Strategies for Rapid Scale up of Nuclear
Capacity U C MuktibodhU C Muktibodh
Executive Director (Engg.)Executive Director (Engg.)
NPCILNPCIL
5th Nuclear Energy Conclave, New Delhi
06 Sept 2013
![Page 2: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/2.jpg)
Inspiration for Growth
• Electricity Demand• Clean source of energy • Sustainability • Energy security
![Page 3: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/3.jpg)
Present Status of Nuclear Power
20 reactors (18 PHWRs+2BWR) 4,780 4,780 at 6 sites in operation at Tarapur, Rawatbhata, Kalpakkam, Narora, Kakrapar and Kaiga
2 PWRs under advanced stage of completion 2,000 6,780 at Kudankulam (2x1000 MW)
PFBR under construction at 500 7,280 Kalpakkam (1 X 500 MW)
Projects construction Launched (XI Plan) 2,800 KAPP-3&4 (2x700 MW PHWR) RAPS-7&8 (2x700 MW PHWR)
Total by 2017 10,080 MW
CAPACITY (MW)
CUMULATIVE CAPACITY(MW)REACTOR TYPE AND CAPACITY
![Page 4: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/4.jpg)
Nuclear Capacity – Under Construction & Planned in XII Plan
•KK-1&2 : 2x1000 MW LWR
•KAPP-3&4 : ( 2x700 MW PHWR)
•RAPP-7&8(2x700 MW PHWR)
•500 MW PFBR
•Planned to be launched in XII Plan-•2x1000 MW LWR, Kudankulam, TN•2x1650 MW LWR , Jaitapur, Maharashtra•2x1500 MW LWR: Kovvada, AP•2x1100 MW LWR : Mithi Virdi,Gujarat•2x700 MW PHWR : Gorakhpur,Haryana•2x700 MW PHWR :Chutaka,M.P•2x700 MW PHWR :Mahi-Banswara, Raj•2x700 MW PHWR : Kaiga,Karnataka•2X500 MW FBR: Kalpakkam, TN•1X300 AHWR: Site being identified
Advanced Stage of completion
Under construction
2000 MW 3300 MW3300 MW 17,400 MW(Planned)
22,700 MW (Construction + Planned)
Units under construction will be completed in XII Plan .
![Page 5: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/5.jpg)
NPPs in Operation & under Construction
![Page 6: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/6.jpg)
Kudankulam, T.N .
2 X 1000 MW
Jaitapur, Maharashtra
2 X 1650 MW
Mithi Virdi, Gujarat
2 X 1100 MW
Kovvada, AP
2 X 1500 MW
Gorakhpur, Haryana
2 X 700 MW
Chutka, MP
2 X 700 MW
Mahi-Banswara,Rajasthan
2 X 700 MW
Kaiga, Karnataka
2 X 700 MW
Kalpakkam, TN
2 X 500 MW
PHWR Site
LWR Site
FBR Site
NPPs under Planning
![Page 7: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/7.jpg)
Nuclear Power Programme
• Three stage nuclear power programme• PHWRs in the first stage
![Page 8: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/8.jpg)
Pressurised Heavy Water Reactors• Evolved through plant sizes of 220, 540 to the present
700 MWe• Matured indigenous technology with impeccable
safety record• Standardised plant size of 700 MWe • Standard plant design • Exploring single or two standard seismic designs• Use of Integrated Engineering Environment tools for
engineering • Project implementation through Mega ePC packages• Target construction period of 5 years
![Page 9: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/9.jpg)
FOR 2012-13 A.F = 90.43 %
![Page 10: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/10.jpg)
Continuous Run (more than a year)
RAPS 5 - 400 days (continuing)
![Page 11: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/11.jpg)
Year Wise Electricity Generation
0
5000
10000
15000
20000
25000
30000
35000
Mill
ion
Un
its
Series1 14927 18803 26472 32455 32863
2008-09 2009-10 2010-11 2011-12 2012-13
![Page 12: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/12.jpg)
Light Water Reactors
• LWRs, as additionalities, being implemented through international collaboration.
• Business model formulated for optimisation of cost and for meeting design & safety requirements.
![Page 13: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/13.jpg)
Strategies
• Public outreach programs• CSR activities• Early Site selection and commencement of
Pre-project activities• Design standardisation• Supply chain support• Project implementation
![Page 14: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/14.jpg)
Support from Industry
• Indian industry has developed capability to supply NPP equipment & components
• The rapid expansion programme will require industry support for maintaining supply chain for high quality equipment, meeting project schedules.
![Page 15: Strategies for Rapid Scale up of Nuclear Capacity U C Muktibodh Executive Director (Engg.) NPCIL 5 th Nuclear Energy Conclave, New Delhi 06 Sept 2013](https://reader036.vdocument.in/reader036/viewer/2022062422/56649ee55503460f94bf5293/html5/thumbnails/15.jpg)
Conclusion
• NPCIL is poised for the rapid expansion programme
• Synergy between NPCIL and Indian industry is a key element to meet the programme
• The programme can be realised in a national mission mode with the support of all stakeholders