PP PP PP STAY POLE PP PP PP PP PP/LP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP PP STAY POLE PP PP PP PP PP/LP PP/LP PP/LP PP/LP PP PP/LP PP PIT Issue Description Date 100mm on Original Project Title Client Project No. Issue Drawing No. Grid Checked Designed Drawn Height A1 Datum Approved Status Scales PERMISSION OF AT&L THIS DRAWING CANNOT BE COPIED OR REPRODUCED IN OTHER PURPOSE OTHER THAN WITHOUT THE WRITTEN THAT ORIGINALLY INTENDED ANY FORM OR USED FOR ANY Bar Scales Civil Engineers and Project Managers 02 9923 1055 02 9439 1777 Level 7, 153 Walker Street North Sydney NSW 2060 Tel: Fax: ABN 96 130 882 405 www.atl.net.au [email protected]F:\17-494 Garfield Road\Drgs\Civil\Final\0000_DA Demolition Stage 1 Package\C0011.dwg C0011 DEMOLITION PLAN SHEET 1 FOR APPROVAL NOT TO BE USED FOR CONSTRUCTION TH TH DS NTS AHD MGA 17-494 DEMOLITION DA VILLA ROSA 280 GARFIELD ROAD EAST AND 259 RIVERSTONE ROAD P2
EXISTING WAREHOUSE AND HARDSTAND AREA TO BE DEMOLISHED
AutoCAD SHX Text
DE-WATER, REMEDIATE AND DEMOLISH EXISTING BASIN (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
DEMOLISH AND REMEDIATE EXISTING AREA ADJOINING WAREHOUSE (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING DAM TO REMAIN
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
EXISTING AWNING TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING OVERHEAD SERVICES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HV LINE TO REMAIN
AutoCAD SHX Text
EXISTING OVERHEAD SERVICES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING OVERHEAD SERVICES TO BE DEMOLISHED
AutoCAD SHX Text
DEMOLISH AND REMEDIATE EXISTING AREA ADJOINING WAREHOUSE
AutoCAD SHX Text
EXISTING HARDSTAND TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND AREA TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND AREA TO BE DEMOLISHED
AutoCAD SHX Text
0
AutoCAD SHX Text
1 : 1000 @ A1 1 : 2000 @ A3
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
60
AutoCAD SHX Text
80
AutoCAD SHX Text
100m
AutoCAD SHX Text
P1
AutoCAD SHX Text
ISSUE FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
10-11-17
AutoCAD SHX Text
P2
AutoCAD SHX Text
RE-ISSUED FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
13-11-17
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
EXISTING BUILDING TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING STRUCTURE/DAM TO REMAIN
AutoCAD SHX Text
EXISTING DAM TO BE DE-WATERED AND DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND/DRIVEWAY TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING LANDSCAPED AREA TO BE DEMOLISHED AND REMEDIATED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO REMAIN
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO REMAIN
AutoCAD SHX Text
EXISTING WATER SERVICE TO REMAIN
AutoCAD SHX Text
EXISTING BASIN TO BE DE-WATERED, REMEDIATED AND DEMOLISHED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO DEMOLISHED
AutoCAD SHX Text
NOTES::
AutoCAD SHX Text
1. ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM DE-WATERING PLAN AND DAM FAUNA STUDY BY ECOLOGICAL. 2. ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING MATERIALS ASSESSMENT BY ADE. 3. ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION PLAN BY ADE AND THE NON-STATUTORY AUDITOR RAP REVIEW BY ZOIC (REMEDIATION UNDER SEPARATE APPROVAL). 4. ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED AS PART OF THE ABOVE DEMOLITION AND REMEDIATION WORKS. 5. ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE REMOVAL ON 'UNZONED' LAND TO BE LIMITED TO THOSE AREAS WHERE DEMOLITION IS TO OCCUR. 6. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. 7. SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO COMMENCEMENT OF WORKS IN ACCORDANCE WITH THE "BLUE BOOK". 8. ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND SHOWN/REFERRED TO FOR INFORMATION ONLY.
EXISTING CHICKEN SHED AND CATTLE GRID TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING GLASSHOUSE TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING RESIDENCE "VILLA ROSA" TO REMAIN
AutoCAD SHX Text
EXISTING SHED TO BE REMOVED BY OWNER. EXISITNG SLAB AND CELLAR TO BE DEMOLISED
AutoCAD SHX Text
EXISTING DAM TO REMAIN
AutoCAD SHX Text
OUTDOOR PLANTER BED TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING WATER TANK TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING SEPTIC TANK TO BE DEMOLISHED
AutoCAD SHX Text
SHED/DWELLING AND ASSOCIATED FOOTINGS TO BE DEMOLISHED
AutoCAD SHX Text
LIVESTOCK FENCE TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING HV LINE TO REMAIN
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
DEWATER AND DEMOLISH EXISTING DAM
AutoCAD SHX Text
OVERHEAD POWER AND COMMS THAT SERVICE "VILLA ROSA" TO REMAIN. OTHERWISE, DEMOLISH OVERHEAD POWER AND COMMS.
AutoCAD SHX Text
0
AutoCAD SHX Text
1 : 1000 @ A1 1 : 2000 @ A3
AutoCAD SHX Text
20
AutoCAD SHX Text
40
AutoCAD SHX Text
60
AutoCAD SHX Text
80
AutoCAD SHX Text
100m
AutoCAD SHX Text
P1
AutoCAD SHX Text
ISSUE FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
10-11-17
AutoCAD SHX Text
P2
AutoCAD SHX Text
RE-ISSUED FOR DEVELOPMENT APPLICATION
AutoCAD SHX Text
13-11-17
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
NOTES::
AutoCAD SHX Text
EXISTING BUILDING TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING STRUCTURE/DAM TO REMAIN
AutoCAD SHX Text
EXISTING DAM TO BE DE-WATERED AND DEMOLISHED
AutoCAD SHX Text
EXISTING HARDSTAND/DRIVEWAY TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING LANDSCAPED AREA TO BE DEMOLISHED AND REMEDIATED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO REMAIN
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO REMAIN
AutoCAD SHX Text
EXISTING WATER SERVICE TO REMAIN
AutoCAD SHX Text
EXISTING BASIN TO BE DE-WATERED, REMEDIATED AND DEMOLISHED (REMEDIATION UNDER SEPARATE APPROVAL)
AutoCAD SHX Text
EXISTING OVERHEAD POWER LINES TO BE DEMOLISHED
AutoCAD SHX Text
EXISTING TELECOMMUNICATIONS LINE TO DEMOLISHED
AutoCAD SHX Text
1. ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM ALL DAMS TO BE DE-WATERED/DEMOLISHED/REMEDIATED TO BE IN ACCORDANCE WITH THE DAM DE-WATERING PLAN AND DAM FAUNA STUDY BY ECOLOGICAL. 2. ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING ALL BUILDING DEMOLITION TO BE IN COMPLETED IN ACCORDANCE WITH THE HAZARDOUS BUILDING MATERIALS ASSESSMENT BY ADE. 3. ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION ALL REMEDIATION WORKS TO BE COMPLETED IN ACCORDANCE WITH THE REMEDIATION ACTION PLAN BY ADE AND THE NON-STATUTORY AUDITOR RAP REVIEW BY ZOIC (REMEDIATION UNDER SEPARATE APPROVAL). 4. ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED ANY ANCILLARY BUILDING STRUCTURES, FENCES, HARDSTAND, FOOTINGS ETC. TO BE DEMOLISHED AS PART OF THE ABOVE DEMOLITION AND REMEDIATION WORKS. 5. ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE ALL VEGETATION AND TREES TO BE CLEARED FROM 'ZONED' LAND. VEGETATION AND TREE REMOVAL ON 'UNZONED' LAND TO BE LIMITED TO THOSE AREAS WHERE DEMOLITION IS TO OCCUR. 6. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. ALL SURPLUS DEMOLITION MATERIAL TO BE REMOVED FROM SITE. 7. SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO SEDIMENTATION AND EROSION CONTROL MEASURES TO BE IMPLEMENTED PRIOR TO COMMENCEMENT OF WORKS IN ACCORDANCE WITH THE "BLUE BOOK". 8. ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND ALL REMEDIATION WORKS ARE NOT INCLUDED AS PART OF THIS DEVELOPMENT APPLICATION AND SHOWN/REFERRED TO FOR INFORMATION ONLY.