Status report - OVF Ministry of Interior General Directorate of Water DISC 2013, Belgrade. Hungary: The Land Endangered by Floods. Flashy rivers (significant and rapid rise of water level after heavy rainfalls). Average inflow: 3602 m 3 /s. Generated average runoff: 180 m 3 /s. - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Status report - OVF

Ministry of InteriorGeneral Directorate of Water

DISC 2013, Belgrade

Page 2: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Hungary: The Land Endangered by Floods

Average outflow: 3782 m3/s

Average inflow: 3602 m3/s

Flashy rivers (significant and rapid rise of water level after heavy rainfalls)

4200 km dyke system2800 km long rivers4200 km long smaller rivers

Generated averagerunoff: 180 m3/s

Page 3: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Flood Prone Area

Page 4: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Protected Area

Length of Flood Protection Dykes

0 5000 10 000 15 000 20 000 25 000km2

0 1000 2000 3000 4000 5000km

Hungary

Tisza Valley

Netherlands

Po Valley

Ukraine

Loire Valley

Hungary

Tisza Valley

Netherlands

Po Valley

Ukraine

Loire Valley

Large Flood Protection Systems in Europe

Page 5: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Danube Flood 2013

– Meteorological background: 4 rainy days (110-140 mm in areal average) on 3 main sub-catchments of the Danube (Upper-Danube, Inn, Traun-Enns)

– New highest water levels (above Mohács)– Successful flood defense with national

collaboration

Page 6: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Discharges of the Danube and its tributaries during the flood period in June 2013

16/05 21/05 26/05 31/05 05/06 10/06 15/06 20/06 25/06 30/06

VáhMoravaEnnsTraunInnUpper Danube

2013

Dis

char

ge (m

3/s)

Page 7: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Hydrological forecasts for the water level of the Danube at Budapest by Hungarian Hydrological Forecastig Service of OVF

Page 8: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

• The project contains 11 construction elements improvement of 200 km dikes.

• Approximately 100 million € project costs (28,3 billion HUF)• Beginning of constructions: 2012 June• Closing of the project: 2015 January (extended due to the flood of

2013)

Danube Flood Protection Project

Page 9: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Pictures of the interventions in the project:

DikesHeight and cross-sectional reinforcement, slope correction, construction of new dikes, paving of dike slope – 200 km

Danube Flood Protection Project

Page 10: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Pictures of the interventions in the project:

Structural developmentsStructure reconstruction(18 pcs)Construction of new structures (7 pcs)

Danube Flood Protection Project

Page 11: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Pictures of the interventions in the project:

Improvement of 2 defense Centres(building&mechanical)

Danube Flood Protection Project

Page 12: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

– WP3 reports have been prepared and already accepted by the WP leader:

• Report on common quality for water level information• Concept for water gauge monitoring• Status quo report on shallow section information

– 1 report is under preparation:• Report about harmonization of water level forecast

- WP5 Ice monitoring camera

Page 13: Status report - OVF Ministry  of  Interior General  Directorate of  Water DISC 2013, Belgrade

Thank You for your attention!Ministry of Interior

General Directorate of Water

February 2012