status of vendors for fresh registration cases …
TRANSCRIPT
1
STATUS OF VENDORS FOR FRESH REGISTRATION CASES (PAINTS), AS ON 01.06.2011
S.No
.
Name of the firms (M/s) Name of Items and
specification
Date of
application
Current status
1. M/S Marudhar Paints and Polymer, Jodhpur
Interior Coaching paints
25.08.2009 (i) STR verification planned in May, 2010 (ii) STR verification done on 28.05.2010 (iii) Deficiency of STR verification conveyed to the firm on 02/03.06.2010. (iv) Show cause for temp. closure on 4.10.10 V) Show cause on 4.5.11
2. M/s Rako Mercantile Traders, Lucknow
Paints to specn no. M&C/PCN/122/2006. RKB
13.01.2010 (i) Deficiency conveyed to firm on 17.03.2010 (ii)Compliances received on 15.06.2010 and under scrutiny. (iii)Scrutiny over and deficiency issued on 22.10 (iv)Compliances received on 23.11.2010 & 21.12.10 (v) Deficiency conveyed. (vi) Compliance received on 25.04.11 (v) Deficiency conveyed on 27.5.11
3. Colour Tech Paints, Pune Paints for wagon ,bridges and other steel structures
28.01.2010 (i) Deficiencies conveyed on 16.03. (ii) Reminder issued on 21.10,No reply recd. (iii) 2
nd reminder issued on 4.2.11
4. M/s Rako Mercantile Traders, Lucknow
Exterior coaching paints
02.02.2009 (i) Deficiencies conveyed on 29.03.2010 ii) ) Compliances received on 07.07.2010 and scrutinized. (iii)2nd deficiency communicated to the 27.9.10 (iv) Compliance received on 18.02.11 & under scrutiny.
5. M/s Rahul Paints, Lucknow
Exterior coaching paints
03.02.2010 (i) Deficiencies conveyed on 29.03.2010 (ii) ) Compliances received on 09.06.2010 and deficiencies conveyed 0n 1.10.10 (iii) Compliances received on 23.11.10 (iv)Deficiencies conveyed on 04.1.2011 Compliance received on 18.03.11 & after scrutiny deficiencies issued on 29.4.11
6. M/s Pagan Paints & Chemicals, Gurgaon
Paints for wagon ,bridges and other steel structures
05.03.2010 (i) Deficiencies conveyed on 16.03.2010 (ii) Compliances received on 10.06.2010 and deff issued ON 22.10.10 (ii) Reminder issued on 27.12.10 (iv) Compliance recd. on 14.1.11 & Deficiencies conveyed on 28.02.2011,letter re- issued on 9.3.11 (v) Compliance recd. on 11.5.11,under scrutiny
7. M/s Pagan Paints & Chemicals, Gurgaon
Interior coaching paints
05.03.2010 (i) Deficiencies conveyed on 16.03.2010 (ii) Compliances received on 10.06.2010 and scrutinized. (iii)2nd deficiency communicated on 30.9.10 (iv) Compliance received on 14.01.2011 and technical scrutiny over and case is under process.
8. M/s Pagan Paints & Chemicals,Gurgaon
Exterior coaching paints
05.03.2010 (i) Deficiencies conveyed on 16.03.2010 (ii) Compliances received on 10.06.2010 and scrutinized. (iii)2nd deficiency communicated to On 30.9.10 (iv) Compliance received on 14.01.2011 and technical scrutiny over and case is under process.
9. SREECHEM RESINS LIMITED, JHAGARPUR, RAJGANGPUR,SUNDARG
Interior coaching paints
05.04.2010 (i) Deficiencies conveyed on 26.04.2010. (ii) Compliances received on 06.08.2010 and (iii)Deff. commm.on 12.10.10
2
ARH, ORRISA
(iv) Compliance recd. on 25.11.10,deficiency issued on 2.2.11
10. M/s G.S.Industries, Jalandhar
Exterior coaching paints
Firm has been given approval from QA-Mech Dte in Part-II status as per ICF guidelines. The firm has been asked option whether to continue with ICF list or voluntarily withdraw approval from ICF list to get registered as RDSO approved vendor. i. Firm has applied for renewal as per RDSO STR
and Guidelines, case is under scrutiny ii. Deficiencies conveyed on 03.1.2011 iii. Reminder issued. compliance recd. on 7.3.11 iv. Deficiencies conveyed on 25.3.2011 v. Compliance received on 29.4.11 vi. Deff issued on 26.5.11
11. M/s Advance Paints, Mumbai
Paint RDSO Specn. M&C/PCN/122/2006
10.08.2010 Deficiencies conveyed on 29.10.2010 Compliance recd. on 13.12.10, under scrutiny Compliance recd. on 06.04.11, under scrutiny
12. M/s Anupam Enterprises, Kolkata
Interior coaching paints
10.09.2010 Deficiencies conveyed on 11.1.2011 Compliance received on 26.4.11 ,under scritny
13. M/s Apex chemicals, KOLKATA
EPOXY/PUPaints for wagon ,bridges and other steel structures
4.10.10 Deficiencies conveyed on 1.11.2010 , compliance recd. on 21.1.11 & 10.3.11,case under scrutiny Compliance received on 10.5.11 and case under process Revised STR sent to firm on 25.5.11. compliance recd. And case is under process after scrutiny.
14. M/s Apex chemicals, KOLKATA
EPOXY/PU Paints for COACHES
4.10.10 Deficiencies conveyed on 18.10.2010Compliance recd. and. Compliance of new STR received ON 30.5.11 and case under process
1. M/s Apex chemicals, KOLKATA
Paints for wagon ,bridges and other steel structures
4.10.10 Deficiencies conveyed on 25.11.2010 Partial Compliance recd. on 7.12.10, 20.1.11 & 28.2.11. Assessment done on 5.4.11 Test ing completed , Approval is under process.
2. NEORADIANT PAINTS PVT. LTD.,DURGAPUR
Paints for( PCN/122)-wagon ,bridges and other steel structures
26.9.10 Deficiencies conveyed on 14.1.2011 Compliance recd. on 20.1.11 & 14.2.2011, scrutiny over. Case under process and STR under revision
3. M/s Grauer & Well India, Mumbai
EPOXY/PUPaints for COACHES
25.11.10 Compliance recd. on 20.1.11 Case is under under process Deficiencies issued on 11.5.11
4. M/s Rahul Paints, Lucknow
Etch primer for wagons, Bridges as an additional item
13.9.10 Case is under scrutiny Deficiencies conveyed Compliance recd. on 14.3.11 Case is under scrutiny
5. M/s MERUPRAVA PETRO-CHEM PVT LTD. Kolkata
Interior painting System
14.2. 2011 Under initial scrutiny Compliance recd. On 16.05.2011 . Case under process and STR under revision
6. M/s Shalimar Paints Ltd., Mumbai
EPOXY/PU Paints for wagon ,bridges and other steel structures
27.1. 2011 Scrutiny over. Deficiencies issued on 13.4.11 Revised STR sent to firm on 25.5.11. for compliance .
23. M/S VIBGYOR PAINTS & CHEMICALS, Pondicherry, Shri Balaji Apartment, No.87/47 ,Harrington Road, Shenoy Nagar, Chennai-600030.
M&C/PCN/123/2006
28.2.11 Assessment done on 22.3 .11 Sample under testing Deficiencies issued on 6.5.11
24. M/S DEO PAINT LTD, KOLKATA
M&C/PCN/120/ 2005
28.4.11 Under scrutiny for FIRE RETARDANT PAINT
3
25. M/s Vibgyor Paints & Chemicals, Pondicherry,Shri Balaji Apartment,No.87/47,Harrington Road, Shenoy Nagar,Chennai-600030
Interior painting system
10.3.11 Change of address and verification done on 2.4.11 & 3.4.11 sample unde test
(B)STATUS OF RENEWAL VENDOR’S REGISTRATION CASES (PAINTS )
DUE (As on 01.06.2011) S.N. Name of the firms
(M/s) Name of Items and specification
Validity of registration
Date of application
Current status of renewal
1. M/s Diana Paints, Hubli.
Paints for wagon ,bridges and other steel structures
31.05.2009 02.01.09 Case file received from QA-Mech Dte on 15.09.10 and under scrutiny. Deficiencies conveyed on 13.10.2010. No reply recd. 2
ND reminder issued on
01.2.2011.Reply received on 25.4.11, under scrutiny
2. M/s Century Paints & Varnish works , Kolkata
Paints for wagon ,bridges and other steel structures
31.07.2010 (i)QMF0024 &QMF0025 sent to the firm on 12/19.05.2010 (ii)Reminder sent to the firm on 09.07.2010. (iii)Firm is temporarily delisted 27.8.10. Iv) 21 days notice issued on 28.3.11 for permanent delisting. Letter returned back. Case put up for permanent delisting.
3. M/s. Anupam Enterprises Pvt. Ltd. Kolkata
Paints for wagon ,bridges and other steel structures
30.11.2010 (i)Deficiency sent to the firm on 20.09.10. (ii)Compliance received and scrutinized. (iii) Firm assessment done on 10.11.10, samples under testing
4. M/s RAKHIT INDUSTRIES, Lucknow
Paints for wagon ,bridges and other steel structures
31.10.2010 19.07.10 (i)The firm has been asked on 12.05.10 apply for renewal. (ii) Compliances received on 19.07.2010 and scrutinized. (iii) Deficiency sent to the firm on 16.09.10. (iv)Compliance recd. and scrutiny is on (v) IInd Deficiencies sent on 15.11.10 vi) Compliance recd. on 23.12 & under scrutiny vii) 21 days Notice issued on 08.2.2011 vii) Final 21 days Notice issued on 18.3.2011 viii) Reply received on 25.4.11 ix) Temporary delisting on 18.5.11
5. M/s Niko Building Systems,Ghaziabad
Paints for wagon, bridges and other steel structures
30.10.2010 18.08.10 (i)The firm has been asked on 12.05.10 to apply for renewal (ii)Firm submitted documents on 18.08.2010 and scrutinized. (iii) Deficiency sent to the firm on 16.09.10. (iv) Compliance recd. on 26.11.10, (v)2
nd deficiency issued on 13.12.10
(vi) Partial compliance recd. on 30.12.10 (vii) Reminder issued on 04.5.11
6. M/s Rahul Paints, Lucknow
Paints for wagon ,bridges and other steel structures
17.1.11 Deficiencies issued. Compliance received on 14.1.11 & 28.3.11 under scrutiny.
7. M/s Dynacon Ltd.,
Kanpur
Paints for wagon
,bridges and
other steel
structures
11.11.10 Deficiencies issued on 20.1.11 1st.Reminder
issued on 28.3.11
4
( C) STATUS OF VENDORS FOR FRESH REGISTRATION CASES (EPOXY-PU PAINTS
FOR WAGONS ), AS ON 01.06.2011 S.No.
Name of the firms (M/s)
Name of Items and specification
Date of application
Current status
1.
M/s Asian Paints, Mumbai
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
09.12.2009 (i)Case has been transferred to M&C Dte for further processing on 15.06.10 (ii) Deficiency sent to the firm on 21.09.10. (iii) Reminder issued on 27.12.10 (iv) Compliance recd. on 24.1.11 (v) Deficiency communicated on 24.2.11 (vi)Compliance recd.on 28.3.11,under scrutiny Revised STR sent to firm on 25.5.11 for compliance
2.
M/s Advance Paints, Mumbai
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
10.12.2009 (i)Case has been transferred to M&C Dte for further processing on 15.06.10 (ii)Case has been scrutinized and and deficiency communicated on 27.9 (iii) Compliance recd. on 9.12.10 iv) Deficiency communicated on 3.3.11 v) Compliance received on 11.4.11, under scrutiny Revised STR sent to firm on 25.5.11 for compliance
3.
M/s Grand Polycoat, Vadodara
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
04.12.2009 Case has been transferred to M&C Dte for further processing on 15.06.10 (ii) Deficiency sent to the firm on 21.09.10. (iii) Reminder issued on 27.12.10 (iv) Compliance recd. on 18.1.11,under scrutiny (v) Deficiency communicated on 15.2.11 vi) Compliance received on 9.3.11, under scrutiny. Revised STR sent to firm on 25.5.11 for compliance
4. M/s Austin Paints, Kolkata
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
08.12.2009 Case has been transferred to M&C Dte for further processing on 15.06.10 (ii)Technical scrutiny completed on 24.09.10 and deficiency communicated on 27.9.10 (iii) Reminder issued on 27.12.10 (iv) Compliance recd. on 19.1.11,under scrutiny (v) Deficiency communicated on 25.2.11 Revised STR sent to firm on 25.5.11 for compliance
5. M/s Deb Paints, Kolkata
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
25.11.2009 (i)Case has been transferred to M&C Dte for further processing on 15.06.10 (ii) Deficiency sent to the firm on 17.09.10. (iii) Compliance RECD.ON 22.10.10,under scrutiny (iv) 2
nd Deficiency sent to the firm on
10.12.10. (v) Compliance recd. & 3
rd deficiencies
communicated on 20.1.2011 vi) Partial compliance recd. on 7.3.11 and 6.4.11, under scrutiny vii) Revised STR sent to firm on 25.5.11 for compliance
5
6 M/s Berger Paints, Kolkata
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
26.11.2009 (i)Case has been transferred to M&C Dte for further processing on 15.06.10 (ii)Deficiency sent to the firm on 22.09.10. (iii) Compliance recd. on 26.11.10 (iv) 2
nd deficiencies communicated on
17.1.2011 v) Compliance recd. on 23.2.11,under scrutiny vi) Deficiencies communicated on 16.3.2011 vii) Compliance received on 13.4.11 under scrutiny Revised STR sent to firm on 25.5.11 for compliance
7 M/s Vibgyor Paints, Pondicherry
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
23.11.2009 (i)Case has been transferred to M&C Dte for further processing on 15.06.10 (ii)Technical scrutiny completed on 30.07.2010. (iii) Deficiency sent to the firm on 15.09.10. (iv) Compliance recd. on 13.12.10 &28.2.11, assessment due vi) Assessment done on 26.3.11 vii) sample under testing Revised STR sent to firm on 25.5.11 for compliance
8 M/s Modi Paints, Modinagar, Ghaziabad
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
11.12.2009 (i)Case has been transferred to M&C Dte for further processing on 15.06.10 (ii) Technical scrutiny completed on 24.09.10 and deficiency communicated on 27.9 (iii) Compliance recd. on 22.12.10,under scrutiny (iv) Compliance recd. on 12.1.11,under scrutiny (v) Deficiency communicated on 17 .2.11 Compliance recd. on 28.3.11,under scrutiny Revised STR sent to firm on 25.5.11 for compliance
9. M/s NEO PACK PLAST (INDIA) PVT.LTD, VAPI, GUJRAT
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
26.05.2010 (i) Case has been transferred to M&C Dte for further processing on 15.06.10 (ii)Technical scrutiny completed on 24.08.2010 (iii) Deficiency issued on 16.09.10. (iv) Compliance received on 7.12.10 (v) Deficiency issued on 28.1.11 Revised STR sent to firm on 25.5.11 for compliance
10 M/s ANUPAM ENTERPRISES, Kolkata
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
03.05.2010 (i)Case has been transferred to M&C Dte for further processing on 15.06.10 (ii)Deficiency issued ON 7.10 iii)Compliance recd.on 22.10 iv) 2nd deficiency issued 06.12.10 v)compliance recd. on 27.1.11 vi) 3rd deficiency issued 14.2.11 vii) compliance recd. on 28.2.11,under scrutiny viii) deficiency issued on14.3.11, compliance recd. on 21.3.11,under scrutiny ix) assessment done on 6.4.11, samples under test Revised STR sent to firm on 25.5.11 for compliance
6
11 M/s Apex chemicals, KOLKATA
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
04.10.10 Deficiencies conveyed on 1.11.2010 , compliance recd. on 21.1.11 & 10.3.11, case under scrutiny Revised STR sent to firm on 25.5.11 for compliance
12 M/s Shalimar Paints Ltd., Mumbai
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
11.1. 2011 Scrutiny over. Deficiency sent to 13.4.11 Revised STR sent to firm on 25.5.11 for compliance
13 M/s Kansai Nerolac Paints Ltd., Ganpatrao kadam marg, Lower Parel, Mumbai-400 013
(i)RDSO SPECN NO. M&C/PCN/102/2009 (ii) RDSO SPECN NO. M&C/PCN/109/2009
Under initial scrutiny. Revised STR sent to firm on 25.5.11 for compliance
(D)STATUS OF VENDORS FOR FRESH REGISTRATION CASES (EPOXY-PU PAINTS
FOR COACHES AS PER RDSO SPECN. NO.M&C/PCN/100/2009 as on 01.06.2011.
SN Name of the firms (M/s) Name of
Items and
specification
Date of
application
Current status
1. M/s Mohan Paints, Goods Shed Road, Aishbagh, Lucknow-226004.
M&C/PCN/100/2009
10.11.2009 (i)Technical scrutiny completed and (ii) Deficiencies has been communicated to the firm 09.02.2010. Notice issued on 15.2.11
2. M/s E.I.Dupont India Private Limited, 7th Floor,Tower-C,DLF Cyber Greens,Sector-25A,DLF City,Gurgaon.
M&C/PCN/100/2009
30.11.2009 (i)Technical scrutiny completed (ii)1st deficiency has been communicated to the firm 09.02.2010. (iii)The firm has replied on 30.03.2010 (iv) The compliance has been checked and 2nd deficiency communicated to the firm on 24.09.2010. (v) compliance recd. on 20.12 .10 (iv) Deficiencies conveyed. on 20.1.11 compliance recd. on 21.3.11, case under scrutiny compliance rcvd on 25.5.11 . factory visit underway
3. M/s Metcon Coatings & Chemical(India)Pvt.Ltd, 11,Ruby,Cheddanagar,Chembur, Mumbai-89
M&C/PCN/100/2009
15.12.2009 Technical scrutiny completed and deficiencies have been communicated to the firm 22.02.2010. Notice issued on 15.2.11 .
4. M/s Akzo Nobel Coating India Pvt .Ltd. Plot No.62P,62A,62B,43E,oskote Industrial Area, Pillagumpa, Hoskote Taluk,Bangalore-562114
M&C/PCN/100/2009
16.12.2009 (i)Technical scrutiny completed. (ii)1st deficiency has been communicated to the firm 16.02.2010. (ii)The firm has replied on14.04.2010. (iii)The compliance has been checked and 2nd deficiency communicated to the firm on 24.09.2010. Notice issued on 22.2.11 for compliance of deficiencies. Part of Compliance rvcd on 19.5.11
5. M/s Austin Paints & Chemicals, 3, Ambica Mukherjee Road, Belgharia, Kolkata-700056.
M&C/PCN/100/2009
08.01.2010 Technical scrutiny completed and deficiencies have to be communicated. It may be noted that the firm has been black listed by RCF due to supply of rejected
7
material.(Ref:RCF letter No.MTQ12006,dated 18.06.2009. (iv) Compliance recd. on 17.1.11,under scrutiny
6. M/s Jenson & Nicholson(India) Ltd.107,Udyog Vihar,Phase-4,Gurgaon-122016
M&C/PCN/100/2009
19.01.2010 (i)Technical scrutiny completed . (ii)1st deficiency has been communicated to the firm 02.03.2010. (iii)The firm has replied on 21.06.2010 . (iv)The compliance has been checked and v.2nd deficiency communicated ON 27.9 to the firm. vi) compliance recd. on 28.12 and under scrutiny
7. M/s German Polymers and Coatings (Pvt.), S.No.23, Rajeev Gandhi Salai, Kandanchavadi, Chennai-96.
M&C/PCN/100/2009
11.02.2010 (i)Technical scrutiny completed. (ii)Deficiency has been communicated to the firm 11.05.2010 (iii)The firm has replied and the compliance has been checked. (ii)2nd deficiency communicated to the firm on 03.09.2010. (iv) Notice issued on 14.2.11, Compliance recd. on 23.2.11 (v)Compliance recd. on 14.3.11 deficiency communicated on 16.3.11 vi) Compliance received on 8.4.11 vii) deficiency conveyed on 29.4.11
8. M/s Vibgyor Paints & Chemicals, Pondicherry,Shri Balaji Apartment,No.87/47,Harrington Road, Shenoy Nagar,Chennai-600030.
M&C/PCN/100/2009
20.03.2010 (i)Technical scrutiny completed. (ii) Deficiencies communicated to the firm on 03.09.2010. Compliance recd ,Scrutiny completed . Deficiency conveyed & compliance recd. on 10.2.11 Assessment underway on 29.3 Capacity assessment & STR done on 31.3.11 & 1.4.11, sample under test
9. M/s CLEAN COATS PVT.LTD. 122,Creative Industrial Premises, Sunder Nagar, Kalina, Santacruze(E), MUMBAI-400098
M&C/PCN/100/2009
15.04.2010 (i)Technical scrutiny completed (ii)Deficiencies communicated to the firm on 15.09.2010. Office address change letter recd. on 19.10.11 (iii) Notice issued on 14.2.11
10. M/s Vibgyor Paints & Chemicals(M.M.Nagar)Raj Flats,,No.42/9,Harrington Road,Shenoy Nagar,Chennai-600030.
M&C/PCN/100/2009
28.04.10 (i)Technical scrutiny completed. (ii) Deficiencies communicated to the firm on 10.09.2010. i) Compliance recd. and scrutinized. and deficiencies conveyed on 06.05.11
11. M/s Apex Chemicals, Danga Dighila,P.O.Bandipur,P.S.-Kharda,Dist.-24 Parganas(N),,Kolkata-700119
M&C/PCN/100/2009
08.05.2010 (i) Deficiencies communicated to the firm on 09.08.2010. (ii)Compliances received on 17.09.2010 iii)2nd deficiencies sent on 14.10 iv) Compliance recd. on 18.11.10, STR under revision, decision will be taken accordingly. v) Compliance recd on 15.3.11 vi) Compliance recvd. On 10.5.2011
12. M/s Advance Paints Pvt.Ltd. Advance House Plot “A”,Makwana Road,Ark Industrial Compound, Marol Naka, Andheri(E) MUMBAI-59.
M&C/PCN/100/2009
15.05.2010 (i)Technical scrutiny completed on 09.08.10. (ii)Deficiencies have been communicated to the firm on 10.09.2010. (iii)Compliance recd. on 15.12.10 under scrutiny iv) Compliance received on 5.4.11 for under scrutiny
8
13. M/s Berger Paints India Limited Berger House 129, Park Street, Kolkata-700017
M&C/PCN/100/2009
24.05.2010 (i)Technical scrutiny completed (ii)Deficiencies communicated to the firm on 24.08.2010. Iii) Compliance recd. on 22.11.10,under scrutiny iv) deficiencies sent on 25.4.11
14. M/s VCM Polyurethanes Pvt.Ltd,10-B,Hoskote Industrial Area, Kasaba Hobli, Hoskote Taluk, Bangalore
M&C/PCN/100/2009
16.08.2010 (i)Technical scrutiny completed. (ii)Deficiency has been communicated to the firm on 1.10.10 (iii) Notice issued on 15.2.11 (iv) Compliance recd. on 10.3.11 Under scrutiny
15. M/s Advance Paints Pvt.Ltd. Advance House Plot “A”,Makwana Road,Ark Industrial Compound, Marol Naka,Andheri(E) MUMBAI-59.
M&C/PCN/123/2006
15.09.2010 i) Scrutiny over, deficiency conveyed on 12.10.10 ii) Compliance recd. on 15.12.10 under scrutiny iii) compliance recvd on 8.4.11 & under scrutiny
16. M/s CLEAN COATS PVT.LTD. 122,Creative Industrial Premises, Sunder Nagar, Kalina,Santacruze(E), MUMBAI-400098
M&C/PCN/123/2006
15.04.2010 i) Received from Carriage Dte (ii) Case is under scrutiny
vii) (iii)Address change intimation recd. viii) (iv)Compliance recd. on 20.12.10 ix) under scrutiny x)
17. M/S Asian Paints Industries, Mumbai
M&C/PCN/100/2009
5.4.11 Under scrutiny
18. M/s Kansai Nerolac Paints Ltd, Mumbai,
M&C/PCN/100/2009
27.4.11 Under scrutiny
19. M/s 3M INDIA LTD , BANGLORE M&C/PCN/123/2006
27.4.11 Under scrutiny
E)STATUS OF UPGRADATION VENDOR’S REGISTRATION CASES (PAINTS ) (As on 01.06.2011
S.No. Name of the firms (M/s) Name of Items and specification
Date of application
Current status
1 M/s Joy Paints and Chemicals, Kolkata.
Paints for wagon ,bridges and other steel structures
15.1.11 Scrutiny over & deff. conyed.
2 M/s. Anupam Enterprises Pvt. Ltd.
Kolkata
Paints to specn no.
M&C/PCN/122/2006.
31.1.11 Under process.
9
( C) STATUS OF VENDORS FOR RENEWAL OF REGISTRATION (ALKYD EXTERIOR FOR COACHES ) ICF Cases, AS ON 01.06.2011.
S.No. Name of the firms (M/s)
Name of Items and specificati
on
Date of application
Current status
1 M/s Berger Paints, Kolkata Exterior coaching paints
ICF cases (i) Deficiencies conveyed on 06.07.2010 (ii)Compliances received on 19.08.2010 (iii) Deficiencies conveyed on 14.12.10. (iv) Assessment done on 28.1.11, samples under testing.
2 M/s Advance Paints, Mumbai
Exterior coaching paints
ICF cases (i) Deficiencies conveyed on (ii) Compliance recd. on 9.12.10 & deficiency issued on 11.2.11 (iii) Compliance rcvd 25.5.11
3 M/s Modi Paints, Modinagar, Gaziabad
Exterior coaching paints
ICF cases (i) Deficiencies conveyed on 29.06.2010. (ii)Compliances received on 16.07.2010 (iii)2
nd Deficiencies conveyed on 23.08.2010
(iv) Compliance recd. on 11.11.12, under scrutiny (v) Deficiency conveyed on 20.1.11 (vi)Compliance recd. on 31.01.11, Deficiency conveyed on 25.2.11 (vii)Compliance recd. on 16.03.11, under scrutiny
4 M/s Deb Paints, Kolkata Exterior coaching paints
ICF cases (i) Deficiencies conveyed on 29.06.2010 (ii)Compliances received on 02.12.2010 and under scrutiny. (iii)Compliance recd. on 22.12.10, under scrutiny (iv) Assessment done on 25.1.11, v) test report has been received and case is under process
.1 M/s Vibgyor paints & chemicals, Chennai
Exterior coaching paints
ICF cases (i) 2nd
Deficiencies conveyed on 24.8.10 (ii)Compliances received on 6.9.2010 (iii)Case put up to DD/M&C on 15.09.2010 (iv)Assessment done on 01.12.10,Sample under
testing v) Approval Certificate issued on 8.4.11
6 M/s. Pushkar Paints Industries Lucknow
Exterior coaching paints
ICF cases i) Deficiencies conveyed on 29.06.2010 and compliance received on 19.11.2010
ii) 2nd
Deficiencies conveyed on 10.12.2010 iii) Compliance recd. on 25.3.11 iv) Compliance received on 5.4.11 and 25.4.11
7 M/s. Asia Industrial & Mfg. Co.Kolkata.
Exterior coaching paints
ICF cases (i)2nd Deficiencies conveyed on 14.9.2010 and compliance received on 12.10.2010
(ii) 3rd Deficiencies conveyed on 03.11.2010 and compliance received on during assessment
(iii)Assessment done on 11.11.10, Sample testing report recd. & under process for approval.
(iv) Approval Certificate issued on 9.3.11.
8 G.S.Industries,Jalandhar Exterior coaching panints
Applied for renewal, under scrutiny Deficiency conveyed on 03.01.11 Reminder issued. compliance recd. on 7.3.11 Deficiencies conveyed on 25.3.2011 Compliance recvd on 29.4.11 Scrutiny done & Compliance sent on 03.05.11 Deficiencies conveyed on 26.5.2011
10
TRIBOLOGY LABORATORY Sub: Current position of vendors for M&P Lubricants
(A) Fresh Approval for M&P Lubricants
Sl. No.
Name& Address of the firm Items applied for Registration
Date of receipt of the Application
Status
1. M/s JSA Lubes(P)Limited, 248,GrandTrunkRoad,Liluah,Howarah711104
IS4578,IS1589,IS493/ PtI,IS493/PtII,IS1115, IS3065,IS2664
06/11.01.2010
(i)Deficiencies have been communicated by 06/07.04.2010 (ii) Reminder sent on 06.08.10
2. M/s Gandhar Oil Refinery India Ltd,1001,10th Floor, UniqueTowers,SVRoad,Goregaon(E),Mumbai400062
IS4578,IS1589,IS493/ PtI,IS493/PtII,IS1115, IS3065.
10.03.2010. (i)Deficiencies have been communicated by 16/17.05.2010 (ii) Reminder sent on 27.09.10.
3. Mahatha Petroleum Pvt.Ltd34,Sree Meenakshi Gardens,Mt.Medavakkam Road,Keela Kattalai, Chennai600117
IS1589,IS493/PtI,IS493/PtII,IS1115,IS3065,IS1118,M&C/Lub/101/06, M&C/Lub/102/2006, IS:2664
10.09.2010 (i)Final scrutiny completed on 08.02.2011 (ii)Compliance fulfilled by the firm except QAP in latest RDSO format. (iii)The firm has been advised on 18.02.2011 to submit QAP as per RDSO format. (iv)QAP received from the firm and is under scrutiny.
4. M/s Growel Sidasa Industries Pvt. Ltd. G Growel House, Akurli Road, Kandiwali East, MUMBAI
IS:2664-1980/Reaffirmed 2004
11.11.2010 Deficiencies have been communicated on 06.01.2011
B. Current status of vendors for Renewal M&P Lubricants
Sl. No.
Name& Address of the firm
Items applied for Registration
Date of receipt of the Application
Validity
Status
1. M/s Raj Petro specialities Pvt Ltd, 2A-D, Doshi Towers (2nd Floor)156, Poonamallee High Road Kilpauk, Chennai - 600010
IS493/PtI,IS493/PtII, IS1118,IS10522,IS 4578,IS1589,IS1012, IS1115,IS8406, IS3065 M&C/Lub/101/06
04.11.2010 05.11.2010. Renewal of approval certificate has been issued to the Firm on 11.05.2011.
C. Pending Application status for up-gradation for M&P Lubricants.
- NIL
11
D. Fresh Approval for Graphite Grease “O” to IS 408:1981
Sl. No.
Name& Address of the firm Date of receipt of the Application
Status
1. M/s Sun Oil Company Pvt. Ltd. 10-B, British Indian Street, Kolkata.
Transferred from QA/Mech Dte.
(i)Deficiency has been communicated to the firm on 14.02.2011. (ii)Reminder has been issued to the firm for time bound reply.
A) Status of vendors for fresh registration cases (Welding
Research Section) as on 5.06.2011
S.N. Name of firm Name of item Applied on Status of Case
1. Maruti Core flux I-1,Kirtinager
New Delhi-110015
FAX:01493-516720
FCW wire
Class-1, IV&VI to
IRS:M46/03
06.01.10
QAM/
25.10.10
Deficiency communicated on
3.12.10. Doc recd 06.01.11. Still
deficiency. Modified STR sent
22.3.11.
2. Precision weld Arc,
46-C,chowrighee Road flat-
14G Everest House
Kolkata-700071 Fax:033-30535006
Solid MIG/MAG
filler wire under
Class -I & III to IRS:M46/03
03.03. 10/
03.03. 10
QAM
Deficiency communicated on
8.12.10. Reminder issued 23.2.11.
Doc recd 16.03.11. Modified STR
sent 22.3.11. QAP recd 19.4.11
3. GEE Limited, Jalan Indl
Park, Kanduah, Dhulagoy,
Howrah
FAX:033-27095660
Solid MIG/MAG
Filler wire Class
III to IRS:M-46/03
29.04.10/
03.05.10
QAM
Inspection & Sampling done in
March’11. Sample recd 16.3.11.
Under test
4. Classic Electrodes(India)
Ltd. Unit-2 Saklail Indl Park
Howrah
Solid MIG/MAG
Filler wire ClassI,
III,IV,VI &VII to
IRSM 46/03
30.4.10/06.05.
10 QAM
Certificate of approval issued.
5. Pengg Usha Martin Pvt. Ltd.,
Ranchi
FAX:0651-3054180
Solid MIG/MAG
filler wire under
Class -I & III to IRS:M46/03
10.05.10/
20.05.10
QAM
Deficiency communicated on
14.12.10. Reminder issued 23.2.11.
Modified STR sent 22.3.11. Doc recd
28.03.11.
6. Valency Compound
services, Unit-2 A-
62,MIDC Area
Ahemadnagar-414111
FAX:0241-6602064
Solid MIG/MAG
filler wire class VI
& VII to IRS:
M-46/03.
23.03.10/
06.04.10
QAM
Deficiency communicated on
14.12.10. Insufficient testing facility.
Case pend Modified STR sent
22.3.11.
7. Dwekam Electrodes Pvt. Ltd.
Talavallichanda, A B
Road,Mangalia-453771
Fax: 0731-4229513.
Flux cored wire
Class- VI&VII to
IRS:M46/03
18.08. 10 The firm has been approved for STR
verification, capacity and sampling.
Modified STR sent 22.3.11
12
8. Adore welding
Ltd.,Melakottaiyar, via vedllur-
600048.
Fax044-27477117.
Flux cored wire
under
Class- III&IV to
IRS:M46/03
11.06.10 The firm has been approved for STR
verification, capacity and sampling.
Modified STR sent 22.3.11
9. GEE Limited, Jalan Indl
Park, Kanduah, Dhulagoy,
Howrah
FAX:033-27095660
SAW wire-
W1,W2,W4to
IRS: M-39/01.
19.08.10 Remainder letter is issued to the
firm on Feb.2011.
Modified STR sent 22.3.11
10. Veritas Industries Pvt.
Ltd.Survey No.32,
GIDC, SARIGAM,
Dist. VALSAD
GUJRAT-396155.
Solid MIG/MAG
filler wire class I
to IRS: M-46/03.
28.10.10 Deficiency communicated on
5.1.11. Doc recd 23.03.11.
Modified STR sent 22.3.11.
11. Nevatia steel and alloys
Pvt.Ltd.,
G-24,MIDC,Tarapur
Industrial area, Boisar,
Dist Thane-401506.
Solid MIG/MAG
filler wire class VI
& VII to IRS:
M-46/03.
22.10.10 Reminder issued March’11.
Modified STR sent 22.3.11.
12. S Chems and allied products
Pvt. Ltd.,
Plot no.L-12,
Cuncolim Indl.Estate,
Cuncolin, Goa-403703.
SAW wire-
W1,F1to IRS: M-
39/01.
20.10.09 The fresh documents have not yet
been received. Reminder issued
28.3.11 Modified STR sent
22.3.11.
13. Calcutta electrodes Pvt. Ltd.,
sardar patel Timber market
Industrial area,
Bhanpuri
Raipur.
Fax:-0771-4070935
Solid MIG/MAG
filler wire class
I,III,IV,VI & VII
to IRS:
M-46/03.
08.12.10 Deficiencies are conveyed to the
firm on 20.01.2011. Modified
STR sent 22.3.11.
14. Mahiendra
Electrodes(INDIA)
Bhathinda Road
Bhuchu Kalan (Pb.)-151001
FAX:0164-2740584
Solid MIG/MAG
filler wire class I
to IRS:M-46/03.
01.12.210 Deficiency communicated on
10.1.11. Doc recd 15.2.11. Still
deficiency. Modified STR sent
22.3.11.
15. KEI Industries Ltd.,SP-919-
929-922, RICCO Industrial
Area Phase-III,
Bhiwadi,Dist.
Alwar,Fax:011-26811959
Solid MIG/MAG
filler wire class VI
to IRS: M-46/03.
17.08.10(Onl
ine)
Hard copy of documents is
awaited.
16 Premier Indl Corpn, R-509,
TTC Indl Area Navi
Mumbai-400701
Fax- 022 27693247
MIG/MAG wire,
Class-III, IV, VI,
VII
07.02.11 Deficiency communicated
23.3.11
S.N. Name of firm Name of item Applied
on
Status of Case
17.
Malu Electrodes Pvt,
Plot o.21,22,sect,3A,IIE
MMAW
Electrodes Under
NIL/
05.05.10
Sample testing is completed and
case is under review for put-up
13
Sidcul,Haridwar
Uttrakhand.
Fax:01334-239414
class-A2 toIRS:M-
28/02
QAM for approval.
18. Kollipara Electrodes Pvt.
Ltd.,59A-13-17, Old P&T
Colony, Patamata 40
Vijayawada- 520 010
FAX:0731-2703166
MMAW
Electrodes under
class A1, A3,
M1&N1 to IRS:
M-28/02
11.05.10/
19.05.10
QAM
Revised STR sent in march 2011
19 Orange Electrodes A/14,
Vishwajeet society Near 3
petrolpum oppo. Industries,
Thane
MMAW
Electrodes under
class
A2,A4/B2,M1,H4
A , IRS: M-28/02
15.03.2010
QAM
Revised STR sent in march 2011
. Doc recd .16.5.11. still deficient
20 Rasi Electrodes Ltd.,
21,Raja Annamali Road Flat
No.A/14,3rd floor RAMS
Apartment
Chennai-600084
FAX:044-26401822
MMAW
Electrodes under
class
A2,A4/B2,M2,M4
, M5&N1to IRS:
M-28/02
31.05.10QA
M
Revised STR sent in march 2011
21 Asian Industries, Gautam
Budha Nager-201301.
Fax:0120-43266009
MMAW
Electrodes under
class
C1,C2,M2,M4,E1
&E2 to IRS: M-
28/02.
29.10.10 Revised STR sent in march 2011
22. Nyyer electrodes Pvt. Ltd.,
Jammu Tawi. Fax: 01923-
181133
MMAW
Electrodes under
class
A2,A3/B1,A4/B2,
N1&N2to IRS: M-
28/02.
01.09.09 Sample testing is completed and
case is under review for put-up
for approval
23. Jain Welding Electrodes
Pvt. Ltd.,Kota.
Fax:0744-2490540
MMAW
Electrodes under
class A2to IRS:
M-28/02.
18.09.10 Revised STR sent in march 2011
S.N Name of firm Name of item Applied
on
Status of Case
24 Nowelco Industries Pvt.
Ltd., Raipur
MMAW
Electrodes under
class A2to IRS: M-
28/02.
18.08.08 Revised STR sent in march 2011
14
25. Ferro weld Electrodes (P)
Ltd., Bilaspur.
MMAW
Electrodes under
class
A1,A2,A4/B2to
IRS: M-28/02.
03.1.201
1
Revised STR sent in march 2011
26. Esab India, Chennai. MMAW
Electrodes under
class M5&Dto IRS:
M-28/02.
18.11.08 Revised STR sent in march 2011
27. Accurate Weld Arc limited,
Hirapur Road,
Raipur
MMAW
Electrodes under
class A2,C1, M2,
M4, M5,D to IRS:
M-28/02.
23.02.11 Revised STR sent in march 2011.
28. Victor Electrodes Ltd T-
1/113-114, Mangolpuri,
Industrial Area Phase-
I,NewDelhi-83.
MMAW
Electrodes under
class C1to IRS: M-
28/02.
24.06.09 Sample testing is under process Revised
STR sent in march 2011
29. Maruthi Electrodes (P) Ltd.
No.12, Doddanekkundi
Industrial area ,II phase
Bangalore
MMAW
Electrodes under
class M4 to IRS:
M-28/02.
16.12.08 Sample testing is under process Revised
STR sent in march 2011
30. Wearresist Tec. Pvt.Ltd.421-
422 GIDC Ramangamdi,
POR Vadodra 391243
MMAW
Electrodes under
class B2 to IRS:
M-28/02.
08.04.11 Revised STR sent in may 2011.
31. Saitron Engineers Pvt. Ltd.
A-36, MIDC Industrial area,
Butibori Nagpur
MMAW
Electrodes under
class A2,B2 to
IRS: M-28/02.
06.04.11 Revised STR sent in may 2011.
S.
No.
Name of firm Name of item Applied
on
Status of Case
32. Weldcraft Private Limited,// 72
Industrial Suburb,1st main ,2
nd
Stage, Tumkur Road,
Yeshwantpur,
Bangalore-560022.
Fax:080-23373379
MMAW Electrodes
Under class-
A2,A4/B2,D,M2,M5,
A3/B1,C1 to
IRS:M-28/02
23.02.11 Revised STR sent in march 2011,
compliance awaited Doc recd 24.5.11 still
deficient.
33. GEE Limited, 135 ABiplabi
Rash Behari Basu Road 2nd
Floor,
Kolkata-700001.
FAX:033-27095660
MMAW Electrodes
under class C1,C2,
H4B to IRS:M-28/02
30.04.10/
20.05.10
QAM
Case is put up for approval.
34. Classic Electrodes(India)
Ltd., 1A,Bonfield Lane
Howrah-700001.
FAX:033-22426081
MMAW Electrodes
Class, M3, M4,
M6, C1, N1, N2 to IRS:M-28/02
28.04.10/
04.05.10
QAM
Approval certificate issued.
15
35. Bhagerwal Electrodes Pvt.
ltd.,22,Vaibhav chamber-7/1
Ushagange, Chhawni
Indore
FAX: 0731-2703166
MMAW
Electrodes under
class
A1 , A2, A3, B1,
A4, B2 & M1 IRS:
M-28/02
18.01.10/
11.02.10
QAM
Revised STR sent in march 2011,
compliance awaited .
36. Valency Compound
services, A-62,MIDC Area
Ahemadnagar-414111
FAX:0241-6602064
MMAW
Electrodes under
class
A4/B2,C1&D ,
IRS: M-28/02
23.03.10/
06.04.10
QAM
Revised STR sent in march 2011,
compliance awaited .
37. Eureka System & Electrodes
Pvt. Ltd.
11/15-a, Selvarajapuram
Chinthamanipudur,
Coimbatour-641103
Fax:0422-2681987
MMAW
Electrodes
10.07.10
M&C
Revised STR sent in march 2011,
compliance awaited .
38. D&H Sechron Electrodes Ltd.,
Indore.
Fax:0731-24123331
MMAW
Electrodes under
class D,E2,M1&M6
to IRS: M-28/02.
27.11.10 Revised STR sent in march 2011,
compliance awaited .
39. Calcutta electrodes Pvt., Ltd.,
Sardar Patel Timber Market
Bhanpuri,
Raipur-493221
Fax:0771-4070953
MMAW
Electrodes under
class C1,
H4B,M2,M4N1&N2
To IRS:M-28/02
03.2.11 Revised STR sent in march 2011,
compliance awaited .
40. Miglani Engineers,1P-1,Raipur
Sahkari udyogic
Kshetra,Bhagwanpur,Roorkee
MMAW Electrodes
under class
A3,A4,B1,B2,C1,E2,
M2,M4 and M5
20.2.11 Revised STR sent in march 2011,
compliance awaited .
(B)Status of vendors for renewal registration cases (Welding
Research Section) as on 5.06. 2011.
S.no Name of firm Name of item Applied
on
Validity Status of case
1. KM Crown Welding
Consumable Pvt.
Ltd.,16A,16B&17A,Indu
strial area No.1,AB
Road,Dewas-455001.
Fax: 07272-258401.
Solid MIG/MAG
Filler wire Class
–I to
IRS: M-46/03.
07.09.10 30.11.10 Approval certificate
issued
2. Anand Arc Ltd.Bandra
Kurla Comlex(BKC)
Bandra
Mumbai.400051.
Fax: 022-42688400.
SAW wire-
W1,F1to IRS: M-
39/01.
03.07.10 31.12.10 Deficiency
communicated on
3.2.11. Doc recd
23.3.11. Under
Scrutiny. 3. Esab india,
Nagpur.
Solid MIG/MAG
Filler wire Class –
VI to
IRS: M-46/03.
20.08.2010 31.08.2010 Reminder issued
11.4.11
16
4. Varun Electrodes Panipat. Solid MIG/MAG
Filler wire Class –
VI,VII to
IRS: M-46/03
30.12.10 31.12.10 &
31.03.11
Deficiency
communicated on
3.2.11. Doc recd
7.3.11. Some
document yet to
receive.
5. Weldcraft Private
Limited,// 72 Industrial
Suburb,1st main ,2
nd
Stage, Tumkur Road,
Yeshwantpur,
Bangalore-560022.
Fax:080-23373379
MMAW
Electrodes under
class C2&M4 to
IRS: M-28/02.
22.06.10 31.07.10 Re-testing planned
for performance test
in June 2011
6. Asian Industries,
Gautam Budha Nager-
201301.
Fax:0120-43266009
MMAW
Electrodes under
class D to IRS:
M-28/02.
04.10. 08 31.03.09&
31.05.09
Inspection re- stored
S.No Name of firm Name of item Applied on Validity Status of case
7. Sundeep electrodes Pvt.
Ltd., Hapur.
Fax:0122-2302793
MMAW
Electrodes under
class
A2,A3,A4/B2to
IRS: M-28/02
15.11.10 31.05.11 Visited in May 11
8. Sundeep electrodes Pvt.
Ltd., Hapur.
Fax:0122-2302793
MMAW
Electrodes under
class
M1,M2,M4to
IRS: M-28/02
22.09.10 31.03.11 Visited in May 11
9. Dwekam electrodes Pvt.
Ltd.,Indore.
Fax:0731-4229513
MMAW
Electrodes under
class A2to IRS:
M-28/02.
16.11.10 31.01.11 Certificate of
approval is issued
10. D&H Sechron
Electrodes Ltd., Indor.
Fax:0731-24123331
MMAW
Electrodes under
class A2to IRS:
M-28/02.
TD --- Case closed
11. Weld alloy Product Ltd.
Noida.
MMAW
Electrodes under
class M5&Dto
IRS: M-28/02.
TD -- Sampling is under
testing
12.
Nucor weld (India) pvt.
Ltd. No.223,
Konappana, Agrahara,
electronic city post
Bangalore-560100
MMAW
Electrodes under
class
H4B,M1,M3,M4,
M5,N1,N2 to
09.09.2010 - Approved for STR
verification,
capability
assessment and
testing planned in
17
IRS: M-28/02. June 2011
13.
Usha Welds Ltd. Patna MMAW
Electrodes under
class D to IRS:
M-28/02
- 31.12.09 Sample testing is
under process
14. GEE Limited Howrah MMAW
Electrodes under
class M2,M4,M5
to IRS: M-28/02
31.5.11 28.2.11 Deficiencies comply
to firm in may 2011
GEE Limited Howrah MMAW Electrodes under class D to IRS: M-28/02
24.5.11 30.6.11 The case is under scrutiny
D&H Sechron Electrodes Ltd., Indor.
MMAW Electrodes under class C1 to IRS: M-28/02
3.3.11 30.6.11 The case is under scrutiny
Mailam India Ltd. Mailam main Road Sedarapat pondichery-605111
MMAW Electrodes under class M2, M4,,A2,A4/B2,C1 to IRS: M-28/02
13.5.11 30.6.11 The case is under scrutiny
Maruti Weld Ltd Gurgaon
MMAW Electrodes under class M2 to IRS: M-28/02
22.2.11 30.6.11 Deficiencies comply to firm in may 2011
S.No Name of firm Name of item Applied on Validity Status of case
15. KM Crown Welding
Consumable Pvt.
Ltd.,16A,16B&17A,Indu
strial area No.1,AB
Road,
Dewas-455001.
Fax: 07272-258401.
MMAW
Electrodes under
class
A3/B1,A4/B2,M
1&M4
To IRS:M-28/02
07.9.11 30.11.11 The case is under
scrutiny.
16. Victor Electrodes Pvt.
Ltd.,New Delhi.
MMAW
Electrodes under
class
A2,A3,G,M1,N1
&N2
To IRS:M-28/02
20.12.2010 31.05.2010 Put up for
temporary delisting
in May 2011
17. Varun Electrodes
Panipat
MMAW
Electrodes under
class A3/B1,
30.12.10 31.12.10&31.
03.11
The case is under
scrutiny.
18
A4,&D
To IRS:M-28/02
18. Hally comet , electrodes
Ishmailpur, Deva sharif
Road Brabanki. (U.P.)
FAX:05248-245374
MMAW
Electrodes under
class A2,D,
H4A,H4BTo
IRS:M-28/02
25.02.09 28.02.09 Letter sent to for the
inspection and reply
is awaited.
19. Esab india,Nagpur.
Solid MIG/MAG
Filler wire Class
–I&III to
IRS: M-46/03.
20.08.2010 28.02.2010 Case merged with
class VI. Reminder
issued 11.4.11
20. Esab india, Nagpur.
SAW wire-
W1,W4
to IRS: M-39/01.
20.08.2010 31.01.2010 Deficiency
communicated 11.4.11
21. Esab india,
Chennai.
SAW wire-
F1,F2,F4
to IRS: M-39/01.
20.08.2010 30.04.2010 Delisted on 18.3.11
22. Victor Electrodes Pvt. Ltd.,
New Delhi.
Solid MIG/MAG
Filler wire Class –
VI,VII to
IRS: M-46/03.
20.12.2010 31.05.2010 Testing completed
in April 2011.
23. Classic Electrodes(India)
Ltd., 1A,Bonfield Lane
,Howrah-700001.
FAX:033-22426081
MMAW
Electrodes under
class H4B to IRS:
M-28/02
07.09.10 TD The sample is under
testing.
24. Royal Arc Electrodes
Ltd Plot no. 26 Royal
House ,W-E highway
Village- Valiv, Vasai E-
401208 Thane
MMAW
Electrodes under
class M5, A4/B2
,M1 to IRS: M-
28/02
7.02.11 (M5)
25.05.11(A4/
B2,M1)
31.05.11(M5)
31.12.11(A4/
B2,M1)
Clarification asked
for change of work
address in May
2011
(C) Status of vendors up gradation cases of (Welding Research Section) as on
5.06.2011- Nil
19
NDT Section
Ultrasonic Equipment
Pending application status for renewal as on 03.6.11
Sl.
No.
Application form No. Name of the firm &
address
Date of receipt of
application
Status
Nil Nil Nil Nil
Pending application status for Approval as on 03.6.11
Sl.
No.
Application form No. Name of the firm &
address
Date of receipt
of application
Status
1. SE/1300/2010-11,
dated 25.10.2010
M/s Modsonic
Instruments Mfg.
Co. (P.) Ltd,
Ahemedabad
29.10.2010 Firm did not reply on
date regarding the
deficiency. 2nd
reminder is being
given.
Pending application status for Upgradation as on 03.6.11
Sl.
No.
Application form
No.
Name of the firm &
address
Date of receipt of
application
Status
Nil Nil Nil N.A