Page 1: Status of the FAIR Project

Status of the FAIR Project

Boris SharkovFAIR Scientific Director (des.)

NuPECC Madrid 31.06.2010

Austria IndiaChina Finland France Germany Greece U KItaly Poland Slovakia Slovenia Spain SwedenRomania Russia Saudi Arabia

Page 2: Status of the FAIR Project

B. Sharkov 2

Research Communities at FAIR

100 m

Nuclear Structure & Astrophysicswith rare isotope beams, x10 000and excellent cooling

High EM Field (HI) _Fundamental Studies (HI & p)Applications (HI)

Plasma Physics: x600 higher target energy density 600kJ/g

Nuclear Matter Physics with35-45 GeV/u HI beams, x1000

Hadron Physicswith antiprotons of 0 - 15 GeV

Special Features:• 50ns Bunched beams• Electron cooling of secondary

beams• SC magnets fast ramping• Parallel operation

SIS 100/300

HESR

SuperFRS

NESR

CBMHADES

FLAIRCR- RESR

Rare Isotope Production Target

AntiprotonProduction Target

Page 3: Status of the FAIR Project

B. Sharkov 3

Development of Project Staging

2003 Recommendation by WissenschaftsRat – FAIR Realisation in three stages

2005 Entire FacilityBaseline Technical Report

2007 Phase APhase BSIS300

2009

Module 0SIS100

Module 1expt areas CBM/HADES and APPA

Module 2Super-FRSfixed target areaNuSTAR

Module 3pbar facility, incl. CR forPANDA,options for NuSTAR

Module 4 LEB for NuSTAR, NESR for NuSTAR and APPA,FLAIR for APPA

Module 5RESRnominal intensity for PANDA & parallel operation with NuSTAR and APPASIS18 Proton Beamline

Module 6SIS300HESR CoolerER

Modularized Start Version

Page 4: Status of the FAIR Project

B. Sharkov 4

Rationale for new Modularized Start Version (WP) in 2009

a detailed cost estimate for CC presented by architectsa new cost estimate in 2009 for the accelerator complexDetailed list of site related construction costs was worked outfirm commitments of FAIR Member States

Germany and State of Hesse announced to cover "site-dependent" construction costs outside FAIR project budget + 110 M€ !

Page 5: Status of the FAIR Project

Basic Criteria :

Outstanding research opportunities should be offered to all four scientific pillars of FAIR by the Modularized Start

Version

B. Sharkov 5

Page 6: Status of the FAIR Project

B. Sharkov 12

Module 3:High-energy antiprotons(p-linac, pbar-target, CR,HESR)

Module 2:Super-FRS

Module 1:Experimental areas

Module 0:SIS100 and connection to existing GSI accel.Module 4:

low energy RIB andlow energy antiprotons

Module 5:RESR storage ringP+ beamlineABM building

Modularized Start Version

Page 7: Status of the FAIR Project

B. Sharkov 13

PANDA

Science with the Modularized Start Version

CBM/HADES

NuSTAR

APPA

Page 8: Status of the FAIR Project

B. Sharkov 14

Cost Estimate Modules 0-3 (Price Basis 2005)

Total accelerator and personnel Modules 0 - 3 502

Total civil construction Modules 0 - 3 400

Experiment funding 78

FAIR GmbH personnel and running costs 47

Grand Total Modules 0 - 3 1027

all values in M€

Page 9: Status of the FAIR Project

B. Sharkov 15

Firm Commitments

FAIR Countries Total declared Contribution (k€) Austria 5.000

China 12.000

Finland 5.000

France 27.000

Germany 705.000

Great Britain 8.000

Greece 4.000

India 36.000

Italy 42.000

Poland 23.740

Romania 11.870

Russia 178.050

Slovenia 12.000

Slovakia 6.000

Spain 19.000

Sweden 10.000

Total 1.104.660Firm Commitments 1.038.660

not firm for the first batch

Kingdom of Saudi-Arabia signed the Declaration to contribute at least 1 %

Primeminister Putinsigned. Officially publicized last week.

Page 10: Status of the FAIR Project

Dear Colleagues,We are happy to inform you that the Decree of the RussianGovernment on Russian participation in FAIR project wasissued and published. Its number is 245-p of February 27, 2010. By this decision Russian Government approved the project of FAIR Convention with Russian contribution to FAIR construction in the amount of 178,05 MEuro (prices of January 2005) and authorizedthe State Corporation “Rosatom” to be Russian Shareholder of FAIR Company. Sincerely,     O.Patarakin, P.Bogdanov. 

Page 11: Status of the FAIR Project

B. Sharkov 17

Finance Summary

Cost of Modularized Start Version = 1027 M€Firm funding commitments of FAIR Partners = 1039 M€

Modularized Start Version secures a swift start within the current funding commitments

Page 12: Status of the FAIR Project

B. Sharkov 18

Evaluation Board 16 October 2009

1. The Modularized Start Version is the right way to proceed.

2. The project is more focussed and is in even better shape.

3. We should now start as soon as possible!

The Green Paper outlines the path to achieve this goal

Page 13: Status of the FAIR Project

B. Sharkov 19

FAIR accelerator Work Packages

Page 14: Status of the FAIR Project

International Partner 1WP 1

International Partner 3WP 3

International Partner 2WP 2

International Partner nWP n

• • •

Consortium(represented by

Consortium Leader)

form

FAIR GmbH

Page 15: Status of the FAIR Project

Preparatory Phase R&D by GSI & Partner Institutes

B. Sharkov 21

IHEP Protvino

SIS300 magnets

Variable FrequencyCavities

BINP Novosibirsk

SIS100 rapidly cycling sc magnetsCEA / CNRS

NESR Electron Cooling

Page 16: Status of the FAIR Project

SIS18upgrade Program

h=2 acceleration cavity for faster ramping

Scrapers and NEG coating for pressure stabilization

Injection system for low charged state heavy ions

Charge separator for higher intensity and high quality beams

The SIS18upgrade program: Booster operation with low charge state heavy ions

Power grid connection

Page 17: Status of the FAIR Project

Acceleration of Intermediate Charge State Heavy Ions

Significant progress with Ta24+ and U27+ ions due to the upgrade program in comparison with 2001

Maximum beam energy about 200 MeV/u

Page 18: Status of the FAIR Project

B. Sharkov 24

Roadmap

Start of construction activities 2010/11 +1 year Schedule is driven by civil construction Aim for earliest commissioning of accelerators and respective experiments

Module Construction time (months)

Ready for installation

0 72 2015 / 16 1 28 2015 / 16 2 60 2016 3 60 2016

+1 year+1 year

+1 year

Page 19: Status of the FAIR Project

Road Map FAIR Site & Buildings

2009 201220112010 2013 201620152014

1 2 3 45

6

Handing in of preplanning documents to hbm

Clarification of user requirements Modularized Start Version (MSV)

Start revised preplanning for MSV

Expected approval of revised planning for MSV

Preparation of documents for building permit

Expected approval for (partial) building permit

Start site preparation (clearing trees)

Award contracts on civil construction work lot 1 … 4

Completion of civil construction work lot 1 … 4

Start installation of accelerators and detectors

12

3

4

5

6

7

7

9

8

10

9

10

8

2017

Page 20: Status of the FAIR Project

B. Sharkov 27

Building the FAIR GmbH

Recruitment of key personnel: Research Director In-Kind Coordinator Head of Sites and Buildings Legal and accounting staff Staff for the coordination of accelerators and experiments (Currently only contracts for 2010 possible (via GSI))

S Richter NN D. Krämer Z. Majka (NN)

Law Office Buildings GSI Acc Liason APPA

Human Ressources Technical Infrastructure Technical follow-up CBM Project Office

Projectadminsitration In-Kind Coordination NuSTAR Public Relations

Procurement/Contracts PANDA Internal Audit

Safety etc.

General Support

Finances, Controlling, and

Accounting

Management BoardChairperson of the Management Board: B. Sharkov

Managing Directors (=Geschäftsführer in the sense ot the GmbH)

Boris Sharkov, Simone Richter

Administration Department

Site & Buildings Departmement

Technical Department Research Department

Page 21: Status of the FAIR Project

B. Sharkov 28

Roadmap to foundation the FAIR company

01 02 03 04 05 06 07 08 09 10 11 12

2010 2011

1 2 3 4 5 6 7 8

1

2

3

4

5

6

8

7

KW1: Fertigstellung der Rechtsdokumente

KW8: Dokumente von Auswärtiges Amt an andere Außenministerien versandt

KW13: Alle Übersetzungen zurück beim Auswärtigen Amt

KW19: Alle offenen Fragen der Übersetzungen bilateral gelöst

KW22: Alle Rechtsdokumente in den fünf Vertragssprachen verfügbar

KW32: Formale Zustimmung aller Partnerländer

KW33: Übersetzerkonferenz – Translation conference

KW37: Formelle Unterzeichnung der Konvention

KW38: Gründung der FAIR GmbH

Page 22: Status of the FAIR Project

B. Sharkov 29

Conclusions

Based on recent cost estimates and firm commitments of FAIR Member States the Modularized Start Version is elaborated

Modules 0-3 ensure a physics programme that is unique, competitive with great discovery potential

All FAIR science communities can perform excellent physics from early on

The facility can be smoothly upgraded towards the full version of FAIR (modules 4,5,6)

Setup of the international FAIR company proceeds in parallel

FAIR is gathering MOMENTUM !

Page 23: Status of the FAIR Project

Board of FAIR Collaborations founded

• APPA, CBM, NuSTAR, PANDA: two representatives each

• discuss common issues (e.g. research and funding)

• initiate joint activities

Contact your funding agencies!

Raise more money for your experiment !

Page 24: Status of the FAIR Project

B. Sharkov 32