Status Report

TOTEM collaboration meetings

24-MAY-2010

[email protected]

Page 2: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Overview

•DCS is in operation 24/7

•DCS team activities

• Maintenance

• Development of new features

Page 3: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Generic Panel (improvements)

Page 4: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

RP motorization panel (new panel)

• Shows motorization status for all the pots• Log messages and configuration and special commands

Page 5: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

RP pot panel (redesign)

• Shows only information of an specific pot• Motorization and Silicon Detectors

Page 6: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

LHC handshake (redesign)

• DIP and LHC Handshake are now isolated processes• This should improve stability of the LHC Handshake• Handshake problems reported to the JCOP support,

and some things will be improved, but not everything

Page 7: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Self-Monitoring box

ELMB boxes (under testing)

Sensors box for T1

Page 8: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

USB-ethernet adapters

• ELMB -> CANbus -> SYSTEC -> USB -> DIGI -> ethernet

• Will help in maintenance, if a computer crashes,all software can be redeployed to another node

withouthaving to recable in the counting room

• Already in production in the lab• Will be used also in H8

Page 9: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Moving of the laboratory to 506

• Everything ready and operational

• But took several working days….of several people….

Page 10: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

LHC information (done)

• Excel file for all the information we need (similar to pinout tables)• Every week something is changing!!!!• Integration of BPM ‘within days’

Page 11: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Consolidation activities (done)

• Exactly the same software in IP5 that in the laboratory• As a ‘shortcut’ to provide something working, the computer

names were hardcoded last year, so it was not possible to debug properly the system before sending to production.

• Migration of SVN repositories• From bigbrother.cern.ch to the central services

• Fixes in the User Interface

Page 12: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

DCS in H8 for RpSi

Replication of the production software form IP5

Page 13: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Workforce confirmed

50% PP CERN100% FLR 3 years CERN100% IA 2.5 years CERN20% FR 1 year CERN

50% JS 0.5 year Budapest100% VT 3 months Trainee Kuopio-Helsinki100% JT 3 months Trainee Kuopio100% GP 3 months Summer Student

Page 14: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Issues (from Jira)

• Last 30 days, not in absolute scale

• All maintenance effort on Ivan and Fernando• Is good having trainees, but they need supervision

They stay ‘short’ time have to focus in very specific tasks

13 new issues

7 issues resolved

98 issues open

date

Page 15: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Next steps (same list of Feb)

• Fix internal DCS problems (some parts have to be rewritten to add new functionality)

• Include in the pinout tables the LV max HW currents

• Finish LHC information integration

• RadMon readout

• Fix User Interface problems (to allow FSM operation)

• Propagation of states in the FSM tree (but no automatic actions)

OK

?

Page 16: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch
Page 17: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

DCS status summary (Feb 2010)

Page 18: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

DCS status summary (May 2010)

Page 19: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Milestone Plan

• 2 WP closed• 3 WP started

-3 months

Too many things on going

Page 20: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Activity Schedule D8 (done)

Page 21: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Activity Schedule D9 (in progress)

Page 22: Status Report TOTEM collaboration meetings 24-MAY-2010 fernando.lucas.rodriguez@cern.ch

Activity Schedule I7 (in progress)