stewardson competition board

3
Wrangler k i t c h e n p o t a b l e b l a c k w a t e r r a i n w a t e r r a i n w a t e r b l a c k w a t e r b a t h r o o m p o t a b l e recycled greywater purification tank cistern percolation piping kitchen bathroom bedroom living room flex space entrance and display solar panels ARTS DISTRICT GRAND OPENING PHILLY 2014 SHERMAN’S CLOTHING OUTLET ARTS DISTRICT GRAND OPENING PHILLY 2014 THE 113TH JOHN STEWARDSON MEMORIAL FELLOWSHIP IN ARCHITECTURE - 2014 sidewalk - 10’ first floor - retail - second / thrid floor - live / work apartments - 50’ sidewalk - 10’ ‘bass fishin’ jazz restaurant (historical connection), fish inspired menu - 80’ bike lane - 4’ bike lane - 4’ median - 4’ street - 16’ street - 16’ potable water Concept: Revitalizing the currently underdeveloped 1500 block of Ridge Avenue into an Arts District Corridor will facilitate economic development and create prosperity and jobs which will restore Francisville to its once grandiose state. The design concept transforms the block into an interactive cultural hub showcasing art and music which encourages visitors and residents to indulge in the multifaceted experience that is the Arts District of Ridge Avenue. By redesigning the streetscape into a pedestrian and bike friendly experience, tourists and locals are encouraged to walk Ridge Avenue establishing a sensorial experience. The infills between row homes introduce a new typology and style to the existing language of Ridge Avenue. Parcel 1: Parcel 1 will consist of demolition, historical preservation (cosmetic improvements to the exterior facades and adaptive reuse to the interiors) and new construction. Every second row home is to be demolished and infilled with three story galleries which promote various types of artwork and showcase the beauty of the city from different vantage points. The program will include retail on the street level, apartments (one and two bedroom apartments and live work studios) and gallery space. Parcel 2: Parcel 2 will consist of demolition and new construction. The only existing structure to be salvaged is the Arts Garage. The program will consist of two restaurants, a café, parking, retail and apartments. Systems: In response to water management systems, a large centralized cistern spans the length of the 1500 block of Ridge Avenue which will collect all storm and rain water. The water then diverts to opposite sides of the road into purification tanks and into storage tanks for regulated building use. Grey-water systems will be integrated in all bathrooms to responsibly manage water usage. Solar panels harvest daylight for energy use. k i t c h e n p o t a b l e b l a c k w a t e r r a i n w a t e r r a i n w a t e r b l a c k w a t e r b a t h r o o m p o t a b l e recycled greywater purification tank potable water New Program SF Total 1 Restaurant 1 7,700 2 Restaurant 2 4,200 3 Café 1,250 13,150 4 Retail 43,500 43,500 5 Residential 5a 2 Bed, 2 Bath 42,000 5b 1 Bed 1and1/2 Bath 21,000 5c Studio, 1 Bath 20,000 83,000 6 Controlled Public Spaces 10,000 Sidewalks Plazas Courtyard 10,000 7 Off Street Parking 5,000 5,000 8a Landscaping 8,000 8b Hardscaping 2,000 10,000 Existing Program 1 Arts Garage 6,000 6,000 160,750 Studio Apartment (475 sf) One Bedroom Apartment (700 sf) Two Bedroom Apartment (900 sf) Site Plan Facade Diagram Gallery Infill - Street Level Perspective - Parcel 1 Axonometric Site Strategy 1 Living Room 2 Kitchen 3 Bedroom 4 Bathroom 1 2 3 4 4 4 3 3 3 2 2 1 1 kitchen supply return return supply PERFORATED METAL BOX BEAM CEILING GRID TIES RAINWATER COLLECTION SYSTEM DUCTWORK ALUMINUM CEILING PANELS CURTAIN WALL GLASS SYSTEM Site Section M E A T Y B I S C U I T S A R T G A L L E R Y MB MB RIDGE AVE FOOD CO-OP RIDGE AVE FOOD CO-OP

Upload: thomas-frank

Post on 07-Mar-2016

219 views

Category:

Documents


0 download

DESCRIPTION

Finalist Selection from Philadelphia University

TRANSCRIPT

Wrangler

kitchen

potable

black

water

rain

water

rain

water

black

water

bathroom

potable

recycled greywaterpurification tank

cistern

percolation piping

kitchenbathroombedroom living room flex space

entrance and display

solar panels

ARTSDISTRICT

GRAND OPENING

PHILLY2014

SHERMAN’S CLOTHING

OUTLET

ARTSDISTRICT

GRAND OPENING

PHILLY2014

THE 113TH JOHN STEWARDSON MEMORIAL FELLOWSHIP IN ARCHITECTURE - 2014

sidewalk - 10’first floor - retail - second / thrid floor - live / work apartments - 50’ sidewalk - 10’ ‘bass fishin’ jazz restaurant (historical connection), fish inspired menu - 80’bike lane - 4’ bike lane - 4’median - 4’street - 16’ street - 16’

potable water

Concept:Revitalizing the currently underdeveloped 1500 block of Ridge Avenue into an Arts District Corridor will facilitate economic development and create prosperity and jobs which will restore Francisville to its once grandiose state. The design concept transforms the block into an interactive cultural hub showcasing art and music which encourages visitors and residents to indulge in the multifaceted experience that is the Arts District of Ridge Avenue. By redesigning the streetscape into a pedestrian and bike friendly experience, tourists and locals are encouraged to walk Ridge Avenue establishing a sensorial experience. The infills between row homes introduce a new typology and style to the existing language of Ridge Avenue.

Parcel 1: Parcel 1 will consist of demolition, historical preservation (cosmetic improvements to the exterior facades and adaptive reuse to the interiors) and new construction. Every second row home is to be demolished and infilled with three story galleries which promote various types of artwork and showcase the beauty of the city from different vantage points. The program will include retail on the street level, apartments (one and two bedroom apartments and live work studios) and gallery space.

Parcel 2: Parcel 2 will consist of demolition and new construction. The only existing structure to be salvaged is the Arts Garage. The program will consist of two restaurants, a café, parking, retail and apartments.

Systems: In response to water management systems, a large centralized cistern spans the length of the 1500 block of Ridge Avenue which will collect all storm and rain water. The water then diverts to opposite sides of the road into purification tanks and into storage tanks for regulated building use. Grey-water systems will be integrated in all bathrooms to responsibly manage water usage. Solar panels harvest daylight for energy use.

kitchen

potable

black

water

rain

water

rain

water

black

water

bathroom

potable

recycled greywater purification tank potable water

New Program SF Total 1 Restaurant 1 7,700 2 Restaurant 2 4,200 3 Café 1,250 13,150 4 Retail 43,500 43,500 5 Residential 5a 2 Bed, 2 Bath 42,000 5b 1 Bed 1and1/2 Bath 21,000 5c Studio, 1 Bath 20,000 83,000 6 Controlled Public Spaces 10,000 Sidewalks Plazas Courtyard 10,000 7 Off Street Parking 5,000 5,000

8a Landscaping 8,000 8b Hardscaping 2,000 10,000 Existing Program 1 Arts Garage 6,000 6,000

160,750Studio Apartment (475 sf)One Bedroom Apartment (700 sf)Two Bedroom Apartment (900 sf)Site Plan

Facade Diagram

Gallery Infill - Street Level Perspective - Parcel 1

Axonometric Site Strategy

1 Living Room

2 Kitchen 3 Bedroom

4 Bathroom

1

2

3

4

44 33

3

22

11

kitchen

supply

return

return

supply

PERFORATED METAL

BOX BEAM

CEILING GRID TIES

RAINWATER COLLECTION SYSTEM

DUCTWORK

ALUMINUM CEILING PANELS

CURTAIN WALL GLASS SYSTEM

Site Section

MEATY

BISCUITS

ART

GALLERY

MBMB

RIDGE AVE FOOD CO-OPRIDGE AVE FOOD CO-OP

Wrangler

kitchen

potable

black

water

rain

water

rain

water

black

water

bathroom

potable

recycled greywaterpurification tank

cistern

percolation piping

kitchenbathroombedroom living room flex space

entrance and display

solar panels

ARTSDISTRICT

GRAND OPENING

PHILLY2014

SHERMAN’S CLOTHING

OUTLET

ARTSDISTRICT

GRAND OPENING

PHILLY2014

THE 113TH JOHN STEWARDSON MEMORIAL FELLOWSHIP IN ARCHITECTURE - 2014

sidewalk - 10’first floor - retail - second / thrid floor - live / work apartments - 50’ sidewalk - 10’bike lane - 4’ bike lane - 4’median - 4’street - 16’ street - 16’

potable water

Concept:Revitalizing the currently underdeveloped 1500 block of Ridge Avenue into an Arts District Corridor will facilitate economic development and create prosperity and jobs which will restore Francisville to its once grandiose state. The design concept transforms the block into an interactive cultural hub showcasing art and music which encourages visitors and residents to indulge in the multifaceted experience that is the Arts District of Ridge Avenue. By redesigning the streetscape into a pedestrian and bike friendly experience, tourists and locals are encouraged to walk Ridge Avenue establishing a sensorial experience. The infills between row homes introduce a new typology and style to the existing language of Ridge Avenue.

Parcel 1: Parcel 1 will consist of demolition, historical preservation (cosmetic improvements to the exterior facades and adaptive reuse to the interiors) and new construction. Every second row home is to be demolished and infilled with three story galleries which promote various types of artwork and showcase the beauty of the city from different vantage points. The program will include retail on the street level, apartments (one and two bedroom apartments and live work studios) and gallery space.

Parcel 2: Parcel 2 will consist of demolition and new construction. The only existing structure to be salvaged is the Arts Garage. The program will consist of two restaurants, a café, parking, retail and apartments.

Systems: In response to water management systems, a large centralized cistern spans the length of the 1500 block of Ridge Avenue which will collect all storm and rain water. The water then diverts to opposite sides of the road into purification tanks and into storage tanks for regulated building use. Grey-water systems will be integrated in all bathrooms to responsibly manage water usage. Solar panels harvest daylight for energy use.

recycled greywater purification tank

New Program SF Total 1 Restaurant 1 7,700 2 Restaurant 2 4,200 3 Café 1,250 13,150 4 Retail 43,500 43,500 5 Residential 5a 2 Bed, 2 Bath 42,000 5b 1 Bed 1and1/2 Bath 21,000 5c Studio, 1 Bath 20,000 83,000 6 Controlled Public Spaces 10,000 Sidewalks Plazas Courtyard 10,000 7 Off Street Parking 5,000 5,000

8a Landscaping 8,000 8b Hardscaping 2,000 10,000 Existing Program 1 Arts Garage 6,000 6,000

160,750Site Plan

Site Section

‘bass fishin’ jazz restaurant (historical connection), fish inspired menu - 80’

kitchen

potable

black

water

rain

water

rain

water

black

water

bathroom

potable

potable water

Studio Apartment (475 sf)One Bedroom Apartment (700 sf)Two Bedroom Apartment (900 sf)

Facade Diagram

Gallery Infill - Street Level Perspective - Parcel 1

Axonometric Site Strategy

1 Living Room

2 Kitchen 3 Bedroom

4 Bathroom

1

2

3

4

44 33

3

22

11

kitchen

supply

return

return

supply

PERFORATED METAL

BOX BEAM

CEILING GRID TIES

RAINWATER COLLECTION SYSTEM

DUCTWORK

ALUMINUM CEILING PANELS

CURTAIN WALL GLASS SYSTEM

MMEATY

BISCUITS

ART

GALLERY

MBMB

RIDGE AVE FOOD CO-OPRIDGE AVE FOOD CO-OP