Page 1: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

STORMWATER MANAGEMENT REPORT

Dundas Square Gardens Inc.

High Rise Residential/Commercial Development

Revised: April 6, 2016 Revised: January 12, 2016 Revised: July 10, 2015 OUR FILE: 14-RE-352 June 16, 2014

Page 2: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

2

TABLE OF CONTENTS         PAGE 

1.0 Scope of work 3 2.0 Existing and proposed land use 3 3.0 Rainfall Data 4 4.0 Calculation of flows 4 5.0 Allowable release rate 4 6.0 Post development runoff and control 5 7.0 Post development combined sanitary, storm and u/g pumped flow discharge 5 7.1 Proposed sanitary runoff Flow calculations 5 7.2 Post development underground flow discharge 6 7.3 Total post development combined sanitary and u/g pumped flow discharge into George Street combined trunk sewer 7 7.4 Post development storm flow discharge into George Street storm sewer 7 8.0 Pre development flow discharge 7 8.1 Existing sanitary runoff 7 8.2 Storm pre development runoff 8 9.0 Storm, sanitary and u/g pumped flows prior and after development 8 9.1 Summary of sanitary and u/g pumped flows draining into combined sewers prior and after development 8 9.2 Total post development storm flow discharge into George Street storm sewer 8 10.0 Calculation of the storage 9 11.0 Major Flow Overland Route 10 12.0 Design of tank 10 13.0 Outlet control for the underground tank 11 14.0 Water quality 12 15.0 Water Balance Management 12 15.1 Abstraction base on land-use

12 15.2 Storm Water re-use for the Cooling electrical/mechanical facilities 13 16.0 Summary 14 17.0 APPENDIX 1 15 18.0 APPENDIX 2 23 19.0 APPENDIX 3 36

Page 3: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

3

1.0 Scope of work

This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The property is in the northwest quadrant of the intersection of Jarvis and Dundas Streets. Legally, the property is described as Lot 1-11, Lot 15 and Part of Lot 16, Registered Plan 10A, Part 1, Plan 63R – 4853. The purpose of this report is to present a feasible stormwater management plan to meet the City of Toronto stormwater management criteria defined in the City of Toronto Wet Weather Flow Management Guidelines (WWFMG).

2.0 Existing and proposes land use The proposed site is 3223 m2. The property in its existing state has a hotel and ground level restaurant and other retail space with underground parking. The development is as such that the runoff from the site will be controlled on the site to the requirements of the City of Toronto. There is no external drainage through the proposed site. The runoff coefficients for the land uses within the site are taken as follows: Landscape/Green roof areas = 0.50 Paved = 0.90 Roofs = 0.90

Controlled by tank

Roof 2890.41 m2 C = 0.90

Green&Landscape 247.06 C= 0.50

Total controlled area 3137.47 m2 Cave = 0.87

Uncontrolled Area

Hard surface 85.17 m2 C = 0.90

Soft surface 0.00 m2 C = 0.50

Total uncontrolled area 85.17 m2 Cave= 0.90

Total site area 3222.64 m2

The coverage of landscape, paved and roof areas is shown on the Site Servicing and Grading Plan in the Appendix 1. For controlled and uncontrolled area for stormwater management see Figure 1 in Appendix 1. Based on the proposed development, the following post development areas and runoff coefficients are derived.

Page 4: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

4

3.0 Rainfall Data

The City of Toronto rainfall intensities are used in the calculations of runoff from the site. For the 2 year storm, the intensity is calculated with the following relationship:

i2 = 21.8T 0.78

where:i2 = intensity corresponding to the 2 year level, mm/hr T = duration of storm in hours

For the 100 year storm the relationship is

i100 = 59.7T-0.80 The rainfall data is for extracted from The Wet Weather Flow Management Guidelines, November 2006, page 32.

4.0 Calculation of flows

The Rational method is typically used in the calculation of flows for sites typical of the proposed development. The rational method is as follows:

Q = 0.00278 CiA

where: Q = flow in m3 /s; i = rainfall intensity, mm/hr; C = runoff coefficient; A = area in hectares.

5.0 Allowable release rate

The City of Toronto, Water and Wastewater Division requires that stormwater management mitigation be provided to attenuate the 100 year post development runoff to the 2 year pre-development to satisfy City’s stormwater management requirements. According to the Wet weather flow Management Guidelines Section 2.2.3.8 General Guidelines, paragraph (3) flows from the properties located adjacent to a public R.O.W’s, which are used to convey major flows, can be controlled from 5 year post development to 2 year storm event. The development is located in the vicinity of the intersection of Dundas and Jarvis Streets, not in the proximity of Lake Ontario. However, the 100 year post to 2 year criteria will be used in this Stormwater management plan. The pre-development flows for the site is determined to be 0.0395m3/s with a 10 minutes time of concentration as detailed in the Wet weather flow Management Guidelines (page 32), and a runoff coefficient of 0.50. The details of the calculations are shown as follows:

Page 5: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

5

Release rate

Qallowable 0.0395 m3/s

Quncontrolled 0.0053 m3/s

Qtotal release 0.0342 m3/s The details of the calculations are shown as follows:

Qallowable = 0.00278 x 0.50 x 0.3223 x 88.18 = 0.0395 m3/sec

An area of 85.17 m2 at the front of the property as shown in Figure 1 is not controlled. The 100 year storm flow from this area is Quncontrolled = 0.00278 x 0.90 x 0.008517 x 250.32 = 0.0053 m3/sec

Summarizing the above to determine the release rate from the site into George Street storm sewer: Qrelease = Qallowable – Quncontrolled = 0.0395 – 0.0053 = 0.0342 m3/s

6.0 Post development storm runoff and control

Runoff from the area of the site is controlled in the tank. The City WWFMG requires that the 100 year storm be controlled to the 2 year with a 50% runoff coefficient. An underground storage tank will be used to store the difference in runoff, and release at the allowable controlled rate to the municipal storm sewer system. All of the site, except the uncontrolled part will drain to the tank. The tank will be discharged with an orifice tube to discharge the tank at a maximum rate of 34.2 litres per second at maximum water level. Flows in excess of the 100 year event will over flow from the tank via an overflow pipe.

7.0 Post development combined sanitary, storm and u/g pumped flow discharge 7.1 Proposed sanitary runoff flow calculations

Podium Building

1 bedroom condominium 1.4 persons / unit 2 bedroom condominium 2.1 persons / unit 3 bedroom condominium 3.1 persons / unit Retail commercial: 1.1 persons / 100 m2 Office Commercial: 3.1 persons / 100 m2 Based on current statistic total population for the podium: (133+62) x 1.4 + 106x2.1 + 16x3.1 = 545 p

Page 6: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

6

Average Residential flow: 450 litres/capita/day = 0.0052 litres/capita/sec Total Retail commercial population: 1113 m2 x 1.1/100 = 12 persons Total Office commercial population: 1300 m2 x 3.3/100 = 43 persons

Total Residential Average flow: 545 x 0.0052 = 2.83 l/sec

Residential Peaking factor: (population in 1000). Peaking Factor = 3.9547

Sanitary peak residential flow from the site: 2.83 x 3.9547 = 11.19 l/sec Total Commercial Peak/average flow: 55 x 0.00289352 = 0.16 l/sec Infiltration Flow: 0.1612 Ha x 0.26 l/sec/Ha = 0.04 l/sec Total Sanitary Flow from the podium: Qsan = 11.39 l/sec This sanitary flow is discharged into George Street 600x900mm combined trunk sewer. Tower Building

1 bedroom condominium 1.4 persons / unit 2 bedroom condominium 2.1 persons / unit 3 bedroom condominium 3.1 persons / unit Based on current statistic total population for the tower: (124+350) x 1.4 + 127x2.1 + 86x3.1 = 1197 p

Average Residential flow: 450 litres/capita/day = 0.0052 litres/capita/sec Total Residential Average flow: 1197 x 0.0052 = 6.22 l/sec

Residential Peaking factor: (population in 1000). Peaking Factor = 3.7483

Sanitary peak residential flow from the site: 6.22 x 3.7483 = 23.31 l/sec Infiltration Flow: 0.1612 Ha x 0.26 l/sec/Ha = 0.04 l/sec Total Sanitary Flow from the tower: Qsan = 23.35 l/sec This sanitary flow is discharged into 900x1350mm Jarvis Street combined trunk sewer. This is to confirm that proposed building sanitary system will have a back-water valve to protect the system in the event of municipal sewer’s surcharge conditions. See Smith & Andersen Consultants letter in the Appendix 1.

7.2 Post development underground flow discharge Application for permanent discharge of groundwater permit was submitted to Mr. Dhiren Barot of Toronto Water together with Geohydrology Study, Water Quality Investigation and all data required by Dhiren. McClymont & Rak geotechnical consultants conducted Water Quality Investigation to determine suitability of groundwater for discharge into the municipal storm sewer.

Page 7: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

7

As per results of the quality test groundwater can be drained only into combined sewer without pre-treatment facility required in the development. See McClymont & Rak Water Quality Investigation Report in the Appendix 3. As per Toronto Water request McClymont & Rak geotechnical consultants provided Permanent Drainage report with computer modelling/simulation of the groundwater influx for permanent drainage system. (See Permanent Drainage report of October 29, 2015 in the Appendix 3). The discharge rate for the project is 25.00 USG/min or:

Qu/g =1.58 l/sec.

Groundwater level varies from 0.6 to 4.09m below surface grade. Proposed building has four levels of underground parking and the slab of the P-4 level is 13.65m below the ground floor. As a result required weeping tile system is below groundwater level. See groundwater level in McClymont&Rak Boreholes Records in Appendix 2. Pumped ground water will be drained into U/G Water Control Manhole and from there into Sanitary Control Manhole as shown on Site Servicing and Grading Plan.

7.3 Total post development sanitary and u/g pumped flow discharge into George Street

combined trunk sewer Total post development flow discharged into combined trunk sewer is:

Qpostdev = Qsan + Qu/g = 11.39 + 1.58 = 12.97 l/sec 7.4 Post development storm flow discharge into George Street storm sewer Total post development flow discharged into George Street storm sewer:

Qrelease = Qallowable – Quncontrolled = 0.0395 – 0.0053 = 0.0342 m3/s = 34.20 l/sec 8.0 Pre development flow discharge 8.1 Existing sanitary runoff

As per IBI Group Municipal Servicing Report the existing site is currently serviced by 2-300mm diameter service connections, one to the Jarvis Street 900x1350mm combined trunk sewer and the other to the George Street 600x900mm combined trunk sewer. Based on IBI preliminary field investigation both these connections are conveying sanitary sewage and storm water in the same pipe. (See page 6 of the IBI report in the Appendix 1). As per IBI Group Municipal Servicing Report total sanitary flow from existing development is 6.40 l/sec. Qsan.predev = 6.40 l/sec See page 7, Table 1 and Sanitary Sewer Design Sheet, Existing condition of the IBI report in the Appendix 1.

Page 8: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

8

8.2 Storm pre development runoff

As per IBI Group Municipal Servicing Report the existing site is currently serviced by 2-300mm diameter service connections, one to the Jarvis Street 900x1350mm combined trunk sewer and the other to the George Street 600x900mm combined trunk sewer. Based on preliminary field investigation, it appears both these connections are conveying sanitary sewage and uncontrolled 2 year pre-development storm flow together in the same pipe. Uncontrolled 2 year pre-development storm flow is:

Q2predev = 0.00278 x 0.90 x 0.3223 x 88.18 = 0.0711 m3/sec = 71.10 l/sec Municipal storm sewers exist across the road frontages of the site on:

- 1350mm x 1450mm storm culvert on Dundas Street; - 525Ø storm sewer on George Street draining into Dundas Street storm sewer.

Total pre development flow was discharged into the city’s Jarvis and George Streets combined trunk sewers.

9.0 Storm, Sanitary and u/g pumped Flows prior and after development 9.1 Summary of Sanitary and u/g pumped Flows draining into combined sewers prior

and after development Total Existing Sanitary Flow prior to development (Section 8.1 page 7) 6.40 l/sec Total Uncontrolled Storm Flow prior to development (Section 8.2 page 8) 71.10 l/sec Total Sanitary and Storm Flow prior to development 77.50 l/sec Total Proposed Sanitary Flow after development (Section 7.1 pages 5.6) 11.39+23.35= 34.74 l/sec Total Post development underground flow discharge (Section 7.2 page 6) 1.58 l/sec Total Sanitary and Storm Flow prior to development 36.32 l/sec

Net Decrease in Peak Flow to the City’s combined sewers 41.18 l/sec As it can be seen total post development sanitary and u/g pumped flow into city’s combined sewer system is 47% less than pre development flow discharge. 9.2 Total post development storm flow discharge into George Street storm sewer Total post development flow discharged into George Street storm sewer: (Section 7.4 page 7) 34.20 l/sec

Page 9: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

9

10.0 Calculations of the storage

The storage is calculated using the Modified Rational Method. The figure shows the storage calculations, graphically. The details of the calculations for the Modified Rational Method are given in Table 1 in the Appendix 1.

Duration of storm = 15 23 minutes

Inflow volumes Q100

= 0.1537 m3/s Volume = ((5+23)*0.5*60*0.154)

= 119.90 m3 Release volumes

Qsite release = 0.0342 m3/s (adjusted for site) Volume = (23+10.78)*0.5*0.0342* 60

= 34.62 m3/s Storage = Volume In - Volume out

= 85.29 m3/s

Page 10: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

10

11.0 Major Flow Overland Route Flows in excess of the 100 year storm will be directed to the City streets.

12.0 Design of tank

As per The Wet Weather Flow Management Guidelines (WWFMG, City of Toronto, 2006), 5mm of the runoff from the site shall be used for irrigation of the green areas of the site. Hence the tank will have two storage volumes:

For stormwater management For irrigation and cooling use

The tank will have a bottom area of 32.24m2. The depth is fixed at 3.90m. (For tank detail see Site Servicing and Grading Plan in Appendix 1). The depths are used as follows: Below is the design summary of the tank:

Volume Bottom area Storage

Use Required of tank Depth provided

(m3) (m2) (m) (m3)

SWM 85.29 32.24 3.40 109.62 Irrigation 16.11 32.24 0.50 16.12 Total 101.40 32.24 3.90 125.74

Note that the storage provided exceeds the storage required for stormwater management and meets the requirements for irrigation and cooling use of storm water.

Stormwater Management Tank is shown on Architectural plan prepared by Page & Steeleles Architects, architectural drawing title – P1 PARKING LEVEL, Job No. 30215, Dwg. No. A106.

Page 11: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

11

Figure 3: Details of the storage tank are shown below.

13.0 Outlet control for the underground tank

The underground tank is located on theP1 level of underground parking. (See Site Servicing and Grading Plan in Appendix). Storm water from the tank will be discharged with a peak allowable rate of 0.0342 m3/sec via 80mmØ orifice plate. See Orifice plate detail on Site Servicing and Grading Plan.

The orifice equation was used to size the orifice to control the flow to the municipal system.

ghCAQ 2

Where Q = discharge (0.03416m3/s) g= gravity (9.81 m2/s) A= area of orifice (m2) C= orifice coefficient (0.82) h= head (3.36m)

The calculations are presented below:

Page 12: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

12

14.0 Water quality

The City requires that water quality be implemented on site to treat runoff from the site to type 1 (80% removals).

The subject site has no exterior surface vehicle parking areas or private driveways, where water quality contaminants are typically generated from the vehicles. The entire site is occupied by building structure and the roof areas flow considered clean and do not carry water quality contaminants. Hence, no water quality is required for the site and storm water quality treatment devices are not required.

15.0 Water Balance Management

The primary objective of The Wet Weather Flow Management Guidelines (WWFMG, City of Toronto, 2006) is to encourage a water balance in managing (collecting and reuse) of annual rainfall on the development site through the control of runoff, infiltration and evapo-transpiration. WWFMG requires that the efficiencies of the provisions in place (infiltration, reuse, etc.) “shall be measured in terms of runoff volume reduction (m3) on an annual basis” (WWFMG, page 4).

15.1 Abstraction base on land-use

The City of Toronto requires the following for water balance requirement.

Q = 0.03416 m3/s

C = 0.82

h = 3.36 m

Q= C A (2gh)0.5 A= 0.00513 m2

d= 80 mm

Page 13: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

13

The volume required to be retained on site Vrequired= 0.005 x 8523 = 16.12m3 For landscape & green roof area, as per the city criteria, 5mm abstraction (330.11) V = 0.005 x 247.06 = 1.24m3

For paved and hard roof areas, as per the city criteria, 1mm abstraction (2890.41.36+85.17) V = 0.001 x 2975.58 = 2.98m3

Total landscape abstraction VA = = 4.22m3

15.2 Storm Water re-use for the Cooling electrical/mechanical facilities

Proposed building will be designed with the pumping system to reuse storm water for cooling electrical/mechanical facilities in the building. As per Smith & Andersen the pump on the system will be using 4.50 US GPM/min which will provide mechanical cooling of the electrical room using 0.8 US GPM/min. It is equal to: 0.8 US GPM/min = 3.03 litres/min = 182 litres/hr = 0.182 m3/hr. For 72 hours pump will use 0.182 x 72 = 13.10 m3. Total volume abstraction and storm water reuse for cooling requirement is: VTOTAL = 4.22 + 13.10 = 17.32 m3 See letter of Smith & Andersen mechanical consultant in Appendix 1. City’s requirement to use 16.12 m3 of the storage in 72 hrs is met.

Page 14: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

14

16.0 Summary

In support of the development application and to address the City of Toronto concerns, this stormwater management plan has been prepared.

The flows are controlled with an underground storage tank providing 109.62m3 of storage for stormwater management. The tank also will provide storage of 16.12 m3 for irrigation and for cooling electrical/mechanical facilities in the building purposes, as required by the City of Toronto Wet Weather Flow Management policy. The flow release rate is 34.2 l/sec with 80mm orifice plate. The water balance criteria is met, as required by the City of Toronto Wet Weather Flow Management policy. Proposed site presently does not accepts any external drainage. Existing drainage patterns on adjacent properties shall not be altered and stormwater runoff from the subject development shall not be directed to drain onto adjacent properties. Riaboy Engineering Ltd. Yuri Riaboy, P. Eng.

Page 15: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

15

17. A P P E N D I X 1

1. Table 1, Calculations for the storage for 100 year storm 2. FIGURE 1. Controlled and Uncontrolled Areas

3. Smith + Andersen conformation letter to provide back-water valve to protect building

sanitary system in sewer surcharge conditions 4. Smith + Andersen conformation letter to provide mechanical design to use storm tank

water for cooling requirements 5. Jablonsky, Ast and Partners structural consultant letter dated October 22, 2015 6. IBI Group Municipal Servicing Report, page 7, Table 1 7. IBI Group Municipal Servicing Report Sanitary Sewer Design Sheet, Existing condition 8. Site Servicing and Grading Plan

Page 16: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

16

Calculations of 100 year storage for site

Rainfall data Release rate

100 year storm Qallowable 0.0395 m3/s

A= 59.7 Quncontrolled 0.0053 m3/s

T= 10 minutes Qtotal release 0.0342 m3/s B= -0.8

Area (ha) = 0.3137

C= 0.8685

Qrelease= 0.0342 m3/s Release Inflow Outflow

Time Intensity rate Qrain Volume Volume Storage (min) (mm/hr) (m3/s) (m3/s) (m3) (m3) (m3)

10.00 250.32 0.0342 0.1896 113.77 28.90 84.88 11.00 231.94 0.0342 0.1757 115.96 30.80 85.16 12.00 216.35 0.0342 0.1639 118.00 32.71 85.29 13.00 202.93 0.0342 0.1537 119.90 34.62 85.29 14.00 191.25 0.0342 0.1449 121.69 36.53 85.17 15.00 180.98 0.0342 0.1371 123.38 38.44 84.94 16.00 171.87 0.0342 0.1302 124.99 40.35 84.63 17.00 163.73 0.0342 0.1240 126.51 42.27 84.24 18.00 156.41 0.0342 0.1185 127.97 44.19 83.78 19.00 149.79 0.0342 0.1135 129.36 46.11 83.25 20.00 143.77 0.0342 0.1089 130.69 48.03 82.66 21.00 138.27 0.0342 0.1047 131.97 49.95 82.02 22.00 133.22 0.0342 0.1009 133.21 51.87 81.34

Storage to control 100 yr post to 2 yr pre-development = 85.29 m3

Page 17: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

17

Page 18: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

18

Page 19: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

19

Page 20: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

20

Page 21: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

21

Page 22: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

22

Page 23: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

23

18. A P P E N D I X 2 McClymont&Rak Geotechnical Report Boreholes Records

Page 24: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

24

Page 25: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

25

Page 26: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

26

Page 27: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

27

Page 28: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

28

Page 29: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

29

Page 30: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

30

Page 31: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

31

Page 32: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

32

Page 33: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

33

Page 34: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

34

Page 35: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

35

Page 36: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

36

Page 37: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

37

19. A P P E N D I X 3 1. McClymont&Rak Water Quality Investigation Report 2. McClymont & Rak Water Permanent Drainage Report

Page 38: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

38

Page 39: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

39

Page 40: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

40

Page 41: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

41

Page 42: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

42

Page 43: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

43

Page 44: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

44

Page 45: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

45

Page 46: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

46

Page 47: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

47

Page 48: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

48

Page 49: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

49

Page 50: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

50

Page 51: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

51

Page 52: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

52

Page 53: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

53

Page 54: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

54

Page 55: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

55

Page 56: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

56

Page 57: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

57

Page 58: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

58

Page 59: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

59

Page 60: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

60

Page 61: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

61

Page 62: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

62

Page 63: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

63

Page 64: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

64

Page 65: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

65

Page 66: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

66

Page 67: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

67

Page 68: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

68

Page 69: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

69

Page 70: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

70

Page 71: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

71

Page 72: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

72

Page 73: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

73

Page 74: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

74

Page 75: STORMWATER MANAGEMENT REPORT Dundas Square Gardens … · This report outlines the stormwater management plan for Dundas Square Gardens at 241 Jarvis Street, Toronto, Ontario. The

Riaboy Engineering Ltd SWM for Dundas Square Gardens Inc. Ontario, Canada High Rise Residential/Commercial Development

75