status of the japan participation and progress in hiroshima
DESCRIPTION
Status of the Japan Participation and progress in Hiroshima. Toru Sugitate and Kenta Shigaki for the Hiroshima ALICE/PHOS Group on 21 January, 2005 at CERN. Activities in Hiroshima CSP ver.3 and its 1 st mass-production continuing studies of PWO/APD/CSP expertizing the PWO carolimeter - PowerPoint PPT PresentationTRANSCRIPT
Status of the Japan Participation and progress in Hiroshima
Toru Sugitate and Kenta Shigaki for the Hiroshima ALICE/PHOS Group
on 21 January, 2005 at CERN
Page 2Toru Sugitate / Hiroshima / ALICE004 / 21 January, 2005
presentation outline
Activities in Hiroshima CSP ver.3 and its 1st mass-production continuing studies of PWO/APD/CSP expertizing the PWO carolimeter
Official Business Associated member in ALICE PHOS at RHIC Grant proposal in Japan
Page 3Toru Sugitate / Hiroshima / ALICE004 / 21 January, 2005
CSP milestones for the 1st PHOS module
discussed in July ‘04, based on the successful PS and SPS tests in ‘03;
no circuit change from ver.2 decouple the test input from
signal lines make space around APD sol
dering holes sample evaluation in Sept/Oct a
t CERN thanks to Iouri
production of ver.3 starts on 25 Oct. in Japan
delivered to Hiroshima in late Dec.
4,500 CSP’s now at CERN
Page 4Toru Sugitate / Hiroshima / ALICE004 / 21 January, 2005
continuing studies of PWO/APD/CSP
1.Static properties of PWO’s by; Furukawa, Japan (2000~) RI&NC in Minsk, Belarus (2003~) North Crystal in Apatity, Russia
on; photon yield and decay timeas a function of temp, and
2. APD gain as a function of; temp. and HV
N.C. PWO w/pmt for 60Co-γ’s photon yield decay time
yiel
d/ch
pulse height[ch] time [ns]
9.4 pe @10℃ 11.1ns @10℃
12.5 pe @0℃ 13.5ns @0℃
15.6 pe @-10℃ 17.0ns @-10℃
22.2ns @-20℃
23.0ns @-25℃
20.6 pe @-20℃
24.2 pe @-25℃
Page 5Toru Sugitate / Hiroshima / ALICE004 / 21 January, 2005
expertizing the PWO calorimeter
Recent PWO/APD/CSP tests in JapanTohoku-LNS (2002); photons at 0.8–1.2 GeV
Hiroshima-REFER (2003/04); electrons at 150 MeV
KEK-PS (2004); hadrons/electrons at 0.5–2 GeV
Hiroshima-REFER(2004/Dec); electron at 150 MeV
3x3 array of North Crystal PWO’s w/APD+ CSP(v2)+amp+PHADC in a metal shielded wooden box w/ double - Peltier modules and thermal insulation layer inside.
Page 6Toru Sugitate / Hiroshima / ALICE004 / 21 January, 2005
high-lights from the beam tests in 2004
Pulse height spectra of a 3x3 North Crystal PWO array w/ APD +CSP(v2) readout chain, operated at bias=405V under a condition at -11 ºC; irradiated by 150MeV electrons at the center crystal in Dec 2004 at Hiroshima-REFER
Energy sum spectra for 1.0 GeV beams
left and below; all events; electron events: require electrons at the center.
E / E (@400V in 0ºC)
= (4.6±0.9)%/E [GeV]
(3.1±0.1)%/E [GeV]
(2.8±0.04)%
Pulse height spectra of a 3x3 Norh Crystal PWO array w/ APD + CSP(v2) readout chain, operated at bias = 400V under a condition at 0ºC; irradiated by 1.0 GeV secondary-beams at KEK-PS in June 2004.
•We should improve S/N ratio, •look the stat. term good, and•should find a better beam line.
E / E = 5.3%
Page 7Toru Sugitate / Hiroshima / ALICE004 / 21 January, 2005
official business
Hiroshima, Tokyo-CNS and Tsukuba are now ALICE associated members, together with RIKEN.
Hiroshima: 3 faculty staffs and grad. studentsVarious discussion made about PHOS@RHIC;
Flemming at BNL in Dec.Hideki et.al. at Tokyo in Dec.
Grant-in-Aid proposal (\1.75b~13M EUR for 6 years) submitted; incl.
PHOS/APD&FEE by HiroshimaTRD/detector by TsukubaTRD/readout by Tokyo-CNSnon-ALICE parts by theory and lattice groups
My R&D grant will end in a year, but still may cover; another prototyping/testing work at Hiroshima, production of T- card for PHOS@RHIC, PHOS activities at RHIC, and travels to CERN/BNL/China?
Page 8Toru Sugitate / Hiroshima / ALICE004 / 21 January, 2005
summary and outlook
1. 4,500 CSP’s are now at CERN for the 1st PHOS module2. Japanese 3 institutes’ official participation in ALICE, together with RIKEN3. Grant proposal submitted for PHOS/TRD in Japan4. Plan/discussion of the PHOS@RHIC project underway5. Ready to kick-off the Physics and Tech. WG’s 6. We are looking forward to working for PHOS@RHIC RSN