stormwater utility project #27w08, district 3 · sw on the north side of state route 12 in...
TRANSCRIPT
Location/project limits
Between Albany Street SW and Dallas Street SW on the north side of State Route 12 in Rochester.
Justification
This project will reduce roadway flooding along Albany Street SW and neighboring streets to the southwest.
Implications for not doing the project
Street flooding would continue along Albany Street SW and neighboring streets.
Strategic Plan
Initiative 8: Support robust and well maintained infrastructure systems for a thriving community.
Initiative 9: Support environmental health and climate stabilization.
Project benefits
• Reduce roadway flooding
• Filter pollutants from stormwater runoff
• Soak water into the ground
• Provide groundwater for the aquifer
• Provide water for the Black River
• Provide new walking trail
• Provide new cross-walk
Estimated project cost
$ 1,500,000
Funding sources
• Washington State Department of Ecology—$1,190,000
• Stormwater Utility Fees—$310,000
Project description
Construct a stormwater pond along Albany Street SW and replace stormwater drainage pipes and catch basins in adjacent residential neighborhood to reduce roadway flooding.
Project addresses:
• Roadway flooding • Water quality • Low stream flows in the Black River • Need for public space
Project photo
Map of project location
Albany Street Stormwater Pond
Stormwater Utility
Project #27W08, District 3
Priority
#1
Stormwater
Pond
Drainage
Improvements
Boundary
Underground
drainage pipes
US-12