1
TROMBAY
TROMBAY
UNIT 8
Steam Blowing
Viren A. Joshi
![Page 2: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/2.jpg)
2
TROMBAY
ACTIVITIES BLOWING PURPOSE
• The objective of steam blowing is to remove scales, loose material, iron cuttings etc, which are entrapped in Super Heaters, reheaters during manufacture, storage, erection at site.
• Failure to remove the debris may result in damage to turbine blades, Valves etc.
![Page 3: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/3.jpg)
3
TROMBAY
STEAM BLOWING COMPLETION CRITEIRA
• For stages 1, 2a, 3a, 4a & 4b the the blowing operations is considered to be completed if the absolute number of pitting on the target plate in the central zone are less than 5.
![Page 4: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/4.jpg)
4
TROMBAY
STEAM BLOWING COMPLETION CRITEIRA
• Alternatively following guide lines may be followed a) No impact marks greater than 1mm.
• b) No more than one indentation of 0.5mm in one square inch area.
• c) All markings under 0.5 mm shall be ignored.
• d) There must be a minimum of 10 blows for each path to be cleaned.
![Page 5: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/5.jpg)
5
TROMBAY
STEAM BLOWING COMPLETION CRITEIRA
• In addition to this, for stages 1, 2a, & 3a Disturbance factor value at selected locations should be greater than unity.
![Page 6: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/6.jpg)
6
TROMBAY
ACTIVITIES PROCEDURE ADOPTED
• Steam blowing is carried out by adopting puffing method for stages 1a, 2a, 2b,3a & 3b in which, boiler pressure is raised to 40KG/CM2 and released through a quick opening valve and steam blowing done till the Drum pressure drops from 40KG/CM2 to 20 KG/CM2.
• Steam blowing for stages 1b & 4 are carried out by continuous method at pr. 40 to 50 % of the rated pr. for the respective system.
![Page 7: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/7.jpg)
7
TROMBAY
PROCEDURE ADOPTED
• Both the above techniques give a thermal shock to the contours being purged and results in loosening of the adhered scale, which is subsequently removed by expanding steam.
![Page 8: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/8.jpg)
8
TROMBAY
EOTV
ESV
EOTV
ESV
DRUM• Stage1a: SH, MSL, ESV, temporary line from ESV to EOTV (Electrically operated temporary valve) and EOTV to exhaust.
• Stage1b:SH, MSL, Aux PRDS, Atomising Steam lines & FO heating/tracing lines continuous blowing.
TP
BLANK
PRDS
MS Line
MS Strainer
![Page 9: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/9.jpg)
9
TROMBAY
EOTV
ESV
EOTV
ESV
DRUM
BLANK
PRDS
MS Line
RH INLET
PRS
HPH 6 HPBPHOTV
BLANK
CRH Line
TP
• Stage – 2a : SH, MSL, ESV, temporary lines from ESV to EOTV, EOTV to CRH line, CRH lines up to boiler end.
• Stage – 2b : HP bypass inter connection, HOTV (hand operated Temporary valve) mounted in place of HP bypass valve and CRH lines up to Boiler end.
![Page 10: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/10.jpg)
10
TROMBAY
• Stage – 3a : SH, MSL, ESV, temporary lines from ESV to EOTV, EOTV to CRH line, CRH lines up to reheater, HRH, IPCV and temporary pipe.
Stage 3a end point will be concluded by observing the indents on target plates.
• Stage-3b: SH, MSL, ESV, temporary lines from ESV to EOTV, EOTV to CRH line, CRH lines up to reheater, HRH plus LP Bypass lines.
![Page 11: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/11.jpg)
11
EOTV
ESV
EOTV
ESV
DRUM
BLANK
PRDS
MS Line
RH INLET
CRH Line
EOTV
ESV ESV
RH OUTLET
EOTV
LPBP LPBP
REHEATER
TP
BLANK
HRH Line
![Page 12: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/12.jpg)
12
TROMBAY
Stage-4 :4a) APRDS to Gland seal steam
4b) CRH to turbine extraction line (HPH 6).
4c) CRH to Deaerator and FST
4f) CRH steam line to Turbine gland sealing line
4g) CRH to APRDS
![Page 13: Steam blowing procedure](https://reader036.vdocument.in/reader036/viewer/2022082908/54c4779f4a795918458b459e/html5/thumbnails/13.jpg)
13
TROMBAY
THANK YOU