SUMMARY
How do we run the business within given Operating boundaries?
How do we respond to challenge?
Strategic and Integrated planning linking the City’s Vision and Strategic
Focus Areas to our own
Measurement against a Balanced Scorecard
Risk-based approach to resource allocation
Strong attention to customer, stakeholder and staff
Staying financially viable, balancing 1st world city development with
social indigent responsibility
Ensuring adequate water resources for future
Environment impact: Reduce demand, prevent pollution, reduce
energy consumption
Efficiencies: Professional staff and Technology
VISION & MISSION
CITY 5 PILLAR FOUNDATION
Caring, Opportunity, Inclusive, Safe, Well-run City
DEPT VISION
To be a “beacon in Africa” for the provision of Water and Sanitation
services
DEPT MISSION
We pledge to achieve our vision by creating a centre of excellence in
Water and Sanitation Department through:
• Optimizing resources
• Implementing environmentally-sustainable interventions
• Continuous improvement and Knowledge management
• Good governance
• Customer satisfaction and excellent Stakeholder relationships
VALUES
Underpinning Mission Statement
• INTEGRITY: highest level of ethics and fairness in all interactions
• RESPECT for all opinions and beliefs - employees as well as customers/
stakeholders
• CUSTOMER FOCUS:
• Meet customers’ needs with excellent service
• They are reason for existence
• Environment as silent equal customer
• Business model and relationship based on TRUST.
• TRANSPARENCY: Operate safely, openly, honestly. Transparency defined
by customers and stakeholders.
• PROFESSIONAL: Use the right competencies to find appropriate solutions
enriched with compassion, innovation, sustainability, cost-effectiveness,
accountability and excellence.
Business Operating Boundaries
Legis
lation/S
tandard
s L
imite
d R
eso
urc
es
Water & Sanitation
Business
Customer Satisfaction
HOW TO WE RESPOND?
Balance Scorecard, Measured performance :
Adopted American Society of Waterworks Model;
Risk-based Approach to resource allocation;
Alignment with IDP priorities
IDP SFA VS. W & S BUDGET DRIVERS IDP SFA BUSINESS FOCUS AREA RISK REGISTER
An Opportunity
City
Employee and Leadership
Development
Human Capacity Constraints
Infrastructure Stability Ageing Infrastructure
Water Resource Adequacy Security of water supply
Product Quality
Safe City Community Sustainability Pollution Risk
A Caring City Consumer Satisfaction Quality of service risk;
Meeting sanitation demands
Operational Optimisation Internal control risk
An Inclusive City Stakeholder Management and
Support
Well-Run City Financial Viability Business Financial Risk
Operational Resilience
IDP, BUSINESS FOCUS AREAS & RISK
MANAGEMENT
PE
RF
OR
MA
NC
E IN
DIC
AT
OR
S
PR
OG
RA
MS
/PR
OJ
EC
TS
STRATEGIC PLANNING IN DEPT
Top-down: participation in IDP and City-wide initiatives eg. Provincial
Working group, Urbanisation Framework, SDF, Growth Management
Strategy, DC Levy policy development
Formalised in Policies, strategies, GIS plans and the SDBIP
+
Bottoms up: Annual Strategy sessions organised by Director:
participation from “trench-face” staff invited via briefing sessions and
suggestion box, resulting in
Proposed updates of Vision/Mission/Objectives
A Strategic Grid grouped by the Department’s Strategic
Objectives (4), broken down to individual Action Plans (239)
STRATEGIC GRID FRAMEWORK
High-level objectives only become effective if
Cascaded down to Real Interventions & programmes,
Funded action plans and projects
with Individual responsibility
STRATEGIC GRID
INTENT/OBJECTIVES
STRATEGIC
INTENT
OBJECTIVE
CUSTOMER
SATISFACTION
AND GOOD
STAKEHOLDER
RELATIONSHIPS
• Ensure uninterrupted provision of quality services
• Improve quality of service;
• Introduce backyarders program
• Create jobs through EPWP;
• Support City Economic development by adequate
provision of services.
ENVIRONMENTAL
SUSTAINABILITY
• Reduce pollution from non-compliant effluent;
• Reduce surcharges from sewers;
• Reduce reliance on Eskom power.
STRATEGIC GRID
INTENT/OBJECTIVES..
STRATEGIC
INTENT
OBJECTIVE
OPTIMISING
RESOURCE
UTILISATION
• Reach 95% staff complement;
• Improve productivity;
• Improve staff morale;
• Use available staff capacity effectively;
• Improve working environment;
• Establish most effective and efficient delivery mechanism;
• Use Budget Effectively;
• Efficient utilisation of water.
GOOD
GOVERNANCE
• Safeguard the Health and Safety of employees;
• Ensure sound professionalism;
• Improve communication within and outside the organisation;
• Ensure City assets are well maintained;
• Comply with SCM legislation.
STRATEGIC GRID
INTENT/OBJECTIVES..
STRATEGIC
INTENT
BROAD OBJECTIVES
CONTINUOUS
IMPROVEMENT &
KNOWLEDGE
MANAGEMENT
• Improve and retain institutional knowledge;
• Encourage innovation and creativity;
• Improve operational efficiencies and effectiveness.
FINANCIAL
SUSTAINABILITY
• Ensure adequate liquidity, revenue protection and budget
breakeven.
INFRASTRUCTURE
STABILITY
• Ensure timely maintenance, replacement, upgrading and
infrastructure expansion
WATER RESOURCE
ADEQUACY
• Ensure availability of water resources(with a diverse mix)
for the City
EMPLOYEE AND
LEADERSHIP
DEVELOPMENT
• Develop and retain skilled and competent staff;
STRATEGIES FOR SERVICES
TO ALL
Adequate water resources to meet demand
Spreading the water resource risk, reducing over-dependency on one
source (currently 98% surface water, rainfall dependant)
Infrastructure availability and stability
Efficient and effective operation of existing infrastructure – skills
training plus automation of certain processes
Quality monitoring of potable water and effluent
Extension of services to Informal Settlements
Backyarder programme
Financial sustainability - efficient metering, reducing water losses,
prioritizing capital investment, Water Management Devices
Free Basic Services and Indigent Policy – Free 6+4.7 kl/mth all
households, additional 10.5 kl/mth Indigent households
CHALLENGES TO SERVICES
FOR ALL
MAIN CHALLENGE IN INFORMAL SETTLEMENTS
Very high density - no space
On private land – not allowed permanent infrastructure
On unusable land eg. servitudes, flood plains
High growth and distribution unpredictable
Information - highly dynamic and unreliable
Vandalism and theft
FORMAL SECTOR CHALLENGES
Funding for resource and infrastructure
Vandalism of meters
CUSTOMER SATISFACTION:
BASIC WATER & SANITATION
CAUSE INTERVENTION
Informal Settlements
backlogs
Provide services depending on availability of
space and servitudes;
Pilot technologies choice;
Janitorial Service;
Staff Capacity enhancement;
Backyard Dwellings Pilots on council rented stock (Langa, Factreton
and Hanover Park);
Service extension to Council owned properties
Formulate W&S policy for the backyarders on
private land;
PLANS FOR SERVICES TO ALL
INFORMAL SECTOR
Five year Informal Settlement Services Plan addressing backlogs – sanitation
biggest challenge
Coordinating with Housing Programmes
Innovative methods and technologies
Awareness campaigns, partnerships with Communities
Balance funding for new services vs maintenance
FORMAL SECTOR
Integrated Master planning of infrastructure 10 year requirements (with other
Departments in line with City strategies)
WC/WDM
Smart metering
Sustainable funding
BACKYARD SETTLEMENT
PROGRAMME
Extend basic services to all backyard dwellers
Housing backlog cannot be met soon with new housing
Means of boosting densification
Not subject to sharing of landlord free allocation as before
Increases local load on existing infrastructure but slows down
provision of new greenfield infrastructure
Integrated programme driven by Human Settlement Directorate
Scope: Municipal Rental stock – 41 000 backyard structures
BACKYARD SETTLEMENT
PROGRAMME…
Basic Services Improvement and Access : Water, Pre cast concrete
toilet structure with tap, Pre – paid electricity to each dwelling
In–fill Housing Planning and Development (Sites identified in
Hanover Park)
Door–to–door Survey in 3 Pilot areas
Land Use Management : Split Zoning
Management : Matrix Management/ Inter- Departmental
Rehabilitation – Bulk and ageing infrastructure
Job Creation : Part of EPWP
Funding : USDG and EFF
ENSURING ADEQUATE WATER
RESOURCES
Demand may outstrip supply by 2019 (depending on WC/WDM
success) - another source must be in place
Working closely with the Department of Water Affairs in prioritizing
the next source
Options include Voëlvlei off-river dam raising, waste water reclamation;
desalination, Lourens river dam, Table Mountain Group Aquifer (ground
water), Stenbras dam raising
Feasibility study for desalination underway and that for wastewater
reclamation will commence soon
Not neglecting smaller sources of spring-water usage, rainwater
harvesting
INCREASE BULK WATER
SECURITY OF SUPPLY
CAUSE INTERVENTION
Water
Sources
TMG aquifer pilots
Desalination studies;
Water Reclaimation (treated effluent re-use);
Bulk Infrastructure Upgrade &BWAS
Water demand management initiatives;
Studies – Spring water / Rain water Harvesting / Voëlvlei
(DWA)
DWA initiatives / incentive based regulation approach
(Blue and Green Drop – High quality level of operations,
maintenance and staffing requirements).
ASSET LIFECYCLE PLANNING
Timely asset creation
Replacement and upgrading
Asset maintenance
Asset management
Primary level Asset Management plans in place
Pipeline and pump station condition assessment a priority over next 2-3
years, to be used to refine replacement plans
CUSTOMER SATISFACTION THROUGH
INFRASTRUCTURE STABILISATION
CAUSE INTERVENTION
Urbanisation /
Densification / New
Developments
New Infrastructure investment / capacity
expansion according to the Master Plan;
Upgrading WWTP capacities;
Servitude Management;
Ageing Infrastructure Develop & implement Infrastructure Asset
Management Policies and Plans;
Upgrading / Replacement of Assets;
Training of staff valve controls;
Material selection;
WATER LOSS REDUCTION
STRATEGY
Adapted SABS 0306:1999 and IWA standard:
NRW Volume and %, categorised losses rather than UAW%
Detail action plans being developed and implemented for
reduction of
Technical losses (Pipe bursts, Leakage, Treatment losses,
System losses)
Apparent losses (illegal connections, metering inefficiencies,
unmetered authorised consumption, unauthorised consumption,
Billing/accounting, meter reading)
Water balance reporting currently at City level, broken
down into Treatment and Reticulation processes only
23
WATER SUPPLY ZONES, DMA’S
System has 187 water supply zones
Prioritized programme by highest suspected loss:
Redefining and isolating zones, links and isolating valves,
operating rules
Enabling zonal measurement: new zone meters and data loggers
Division into further DMA’s
In parallel with Pressure Reduction Zone installation where
feasible
IWA reporting will be taken down to Districts, Zones and
DMA’s over next 2-3 years
24
IWA Table (2011/12)
25
Unbilled Metered Consumption
13.29
million m3/annum
Unbilled Unmetered Consumption
2.13
million m3/annum
Unauthorised Consumption
3.30
million m3/annum
Customer Meter Inaccuracies
17.71
million m3/annum
Leakage on Transmission and
Distribution Mains
30.80
million m3/annum
Leakage on Overflows at Storage
Tanks
0.32
million m3/annum
Leakage on Service Connections
up to point of customer meter
Neglible
Apparent Losses
21.01
million m3/annum
Real Losses
31.12
million m3/annum
System Volume
Input
330.05
million
m3/annum
Authorised
Consumption
277.92
million
m3/annum
Billed Authorised
Consumption
262.50
million m3/annum
Billed metered consumption
262.50
million m3/annum Revenue Water
262.50
million m3/annum
Billed unmetered consumption
0 million m3/annum
Unbilled
Authorised
Consumption
15.42
million m3/annum
Non Revenue Water
67.55million m3/annum
(20.5% of Input Volume)
Water Losses
52.13
million
m3/annum
(15.8% of Input
Volume)
NON – REVENUE REDUCTION Description 2010/11
(Baseline)
2011/12 Target(2015/
16)
Intervention
GOAL
A
Water Losses 19.8% 15.3% <15%
Apparent Losses (Unbilled Unauthorised Consumption)
7% 6.3% 4% - Meter replacement program
- Meter Audits and data clean-up
Unauthorised Consumption 1.0% 1% 1% Conforms to International benchmarks.
Water Audits would be useful in reduce
and maintaining
Customer Meter Inaccuracies 6.0% 5.3% 3%-4% - Water Audits
- Meter age analysis/Audits
Meter replacement Program
Real Losses 12.8% 9.3% 8%-9%
Leakage on Transmission and Distribution Mains
12.71% 9.18% 8%-9% -Pressure Management
-Leak Detection
-Pipe Replacement
Leakage on Overflows at Storage Tanks
0.05% 0.10% - Monitor and respond to concerns – pro-
active maintenance and on demand
maintenance/repairs.
Leakage on Service Connections
Negligible Negligible - -
GOAL
D
NRW 23.4% 20.5% <20%
Unbilled Authorised Consumption
3.61% 5.15% 2%-3% Metering and monitoring and pro-active
maintenance
SAP clean up
Apparent Losses (Unbilled Unauthorised Consumption)
7% 6% 3- 4% As stated in Goal A
Real Losses 12.8% 9.3% 8-9% As stated in Goal A
WC/WDM STRATEGY - ALL
INITIATIVES, 10 YR REQUIREMENT
BUDGET 10 YR INITIATIVE
CAPITAL R1 890 M • Pressure management
• Pipe replacement
• Treated effluent reuse
• Zone metering, logging
• Water meter replacement
OPERATING R668 M • Retrofit plumbing and leak repair
• Community engagement, Awareness campaigns
• Water management device/ Smart metering
• Leak Detection
• Feasibility studies/ research
• Infrastructure condition assessment
• Pipe, Valve, PRV maintenance
• Meter Audits
27
SAVINGS
Since 2007
million
m3/annum
28
Additional potential
49.47
Cumulative 82.02
(by 2020/21)
32.55
(by
2012/13)
Impact of WC/WDM Initiatives
29
HWR at 3.38%
(2016)
LWR at 2%
(2019)
Reduced from 3.38% to 2.88%
Additional Resource Required by
2017
Reduced from 2% to 1.40%
Additional Resources Required
by 2022
Impact of WC/WDM Initiatives
30
HWR at 3.38%
(2016)
LWR at 2%
(2019)
Reduced from 3.38% to 2.40%
Additional Resource Required by
2019
Reduced from 2% to 1.00%
Additional Resources
Required by 2025
REDUCING POLLUTION FROM SEWAGE
DISCHARGE, PREVENTING
INFRASTRUCTURE DAMAGE
By-law awareness promotion especially to BUS/COMM sector
Promoting use of Pre-treatment facility installations at source – cost-
saving through recycling
Approval of fines for the wastewater & industrial effluent by-law
Peace Officer training & appointment for all Inspectors to issue spot
fines, institute legal action (Criminal Procedure Act), amend by-law
Surcharge tariff also serves as punitive measure where allowable
limits exceeded
Pilot installation of automated pollution monitoring technology for
more efficient compliance monitoring & enforcement
31
REDUCE POLLUTION RISK
CAUSE INTERVENTION
Sewage overflows Sewer pipe replacement
Reduce storm-water ingress;
Manhole covers replacement
Condition Assessment CCTV;
Sewer pipe upgrade;
Education Awareness;
Servitude management;
Pump station upgrade;
Sewer grade lines reviews
WWTW legacy design upgrades
Sludge Disposal Upgrade sludge management facilities;
Alternative methods of sludge disposal
REDUCING POLLUTION OF
WATER BODIES & CATCHMENTS
Awareness promotion
Pollution investigation projects, as per SLA with Catchment, Storm-
water & River Management branch
Random inspections of storm-water outlets in industrial areas
Enforcement, Issuing of spot fines relating to storm-water
management by-law
33
CITY INTEGRATED PLANNING
Depends on interdepartmental cooperation and data
standardisation
Spatial plan is GIS-based to translate strategies in IDP to
specific potential recipients of services
Mapping of Infrastructure capacity shortfalls (requires
good Master Planning / Hydraulic models as informant)
Mapping of planned capital infrastructure
Matching to planned/estimated housing needs (City and
private sector) in order to prioritise
Overlay service sector maps to get integrated view
34
ENSURE OPERATIONAL EFFICIENCY,
FINANCIAL VIABILITY
CAUSE INTERVENTION
Inefficient Processes/
Inappropriate working
environment
Implementation of ISO
First level response
Centralised accommodation
Regional Depots;
Depot rehabilitation/maintenance
Collection of cash /
Revenue generation
requirement / Growth in
subsidised demand /
Price Elasticity / Rising
Energy Costs
WMD / Smart metering
Increase in debt actions
Revenue Protection
Purification of data
Meter readability
Meter Audits
Waste to Energy / Hydro-Electricity
Capacity Constraints: WWTW
36
37
CAPITAL BUDGET
LARGER
PROJECTS
Example: Northern Area Sewer
38
Budget: R 125 million
Northern Area
Sewer
BUILDING PROFESSIONAL STAFF
Programme of building in-house skills - Engineers versus
project coordinators, Career paths created
Skills transfer included in contracts with consultants
working on current projects:
Hydraulic modelling and Integrated Master Planning: update
current city-wide model (Includes water balance, conceptual
planning, development applications) = FIRST IN SA
DIMS information system update – real-time time series reporting
to all desktops = FIRST IN SA
Pressure management zones (*)
Design of infrastructure (*)
Multi-skilling/ diversification
Training to enable Professional Registration
39
PROJECT PRIORITISATION MODEL
Developed to quantify priority of investment (capital and
operating projects)
Spreadsheet model, considering in 4 main focus areas:
Project why, what, where, when
Strategic linkages (IDP, IMP, WSDP, AMP)
Risk Register
Legal (commitments)
Ecomonic benefits (catchment households, litres/household,
indigent %, jobs created)
20 year lifecycle costs (capital, operating impact)
Project Gantt & readiness
Financial benefit (NPV/Cost, IRR)
40
PROJECT PRIORITISATION MODEL..
Multi-criterion decision analysis model yielding a project
score out of 10
Projects compete within baskets that each get a
proportion of funding:
Capex or Opex
Investment category
Capacity = new
Continuity = replace, refurbish
Capability = institutional efficiency
Risk Category
Aligns with new SAP Project module under development
Side benefit of encouraging better project planning &
definition 41
SMART METERING
Previous successful initiatives:
AMR pilot (2 100 meters, 3 types of suburbs)
Water Management Devices (widely used, very
effective for WDM, prevention of bad debt, limitation of
leaks)
Current tender issued for award 2013, to
encourage development of Smart meter
combining the best of all previous incl.
Prepayment
42
Thank You!
43