    HALO ROOF Gold Coast

    ATRAA 2011

    Case Study

    Michael KnowlesAdam Kamine

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    2/61

    Introduction- Who is Stowe Australia??

    Australias largest privately owned Electrical & CommunicationsContractor

    100+ year old Company

    Family Owned

    1600 Employees Australia wide

    Covering the Industrial, Construction and Client based electrical sectors

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    3/61

    Project Overview

    Project Title Metricon Stadium Solar Halo BIPV System

    Location

    Commencement

    Completion

    Gold Coast

    July 2010

    April 2011

    ProgramTotal Hours

    Average Man

    9 Months22,000 Man Hours

    15

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    4/61

    nnova ve es gn us ra an rs

    Australian First

    Largest BIPV Project Lar est BIPV Out ut

    Custom hand made BIPV modules System design parameters BIPV stadium roof

    BIPV back connection box

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    5/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    6/61

    Modules had to be re-engineered

    Optimised solar electrical design

    6 lighting towers surrounding the stadium

    A s ecialised structure was re uired to fabricate the ba s Solar Cit

    ARUP engineers provided independent witness testing

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    7/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    8/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    9/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    10/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    11/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    12/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    13/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    14/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    15/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    16/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    17/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    18/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    19/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    20/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    21/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    22/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    23/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    24/61

    Australias Most Sophisticated Design

    Multi-functional PV system, architecturally designed to provide pleasing aesthetic, and shelter from sun and rain for patrons

    580 panels with 290 unique azimuths

    Each bay was unique in dimension

    39 Curved Bays circumnavigating 75% of the football stadium oval.

    Unavoidable Shading

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    25/61

    Design Objective:

    Guaranteed Performance, with270 different panel azimuthsand 6 giant manmade treesDesign Constraint:

    Fixed budget & architecture.Value Engineering:

    Intelligent Wiring &Modelling oIncrease cell density by 14%

    == $$$

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    26/61

    Design Approach:

    Split Bays into half?Split Bays into thirds &wire bays into pairs.Design Complexity:

    Bays of 6, 14, 18 panels2MPPT (unbalanced)

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    27/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    28/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    29/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    30/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    31/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    32/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    33/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    34/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    35/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    36/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    37/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    38/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    39/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    40/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    41/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    42/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    43/61

    Air freight 36 BIPV modules

    Accelerate the installation process from lessons learned

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    44/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    45/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    46/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    47/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    48/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    49/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    50/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    51/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    52/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    53/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    54/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    55/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    56/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    57/61

    Monitoring System-

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    58/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    59/61

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    60/61

    The future for Carrara Stadium

  • 7/29/2019 Stowe ATRAA Carrara Project Presentation

    61/61

    Managing Contractor

    Watpac

    Project Manager

    Adam Kamine

    Business Development

    Manager

    Michael KnowlesCEC Accredited

    Gold Coast Manager

    Les McMahonBeenleigh Steel

    Steel Fabrication

    Tony Ansell

    G James

    Glazing Specialist

    Peter J ones

    Stowe Installation Team

    Solar

    Gary Risk

    NDY Consultant

    Peter BuckbyOff Site Production Preparation

    PV Wiring

    Installation

    CEC Accredited

    Glazing

    ARUP Consultant

    Freeman McGrath

    PV Design VerificationOn Site Production

    Shaun BrookesDarren Eather

    Dean Richardson

    Warwick J ohnstonField Staff

    Foreman

    Leading Hand

    Field Staff

    Foreman

    Leading Hand

    Field Staff

    Foreman

    Leading Hand

    Field Staff

    Foreman

    Leading Hand

    Tradesman

    Apprentices ApprenticesApprentices Apprentices