PROTOCOL
BHEL: BHAVINI Site (1x500 MWe)
PLANT AREA: TG MS LINE
ACTIVITIES : STEAM BLOWIG OF MS LINE DATE: 30.07.14
STEAM BLOWING of Stage-8A, 8B, 8C & 8D (MS SGB-EAST) was
successfully completed on 26.07.2014.
The Target Plate in MS-SGB-EAST side was found satisfactory.
Sl.No.Aux. boiler drum pressure
Deaearator pressure (Kg/Cm2)Durationof Steam blowingDescription of lineTarget PlateRemarks
OpenClose
Description
BHEL ERECRTION BHEL COMMISSIONING BHAVINI
O & M BHAVINI
ERECTION
SIGN
NAME
DATE