storage, loading and marine adaptations for png lng recovery · storage, loading and marine...
TRANSCRIPT
Storage, Loading and Marine
Adaptations for PNG LNG Recovery
Benjamin Douglas
PNG Technical Advisor
ExxonMobil Papua New Guinea Ltd
Outline
• Background
• Fuel Gas & LNG Optimization
• LNG Weathering Model
• LNG Rollover Model
• Ship Vaporizer Utilization
• Conclusion
Conclusion
Imported LNG, planned
and executed in 4 weeks
Recycled LNG using the
ship’s vaporizer
Developed weathering
and rollover model
Optimized fuel gas and
LNG usage