  • 7/31/2019 Step by Step for LIS Delta Configuration

    1/14

    Run SBIW and find Connect Information Structure under Logistics Information

    System.

    Click to execute.

    Setup LIS environment:

    Generate DataSource:

  • 7/31/2019 Step by Step for LIS Delta Configuration

    2/14

    select fields and then click Save.

    select No.

    setup delta updating in LIS.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    3/14

    Activate delta update in following screen.

    After completing the above 4 steps, you can display the datasource to confirm if your

    DataSource is able to support Complete update and delta update as below.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    4/14

    Disable infoStructure updating if you have not done so.

    Choose Purchasing

  • 7/31/2019 Step by Step for LIS Delta Configuration

    5/14

    Double-click on your infoStructure S860 to change updating method if necessary.

    select No updating and Save.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    6/14

    Clikc Yes to confirm change

    Click to continue. (You may need to create a new transport request by clicking if

    you dont see a transport request ID in the screen below)

    Go to BW to replicate data source.

    Assign infoSource to this data source.

    Create target data target if the data target is not available yet.Create update rule to link data target and the infoSource.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    7/14

    Create infoPackage for Initilization run.

    Schedule the infoPackage to load data from R3.

    When the job is successfully completed, go back to R3.

    Enable the infoStructure updating.

    infoStructure updating if you have not done so.

    Choose Purchasing

  • 7/31/2019 Step by Step for LIS Delta Configuration

    8/14

    Double-click on your infoStructure S860 to change updating method if necessary.

    select Asynchronous updating (2) and Save.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    9/14

    Clikc Yes to confirm change

    Click to continue. (You may need to create a new transport request by clicking if

    you dont see a transport request ID in the screen below)

    Check control table TMCBIW to confirm the delta is active (field: BIW active) and the

    activate delta table (field: BIW status). In this example, the active delta table is S860BIW1.

    All changes to PO should go to this table for delta update in BW.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    10/14

    Before changing PO, the table S860BIW1 and S860BIW2 should be empty. You can checkit using TCode: SE16.

    Create a new PO: ME21N.

    Enter data as below. Do not use 1000 as company code!

    PO detail part:

  • 7/31/2019 Step by Step for LIS Delta Configuration

    11/14

    Ignore warning message and click Save.

    If you cannot create new PO for any reason, use update method to modify an existing PO.

    You can modify existing PO by using TCode: ME22N. Change the existing PO quantity

    and Save. (You can select another PO by press Shift + F5 and then choose another PO inthe pull-down list.)

    After you save the changes, you will be able to see the changed records in table S860BIW1

    The table S860BIW2 should be blank.

    Go to BW to create a new infopackage for delta.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    12/14

    Run this infoPackage and check the job monitor. You will see 2 records are loaded.

    Go back to R3, check the control table: TMCBIW. The active delta table is changed to 2

    (S860BIW2).

  • 7/31/2019 Step by Step for LIS Delta Configuration

    13/14

    Run RSA7, to check the delta queue. The data have been successfully passed to BW and

    the table content for this data source will be empty. If it shows red, the data in delta queuewill stay and it will be ready for delta repeat.

  • 7/31/2019 Step by Step for LIS Delta Configuration

    14/14

    If the check S860BIW1, the data will remain as it was until you run the next delta

    infoPackge on BW side.

    In this example, if you enter new PO, the data will go to S860BIW2.

    After you run another delta infoPackage on BW side, the data in table S860BIW1 will be

    removed and the active delta table in the LIS control table TMCBIW will be 1 again.