status of the planning working group’s (pwg) efforts
DESCRIPTION
Status of the Planning Working Group’s (PWG) Efforts. Name Date. Education Process. Shared and discussed transmission planning practices among Participants Identified similarities and differences in the reliability assumptions used by PEC and Duke in their transmission planning processes. - PowerPoint PPT PresentationTRANSCRIPT
Status of the Planning Working Group’s (PWG) Efforts
Name
Date
DRAFT 2
Education Process
• Shared and discussed transmission planning practices among Participants
• Identified similarities and differences in the reliability assumptions used by PEC and Duke in their transmission planning processes
DRAFT 3
Exchange of Information
• LSEs provided load and resource forecasts
• LSEs provided dispatch order for their resources
• Duke and PEC coordinated interchange• Contingency and monitored line lists
DRAFT 4
Case Development
• The Base Case has been developed with detailed internal models for Duke and PEC
• Dispatch files for generation maintenance and import cases have been developed
DRAFT 5
Screening Results
• Screening of Base Case and base with generation maintenance cases are completed
• [Add detail based on where we are at on April 18th]
DRAFT 6
Next Steps
• Develop “baseline” reliability plan
• Based on Base Case screening results evaluate import cases to study
DRAFT 7
Potential Import Cases for StudyAlternative Source Sink Sink Net Change Test Level
PJM (AEP) Duke 473 600
SOCO Duke 564 600
TVA Duke 464 600
SCEG Duke 464 600
SC Duke 464 600
CPLE Duke 464 600
PJM (AEP) CPLE 535 600
PJM (VP) CPLE 535 600
SCEG CPLE 600 600
SC CPLE 500 600
DUKE CPLE 500 600
PJM (AEP/AEP) Duke CPLE 1,008 600 / 600
PJM (AEP/VP) Duke CPLE 1,008 600 / 600
PJM (AEP) CPLW 20 20