status of the bmbf project · cryo detector lab ccc project meeting 25 thand 26 june 2018 volker...

53
Status of the BMBF project CCC Project Meeting 25 th and 26 th June 2018 Volker Tympel (HI-Jena) CERN Geneva BMBF- Joint Project 05P2018 R&D BESCHLEUNIGER (DIAGNOSE) July 2018 June 2021 (1) 05P18SJRB1 (2.5 FTE) Prof. T. Stöhlker / Prof. Schmidl „Innovative Kryo-Stromkomparatoren (CCC) für FAIR” (2) 05P18RDRB1 (0.5 FTE) Prof. H. De Gersem Quenchsimulation für Supraleitende Magnete Associated partners: GSI Darmstadt, CERN Genf (3) Uni Frankfurt (4) Uni Mainz Interim report 2018/III&IV + 2019/I&II

Upload: others

Post on 28-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Status of the BMBF project

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

BMBF- Joint Project 05P2018 – R&D BESCHLEUNIGER (DIAGNOSE)

July 2018 – June 2021

(1) 05P18SJRB1 (2.5 FTE) Prof. T. Stöhlker / Prof. Schmidl

„Innovative Kryo-Stromkomparatoren (CCC) für FAIR”

(2) 05P18RDRB1 (0.5 FTE) Prof. H. De Gersem

„Quenchsimulation für Supraleitende Magnete “

Associated partners: GSI Darmstadt, CERN Genf

(3) Uni Frankfurt

(4) Uni Mainz

Interim report 2018/III&IV + 2019/I&II

Page 2: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Status BMBF 2019/II Milestone 1

M1

return

stop

forward

parties agree to

continue with the

project as foreseen

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Arbeitsplan 2 0 1 8 2 0 1 9

III IV I II III

Meilensteine J A S O N D J F M A M J J A

M1 Designphase abgeschlosseno

M2 Inbetriebnahme Laborteststand

M3 Herstellung und Labortests der

Demonstratoren abgeschlossen

M4 Strahltests des CCC-Komplett-

systems abgeschl. u. dokumentiert

M1: design phase completed

Page 3: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Milestone 1 Task 1

1.1.1 Geometry & Adaptation: on time

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

AP1 Steigerung der Leistungsfähigkeit der Kryo-Stromkomparatoren (Prof. Schmidl)

AP1.1 Kern-Verbesserungen,

neue Materialien

AP1.1.1 Geometrie und

Anpassung

AP1.1.2 Kernlos Geometrie

AP1.2 Verbesserung Slew

rate / Dynamik

AP1.3 Verbesserung

Schirmfaktor

AP1.4 Referenzsensoren

AP1.5 Signalaufbereitung

M1

Page 4: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Milestone 1 Task 2

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

AP2 Entwicklung eines robusten Demonstrators (Prof. Stöhlker)

AP2.1 Kostengünstige SL-

Technologie

AP2.2 robuste Auslese

AP2.3 Simul. Mechanik,

Schwingungsunterdrückung

AP2.4 Ausbau UHV-Fähigkeit

AP2.5 Optimierung /

Entstörung Rückverflüssiger

M1

2.1 Inexpensive sc-technology: on time

Page 5: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

AP3 Durchführung von Testmessungen (Prof. Schmidl + Prof. Stöhlker)

AP3.1 Aufbau CCC-System-

Testplatz

AP3.2 Einbau Kryostat

AP3.3 Optimierung Kryostat

und CCC

AP3.4 Testmessungen

AP3.5 Analyse der Daten

Milestone 1 Task 3

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

M1

3.2 Installation CCC in cryostat: not on timenot part of M1: „design phase completed“

Page 6: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Publications

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Status BMBF 2019/II

1x Paper (IPHT)

Page 7: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

IBIC 2018

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

2x Poster +

proceedings

(GSI, FSU)

Status BMBF 2019/II

Page 8: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

PublicationsWorkshop 'Kryoelektronische Bauelemente 2018' (Kryo 2018), Kloster Schöntal

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Status BMBF 2019/II

2x Poster

(HI-Jena, FSU-Jena)

Page 9: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

IPAC 2019

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

1x Talk + proceedings

1x Poster + proceedings

Status BMBF 2019/II

Page 10: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

PublicationsMT Meeting 2018 Berlin & 2019 Jena

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

1x Poster & speed talk (HI-Jena) 2x Poster (HI-Jena, FSU-Jena)

3x Lab tour (Cryo Detector Lab)

Status BMBF 2019/II

Page 11: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Proposal

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Status Helmholtz-DDL

Start: MT Meeting June 2018, Berlin

Helmholtz Distributed Detector Laboratory (DDL)

Proposal for a large investment (> EUR 15 million)

Now: Proposal ready, supported by GSI management

Jena (HI-Jena, FSU-Jena, Leibniz-IPHT) < 5 EUR million

located at FSU-Jena: Cryo Detector Lab

Page 12: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Cryo Detector Lab

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Status Helmholtz-DDL

Cryogenic service

TiefTemperaturService

annual production is over 60,000 liters LHe

Magnetically & acoustically

shielded chamber

LHe-wide-neck bath cryostat (380 mm max. sample diameter) with a

dual-diaphragm condenser microphone (2 Hz – 20 kHz) in the

acoustically and magnetically shielded chamber at the Institute of

Solid State Physics (IFK).

Page 13: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Cryo Detector Lab

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Status Helmholtz-DDL

Cryogenic x-ray spectrometer imaging– SQUID-based Metallic Magnetic Calorimeter

– coming up, Helmholtzweg 5, Room K010

[SPARC Technical Design Report 2014, A. Fleischmann]

CCCs– Helmholtzweg 5, Room K021, TTS

– in progress

Page 14: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Cryo Detector Lab

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Status Helmholtz-DDL

PurchasedAntivibration

up to 800 kg loadMagnetic field room

generation /

compensation

Superfluidity

Strong He-pump, 65 m3/h

Page 15: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Rapid CCC prototyping

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Measurements with dummy Pb-Core-CCCs

Core GSI328plus GSI328plus Mf106

Page 16: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Measurementsdummy Pb-CCC

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Measurements:

- Current noise desity

* White noise 1 kHz - 10 kHz

* Low Frequency 50 mHz – 1 Hz

* Long time jumps

- Thermal drifts

- Slew rate

- Small pulses

- Transfer function

meander skipping

Page 17: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

GSI-Nb-CCC-XD vs. dummy-Pb-CCC-XD-3b

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Full GSI328 plus core (3 bands)1 pickup coil, 80 µH @ 4.2 K, 1 kHz

Measurements:

- Current noise desity

* White noise 1 kHz - 10 kHz

* Low Frequency 50 mHz – 1 Hz

* Long time jumps

- Thermal drifts

- Slew rate

- Small pulses

- Transfer function

dummy Pb-CCC Measurements

meander skipping

Page 18: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

GSI-Nb-CCC-XD vs. dummy-Pb-CCC-XD-3b

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Measurements:

- Current noise desity

* White noise 1 kHz - 10 kHz

* Low Frequency 50 mHz – 1 Hz

* Long time jumps

- Thermal drifts

- Slew rate

- Small pulses

- Transfer function

100m 1 10 100 1k 10k 100k 1M

100f

1p

10p

100p

1n

Cu

rre

nt

no

ise

de

nsity (

A/

Hz)

Frequency (Hz)

Dummy-Pb-CCC-XD direct version

GSI-Nb-CCC-XD balanced version

dummy Pb-CCC Measurements

Page 19: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

dummy-Pb-CCC-XD-3b

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

100m 1 10 100 1k 10k 100k

1p

10p

100p

1n

Curr

ent nois

e d

ensity (

A/

Hz)

Frequency (Hz)

49,0 49,2 49,4 49,6 49,8 50,0 50,2 50,4

1p

10p

100p

1n

Curr

ent nois

e d

ensity (

A/

Hz)

Frequency (Hz)

Current noise density

Measurements

Page 20: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

GSI328plus core: 3 bands vs. 1 band

Making

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

dummy-Pb-CCC-XD-1b

Page 21: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

GSI328plus core 1 band: dummy-Pb-CCC-XD-1band

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

1 core band shielded dummy Pb-CCCPickup coil

dummy-Pb-CCC-XD-1b Making

Page 22: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

dummy-Pb-CCC-XD-3b vs. dummy-Pb-CCC-XD-1b

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Measurements:

- Current noise desity

* White noise 1 kHz - 10 kHz

* Low Frequency 50 mHz – 1 Hz

* Long time jumps

- Thermal drifts

- Slew rate

- Small pulses

- Transfer function

100m 1 10 100 1k 10k 100k

1p

10p

100p

1n

Cu

rre

nt

no

ise

de

nsity (

A/

Hz)

Frequency (Hz)

1/3 GSI328plus

3/3 GSI328plus

dummy-Pb-CCC-XD Measurements

Page 23: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

dummy-Pb-CCC-XD-3/3 vs. dummy-Pb-CCC-XD-1/3

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Measurements:

- Current noise desity

* White noise 1 kHz - 10 kHz

* Low Frequency 50 mHz – 1 Hz

* Long time jumps

- Thermal drifts

- Slew rate

- Small pulses

- Transfer function

2k 4k 6k 8k 10k

2,0p

2,5p

3,0p

3,5p

4,0p

4,5p

5,0p

5,5p

6,0p

Cu

rre

nt

no

ise

de

nsity (

A/

Hz)

Frequency (Hz)

1/3 GSI328plus

3/3 GSI328plus

x 1.7 (≈√3)

dummy-Pb-CCC-XD Measurements

Page 24: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

SPICE Simulation

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

dummy-Pb-CCC-XD-3b vs. dummy-Pb-CCC-XD-1b

1 A 0.99 A0.97 A

27 µH 27 µH

dummy-Pb-CCC-XD

Page 25: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Pb-CCC-XD-3c

1 A 2.7 A

80 µH 9 µH => Max Stapelfeld

Predicted white noise:

3 pA / 2.7 => 1.1 pA/√Hz

dummy-Pb-CCC-XD SPICE Simulation

Page 26: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

dummy-Pb-CCC-XD-1b

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Measurements:

- Current noise desity

* White noise 1 kHz - 10 kHz

* Low Frequency 50 mHz – 1 Hz

* Long time jumps

- Thermal drifts

- Slew rate

- Small pulses

- Transfer function

0 60 120 180 240 300 360

-1µ

-900n

-800n

-700n

-600n

-500n

-400n

-300n

-200n

-100n

0

100n

200n

Cu

rre

nt

(A)

Time (min)

day 3 (Fri 15:00)

day 5 (Sun 06:00)

day 6 (Mon 15:00) + Grd + Ferrite

day 7 (Tue 16:00) + Grd + 2xFerrite

Sheath current filter !

dummy-Pb-CCC-XD Measurements

Page 27: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Sheath current filter

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Power supply SQUID signal

dummy-Pb-CCC-XD Measurements

Page 28: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Long time jumps

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

CERN-Nb-CCC

before low passing

100m 1 10 100 1k 10k 100k 1M

100f

1p

10p

100p

1n

Cu

rre

nt

no

ise

de

nsity (

A/

Hz)

Frequency (Hz)

Dummy-Pb-CCC-XD direct version

GSI-Nb-CCC-XD balanced version

GSI-Nb-CCC-DX

0.1 1 Hz

500 80 450 150 pA/√Hz

500 pA/√Hz @ 100 mHz

0.1 1 Hz

Nb-CCCs Measurements

Page 29: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

other core materialRapid prototyping

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Manifer 106

Initial permeability: 2 000

Mf 106 sample: Ferritkern RK

(120x70x30) mm, AL 5.6 µH

MnaZn(1-a)Fe2O4

70 mm

Manganese-zinc ferrite

Page 30: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

100m 1 10 100 1k 10k 100k 1M

1p

10p

100p

1n

10n

100n

dummy Mf106-CCC

Input curr

ent density (

Arm

s/

Hz)

Frequency (Hz)

Current noise density

dummy Pb-CCC-Mf106

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

100m 1 10 100 1k 10k 100k 1M

1p

10p

100p

1n

10n

100n

dummy Mf106-CCC

GSI-Nb-CCC-XD

Inpu

t cu

rren

t d

en

sity (

Arm

s/

Hz)

Frequency (Hz)

100x

10x

Mf106 core + 1 µH SQUID

Measurements

Page 31: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

10 100 1k 10k 100k 1M

10n

100n

10µ

One-t

urn

loop inducta

nce L

s (

H)

Frequency (Hz)

300K

4.2 K

Inductance Ls=f(frequency)

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

1/60

Mf106 core + 6 turns

Measurementsdummy Pb-CCC-Mf106

Page 32: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

50 100 150 200 250 300

0,0

1,0µ

2,0µ

3,0µ

4,0µ

5,0µ

6,0µ

One-t

urn

loop inducta

nce L

s (

H)

Temperature (K)

100 Hz

1 kHz

10 kHz

100 kHz

200 kHz

Mf106 core + 6 turns

dummy Pb-CCC-Mf106

Inductance Ls=f(temperature)

Measurements

Page 33: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

50 100 150 200 250 300

0,0

1,0µ

2,0µ

3,0µ

4,0µ

5,0µ

6,0µ

One-t

urn

loop inducta

nce L

s (

H)

Temperature (K)

100 Hz

1 kHz

10 kHz

100 kHz

200 kHz

10 100

0,0

1,0µ

2,0µ

3,0µ

4,0µ

5,0µ

6,0µ

One-t

urn

loop inducta

nce L

s (

H)

Temperature (K)

100 Hz

1 kHz

10 kHz

100 kHz

200 kHz

dummy Pb-CCC-Mf106 Measurements

Inductance Ls=f(temperature)

Page 34: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

10 100

0,0

1,0µ

2,0µ

3,0µ

4,0µ

5,0µ

6,0µ

One-t

urn

loop inducta

nce L

s (

H)

Temperature (K)

100 Hz

1 kHz

10 kHz

100 kHz

200 kHz

10 100

100n

10µ

One-t

urn

loop inducta

nce L

s (

H)

Temperature (K)

100 Hz

1 kHz

10 kHz

100 kHz

200 kHz

dummy Pb-CCC-Mf106 Measurements

Inductance Ls=f(temperature)

Page 35: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

10 100

100n

10µ

One-t

urn

loop inducta

nce L

s (

H)

Temperature (K)

100 Hz

1 kHz

10 kHz

100 kHz

200 kHz

10 100

100µ

1m

10m

100m

1

One-t

urn

loop r

ests

tance R

s (W

)

Temperature (K)

100 Hz

1 kHz

10 kHz

100 kHz

200 kHz

dummy Pb-CCC-Mf106 Measurements

Inductance Ls=f(temperature) Resistance Ls=f(temperature)

Page 36: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Small inductance

1 A 0.09 A

100 nH 100 nH

Mismatch => insensitivity

dummy Pb-CCC-Mf106 SPICE Simulation

Page 37: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

1 A 0.75 A

300 nH 300 nH 100 nH

=> Factor 8.3x (+ √3x noise reduction)

dummy Pb-CCC-Mf106

Small inductance

SPICE Simulation

Page 38: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

100m 1 10 100 1k 10k 100k 1M

1p

10p

100p

1n

10n

100n

dummy Mf106-CCC

GSI-Nb-CCC-XD

Input curr

ent density (

Arm

s/

Hz)

Frequency (Hz)

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

10x

3x Mf106 cores + 100 nH SQUID

Only prediction,

was not measured yet!

OK

dummy Pb-CCC-Mf106

Small inductance

SPICE Simulation

Page 39: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Pulse

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Mf106 cores + 1 µH SQUID

GBP: 7.2 GHz

1µs-pulse: 400 nApp

-1,0µ -500,0n 0,0 500,0n 1,0µ 1,5µ 2,0µ

-400n

-200n

0

200n

400n

Cu

rre

nt

(A)

Time (s)

CCC

Input

Delay: 100 ns

Time-resolution: 100 ns

dummy Pb-CCC-Mf106 Measurements

Page 40: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Mf106 cores + 1 µH SQUID

GBP: 0.55 GHz

25 s-pulse: 1.6 µApp

Creeping approach: 25 s

Transfer function

below 1 Hz ?

-5 0 5 10 15 20 25 30

-0,8

-0,6

-0,4

-0,2

0,0

0,2

0,4

0,6

0,8

Time (s)

Calib

ration c

oil

curr

ent (µ

A)

-300

-200

-100

0

100

200

300

Raw

SQ

UID

sig

nal (m

V)

dummy Pb-CCC-Mf106 Measurements

Pulse

Page 41: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Transfer function

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Mf106 cores + 1 µH SQUID

GBP: 7.2 GHz

10m 100m 1 10 100 1k 10k 100k 1M

50

100

150

200

250

300

350

Input sensitiv

ity (

mV

/µA

)

Frequency (Hz)

@ 4 K more time is necessery to

change the magnetic order of Mf106

(typical range 10 s)

CCC => Signal deconvolution!

dummy Pb-CCC-Mf106 Measurements

Page 42: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

GSI-Nb-CCC-XD

GBP: 0.23 GHz

-5 0 5 10 15 20 25 30

-0,8

-0,6

-0,4

-0,2

0,0

0,2

0,4

0,6

0,8

Time (s)

Calib

ration c

oil

curr

ent (µ

A)

-300

-200

-100

0

100

200

300

Raw

SQ

UID

sig

nal (m

V)

-100 -50 0 50 100 150 200 250 300 350 400

-4

-2

0

2

4

6

8

10

12

GS

I-N

b-C

CC

-XD

cu

rre

nt

(nA

)

Time (µs)

measured, CCC output

test signal, CCC input

dummy Pb-CCC-Mf106 Measurements

Pulse

Page 43: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

Squid it !

Short summary

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

1. Dummy CCCs without meander can be useful.

2. Other core materials – other problems.

Page 44: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

100m 1 10 100 1k 10k 100k 1M

100f

1p

10p

100p

1n

10n

Curr

ent nois

e d

ensi

ty (

Arm

s/H

z)

Frequency (Hz)

Pb-4C-XD DT100+HP100k+HP5M

Nb-CCC-XD magnetic shielded chamber 1.8 GHz

Pb-4C Measurements

Page 45: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

-200µ -100µ 0 100µ 200µ 300µ 400µ

-50n

0

50n

100n

150n

200n

Cu

rre

nt

(A)

Time (s)

CCC

Input

Pb-4C Measurements

Page 46: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

-200µ -100µ 0 100µ 200µ 300µ 400µ

0

5n

10n

15n

20n

Cu

rre

nt

(A)

Time (s)

measured CCC input current

current through the CCC

Pb-4C Measurements

Page 47: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

dummy Pb-CCC-XD-3c SPICE Simulation

Page 48: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

dummy Pb-CCC-XD-3c SPICE Simulation

Page 49: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Pb-CCC-XD-3c SPICE Simulation

Meander: Cm=250 nF

Page 50: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Pb-CCC-XD-3c SPICE Simulation

Meander: Cm=250 nF

Page 51: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Pb-CCC-XD-3c SPICE Simulation

Meander: Cm=500 nF

Page 52: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Pb-CCC-XD-3c SPICE Simulation

1 kHz Low pass (10 turns + 20 µF + 5Ω)

Page 53: Status of the BMBF project · Cryo Detector Lab CCC Project Meeting 25 thand 26 June 2018 Volker Tympel (HI-Jena) CERN Geneva Status Helmholtz-DDL Cryogenic x-ray spectrometer imaging

CCC Project Meeting 25th and 26th June 2018 Volker Tympel (HI-Jena) CERN Geneva

Pb-CCC-XD-3c SPICE Simulation

1 kHz Low pass (10 turns + 20 µF + 5Ω)