status of tiger test activities - ihepindico.ihep.ac.cn/event/6841/contribution/4/material/...status...

19
Status of TIGER test activities Michela Greco On behalf of Torino TIGER test group CGEM IT

Upload: others

Post on 18-Jan-2021

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Status of TIGER test activities

Michela GrecoOn behalf of Torino TIGER test group

CGEM IT

Page 2: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

OutlineCGEM

TIGER electrical characterization

First tests with (planar and) cylindrical GEM

Radiation hardness tests

TIGER Front End cards design

M: Greco, CGEM meeting, March 2017

Page 3: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Torino Integrated Gem Electronics for ReadoutContact person: Manuel ROLO-INFN Torino

CGEM

Detector Spatial Resolution ≤130 m using TPC readout

TIGER ASIC Channels-UMC 110 nm technology

10 000 Channels 160 ASICs 40+40 FE cards

64 Channels per ASIC 2 ASICs per FE card

ASIC Requirements

1 – 50 fC Input Charge

signal duration 30-50 ns, 30-40 ns rising time, 10 ns falling time

up to 100 pF sensor capacitance

60 kHz event rate per channel (safety factor of 4 included)

4-5 ns time resolution

<10 mW/channel power consumption (analog+digital)

M: Greco, CGEM meeting, March 2017

Page 4: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Each channelCGEM

front-end Back-end+SEU protection

Time-based readoutsingle or double thresholdtime stamp on rising/falling edge (sub-50 ps binning quad-buffered TDC)charge measurement with Time-over-Threshold

Time and amplitude samplingtime stamp on rising edge (sub-50 ps binning quad-buffered TDC)Sample-and-Hold circuit for peak amplitude sampling:slow shaper output voltage is sampled and digitised with a 10-bit Wilkinson ADC

M: Greco, CGEM meeting, March 2017

Page 5: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

First test setupCGEM

M: Greco, CGEM meeting, March 2017

FPGA controlM. Alekseev, M. Gertosio, R. Wheadon

Test boardM. Mignone

Page 6: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Test setups installedFirst data out from Setup #1 by end October 2016Setup #2 installed end November 2016

In summaryR/W Channel/Global configuration registers

Data TX and decoding

(dual-) TDC operation and fine calibrationquantisation error lower than 40 ps r.m.s. after calibration

Front-end performanceinternal calibration circuitryexternal charge injection (channel 63) Charge measurement: Time-over-threshold and Sample/HoldAmplifier baseline shifted, may limit linearity of S/H for big chargeOperation at higher temperature to recover BL shift

Baseline and threshold equalisation

(ongoing) Channel intrinsic noise wrt Cin

(ongoing) Linearity of charge measurements

CGEMCGEM

Characterization runs

M: Greco, CGEM meeting, March 2017

Page 7: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Scan over dynamic range sweeping internal test-pulse phaseCreate LUT with gain and offset correction all channelsAverage TDC quantisation error after calibration ~30 ps r.m.s.

CGEMCGEM

TDC operation

TBD: to quantify intrinsic jitter through test pulse injected to FE

M: Greco, CGEM meeting, March 2017

Page 8: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Injection of Q=8fC with internal test-pulse

Average gain above 10mV/fC (expected 11mV/fC from post-layout simulations)

Results after baseline equalisation: below 25 mV r.m.s. dispersion on the DC operating point(expected residual channel-to-channel dispersion (0.2 mV/fC r.m.s.)

CGEMCGEM

Gain dispersion

M: Greco, CGEM meeting, March 2017

Page 9: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Time –over-ThresholdSample-and Hold

Calibration of dynamic range with an external test-pulse generator

CGEMCGEM

Charge measurements (ongoing)

difficult to measure below 5 fC working on interference noise and grounding

M: Greco, CGEM meeting, March 2017

Page 10: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Noise evaluated for each input capacitance from a typ 50 points threshold -scan with fixed test-pulse (sigmoid fit). Measure repeated typ 100 times

CGEMCGEM

Noise measurements (ongoing)

PSRR, interference and grounding: under study

expecting 1700 e- from post-layout simulations at T=40C

M: Greco, CGEM meeting, March 2017

Page 11: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

In summaryTime-based readout working properly

Charge measurement S/H seems to work Baseline dependence on temperatureroot cause: fragility of bias conditions of baseline holder circuit reproduced fairly well in simulationsminor revision activities started

Status of TIGER test activities

Moving towards integration with off-detector electronics

GEM testing for assessing sensitivity to grounding or system-level power integrity

What next

Main result

A second prototype is not needed, minor revisions on engineering run

CGEM

M: Greco, CGEM meeting, March 2017

Page 12: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Tests at Ferrara, 8-10 March

What next

Main result

CGEM

after first trials with planar gems…

M: Greco, CGEM meeting, March 2017

Page 13: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Tests at Ferrara, 8-10 March

What next

Main result

CGEM

TIGER interfaced to Layer 2

M: Greco, CGEM meeting, March 2017

Page 14: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Tests at Ferrara, 8-10 March

What next

Main result

CGEM

First signals acquired from exposition to 90-Sr

Page 15: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Tests at Ferrara, 8-10 March

What next

Main result

CGEM

First signals acquired from exposition to cosmic rays (night acquisition)

M: Greco, CGEM meeting, March 2017

Page 16: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

In summary (November 2016)Test board irradiated to about 30 krad to test radiation damage on Voltage Regulators

n runs

Radiation hardness @ GIF++ (CERN)

SEU test request submitted for run at Legnaro Sirad facility (July 2017)Higher dose TID test on planning

What next

Analog power: TPS78601KTTT, TPS78601DCQDigital power: TPS78601DCQ, TPS78625DCQ

PRE (V) POST (V) %

Analog power

T1 1,232 1,222 0,992

T2 1,232 1,222 0,992

Digital power

T3 1,232 1,222 0,992

T4 2,505 2,488 0,993

Top

ASICinside

-0.7/0.8 %ok!

LT3021for Voltage reference

PRE (V) POST (V) %

Vref (T5) 0,835 0,867 1,038

Vblh (T7) 0,301 0,327 1,086

Vout_th 0,575 0,452 0,786

Vout_y 0,506 0,5 0,988

Bottom

we will have resistor voltage dividers

CGEM

M: Greco, CGEM meeting, March 2017

Page 17: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

In summary for Layer 3

Board FE1 (56x40 mm2)2 ASICs, biasing and references, filtering ESD protection network for 122 channels 2 Analogue domain power regulators connector towards anode/connector towards FE2Routing done, finalization ongoing

Board FE2 (56x30 mm2)2 Digital domain power regulators 7 LVDS Buffersconnector towards FE1: power, signallingRouting done, finalization ongoing

TIGER Front-end cards designContact person: Marco Mignone-INFN Torino

Board FE1 (56x52.8 mm2) Board FE2 (56x67 mm2)

Layout to be started, Layer 3 FEs as reference

What next for Layer 1 and 2

CGEM

M: Greco, CGEM meeting, March 2017

Page 18: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Conclusions

TIGER electrical characterization ongoing:

a second prototype is not needed,

minor revisions in engineering run

TIGER Front End cards design: on schedule

area/volume constraints overcome for layer 3

Radiation hardness tests:

Good results from first tests on voltage regulators

SEU and TID tests planned

First tests with cylindrical GEM & first signals acquired!

data analysis ongoing and next months activity to be scheduled

CGEM

M: Greco, CGEM meeting, March 2017

Page 19: Status of TIGER test activities - IHEPindico.ihep.ac.cn/event/6841/contribution/4/material/...Status of TIGER test activities Moving towards integration with off-detector electronics

Torino TIGER Test GroupFabio Cossio, Marco Mignone,

Manuel Rolo, Richard Wheadon Maxim Alexeev, Martina Gertosio

Michela Greco, Simonetta Marcello