz
25 s-pulse: 1.6 µApp
Creeping approach: 25 s
Transfer function
below 1 Hz ?
-5 0 5 10 15 20 25 30
-0,8
-0,6
-0,4
-0,2
0,0
0,2
0,4
0,6
0,8
Time (s)
Calib
ration c
oil
curr
ent (µ
A)
-300
-200
-100
0
100
200
300
Raw
SQ
UID
sig
nal (m
V)
dummy Pb-CCC-Mf106 Measurements
Pulse
Transfer function
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Mf106 cores + 1 µH SQUID
GBP: 7.2 GHz
10m 100m 1 10 100 1k 10k 100k 1M
50
100
150
200
250
300
350
Input sensitiv
ity (
mV
/µA
)
Frequency (Hz)
@ 4 K more time is necessery to
change the magnetic order of Mf106
(typical range 10 s)
CCC => Signal deconvolution!
dummy Pb-CCC-Mf106 Measurements
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
GSI-Nb-CCC-XD
GBP: 0.23 GHz
-5 0 5 10 15 20 25 30
-0,8
-0,6
-0,4
-0,2
0,0
0,2
0,4
0,6
0,8
Time (s)
Calib
ration c
oil
curr
ent (µ
A)
-300
-200
-100
0
100
200
300
Raw
SQ
UID
sig
nal (m
V)
-100 -50 0 50 100 150 200 250 300 350 400
-4
-2
0
2
4
6
8
10
12
GS
I-N
b-C
CC
-XD
cu
rre
nt
(nA
)
Time (µs)
measured, CCC output
test signal, CCC input
dummy Pb-CCC-Mf106 Measurements
Pulse
Squid it !
Short summary
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
1. Dummy CCCs without meander can be useful.
2. Other core materials – other problems.
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
100m 1 10 100 1k 10k 100k 1M
100f
1p
10p
100p
1n
10n
Curr
ent nois
e d
ensi
ty (
Arm
s/H
z)
Frequency (Hz)
Pb-4C-XD DT100+HP100k+HP5M
Nb-CCC-XD magnetic shielded chamber 1.8 GHz
Pb-4C Measurements
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
-200µ -100µ 0 100µ 200µ 300µ 400µ
-50n
0
50n
100n
150n
200n
Cu
rre
nt
(A)
Time (s)
CCC
Input
Pb-4C Measurements
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
-200µ -100µ 0 100µ 200µ 300µ 400µ
0
5n
10n
15n
20n
Cu
rre
nt
(A)
Time (s)
measured CCC input current
current through the CCC
Pb-4C Measurements
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
dummy Pb-CCC-XD-3c SPICE Simulation
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
dummy Pb-CCC-XD-3c SPICE Simulation
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Pb-CCC-XD-3c SPICE Simulation
Meander: Cm=250 nF
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Pb-CCC-XD-3c SPICE Simulation
Meander: Cm=250 nF
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Pb-CCC-XD-3c SPICE Simulation
Meander: Cm=500 nF
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Pb-CCC-XD-3c SPICE Simulation
1 kHz Low pass (10 turns + 20 µF + 5Ω)
CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva
Pb-CCC-XD-3c SPICE Simulation
1 kHz Low pass (10 turns + 20 µF + 5Ω)