statutory clearances
TRANSCRIPT
-
7/31/2019 Statutory Clearances
1/16
STATUTORYREQUIREMENTS /
CLEARANCESWELCOME TO ALL
-
7/31/2019 Statutory Clearances
2/16
STATUTORY REQUIREMENTS /CLEARANCES
WHY ?
TO INSURE HEALTHY ENVIRONMENT
TO TAKE CARE OF SAFETY ANDWELFARE OF WORKMEN
TO INSURE SAFETY OF MACHINES
-
7/31/2019 Statutory Clearances
3/16
STATUTORY REQUIREMENTS /CLEARANCES
WHAT ARE THE AREAS ?
CLEARANCES BEFORE AWARD OF PROJECT SITING CRITERIA & RELATED CLEARANCES
EIA STUDY SOCIO-ECONOMIC STUDY
CLEARANCES AFTER AWARD OF PROJECT CLEARANCE FROM BOILER INSPECTOR
CEA CLEARANCES EXPLOSIVE CLEARANCE LPA CLEARANCE MISC. CLEARANCES
-
7/31/2019 Statutory Clearances
4/16
CLEARANCES BEFORE AWARD
Should be avoided within 25 kms of theouter peripheries of Metropolitan cities
National Park and Wildlife sanctuaries
Ecologically sensitive areas like tropicalforests, biosphere reserves, National Parks &Sanctuaries, important lakes and coastalareas rich in coral formations.
500 m of HTL, a buffer zone of 500 mts shouldbe kept free
-
7/31/2019 Statutory Clearances
5/16
CLEARANCES BEFORE AWARD
Chimney should not fall within the approachfunnel of the runway.
500 mts. Away from National Highway, Railway
and Flood Plains of the Riverine Systems 10 kms away from archaeological, historical,
cultural, religious or tourist importance anddefense installations
No forest or prime agricultural land should beutilized for setting up of TPS, or for ash disposal. Should not be on coal bearing area.
-
7/31/2019 Statutory Clearances
6/16
EIA STUDY
Environmental Impact Assessment (EIA ) StudyBroad scope includes: Field studies Impact assessment
Preparation of the EIA document covering Land Use, Water Use,Soils, Geology, Hydrology, Sediments, Water Quality, Meteorology,Air Quality, Terrestrial Ecology, Aquatic Ecology, Noise, RiskAssessment, Ash Utilization and Occupational Health and Safety.Services (based on 12 months data).
EIA report covers the existing environmental baseline conditions,impacts due to operation of the power plant, EnvironmentalManagement Plan, post study-monitoring programme, OccupationSafety & Health and Risk Assessment.
-
7/31/2019 Statutory Clearances
7/16
SOCIO-ECONOMIC STUDY
Socio-economic StudyBroad scope includes : Assessing the number of Project Affected Persons (PAPs), overall
impact due to land acquisition and establishment of the project on theaffected villages and its populace in general and the PAPs , whose
livelihood is affected (directly or indirectly) in particular. To establish base line condition, assess the social-economic impacts
and to what extent, analyse the impoverishment risk to find out themost vulnerable section of the society and to suggest the initiativesto address these issues.
To establish social inventory of affected villages covering the social,cultural, economic, historical, political and environmental aspects.
To identify indicators for monitoring the standards of living of PAPsin future.
-
7/31/2019 Statutory Clearances
8/16
CLEARANCES REQUIRED
Input AgencyLand Availability State Government
Water Availability State Irrigation Deptt.CWC / MOWR
Coal Linkage Dept. of Coal (SLC)
Gas/Liquid Fuel
Availability
Ministry of Petroleum &
Natural GasFuel Transportation Railways /
GAIL/Oil Companies
-
7/31/2019 Statutory Clearances
9/16
CLEARANCES REQUIRED
Clearance Agency
Clearance for Chimneyheight
Airports Authority of
India
Defence Clearance Ministry of Defence
Public Hearing SPCB
Environment Clearance MOEF
Forest Clearance State Forest Department/ MOEF
R&R of displaced family Concerned State Govts
-
7/31/2019 Statutory Clearances
10/16
CLEARANCES AFTER AWARD
CLEARANCES FROM CHIEF BOILER INSPECTOR ASPER IBR-1950
1. MANUFACTURING
Submission of drawings before fabrication
Test certificates of materials used
Testing of High Pressure Welder
Inspection at every stage of fabrication
Hydro testing and stamping
-
7/31/2019 Statutory Clearances
11/16
CLEARANCE FROM BOILERINSPECTOR
2. INSTALLATION Submission of all clearances from inspector in the state of
manufacture to the inspector in the state of installation Registration of agency for the start of work
Test of welder for site welding Offering all pr. Parts for inspection Submitting all the documents for welding checks at site Witnessing of hydro test Clearance for charging of boiler Witnessing of safety valve floating
BOLER OPERATING CERTIFICATE IS OBTAINED BY INSPECTORWHICH IS RENEWED EVERY YEAR AFTER SPECIFIED CHECKESUNDER INDIAN BOILER ACT-1923
-
7/31/2019 Statutory Clearances
12/16
CEA CLEARANCE
APPROVAL TO ENERGISE THE HV/EHV OVERHEAD
TRANSMISSION LINES & UNDERGROUND CABLES
APPROVAL TO ENERGISE THE HV/EHV
APPARATUS/INSTALLATIONS
-
7/31/2019 Statutory Clearances
13/16
EXPLOSIVE CLEARANCE
TO REGULATE THE MANFACTURE, POSSESSION, USE,SALE & TRANSPORT OF EXPLOSIVES, CLEARANCEUNDER INDIAN EXPLOSIVE ACT IS REQUIRED FOR
HYDROGEN GENERATION PLANT
LDO, HFO OR ANY OTHER FUEL TANKCHLORINATION SYSTEM
-
7/31/2019 Statutory Clearances
14/16
LPA CLEARANCE
FIRE FIGHTING SYSTEM SHOULD BE INSTALLED AS
PER THE GUIDELINES OF LPA
-Insurance of the equipments and systems installed
in project can only be obtained after installation of
fire fighting system
-
7/31/2019 Statutory Clearances
15/16
MISCELLANEOUSCLEARANCES/REQUIREMENTS
LABOUR LICENCE
PF CLEARANCE
LOAD TEST OF LIFTING TOOLS AND TACKLES
ENFORCEMENT OF SAFETY RULES AND
APPOINTMENT OF SAFETY OFFICER UNDER
FACTORIES ACT-1948
-
7/31/2019 Statutory Clearances
16/16