Project No.: TR16-0587 [ Month Year ] STRATEGY 4 INC. TRAFFIC IMPACT STUDY Iroquois Ridge #2 – Proposed Residential Development, Town of Oakville COLE ENGINEERING GROUP LTD. HEAD OFFICE 70 Valleywood Drive Markham, ON CANADA L3R 4T5 T. 905.940.6161 | 416.987.6161 F. 905.940.2064 | www.ColeEngineering.ca GTA WEST OFFICE 151 Superior Boulevard, Units 1 & 2 Mississauga, ON CANADA L5T 12L1 T. 905.364.6161 F. 905.364.6162 DECEMBER 2016

Upload: nguyenque

Post on 11-Mar-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Project No.: TR16-0587

[ Month Year ]

STRATEGY 4 INC.

TRAFFIC IMPACT STUDY

Iroquois Ridge #2 – Proposed Residential Development, Town of Oakville

COLE ENGINEERING GROUP LTD.

HEAD OFFICE

70 Valleywood DriveMarkham, ON CANADA L3R 4T5T. 905.940.6161 | 416.987.6161F. 905.940.2064 | www.ColeEngineering.ca

GTA WEST OFFICE

151 Superior Boulevard, Units 1 & 2 Mississauga, ON CANADA L5T 12L1T. 905.364.6161F. 905.364.6162DECEMBER 2016

Page 2: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

December 7, 2016 Reference No. TR16-0587 Mr. Jeff Kenny Strategy 4 Inc. 2620 Bristol Circle, Suite #100 Oakville, ON L6H 6Z7 Dear Mr. Kenny:

Re: Engineering Services for a Traffic Impact Study Iroquois Ridge #2 – Proposed Residential Development Town of Oakville

Cole Engineering Group Ltd. (“Cole Engineering”) is pleased to submit this Traffic Impact Study (TIS) for the above mentioned proposed residential development located south of North Ridge Trail and east of Eighth Line in the Town of Oakville (the “Town”).

This TIS details the existing and future traffic conditions and the anticipated impact on the surrounding road network as a result of the proposed development. The study has determined that the proposed development will have minimal impact to the operation of existing study area intersections in the future and there is adequate manoeuvring space provided for passenger vehicles and trucks to access / egress the site driveway system.

Should you have any questions, please do not hesitate to contact the undersigned.

Yours truly,

COLE ENGINEERING GROUP LTD. Rao N. Marthi, B.Eng., MCIP, RPP Kavleen Sachdeva, EIT Project Manager Traffic Analyst Traffic, Transportation Traffic, Transportation KS/RM:jay

Page 3: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

PREPARED BY:

COLE ENGINEERING GROUP LTD.

Kavleen Sachdeva, EIT Traffic Analyst Traffic, Transportation

CHECKED BY:

COLE ENGINEERING GROUP LTD.

Rao N. Marthi, B.Eng., MCIP, RPP Project Manager Traffic, Transportation

Adam Bell, A.Sc.T Team Leader Traffic, Transportation

Issues and Revisions Registry

Identification Date Description of issued and/or revision

Draft Report December 2016 For Client review

Final Report December 2016 For submission

Page 4: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

Statement of Conditions

This Report/Study (the “Work”) has been prepared at the request of, and for the exclusive use of, the Owner/Client, and its affiliates (the “Intended User”). No one other than the Intended User has the right to use and rely on the Work without first obtaining the written authorization of Cole Engineering Group Ltd. and its Owner. Cole Engineering Group Ltd. expressly excludes liability to any party except the intended User for any use of, and/or reliance upon, the work.

Neither possession of the Work, nor a copy of it, carries the right of publication. All copyright in the Work is reserved to Cole Engineering Group Ltd. The Work shall not be disclosed, produced or reproduced, quoted from, or referred to, in whole or in part, or published in any manner, without the express written consent of Cole Engineering Group Ltd. and the Owner.

Page 5: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

i

Table of Contents

1 Introduction ............................................................................................................................. 1

2 Proposed Development ............................................................................................................ 2

3 Existing Conditions ................................................................................................................... 4

3.1 Existing Road Network ............................................................................................................. 4

3.2 Existing Transit Routes ............................................................................................................. 4

3.3 Existing Traffic Counts and Signal Timings ............................................................................... 7

3.4 Existing Traffic Analysis ............................................................................................................ 7

4 Future (2021) Background Traffic ............................................................................................ 10

4.1 Future (2021) Background Growth Rate ................................................................................ 10

4.2 Future (2021) Background Developments ............................................................................. 10

4.3 Future (2021) Planned Roadway Improvements ................................................................... 12

4.4 Future (2021) Background Traffic Analysis ............................................................................ 12

5 Future (2021) Total Traffic Conditions ..................................................................................... 13

5.1 Site Generated Traffic ............................................................................................................ 13

5.2 Site Trip Distribution .............................................................................................................. 14

5.3 Future (2021) Total Traffic Volumes ...................................................................................... 16

5.4 Future (2021) Total Traffic Analysis ....................................................................................... 16

6 Site Circulation ....................................................................................................................... 18

7 Conclusions and Recommendations ........................................................................................ 22

LIST OF TABLES

Table 3.1 Intersection Turning Movement Count Details .................................................................. 7 Table 3.2 Existing Weekday AM and PM Peak Hour Traffic Analysis ................................................. 8 Table 4.1 Future (2021) Background Weekday AM and PM Peak Hour Traffic Analysis ................. 12 Table 5.1 Site Trip Generation .......................................................................................................... 13 Table 5.2 Site Trip Distribution ......................................................................................................... 14 Table 5.3 Future (2021) Total Weekday AM and PM Peak Hour Traffic Analysis ............................ 16

Page 6: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

ii

LIST OF FIGURES

Figure 1-1 Site Location ........................................................................................................................ 2 Figure 2-1 Draft Subdivision Plan ......................................................................................................... 3 Figure 3-1 Existing Lane Configuration and Traffic Controls ................................................................ 5 Figure 3-2 Existing Transit Service ....................................................................................................... 6 Figure 3-3 Existing Traffic Volumes – Weekday AM and PM Peak Hours ............................................ 9 Figure 4-1 Future (2021) Background Traffic Volumes – Weekday AM and PM Peak Hours ............ 11 Figure 5-1 Site Generated Traffic Volumes-Weekday AM and PM Peak Hours ................................ 15 Figure 5-2 Future (2021) Total Traffic Volumes-Weekday AM and PM Peak Hours ......................... 17 Figure 6-1 AutoTURN Analysis for Passenger Vehicle (5.6m) ............................................................ 19 Figure 6-2 AutoTURN Analysis for HSU Truck (11.50 m) .................................................................... 20 Figure 6-3 AutoTURN Analysis for HSU Truck (11.50 m) .................................................................... 21 APPENDICES

Appendix A Existing Turning Movement Count and Signal Timing Plans Data

Appendix B Intersection Capacity Analysis Reports - 2016 Conditions

Appendix C Intersection Capacity Analysis Reports – Future (2021) Background Conditions

Appendix D 2011 Transportation Tomorrow Survey Data Analysis

Appendix E Intersection Capacity Analysis Reports - Future (2021) Total Conditions

Page 7: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

1

1 Introduction

Cole Engineering Group Ltd. (“Cole Engineering”) was retained by Strategy 4 Inc. (the ‘Owner’) to undertake a Traffic Impact Study for a proposed residential development of Iroquois Ridge #2, south of North Ridge Trail and east of Eighth Line in the Town of Oakville (the “Town”).

The purpose of this study is to:

Focus on the intersections of:

- Eighth Line and North Ridge Trail (signalized);

- Eighth Line and Kestell Boulevard (signalized);

- North Ridge Trail and Coronation Drive (un-signalized);

- Coronation Drive and Kestell Boulevard (un-signalized); and,

- Coronation Drive and Site Access (un-signalized).

Assess the existing operations of the above noted study area intersections during the weekday AM and PM peak hours;

Assess the future background traffic in a 5-year (2021) traffic horizon during the weekday AM and PM peak hours incorporating both traffic growth and background developments in the area to identify any additional deficiencies or operational problems;

Estimate site traffic based on information published in the Trip Generation Manual, 9th Edition, by the Institute of Transportation Engineers (ITE);

Assess future total traffic operations in a 5-year (2021) traffic horizon during the weekday AM and PM peak hours and identify any operational deficiencies;

Review and provide comments on updated Site Plan regarding the functionality of the internal vehicular circulation related to the proposed residential development using AutoTURN, as required; and,

Recommend improvements, if applicable, should capacity constraints be observed in the future horizons.

The proposed site is located in the southeast quadrant of Eighth Line and North Ridge Trail intersection in the Town of Oakville. Existing residential buildings bound the site to the north, west and south, and Coronation Drive to the east side. The site location is shown in Figure 1-1.

Page 8: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

2

Figure 1-1 Site Location

2 Proposed Development

The proposed development consists of 59 detached and semi-detached homes. Vehicle access to the subject site will be provided via Coronation Drive, which runs north to south and connects to the North Ridge Trail approximately 80 m north of the access. The proposed draft subdivision plan is provided in Figure 2-1.

Proposed Development

Page 9: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Figure 2-1Site Plan

Ref.# TR16-0587 December )( 2016

Town of Oakville

Strategy 4 Inc.

Traffic Impact Study

Iroquois Ridge #2-HCDSB Draft Plan

Page 10: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

4

3 Existing Conditions

3.1 Existing Road Network

The existing road network, lane configuration and traffic control for the study intersections are shown in Figure 3-1 on the following page. The details are as follows:

Eighth Line is a two (2) lane north-south minor arterial, which connects to Dundas Street East to the north and Upper Middle Road East to the south, with a posted speed limit of 50 km/h. Sidewalks and on-street bike lanes are available on both sides of Eighth Line within the site vicinity. This minor arterial road intersects with Kestell Boulevard and North Ridge Trail and are controlled through signalized intersections.

Eighth Line flares out at its intersections with North Ridge Trail and Kestell Boulevard. At the signalized intersection with North Ridge Trail, exclusive left and right turn lanes have been provided on the north approach and an exclusive left turn lane on the south approach. At the signalized intersection with Kestell Boulevard, exclusive left turn lanes have been provided in both north and south approach.

Coronation Drive is a two (2) lane local roadway with an urban cross-section and a posted speed limit of 50 km/h. Development along this roadway consists of residential units. Sidewalks are available on both sides of Coronation Drive. The local road intersects with North Ridge Trail and forms a four (4)-way stop intersection. Coronation Drive and Kestell Boulevard intersect and form a three (3)-way stop intersection.

North Ridge Trail is a two (2) lane east-west major collector roadway, which connects to Eighth line to the west and Upper Middle Road to the east, with a speed limit of 50 km/h within the study area. Development along this roadway primarily consists of residential units, bike lanes and sidewalks are available on both sides of North Ridge Trail in the study area.

North Ridge Drive flares out at its intersections with Eighth Line and Coronation Drive. At both intersections, exclusive left turn lanes have been provided in both directions with the intersection of Eighth Line and North Ridge Trail operates as a signalized intersection, and the intersection of Coronation Drive and North Ridge Drive operates as an all-way stop intersection.

Kestell Boulevard is a two (2) lane east west local road connecting Eighth Line to the west and North Ridge Trail to the east with a speed limit of 50 km/h. Development along this roadway consists of residential units, sidewalks are available on both sides of Parkside Drive in the study area.

3.2 Existing Transit Routes

Oakville Transit provides transit services within the study area. The area is currently serviced by transit Route 20 (Northridge), which operates on 7-minute headways from Monday to Friday from 5:55 AM to 9:35 AM and 3:10 PM to 11:05 PM and with 30-minutes headways from 9:35 AM to 3:10 PM. On Saturdays, it operates on 7-minute headways 7:10 AM to 11:35 AM and 4:10 PM to 11:35 PM and with 30 minutes headways from 11:35 AM to 4:10 PM. On Sundays or holidays it operates with 7-minute headways from 8:10 AM to 10:35 AM and from 5:10 PM to 7:35 PM and with 30 minute headways from 10:35 AM to 5:10 PM. The route provides service between Oakville GO Station and Uptown Core. Existing transit routes are provided in Figure 3-2.

Page 11: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Eig

hth

Lin

e

Coro

nation

Drive

Town of Oakville

Strategy 4 Inc.

Traffic Impact Study

Iroquois Ridge #2-HCDSB Draft Plan

Kestell Boulevard

North Ridge Trail

N.T.S

Figure 3-1Existing Lane Configurations and Traffic Contrals

Existing Lane Configuration

Legend

Existing Traffic Control Signal

Existing Stop Control

Ref.# TR16-0587 December )( 2016

SITE

Page 12: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Figure 3-2Existing Transit Services

Town of Oakville

Strategy 4 Inc.

Traffic Impact Study

Iroquois Ridge #2-HCDSB Draft Plan

Ref.# TR16-0587 December )( 2016

Site Location

Page 13: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

7

3.3 Existing Traffic Counts and Signal Timings

Details of intersection turning movement counts used in the traffic assessment are summarized in Table 3.1 below. The existing traffic data and traffic signal timing plans are provided in Appendix A.

Table 3.1 Intersection Turning Movement Count Details

Intersection Count Date Count Hours Peak Hours

Eighth Line and North Ridge Trail Thursday,

November 24, 2016

7:00 AM to 9:00 AM

4:00 PM to 6:00 PM

8:00 AM to 9:00 AM

4:45 PM to 5:45 PM

Eighth Line and Kestell Boulevard Thursday,

November 24, 2016

7:00 AM to 9:00 AM

4:00 PM to 6:00 PM

8:00 AM to 9:00 AM

5:00 PM to 6:00 PM

Coronation Drive and North Ridge Trail Thursday,

November 24, 2016

7:00 AM to 9:00 AM

4:00 PM to 6:00 PM

8:00 AM to 9:00 AM

4:45 PM to 5:45 PM

Coronation Drive and Kestell Boulevard Thursday,

November 24, 2016 7:00 AM to 9:00 AM

4:00 PM to 6:00 PM

8:00 AM to 9:00 AM

5:00 PM to 6:00 PM

3.4 Existing Traffic Analysis

The existing traffic volumes for the weekday AM and PM peak hours are illustrated in Figure 3-3. These peak hour volumes were analyzed using the Synchro 9.0 software which employs the 2000 Highway Capacity Methodology for the intersection analysis. The results of the existing intersection traffic operations are summarized in Table 3.2 below with level of service (LOS) and the volume to capacity (v/c) ratios for overall and individual movements.

As per Halton Region Traffic Impact Study Guidelines, LOS for individual movements at an unsignalized intersections equal to “D” or greater is bolded. In case of signalized intersections, v/c ratios for overall intersection operations, through movements, or shared through / turning movements greater than 0.85, and v/c ratios for exclusive movements greater than 0.95 have been shown in bold. The intersection capacity analysis reports under the existing conditions are presented in Appendix B.

Page 14: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

8

Table 3.2 Existing Weekday AM and PM Peak Hour Traffic Analysis

Intersection Key Movement AM Peak Weekday PM Peak Weekday

LOS V/C LOS V/C

Eighth Line and North Ridge Trail

(Signalized)

Overall

EB left

EB through + right

WB left

WB through + right

NB left

NB through + right

SB left

SB through

SB right

C

C

D

E

D

C

B

E

B

B

0.40

0.16

0.60

0.85

0.54

0.31

0.25

0.50

0.21

0.01

C

C

D

D

D

D

B

D

B

B

0.42

0.07

0.69

0.57

0.45

0.46

0.26

0.39

0.30

0.03

Coronation Drive and North Ridge Trail

(Unsignalized)

EB left

EB through + right

WB left

WB through + right

NB left + through + right

SB left + through + right

A

-

A

-

A

A

-

-

-

-

-

-

A

-

A

-

A

A

-

-

-

-

-

-

Kestell Boulevard and Coronation Drive

(Unsignalized)

EB left + through

WB through + right

SB left + right

A

A

A

-

-

-

A

A

A

-

-

-

Eighth Line and Kestell Boulevard

(Signalized)

Overall

EB left + through + right

WB left + through + right

NB left

NB through + right

SB left

SB through + right

B

C

D

A

A

D

B

0.46

0.04

0.71

0.02

0.39

0.44

0.39

A

D

D

A

A

D

A

0.40

0.02

0.38

0.07

0.41

0.29

0.31

The results of the intersection capacity analysis under the existing conditions indicates that the study area intersections operate at acceptable overall LOS during both the morning and afternoon peak hour time periods.

Page 15: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Eig

hth

Lin

e

Coro

nation

Drive

Figure 3-3Existing Traffic Volumes Weekday AM and PM Peak Hours

Ref.# TR16-0587 December )( 2016

Town of Oakville

Strategy 4 Inc.

Traffic Impact Study

Iroquois Ridge #2-HCDSB Draft Plan

Kestell Boulevard

North Ridge Trail

N.T.S

40

(34)

24

(6)

16 (13)97 (56)

(33) 26(84) 73

3(4

)435

(407)

10

(14)

88

(104)

334

(431)

10

(48)

22 (20)2 (0)125 (73)

(3) 2(0) 1

(22) 37

20

(53)

172

(264)

13

(21)

67

(80)

214

(215)

102

(151)

15 (32)157 (128)103 (63)

(15) 27(125) 95(145) 131

14

(3)

1(1

)9

(5)

35

(13)

2(0

)16

(9)

6 (10)214 (195)19 (32)

(8) 5(159) 163

(23) 13

Legend

Right Turn Movement

Through MovementLeft Turn Movement

XX (XX) Weekday AM (Weekday PM) Peak Hour

SITE

Page 16: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

10

4 Future (2021) Background Traffic

A 5-year (2021) horizon was selected to represent future traffic conditions. Future background traffic volumes for the 2021 horizon year consist of the following components:

Background traffic growth from outside the study area; and,

Traffic generated within the study area from other proposed developments in the vicinity of the subject development.

4.1 Future (2021) Background Growth Rate

To account for developments from beyond the study area, growth rate is calculated based on historical data. The Town had provided historical data from the year 2011 for Coronation Drive, from 2015 for North Ridge Trail and Kestell Boulevard and from 2016 for Eighth Line. Since the counts are fairly recent for Eighth Line, North Ridge Trail and Kestell Boulevard, a conservative 2% growth rate was applied to through movements on Eighth Line, and 1% growth rate was applied to through movements on North Ridge Trail and Kestell Boulevard.

Based on the data received for Coronation Drive, annual traffic growth rate was calculated based on the data received and the data collected for the current traffic analysis. The calculated growth rate was found to be negative, therefore no growth rate has been applied for Coronation Drive.

4.2 Future (2021) Background Developments

Cole Engineering has searched the Town’s Active Development Applications on the Town’s website to locate any upcoming developments in the area. Based on the data available, there are multiple upcoming developments on the north of Dundas Street East. Most of the active developments will not impact the road network analysed for this study. However, the site generated traffic from the development located at 467 Dundas Street East has been included in the analysis.

The resulting future (2021) background traffic, including background growth and other area developments, are presented in Figure 4-1 for the weekday AM and PM peak hours.

Page 17: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Eig

hth

Lin

e

Coro

nation

Drive

Town of Oakville

Strategy 4 Inc.

Traffic Impact Study

Iroquois Ridge #2-HCDSB Draft Plan

Kestell Boulevard

North Ridge Trail

N.T.S

40

(34)

24

(6)

16 (13)102 (59)

(33) 26(88) 77

3(4

)485

(452)

10

(14)

88

(104)

369

(480)

10

(48)

22 (20)2 (0)125 (73)

(3) 2(0) 1

(22) 37

20

(53)

195

(294)

13

(21)

67

(80)

237

(243)

102

(151)

15 (32)165 (134)103 (63)

(15) 27(131) 100(145) 131

14

(3)

1(1

)9

(5)

35

(13)

2(0

)16

(9)

6 (10)225 (205)19 (32)

(8) 5(167) 171

(23) 13

Figure 4-1Future (2021) Background Traffic Volumes - Weekday AM and PM Peak Hours

Ref.# TR16-0587 December )( 2016

Legend

Right Turn Movement

Through MovementLeft Turn Movement

XX (XX) Weekday AM (Weekday PM) Peak Hour

SITE

Page 18: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

12

4.3 Future (2021) Planned Roadway Improvements

There are no planned road improvements are proposed for the study area roadways.

4.4 Future (2021) Background Traffic Analysis

The future (2021) background traffic volumes were analyzed using the Synchro 9.0 software which employs the 2000 Highway Capacity Methodology for the intersection analysis.

At the signalized intersection of Eighth Line and North Ridge Trail, 103 vehicles (approximately 36 percent of total approaching volume) are turning left on the east approach arm. In order to assess the need for a left-turn phase for this movement, a left-turn warrant analysis was done as per Ontario Traffic Manual (OTM) Book 12.

Under the future (2021) background conditions, the westbound left-turn volume (103 vehicles) exceeds the volumes with two (2) vehicles per cycle length [2*(3600/100) = 72 vehicles per hour]. Hence, a separate left-turn for the westbound left-turn was considered in the future (2021) background conditions.

The results are summarized in Table 4.1 below with LOS and the v/c ratios for overall and individual movements. The intersection capacity analysis reports under the future (2021) background conditions are presented in Appendix C.

Table 4.1 Future (2021) Background Weekday AM and PM Peak Hour Traffic Analysis

Intersection Key Movement AM Peak Weekday PM Peak Weekday

LOS V/C LOS V/C

Eighth Line and North Ridge Trail

(Signalized)

Overall

EB left

EB through + right

WB left

WB through + right

NB left

NB through + right

SB left

SB through

SB right

C

D

D

C

C

C

B

E

C

C

0.42

0.14

0.64

0.48

0.36

0.24

0.32

0.50

0.36

0.01

C

C

D

D

D

D

B

D

B

B

0.45

0.07

0.70

0.56

0.46

0.47

0.29

0.39

0.34

0.03

Coronation Drive and North Ridge Trail

(Unsignalized)

EB left

EB through + right

WB left

WB through + right

NB left + through + right

SB left + through + right

A

-

A

-

A

A

-

-

-

-

-

-

A

-

A

-

A

A

-

-

-

-

-

-

Kestell Boulevard and Coronation Drive

(Unsignalized)

EB left + through

WB through + right

SB left + right

A

A

A

-

-

-

A

A

A

-

-

-

Page 19: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

13

Intersection Key Movement AM Peak Weekday PM Peak Weekday

LOS V/C LOS V/C

Eighth Line and Kestell Boulevard

(Signalized)

Overall

EB left + through + right

WB left + through + right

NB left

NB through + right

SB left

SB through + right

B

C

D

A

A

D

B

0.49

0.04

0.71

0.02

0.42

0.44

0.44

A

D

D

A

A

D

A

0.44

0.02

0.38

0.08

0.45

0.29

0.35

The results of the intersection capacity analysis under the future (2021) background conditions indicates that the study area intersections operate at acceptable overall LOS during both the morning and afternoon peak hour time periods.

5 Future (2021) Total Traffic Conditions

5.1 Site Generated Traffic

The site trip generation was undertaken using information contained in the Trip Generation Manual, 9th Edition published by the Institute of Transportation Engineers (ITE). The weekday AM and PM peak hour of adjacent street traffic was used in the ITE manual for Land Use Code 210 (Single Family Detached Housing). The fitted curve equation during the AM and PM peak hours for this land use was used as the R2 and the standard deviation of the fitted curve equation are more than 0.75 and 55%, respectively.

2011 Transportation Tomorrow Survey (TTS) data analysis for traffic zones (4025, 4032 to 4034) in the vicinity of the proposed development was done and the results are presented in Appendix D. As per the TTS data analysis, a trip reduction of 10% was used to account for non-auto mode use. The summary of the trip generation is shown in Table 5.1 below.

Table 5.1 Site Trip Generation

Land Use Code Units AM Peak Hour PM Peak Hour

In Out Total In Out Total

Single Family Detached Housing

Directional Distribution

210 59

25% 75% 100% 63% 37% 100%

Gross Trips 13 38 51 41 24 65

Non-Auto Reduction (10%) 1 4 5 4 3 7

Total New Trips 12 34 46 37 21 58

The proposed development is expected to generate 46 two (2) way new trips (12 trips in / 34 trips out) during the weekday AM peak hour and 58 two (2) way new trips (37 trips in / 21 trips out) during the PM peak hour.

Page 20: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

14

5.2 Site Trip Distribution

The trip distribution was based on existing turning movements in the vicinity of the site along with the 2011 TTS data analysis and presented in Table 5.2. The TTS data analysis is presented in Appendix D and Figure 5-1 illustrate the resulting site trip assignments.

Table 5.2 Site Trip Distribution

To / From Via AM Peak Hour PM Peak Hour

Inbound Outbound Inbound Outbound

North Eighth line 5% 5% 5% 5%

South Eighth line 6% 5% 5% 6%

Coronation drive 24% 20% 20% 24%

East North Ridge Trail 50% 50% 50% 50%

west North Ridge Trail 11% 14% 14% 11%

Kestell Boulevard 5% 6% 6% 5%

Total 100% 100% 100% 100%

Page 21: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Eig

hth

Lin

e

Coro

nation

Drive

Town of Oakville

Strategy 4 Inc.

Traffic Impact Study

Iroquois Ridge #2-HCDSB Draft Plan

Kestell Boulevard

North Ridge Trail

N.T.S

SITE

7(5

)2

(1)

0 (2)0 0)

(7) 3(0) 0

0(0

)2

(1)

0(0

)

3(7

)1

(2)

0(0

)

0 (0)0 (0)7 (5)

(0) 0(0) 0(0) 0

0(0

)0

(0)

1(2

)

1(2

)0

(0)

0(0

)

2 (1)16 (11)2 (1)

(0) 0(19) 3(0) 0

0(0

)0

(0)

0(0

)

5(2

)0

(0)

20

(13)

0 (0)0 (0)4 (5)

(0) 0(0) 0

(23) 5

Figure 5-1Site Generated Traffic Volumes - Weekday AM and PM Peak Hours

Ref.# TR16-0587 December )( 2016

Legend

Right Turn Movement

Through MovementLeft Turn Movement

XX (XX) Weekday AM (Weekday PM) Peak Hour

9(2

8)

0(0

)

0(0

)3

(9)

(15) 25(6) 9

Site Access

Page 22: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

16

5.3 Future (2021) Total Traffic Volumes

The future (2021) total traffic consists of future (2021) background traffic and site related traffic. The future (2021) total traffic volumes in the weekday AM and PM peak hours are illustrated Figure 5-2.

5.4 Future (2021) Total Traffic Analysis

Intersection capacity analysis under the future (2021) total traffic conditions was completed using Synchro 9 software which employs the 2000 Highway Capacity Methodology for the intersection analysis. The traffic analysis results for future (2021) total traffic are summarized in Table 5.3 below with LOS and the v/c ratios for overall and individual movements. The intersection capacity analysis reports under the future (2021) total conditions are presented in Appendix E.

Table 5.3 Future (2021) Total Weekday AM and PM Peak Hour Traffic Analysis

Intersection Key Movement AM Peak Weekday PM Peak Weekday

LOS V/C LOS V/C

Eighth Line and North Ridge Trail

(Signalized)

Overall

EB left

EB through + right

WB left

WB through + right

NB left

NB through + right

SB left

SB through

SB right

C

C

D

C

C

C

C

D

C

C

0.42

0.14

0.65

0.48

0.40

0.24

0.33

0.28

0.36

0.01

C

C

D

D

D

D

B

D

B

B

0.46

0.07

0.72

0.56

0.46

0.51

0.29

0.41

0.34

0.03

Coronation Drive and North Ridge Trail

(Unsignalized)

EB left

EB through + right

WB left

WB through + right

NB left + through + right

SB left + through + right

A

-

A

-

A

A

-

-

-

-

-

-

A

-

A

-

A

A

-

-

-

-

-

-

Kestell Boulevard and Coronation Drive

(Unsignalized)

EB left + through

WB through + right

SB left + right

A

A

A

-

-

-

A

A

A

-

-

-

Eighth Line and Kestell Boulevard

(Signalized)

Overall

EB left + through + right

WB left + through + right

NB left

NB through + right

SB left

SB through + right

B

C

D

A

A

D

B

0.50

0.04

0.73

0.02

0.43

0.44

0.44

A

D

D

A

A

D

A

0.45

0.02

0.41

0.08

0.46

0.29

0.35

Coronation Drive & Site Access

EB left + right

NB left + through

SB through + right

A

A

-

0.04

0.00

0.03

A

A

-

0.03

0.01

0.05

The results of the intersection capacity analysis under the future (2021) total traffic conditions indicates that the study area intersections operate at acceptable overall LOS during both the morning and afternoon peak hour time periods.

Page 23: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Eig

hth

Lin

e

Coro

nation

Drive

Town of Oakville

Strategy 4 Inc.

Traffic Impact Study

Iroquois Ridge #2-HCDSB Draft Plan

Kestell Boulevard

North Ridge Trail

Site Access

N.T.S

SITE

Figure 5-2Future (2021) Background Traffic Volumes -Weekday AM and PM Peak Hours

Ref.# TR16-0587 December )( 2016

Legend

Right Turn Movement

Through MovementLeft Turn Movement

XX (XX) Weekday AM (Weekday PM) Peak Hour

9(2

8)

33

(56)

53

(22)

3(9

)

(15) 25(6) 9

47

(39)

26

(7)

16 (15)102 (59)

(40) 29(88) 77

3(4

)487

(453)

10

(14)

91

(111)

370

(482)

10

(48)

22 (20)2 (0)132 (78)

(3) 2(0) 1

(22) 37

20

(53)

195

(294)

14

(23)

68

(82)

237

(243)

102

(151)

17 (33)181 (145)105 (64)

(15) 27(150) 103(145) 131

14

(3)

1(1

)9

(5)

40

(15)

2(0

)36

(22)

6 (10)225 (205)23 (37)

(8) 5(167) 171

(46) 18

Page 24: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

18

6 Site Circulation

Vehicle access routes for garbage trucks and passenger vehicles were assessed using AutoTURN analysis depicting the swept path of vehicles in relation to the proposed driveway system utilizing the Transportation Association of Canada’s (TAC) design vehicles.

To ensure the vehicles manoeuvre throughout the subject site, a typical 11.50 m Heavy Single Unit (HSU) Truck and a 5.60 m passenger car were used. Figure 6-1 shows the typical passenger vehicle maneuvering through the site with no constraints. Figure 6-2 and Figure 6-3 show the assessment for the HSU truck. As illustrated in the figures, the HSU truck can enter, exit and manoeuver the site with no constraints.

Page 25: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

PASSENGER VEHICLE (PTAC 5.6 m) - AUTOTURN TEMPLATE

SCALE:

DATE: PROJECT No.:

FIGURE No.:NTS

PROPOSED RESIDENTIAL DEVELOPMENT

IROQUOIS RIDGE #2-HCDSB DRAFT PLAN

TOWN OF OAKVILLE

DECEMBER, 2016TR16-0587

DESIGN VEHICLELEGEND

6-1

Page 26: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

LEGEND DESIGN VEHICLE

SCALE:

DATE: PROJECT No.:

FIGURE No.:NTS

AUTOTURN TEMPLATE FOR HSU (11.50m)

PROPOSED RESIDENTIAL DEVELOPMENT

IROQUOIS RIDGE #2-HCDSB DRAFT PLAN

TOWN OF OAKVILLE

DECEMBER, 2016TR16-0587

6-2

Page 27: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

LEGEND DESIGN VEHICLE

SCALE:

DATE: PROJECT No.:

FIGURE No.:NTS

AUTOTURN TEMPLATE FOR HSU (11.50m)

PROPOSED RESIDENTIAL DEVELOPMENT

IROQUOIS RIDGE #2-HCDSB DRAFT PLAN

TOWN OF OAKVILLE

DECEMBER, 2016TR16-0587

6-3

Page 28: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development

Traffic Impact Study

TR16-0587 (December 2016)

22

7 Conclusions and Recommendations

The findings and conclusions of our analysis are as follows:

All the intersections function below-capacity for existing traffic conditions;

A growth rate of 2% was applied along Eighth Line, and 1% along Kestell Boulevard and North Ridge Trail for general background growth for the 2021 horizon year and background traffic generation from proposed and planned developments within the study area were derived from the Active Development Applications page on the Town’s website;

During future background traffic conditions, all the key intersections are expected to function below-capacity;

The proposed development is expected to generate 46 two (2)-way new trips (12 trips in / 34 trips out) during the weekday AM peak hour and 58 two (2)-way new trips (37 trips in / 21 trips out) during the PM peak hour.

The proposed development is expected to have a minimal impact on the surrounding road network as future total traffic is expected to operate in a similar fashion to the future background scenario;

The proposed full-movement access on Coronation Drive is anticipated to function at a good LOS and well below capacity; and,

The traffic analysis under the future (2021) total Traffic conditions concludes that no roadway improvements are required at the study area intersections as a result of proposed development.

Page 29: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

APPENDIX A Existing Turning Movement Counts and 

Signal Timings Data  

Page 30: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Morning Peak Diagram Specified Period

From:To:

7:00:009:00:00

One Hour PeakFrom:To:

8:00:009:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600001Eighth Ln & North Ridge Tr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Signalized Intersection ** Major Road: Eighth Ln runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

461

205

9

Heavys

Trucks

Cars

Totals

0

1

19

20

0

0

172

172

0

0

13

13

0

1

204

Heavys

Trucks

Cars

Totals

4

0

252

256

Heavys Trucks Cars Totals

5 1 273 279

Heavys Trucks Cars Totals

1 0 26 27

4 0 91 95

4 0 127 131

9 0 244

Peds Cross:

West Peds:

West Entering:

West Leg Total:

4

253

532

Eighth Ln

North Ridge TrW

N

E

SNorth Ridge Tr

Eighth Ln

East Leg Total:

East Entering:

East Peds:

Peds Cross:

450

275

6

Cars Trucks Heavys Totals

15 0 0 15

153 0 4 157

98 0 5 103

266 0 9

Cars Trucks Heavys Totals

168 0 7 175

Cars

Trucks

Heavys

Totals

397

0

9

406

Cars

Trucks

Heavys

Totals

101

0

1

102

211

0

3

214

64

0

3

67

376

0

7

Peds Cross:

South Peds:

South Entering:

South Leg Total:

1

383

789

Comments

Page 31: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Afternoon Peak Diagram Specified Period

From:To:

16:00:0018:00:00

One Hour PeakFrom:To:

16:45:0017:45:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600001Eighth Ln & North Ridge Tr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Signalized Intersection ** Major Road: Eighth Ln runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

601

338

2

Heavys

Trucks

Cars

Totals

0

0

53

53

0

1

263

264

0

0

21

21

0

1

337

Heavys

Trucks

Cars

Totals

0

1

262

263

Heavys Trucks Cars Totals

4 1 327 332

Heavys Trucks Cars Totals

0 0 16 16

4 1 120 125

0 0 145 145

4 1 281

Peds Cross:

West Peds:

West Entering:

West Leg Total:

0

286

618

Eighth Ln

North Ridge TrW

N

E

SNorth Ridge Tr

Eighth Ln

East Leg Total:

East Entering:

East Peds:

Peds Cross:

449

223

2

Cars Trucks Heavys Totals

32 0 0 32

123 1 4 128

63 0 0 63

218 1 4

Cars Trucks Heavys Totals

221 1 4 226

Cars

Trucks

Heavys

Totals

471

1

0

472

Cars

Trucks

Heavys

Totals

151

0

0

151

214

1

0

215

80

0

0

80

445

1

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

3

446

918

Comments

Page 32: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600001Eighth Ln & North Ridge Tr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Signalized Intersection ** Major Road: Eighth Ln runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

1899

915

15

Heavys

Trucks

Cars

Totals

0

1

123

124

6

2

729

737

0

0

54

54

6

3

906

Heavys

Trucks

Cars

Totals

15

2

967

984

Heavys Trucks Cars Totals

23 4 964 991

Heavys Trucks Cars Totals

4 0 86 90

18 2 346 366

7 1 488 496

29 3 920

Peds Cross:

West Peds:

West Entering:

West Leg Total:

8

952

1943

Eighth Ln

North Ridge TrW

N

E

SNorth Ridge Tr

Eighth Ln

East Leg Total:

East Entering:

East Peds:

Peds Cross:

1489

845

9

Cars Trucks Heavys Totals

99 0 2 101

431 3 20 454

282 0 8 290

812 3 30

Cars Trucks Heavys Totals

620 2 22 644

Cars

Trucks

Heavys

Totals

1499

3

21

1523

Cars

Trucks

Heavys

Totals

410

0

3

413

782

2

9

793

220

0

4

224

1412

2

16

Peds Cross:

South Peds:

South Entering:

South Leg Total:

6

1430

2953

Comments

Page 33: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Traffic Count Summary

Intersection: Eighth Ln & North Ridge Tr Count Date: 24-Nov-16 Municipality: OakvilleNorth Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

HourEnding

HourEnding

HourEnding

HourEnding

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

GrandTotal

GrandTotal

GrandTotal

GrandTotal

TotalPeds

TotalPeds

TotalPeds

TotalPeds

North/SouthTotal

Approaches

East/WestTotal

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 4 99 4 107 3 318 8:00:00 35 160 16 211 09:00:00 13 172 20 205 9 588 9:00:00 102 214 67 383 116:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 16 215 41 272 1 665 17:00:00 122 206 65 393 318:00:00 21 251 59 331 2 774 18:00:00 154 213 76 443 2

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 59 39 24 122 1 282 8:00:00 33 40 87 160 09:00:00 103 157 15 275 6 528 9:00:00 27 95 131 253 416:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 67 128 33 228 0 493 17:00:00 13 117 135 265 418:00:00 61 130 29 220 2 494 18:00:00 17 114 143 274 0

7:00 8:00 9:00 16:00 17:00 18:00 0:00 0:000 135 297 0 212 212 0 0

54 737 124 915 15 2345 S Totals: 413 793 224 1430 6

290 454 101 845 9 1797 W Totals: 90 366 496 952 8

Page 34: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

01

Inte

rval

Tim

e

Pass

enge

r Car

s - N

orth

App

roac

hTr

ucks

- N

orth

App

roac

hH

eavy

s - N

orth

App

roac

hPe

dest

rians

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htN

orth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

00

1717

00

00

00

00

00

11

00

00

7:30

:00

22

3417

00

00

00

00

00

32

00

11

7:45

:00

31

6026

33

00

00

00

00

52

00

21

8:00

:00

41

9232

41

00

11

00

00

61

00

31

8:15

:00

73

129

377

30

01

00

00

06

00

05

28:

30:0

08

117

243

147

00

10

00

00

60

00

83

8:45

:00

135

208

3620

60

01

00

00

06

00

08

09:

00:0

017

426

456

233

00

10

11

00

60

00

124

9:15

:00

170

264

023

00

01

01

00

06

00

012

016

:00:

0017

026

40

230

00

10

10

00

60

00

120

16:1

5:00

214

317

5337

140

01

01

00

06

00

012

016

:30:

0024

337

356

458

00

10

10

00

60

00

131

16:4

5:00

295

411

3857

120

01

01

00

06

00

013

017

:00:

0033

447

968

647

00

10

10

00

60

00

130

17:1

5:00

374

539

6073

90

02

11

00

06

00

013

017

:30:

0043

661

273

8916

00

20

10

00

60

00

152

17:4

5:00

507

674

6211

021

00

20

10

00

60

00

150

18:0

0:00

544

729

5512

313

00

20

10

00

60

00

150

18:1

5:00

540

729

012

30

00

20

10

00

60

00

150

18:1

5:15

540

729

012

30

00

20

10

00

60

00

150

Page 35: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

01

Inte

rval

Tim

e

Pass

enge

r Car

s - E

ast A

ppro

ach

Truc

ks -

East

App

roac

hH

eavy

s - E

ast A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htEa

st C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

77

55

33

00

00

00

00

22

00

00

7:30

:00

1912

94

107

00

00

00

11

31

00

00

7:45

:00

3516

1910

199

00

00

00

10

41

00

00

8:00

:00

5722

3213

245

00

00

00

21

73

00

11

8:15

:00

9538

5826

262

00

00

00

31

92

00

32

8:30

:00

118

2398

4031

50

00

00

04

110

10

06

38:

45:0

014

123

132

3435

40

00

00

06

211

10

07

19:

00:0

015

514

185

5339

40

00

00

07

111

00

07

09:

15:0

015

50

185

039

00

00

00

07

011

00

07

016

:00:

0015

50

185

039

00

00

00

07

011

00

07

016

:15:

0017

015

216

3150

110

01

10

07

013

21

17

016

:30:

0018

515

242

2656

60

01

00

08

114

11

07

016

:45:

0020

520

273

3162

60

02

10

08

015

12

17

017

:00:

0022

116

305

3270

80

03

10

08

016

12

07

017

:15:

0023

514

332

2776

60

03

00

08

016

02

07

017

:30:

0025

318

361

2983

70

03

00

08

018

22

07

017

:45:

0026

815

396

3594

110

03

00

08

019

12

09

218

:00:

0028

214

431

3599

50

03

00

08

020

12

09

018

:15:

0028

20

431

099

00

03

00

08

020

02

09

018

:15:

1528

20

431

099

00

03

00

08

020

02

09

0

Page 36: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

01

Inte

rval

Tim

e

Pass

enge

r Car

s - S

outh

App

roac

hTr

ucks

- So

uth

Appr

oach

Hea

vys

- Sou

th A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htSo

uth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

1010

3232

11

00

00

00

00

11

00

00

7:30

:00

144

6634

21

00

00

00

00

10

00

00

7:45

:00

206

109

437

50

00

00

00

02

10

00

08:

00:0

035

1515

849

169

00

00

00

00

20

00

00

8:15

:00

5217

209

5124

80

00

00

00

03

12

21

18:

30:0

077

2525

849

4723

00

00

00

11

41

31

10

8:45

:00

105

2832

466

7023

00

00

00

10

40

30

10

9:00

:00

136

3136

945

8010

00

00

00

10

51

30

10

9:15

:00

136

036

90

800

00

00

00

10

50

30

10

16:0

0:00

136

036

90

800

00

00

00

10

50

30

10

16:1

5:00

166

3042

253

9515

00

00

00

32

61

41

10

16:3

0:00

197

3146

139

107

120

00

00

03

09

34

02

116

:45:

0022

427

526

6512

114

00

11

00

30

90

40

31

17:0

0:00

256

3256

943

144

230

02

10

03

09

04

04

117

:15:

0030

852

634

6516

521

00

20

00

30

90

40

40

17:3

0:00

339

3168

753

188

230

02

00

03

09

04

04

017

:45:

0037

536

740

5320

113

00

20

00

30

90

40

62

18:0

0:00

410

3578

242

220

190

02

00

03

09

04

06

018

:15:

0041

00

782

022

00

00

20

00

30

90

40

60

18:1

5:15

410

078

20

220

00

02

00

03

09

04

06

0

Page 37: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

01

Inte

rval

Tim

e

Pass

enge

r Car

s - W

est A

ppro

ach

Truc

ks -

Wes

t App

roac

hH

eavy

s - W

est A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htW

est C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

22

55

88

00

00

00

00

11

00

00

7:30

:00

119

127

2214

00

00

00

00

32

11

00

7:45

:00

209

2614

4523

00

00

00

22

41

21

00

8:00

:00

3111

348

8540

00

00

00

20

62

20

00

8:15

:00

387

4713

112

270

00

00

03

17

13

11

18:

30:0

051

1366

1915

644

00

00

00

30

81

52

32

8:45

:00

543

9731

191

350

00

00

03

09

15

04

19:

00:0

057

312

528

212

210

00

00

03

010

16

14

09:

15:0

057

012

50

212

00

00

00

03

010

06

04

016

:00:

0057

012

50

212

00

00

00

03

010

06

04

016

:15:

0058

115

126

241

290

00

00

03

011

16

05

116

:30:

0062

417

524

279

380

01

11

13

013

27

16

116

:45:

0067

520

328

313

340

01

01

04

113

07

08

217

:00:

0069

223

633

345

320

01

01

04

015

27

08

017

:15:

0071

226

529

379

340

02

11

04

016

17

08

017

:30:

0078

728

924

423

440

02

01

04

016

07

08

017

:45:

0083

532

334

458

350

02

01

04

017

17

08

018

:00:

0086

334

623

488

300

02

01

04

018

17

08

018

:15:

0086

034

60

488

00

02

01

04

018

07

08

018

:15:

1586

034

60

488

00

02

01

04

018

07

08

0

Page 38: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Morning Peak Diagram Specified Period

From:To:

7:00:009:00:00

One Hour PeakFrom:To:

8:00:009:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600003Kestell Blvd & Coronation Dr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Non-Signalized Intersection ** Major Road: Kestell Blvd runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

106

64

0

Heavys

Trucks

Cars

Totals

2

0

38

40

0

0

24

24

2

0

62

Heavys

Trucks

Cars

Totals

3

0

39

42

Heavys Trucks Cars Totals

5 0 132 137

Heavys Trucks Cars Totals

2 0 24 26

5 0 68 73

7 0 92

Peds Cross:

West Peds:

West Entering:

West Leg Total:

43

99

236

Coronation Dr

Kestell BlvdW

N

E

SKestell Blvd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

210

113

33

Cars Trucks Heavys Totals

15 0 1 16

94 0 3 97

109 0 4

Cars Trucks Heavys Totals

92 0 5 97

Comments

Page 39: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Afternoon Peak Diagram Specified Period

From:To:

16:00:0018:00:00

One Hour PeakFrom:To:

17:00:0018:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600003Kestell Blvd & Coronation Dr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Non-Signalized Intersection ** Major Road: Kestell Blvd runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

86

40

1

Heavys

Trucks

Cars

Totals

0

0

34

34

0

0

6

6

0

0

40

Heavys

Trucks

Cars

Totals

0

0

46

46

Heavys Trucks Cars Totals

0 0 90 90

Heavys Trucks Cars Totals

0 0 33 33

0 0 84 84

0 0 117

Peds Cross:

West Peds:

West Entering:

West Leg Total:

6

117

207

Coronation Dr

Kestell BlvdW

N

E

SKestell Blvd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

159

69

1

Cars Trucks Heavys Totals

13 0 0 13

56 0 0 56

69 0 0

Cars Trucks Heavys Totals

90 0 0 90

Comments

Page 40: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600003Kestell Blvd & Coronation Dr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Non-Signalized Intersection ** Major Road: Kestell Blvd runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

310

169

6

Heavys

Trucks

Cars

Totals

5

0

117

122

1

0

46

47

6

0

163

Heavys

Trucks

Cars

Totals

5

0

136

141

Heavys Trucks Cars Totals

12 0 363 375

Heavys Trucks Cars Totals

3 0 93 96

10 0 226 236

13 0 319

Peds Cross:

West Peds:

West Entering:

West Leg Total:

65

332

707

Coronation Dr

Kestell BlvdW

N

E

SKestell Blvd

East Leg Total:

East Entering:

East Peds:

Peds Cross:

581

298

50

Cars Trucks Heavys Totals

43 0 2 45

246 0 7 253

289 0 9

Cars Trucks Heavys Totals

272 0 11 283

Comments

Page 41: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Traffic Count Summary

Intersection: Kestell Blvd & Coronation Dr Count Date: 24-Nov-16 Municipality: OakvilleNorth Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

HourEnding

HourEnding

HourEnding

HourEnding

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

GrandTotal

GrandTotal

GrandTotal

GrandTotal

TotalPeds

TotalPeds

TotalPeds

TotalPeds

North/SouthTotal

Approaches

East/WestTotal

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 11 0 27 38 4 38 8:00:00 0 0 0 0 09:00:00 24 0 40 64 0 64 9:00:00 0 0 0 0 016:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 6 0 21 27 1 27 17:00:00 0 0 0 0 018:00:00 6 0 34 40 1 40 18:00:00 0 0 0 0 0

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 0 51 4 55 8 81 8:00:00 10 16 0 26 59:00:00 0 97 16 113 33 212 9:00:00 26 73 0 99 4316:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 0 49 12 61 8 151 17:00:00 27 63 0 90 1118:00:00 0 56 13 69 1 186 18:00:00 33 84 0 117 6

7:00 8:00 9:00 16:00 17:00 18:00 0:00 0:000 24 100 0 25 13 0 0

47 0 122 169 6 169 S Totals: 0 0 0 0 0

0 253 45 298 50 630 W Totals: 96 236 0 332 65

Page 42: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

03

Inte

rval

Tim

e

Pass

enge

r Car

s - N

orth

App

roac

hTr

ucks

- N

orth

App

roac

hH

eavy

s - N

orth

App

roac

hPe

dest

rians

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htN

orth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

22

00

22

00

00

00

00

00

00

11

7:30

:00

42

00

75

00

00

00

00

00

00

32

7:45

:00

62

00

136

00

00

00

11

00

11

30

8:00

:00

104

00

2613

00

00

00

10

00

10

41

8:15

:00

133

00

348

00

00

00

10

00

32

40

8:30

:00

207

00

4814

00

00

00

10

00

30

40

8:45

:00

3010

00

6012

00

00

00

10

00

30

40

9:00

:00

344

00

644

00

00

00

10

00

30

40

9:15

:00

340

00

640

00

00

00

10

00

30

40

16:0

0:00

340

00

640

00

00

00

10

00

30

40

16:1

5:00

373

00

695

00

00

00

10

00

52

40

16:3

0:00

381

00

745

00

00

00

10

00

50

40

16:4

5:00

391

00

773

00

00

00

10

00

50

40

17:0

0:00

401

00

836

00

00

00

10

00

50

51

17:1

5:00

411

00

9310

00

00

00

10

00

50

61

17:3

0:00

410

00

100

70

00

00

01

00

05

06

017

:45:

0045

40

011

010

00

00

00

10

00

50

60

18:0

0:00

461

00

117

70

00

00

01

00

05

06

018

:15:

0046

00

011

70

00

00

00

10

00

50

60

18:1

5:15

460

00

117

00

00

00

01

00

05

06

0

Page 43: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

03

Inte

rval

Tim

e

Pass

enge

r Car

s - E

ast A

ppro

ach

Truc

ks -

East

App

roac

hH

eavy

s - E

ast A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htEa

st C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

00

1212

00

00

00

00

00

00

00

00

7:30

:00

00

197

00

00

00

00

00

00

00

11

7:45

:00

00

3011

11

00

00

00

00

11

11

21

8:00

:00

00

4919

32

00

00

00

00

21

10

86

8:15

:00

00

7324

41

00

00

00

00

31

21

168

8:30

:00

00

9926

73

00

00

00

00

41

20

3822

8:45

:00

00

121

2213

60

00

00

00

05

12

039

19:

00:0

00

014

322

185

00

00

00

00

50

20

412

9:15

:00

00

143

018

00

00

00

00

05

02

041

016

:00:

000

014

30

180

00

00

00

00

50

20

410

16:1

5:00

00

157

1421

30

00

00

00

06

12

044

316

:30:

000

017

215

221

00

00

00

00

71

20

440

16:4

5:00

00

181

928

60

00

00

00

07

02

044

017

:00:

000

019

09

302

00

00

00

00

70

20

495

17:1

5:00

00

204

1432

20

00

00

00

07

02

049

017

:30:

000

022

016

342

00

00

00

00

70

20

501

17:4

5:00

00

231

1141

70

00

00

00

07

02

050

018

:00:

000

024

615

432

00

00

00

00

70

20

500

18:1

5:00

00

246

043

00

00

00

00

07

02

050

018

:15:

150

024

60

430

00

00

00

00

70

20

500

Page 44: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

03

Inte

rval

Tim

e

Pass

enge

r Car

s - S

outh

App

roac

hTr

ucks

- So

uth

Appr

oach

Hea

vys

- Sou

th A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htSo

uth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

00

00

00

00

00

00

00

00

00

00

7:30

:00

00

00

00

00

00

00

00

00

00

00

7:45

:00

00

00

00

00

00

00

00

00

00

00

8:00

:00

00

00

00

00

00

00

00

00

00

00

8:15

:00

00

00

00

00

00

00

00

00

00

00

8:30

:00

00

00

00

00

00

00

00

00

00

00

8:45

:00

00

00

00

00

00

00

00

00

00

00

9:00

:00

00

00

00

00

00

00

00

00

00

00

9:15

:00

00

00

00

00

00

00

00

00

00

00

16:0

0:00

00

00

00

00

00

00

00

00

00

00

16:1

5:00

00

00

00

00

00

00

00

00

00

00

16:3

0:00

00

00

00

00

00

00

00

00

00

00

16:4

5:00

00

00

00

00

00

00

00

00

00

00

17:0

0:00

00

00

00

00

00

00

00

00

00

00

17:1

5:00

00

00

00

00

00

00

00

00

00

00

17:3

0:00

00

00

00

00

00

00

00

00

00

00

17:4

5:00

00

00

00

00

00

00

00

00

00

00

18:0

0:00

00

00

00

00

00

00

00

00

00

00

18:1

5:00

00

00

00

00

00

00

00

00

00

00

18:1

5:15

00

00

00

00

00

00

00

00

00

00

Page 45: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

03

Inte

rval

Tim

e

Pass

enge

r Car

s - W

est A

ppro

ach

Truc

ks -

Wes

t App

roac

hH

eavy

s - W

est A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htW

est C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

22

11

00

00

00

00

00

00

00

00

7:30

:00

31

21

00

00

00

00

11

11

00

00

7:45

:00

85

64

00

00

00

00

10

10

00

22

8:00

:00

91

115

00

00

00

00

10

54

00

53

8:15

:00

134

2817

00

00

00

00

21

83

00

149

8:30

:00

174

4416

00

00

00

00

31

91

00

4531

8:45

:00

225

6824

00

00

00

00

30

101

00

483

9:00

:00

3311

7911

00

00

00

00

30

100

00

480

9:15

:00

330

790

00

00

00

00

30

100

00

480

16:0

0:00

330

790

00

00

00

00

30

100

00

480

16:1

5:00

385

8910

00

00

00

00

30

100

00

579

16:3

0:00

4810

103

140

00

00

00

03

010

00

058

116

:45:

0055

712

421

00

00

00

00

30

100

00

591

17:0

0:00

605

142

180

00

00

00

03

010

00

059

017

:15:

0066

615

816

00

00

00

00

30

100

00

623

17:3

0:00

748

181

230

00

00

00

03

010

00

063

117

:45:

0085

1120

423

00

00

00

00

30

100

00

630

18:0

0:00

938

226

220

00

00

00

03

010

00

065

218

:15:

0093

022

60

00

00

00

00

30

100

00

650

18:1

5:15

930

226

00

00

00

00

03

010

00

065

0

Page 46: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Morning Peak Diagram Specified Period

From:To:

7:00:009:00:00

One Hour PeakFrom:To:

8:00:009:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600002Eighth Ln & Kestell Blvd124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Signalized Intersection ** Major Road: Eighth Ln runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

806

448

5

Heavys

Trucks

Cars

Totals

2

0

1

3

6

2

427

435

2

0

8

10

10

2

436

Heavys

Trucks

Cars

Totals

7

1

350

358

Heavys Trucks Cars Totals

2 1 12 15

Heavys Trucks Cars Totals

0 0 2 2

0 0 1 1

0 1 36 37

0 1 39

Peds Cross:

West Peds:

West Entering:

West Leg Total:

5

40

55

Eighth Ln

Woodridge WayW

N

E

SKestell Blvd

Eighth Ln

East Leg Total:

East Entering:

East Peds:

Peds Cross:

248

149

7

Cars Trucks Heavys Totals

21 0 1 22

2 0 0 2

121 0 4 125

144 0 5

Cars Trucks Heavys Totals

93 0 6 99

Cars

Trucks

Heavys

Totals

584

3

10

597

Cars

Trucks

Heavys

Totals

9

1

0

10

327

1

6

334

84

0

4

88

420

2

10

Peds Cross:

South Peds:

South Entering:

South Leg Total:

19

432

1029

Comments

Page 47: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Afternoon Peak Diagram Specified Period

From:To:

16:00:0018:00:00

One Hour PeakFrom:To:

17:00:0018:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600002Eighth Ln & Kestell Blvd124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Signalized Intersection ** Major Road: Eighth Ln runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

879

425

0

Heavys

Trucks

Cars

Totals

0

0

4

4

1

0

406

407

0

0

14

14

1

0

424

Heavys

Trucks

Cars

Totals

0

2

452

454

Heavys Trucks Cars Totals

0 0 52 52

Heavys Trucks Cars Totals

0 0 3 3

0 0 0 0

0 0 22 22

0 0 25

Peds Cross:

West Peds:

West Entering:

West Leg Total:

1

25

77

Eighth Ln

Woodridge WayW

N

E

SKestell Blvd

Eighth Ln

East Leg Total:

East Entering:

East Peds:

Peds Cross:

211

93

1

Cars Trucks Heavys Totals

20 0 0 20

0 0 0 0

73 0 0 73

93 0 0

Cars Trucks Heavys Totals

118 0 0 118

Cars

Trucks

Heavys

Totals

501

0

1

502

Cars

Trucks

Heavys

Totals

48

0

0

48

429

2

0

431

104

0

0

104

581

2

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

5

583

1085

Comments

Page 48: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600002Eighth Ln & Kestell Blvd124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Signalized Intersection ** Major Road: Eighth Ln runs N/S

North Leg Total:

North Entering:

North Peds:

Peds Cross:

2945

1545

6

Heavys

Trucks

Cars

Totals

3

0

9

12

19

5

1467

1491

4

0

38

42

26

5

1514

Heavys

Trucks

Cars

Totals

15

5

1380

1400

Heavys Trucks Cars Totals

5 1 103 109

Heavys Trucks Cars Totals

1 0 5 6

0 0 1 1

0 1 118 119

1 1 124

Peds Cross:

West Peds:

West Entering:

West Leg Total:

9

126

235

Eighth Ln

Woodridge WayW

N

E

SKestell Blvd

Eighth Ln

East Leg Total:

East Entering:

East Peds:

Peds Cross:

718

389

11

Cars Trucks Heavys Totals

61 0 2 63

4 0 0 4

313 0 9 322

378 0 11

Cars Trucks Heavys Totals

318 0 11 329

Cars

Trucks

Heavys

Totals

1898

6

28

1932

Cars

Trucks

Heavys

Totals

90

1

2

93

1314

5

12

1331

279

0

7

286

1683

6

21

Peds Cross:

South Peds:

South Entering:

South Leg Total:

34

1710

3642

Comments

Page 49: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Traffic Count Summary

Intersection: Eighth Ln & Kestell Blvd Count Date: 24-Nov-16 Municipality: OakvilleNorth Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

HourEnding

HourEnding

HourEnding

HourEnding

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

GrandTotal

GrandTotal

GrandTotal

GrandTotal

TotalPeds

TotalPeds

TotalPeds

TotalPeds

North/SouthTotal

Approaches

East/WestTotal

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 5 261 1 267 0 465 8:00:00 6 176 16 198 29:00:00 10 435 3 448 5 880 9:00:00 10 334 88 432 1916:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 13 388 4 405 1 902 17:00:00 29 390 78 497 818:00:00 14 407 4 425 0 1008 18:00:00 48 431 104 583 5

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 65 0 7 72 0 111 8:00:00 0 0 39 39 19:00:00 125 2 22 149 7 189 9:00:00 2 1 37 40 516:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 59 2 14 75 3 97 17:00:00 1 0 21 22 218:00:00 73 0 20 93 1 118 18:00:00 3 0 22 25 1

7:00 8:00 9:00 16:00 17:00 18:00 0:00 0:000 67 153 0 71 81 0 0

42 1491 12 1545 6 3255 S Totals: 93 1331 286 1710 34

322 4 63 389 11 515 W Totals: 6 1 119 126 9

Page 50: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

02

Inte

rval

Tim

e

Pass

enge

r Car

s - N

orth

App

roac

hTr

ucks

- N

orth

App

roac

hH

eavy

s - N

orth

App

roac

hPe

dest

rians

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htN

orth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

00

4040

00

00

11

00

00

11

00

00

7:30

:00

00

8848

00

00

10

00

00

43

00

00

7:45

:00

33

155

670

00

01

00

00

07

30

00

08:

00:0

03

025

196

00

00

21

00

22

81

11

00

8:15

:00

63

358

107

00

00

31

00

20

102

10

11

8:30

:00

93

485

127

00

00

41

00

31

122

21

54

8:45

:00

101

581

960

00

04

00

04

113

12

05

09:

00:0

011

167

897

11

00

40

00

40

141

31

50

9:15

:00

110

678

01

00

04

00

04

014

03

05

016

:00:

0011

067

80

10

00

40

00

40

140

30

50

16:1

5:00

132

775

973

20

04

00

04

015

13

05

016

:30:

0018

586

792

41

00

51

00

40

183

30

50

16:4

5:00

235

955

884

00

05

00

04

018

03

05

017

:00:

0024

110

6110

65

10

05

00

04

018

03

06

117

:15:

0029

511

5695

50

00

50

00

40

191

30

60

17:3

0:00

345

1276

120

72

00

50

00

40

190

30

60

17:4

5:00

362

1372

968

10

05

00

04

019

03

06

018

:00:

0038

214

6795

91

00

50

00

40

190

30

60

18:1

5:00

380

1467

09

00

05

00

04

019

03

06

018

:15:

1538

014

670

90

00

50

00

40

190

30

60

Page 51: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

02

Inte

rval

Tim

e

Pass

enge

r Car

s - E

ast A

ppro

ach

Truc

ks -

East

App

roac

hH

eavy

s - E

ast A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htEa

st C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

77

00

22

00

00

00

00

00

00

00

7:30

:00

2114

00

20

00

00

00

00

00

00

00

7:45

:00

3615

00

42

00

00

00

22

00

00

00

8:00

:00

6327

00

73

00

00

00

20

00

00

00

8:15

:00

9431

00

92

00

00

00

53

00

00

11

8:30

:00

132

380

016

70

00

00

05

00

01

16

58:

45:0

016

129

00

237

00

00

00

61

00

10

71

9:00

:00

184

232

228

50

00

00

06

00

01

07

09:

15:0

018

40

20

280

00

00

00

60

00

10

70

16:0

0:00

184

02

028

00

00

00

06

00

01

07

016

:15:

0020

016

42

335

00

00

00

82

00

21

81

16:3

0:00

215

154

035

20

00

00

09

10

02

010

216

:45:

0022

813

40

361

00

00

00

90

00

20

100

17:0

0:00

240

124

041

50

00

00

09

00

02

010

017

:15:

0025

919

40

476

00

00

00

90

00

20

100

17:3

0:00

280

214

053

60

00

00

09

00

02

010

017

:45:

0029

818

40

541

00

00

00

90

00

20

111

18:0

0:00

313

154

061

70

00

00

09

00

02

011

018

:15:

0031

30

40

610

00

00

00

90

00

20

110

18:1

5:15

313

04

061

00

00

00

09

00

02

011

0

Page 52: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

02

Inte

rval

Tim

e

Pass

enge

r Car

s - S

outh

App

roac

hTr

ucks

- So

uth

Appr

oach

Hea

vys

- Sou

th A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htSo

uth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

22

3737

22

00

00

00

00

11

00

00

7:30

:00

20

7033

31

00

00

00

00

10

11

22

7:45

:00

53

117

478

50

00

00

00

02

11

02

08:

00:0

05

017

457

135

00

00

00

11

20

32

20

8:15

:00

61

241

6732

190

01

10

01

05

36

35

38:

30:0

08

232

584

4715

00

10

00

10

72

71

1813

8:45

:00

113

427

102

7528

11

10

00

10

70

70

202

9:00

:00

143

501

7497

221

01

00

01

08

17

021

19:

15:0

014

050

10

970

10

10

00

10

80

70

210

16:0

0:00

140

501

097

01

01

00

01

08

07

021

016

:15:

0018

459

291

109

121

01

00

01

010

27

023

216

:30:

0026

867

684

130

211

01

00

02

112

27

025

216

:45:

0035

978

611

015

323

10

21

00

20

120

70

283

17:0

0:00

427

885

9917

522

10

31

00

20

120

70

291

17:1

5:00

508

1011

126

197

221

03

00

02

012

07

031

217

:30:

0063

1311

1610

521

821

10

30

00

20

120

70

321

17:4

5:00

7310

1217

101

253

351

03

00

02

012

07

034

218

:00:

0090

1713

1497

279

261

05

20

02

012

07

034

018

:15:

0090

013

140

279

01

05

00

02

012

07

034

018

:15:

1590

013

140

279

01

05

00

02

012

07

034

0

Page 53: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

02

Inte

rval

Tim

e

Pass

enge

r Car

s - W

est A

ppro

ach

Truc

ks -

Wes

t App

roac

hH

eavy

s - W

est A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htW

est C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

00

00

99

00

00

00

00

00

00

11

7:30

:00

00

00

145

00

00

00

00

00

00

10

7:45

:00

00

00

2612

00

00

00

00

00

00

10

8:00

:00

00

00

3913

00

00

00

00

00

00

10

8:15

:00

00

00

478

00

00

00

00

00

00

10

8:30

:00

11

00

6013

00

00

00

00

00

00

43

8:45

:00

21

11

666

00

00

00

00

00

00

40

9:00

:00

20

10

759

00

00

11

00

00

00

62

9:15

:00

20

10

750

00

00

10

00

00

00

60

16:0

0:00

20

10

750

00

00

10

00

00

00

60

16:1

5:00

20

10

794

00

00

10

11

00

00

71

16:3

0:00

20

10

801

00

00

10

10

00

00

70

16:4

5:00

20

10

888

00

00

10

10

00

00

81

17:0

0:00

20

10

968

00

00

10

10

00

00

80

17:1

5:00

42

10

100

40

00

01

01

00

00

08

017

:30:

005

11

010

44

00

00

10

10

00

00

80

17:4

5:00

50

10

110

60

00

01

01

00

00

09

118

:00:

005

01

011

88

00

00

10

10

00

00

90

18:1

5:00

50

10

118

00

00

01

01

00

00

09

018

:15:

155

01

011

80

00

00

10

10

00

00

90

Page 54: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Morning Peak Diagram Specified Period

From:To:

7:00:009:00:00

One Hour PeakFrom:To:

8:00:009:00:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600004North Ridge Tr & Coronation Dr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Non-Signalized Intersection ** Major Road: North Ridge Tr runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

37

24

3

Heavys

Trucks

Cars

Totals

0

0

14

14

0

0

1

1

0

0

9

9

0

0

24

Heavys

Trucks

Cars

Totals

1

0

12

13

Heavys Trucks Cars Totals

7 0 237 244

Heavys Trucks Cars Totals

0 0 5 5

5 0 158 163

1 0 12 13

6 0 175

Peds Cross:

West Peds:

West Entering:

West Leg Total:

13

181

425

Felhaber Cres

North Ridge TrW

N

E

SNorth Ridge Tr

Coronation Dr

East Leg Total:

East Entering:

East Peds:

Peds Cross:

446

239

15

Cars Trucks Heavys Totals

5 0 1 6

209 0 5 214

18 0 1 19

232 0 7

Cars Trucks Heavys Totals

201 0 6 207

Cars

Trucks

Heavys

Totals

31

0

2

33

Cars

Trucks

Heavys

Totals

14

0

2

16

2

0

0

2

34

0

1

35

50

0

3

Peds Cross:

South Peds:

South Entering:

South Leg Total:

2

53

86

Comments

Page 55: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Afternoon Peak Diagram Specified Period

From:To:

16:00:0018:00:00

One Hour PeakFrom:To:

16:45:0017:45:00

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600004North Ridge Tr & Coronation Dr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Non-Signalized Intersection ** Major Road: North Ridge Tr runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

27

9

9

Heavys

Trucks

Cars

Totals

0

0

3

3

0

0

1

1

0

0

5

5

0

0

9

Heavys

Trucks

Cars

Totals

0

0

18

18

Heavys Trucks Cars Totals

4 0 203 207

Heavys Trucks Cars Totals

0 0 8 8

4 1 154 159

0 0 23 23

4 1 185

Peds Cross:

West Peds:

West Entering:

West Leg Total:

3

190

397

Felhaber Cres

North Ridge TrW

N

E

SNorth Ridge Tr

Coronation Dr

East Leg Total:

East Entering:

East Peds:

Peds Cross:

414

237

4

Cars Trucks Heavys Totals

10 0 0 10

191 0 4 195

32 0 0 32

233 0 4

Cars Trucks Heavys Totals

172 1 4 177

Cars

Trucks

Heavys

Totals

56

0

0

56

Cars

Trucks

Heavys

Totals

9

0

0

9

0

0

0

0

13

0

0

13

22

0

0

Peds Cross:

South Peds:

South Entering:

South Leg Total:

6

22

78

Comments

Page 56: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Total Count Diagram

Municipality:Site #:Intersection:TFR File #:Count date:

Oakville1618600004North Ridge Tr & Coronation Dr124-Nov-16

Weather conditions:

Person counted:Person prepared:Person checked:

** Non-Signalized Intersection ** Major Road: North Ridge Tr runs W/E

North Leg Total:

North Entering:

North Peds:

Peds Cross:

121

61

22

Heavys

Trucks

Cars

Totals

0

0

35

35

0

0

2

2

0

0

24

24

0

0

61

Heavys

Trucks

Cars

Totals

1

0

59

60

Heavys Trucks Cars Totals

27 3 736 766

Heavys Trucks Cars Totals

0 0 29 29

18 3 505 526

1 0 53 54

19 3 587

Peds Cross:

West Peds:

West Entering:

West Leg Total:

22

609

1375

Felhaber Cres

North Ridge TrW

N

E

SNorth Ridge Tr

Coronation Dr

East Leg Total:

East Entering:

East Peds:

Peds Cross:

1437

800

31

Cars Trucks Heavys Totals

25 0 1 26

656 3 21 680

88 0 6 94

769 3 28

Cars Trucks Heavys Totals

615 3 19 637

Cars

Trucks

Heavys

Totals

143

0

7

150

Cars

Trucks

Heavys

Totals

45

0

6

51

5

0

0

5

86

0

1

87

136

0

7

Peds Cross:

South Peds:

South Entering:

South Leg Total:

23

143

293

Comments

Page 57: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Accu-Traffic Inc.Traffic Count Summary

Intersection: North Ridge Tr & Coronation Dr Count Date: 24-Nov-16 Municipality: OakvilleNorth Approach Totals South Approach Totals

East Approach Totals West Approach Totals

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

Includes Cars, Trucks, & Heavys Includes Cars, Trucks, & Heavys

HourEnding

HourEnding

HourEnding

HourEnding

Left Left

Left Left

Thru Thru

Thru Thru

Right Right

Right Right

GrandTotal

GrandTotal

GrandTotal

GrandTotal

TotalPeds

TotalPeds

TotalPeds

TotalPeds

North/SouthTotal

Approaches

East/WestTotal

Approaches

Calculated Values for Traffic Crossing Major StreetHours Ending:Crossing Values:

Totals:

Totals:

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 5 0 6 11 6 46 8:00:00 11 0 24 35 79:00:00 9 1 14 24 3 77 9:00:00 16 2 35 53 216:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 3 1 11 15 9 46 17:00:00 17 2 12 31 918:00:00 7 0 4 11 4 35 18:00:00 7 1 16 24 5

7:00:00 0 0 0 0 0 0 7:00:00 0 0 0 0 08:00:00 10 83 1 94 12 163 8:00:00 2 63 4 69 49:00:00 19 214 6 239 15 420 9:00:00 5 163 13 181 1316:00:00 0 0 0 0 0 0 16:00:00 0 0 0 0 017:00:00 31 188 10 229 0 409 17:00:00 8 151 21 180 418:00:00 34 195 9 238 4 417 18:00:00 14 149 16 179 1

7:00 8:00 9:00 16:00 17:00 18:00 0:00 0:000 32 55 0 26 20 0 0

24 2 35 61 22 204 S Totals: 51 5 87 143 23

94 680 26 800 31 1409 W Totals: 29 526 54 609 22

Page 58: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

04

Inte

rval

Tim

e

Pass

enge

r Car

s - N

orth

App

roac

hTr

ucks

- N

orth

App

roac

hH

eavy

s - N

orth

App

roac

hPe

dest

rians

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htN

orth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

11

00

00

00

00

00

00

00

00

00

7:30

:00

32

00

22

00

00

00

00

00

00

11

7:45

:00

41

00

53

00

00

00

00

00

00

21

8:00

:00

51

00

61

00

00

00

00

00

00

64

8:15

:00

61

00

82

00

00

00

00

00

00

60

8:30

:00

71

11

124

00

00

00

00

00

00

82

8:45

:00

114

10

197

00

00

00

00

00

00

80

9:00

:00

143

10

201

00

00

00

00

00

00

91

9:15

:00

140

10

200

00

00

00

00

00

00

90

16:0

0:00

140

10

200

00

00

00

00

00

00

90

16:1

5:00

151

10

233

00

00

00

00

00

00

101

16:3

0:00

161

10

274

00

00

00

00

00

00

122

16:4

5:00

160

10

314

00

00

00

00

00

00

131

17:0

0:00

171

21

310

00

00

00

00

00

00

185

17:1

5:00

192

20

321

00

00

00

00

00

00

213

17:3

0:00

201

20

331

00

00

00

00

00

00

221

17:4

5:00

211

20

341

00

00

00

00

00

00

220

18:0

0:00

243

20

351

00

00

00

00

00

00

220

18:1

5:00

240

20

350

00

00

00

00

00

00

220

18:1

5:15

240

20

350

00

00

00

00

00

00

220

Page 59: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

04

Inte

rval

Tim

e

Pass

enge

r Car

s - E

ast A

ppro

ach

Truc

ks -

East

App

roac

hH

eavy

s - E

ast A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htEa

st C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

11

99

00

00

00

00

00

11

00

00

7:30

:00

32

2213

00

00

00

00

00

21

00

11

7:45

:00

52

4725

00

00

00

00

22

31

00

21

8:00

:00

83

7730

11

00

00

00

20

63

00

1210

8:15

:00

102

121

441

00

00

00

03

18

20

022

108:

30:0

014

417

150

10

00

00

00

30

80

11

264

8:45

:00

195

219

483

20

00

00

03

010

21

026

09:

00:0

026

728

667

63

00

00

00

30

111

10

271

9:15

:00

260

286

06

00

00

00

03

011

01

027

016

:00:

0026

028

60

60

00

00

00

30

110

10

270

16:1

5:00

337

328

428

20

01

10

05

213

21

027

016

:30:

0040

737

042

80

00

10

00

61

152

10

270

16:4

5:00

499

416

4613

50

03

20

06

016

11

027

017

:00:

0054

546

549

163

00

30

00

60

171

10

270

17:1

5:00

6713

502

3716

00

03

00

06

017

01

029

217

:30:

0073

655

149

204

00

30

00

60

192

10

290

17:4

5:00

818

607

5623

30

03

00

06

020

11

031

218

:00:

0088

765

649

252

00

30

00

60

211

10

310

18:1

5:00

880

656

025

00

03

00

06

021

01

031

018

:15:

1588

065

60

250

00

30

00

60

210

10

310

Page 60: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

04

Inte

rval

Tim

e

Pass

enge

r Car

s - S

outh

App

roac

hTr

ucks

- So

uth

Appr

oach

Hea

vys

- Sou

th A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htSo

uth

Cro

ss

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

11

00

22

00

00

00

00

00

00

00

7:30

:00

32

00

86

00

00

00

11

00

00

11

7:45

:00

63

00

179

00

00

00

21

00

00

43

8:00

:00

93

00

247

00

00

00

20

00

00

73

8:15

:00

167

00

317

00

00

00

31

00

11

92

8:30

:00

193

11

387

00

00

00

41

00

10

90

8:45

:00

223

10

5113

00

00

00

40

00

10

90

9:00

:00

231

21

587

00

00

00

40

00

10

90

9:15

:00

230

20

580

00

00

00

40

00

10

90

16:0

0:00

230

20

580

00

00

00

40

00

10

90

16:1

5:00

318

20

591

00

00

00

51

00

10

123

16:3

0:00

321

31

601

00

00

00

61

00

10

153

16:4

5:00

331

41

666

00

00

00

60

00

10

172

17:0

0:00

385

40

704

00

00

00

60

00

10

181

17:1

5:00

424

40

722

00

00

00

60

00

10

202

17:3

0:00

420

40

742

00

00

00

60

00

10

211

17:4

5:00

420

40

795

00

00

00

60

00

10

232

18:0

0:00

453

51

867

00

00

00

60

00

10

230

18:1

5:00

450

50

860

00

00

00

60

00

10

230

18:1

5:15

450

50

860

00

00

00

60

00

10

230

Page 61: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Acc

u-Tr

affic

Inc.

Cou

nt D

ate:

24-

Nov

-16

Site

#:

1618

6000

04

Inte

rval

Tim

e

Pass

enge

r Car

s - W

est A

ppro

ach

Truc

ks -

Wes

t App

roac

hH

eavy

s - W

est A

ppro

ach

Pede

stria

ns

Left

Left

Left

Thru

Thru

Thru

Rig

htR

ight

Rig

htW

est C

ross

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Cum

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

Incr

7:00

:00

00

00

00

00

00

00

00

00

00

00

7:15

:00

00

1010

00

00

00

00

00

11

00

00

7:30

:00

00

199

22

00

00

00

00

21

00

00

7:45

:00

22

3819

20

00

00

00

00

31

00

11

8:00

:00

20

5820

42

00

00

00

00

52

00

43

8:15

:00

31

7921

62

00

00

00

00

72

11

95

8:30

:00

41

120

418

20

00

00

00

08

11

016

78:

45:0

04

017

555

135

00

00

00

00

91

10

160

9:00

:00

73

216

4116

30

00

00

00

010

11

017

19:

15:0

07

021

60

160

00

00

00

00

100

10

170

16:0

0:00

70

216

016

00

00

00

00

010

01

017

016

:15:

008

125

236

193

00

00

00

00

122

10

170

16:3

0:00

91

283

3124

50

01

10

00

013

11

019

216

:45:

0015

631

835

284

00

10

00

00

130

10

190

17:0

0:00

150

361

4337

90

01

00

00

015

21

021

217

:15:

0018

340

140

414

00

21

00

00

161

10

221

17:3

0:00

202

435

3446

50

02

00

00

016

01

022

017

:45:

0023

347

237

515

00

20

00

00

171

10

220

18:0

0:00

296

505

3353

20

03

10

00

018

11

022

018

:15:

0029

050

50

530

00

30

00

00

180

10

220

18:1

5:15

290

505

053

00

03

00

00

018

01

022

0

Page 62: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Configuration-----------------------------------------------------------------

Controller Sequence Priority 1 2 3 4 5 6 7 8 9 10 11 12

Ring 1 Phases . . 1 2 | 3 4 | 9 10 | 0 0 0 0 0 0 Ring 2 Phases . . 5 6 | 7 8 |11 12 | 0 0 0 0 0 0

Phase 1 2 3 4 5 6 7 8 9 10 11 12

In Use. . . . . . X X . X X X . X . . . .Exclusive Ped . . . . . . . . . . . . . .Direction . . . .

Overlap A B C DDirection . . .

Load Switch Channel/Driver Group Assign (Info Only): Load Signal Switch Driver Group (MMU) Phase/ Channel Ovlap Ped 1 . . . . . . 1 . 2 . . . . . . 2 . 3 . . . . . . 3 . 4 . . . . . . 4 . 5 . . . . . . 5 . 6 . . . . . . 6 . 7 . . . . . . 7 . 8 . . . . . . 8 . 9 . . . . . . 2 X 10 . . . . . . 4 X 11 . . . . . . 6 X 12 . . . . . . 8 X 13 . . . . . . A . 14 . . . . . . B . 15 . . . . . . C . 16 . . . . . . D .

BWyllie
Typewritten Text
NB
BWyllie
Typewritten Text
SB
BWyllie
Typewritten Text
EB
BWyllie
Typewritten Text
WB
BWyllie
Typewritten Text
SBL
BWyllie
Typewritten Text
NBL
BWyllie
Typewritten Text
Page 63: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Configuration Continued-----------------------------------------------------------------

Enable BIU: 1 2 3 4 5 6 7 8Terminal/Facilities. . . . X X . . . . . .Detector Rack. . . . . . . X . . . . . . .

Type 2 Runs as Type 1. . . .MMU Disable. . . . . . . . .Diagnostic Enable. . . . . .Peer-Peer Comm Enable. . . .

1 2 3 4 5 6 7 8 9 10Peer To Peer Addresses . . 255 255 255 255 255 255 255 255 255 255

Port 2:

Port 2 Protocol . . . . . . . . TerminalPort 2 Enable . . . . . . . . . NOAB3418 Address. . . . . . . . . 1AB3418 Group Address. . . . . . 0AB3418 Response Delay . . . . . 0AB3418 Single Flag Enable . . . NOAB3418 Drop-Out Time. . . . . . 0AB3418 TOD SF Select. . . . . . 0Data Rate . . . . . . . . . . . 1200 bpsData, Parity, Stop. . . . . . . 8, 0, 1

Port 3:

Port 3 Protocol . . . . . . . . TelemetryPort 3 Enable . . . . . . . . . YESTelemetry Address . . . . . . . 16System Detector 9-16 Address. . 0Telemetry Response Delay. . . . 8700AB3418 Address. . . . . . . . . 0AB3418 Group Address. . . . . . 0AB3418 Response Delay . . . . . 0AB3418 Single Flag Enable . . . NOAB3418 Drop-Out Time. . . . . . 0AB3418 TOD SF Select. . . . . . 0Duplex. . . . . . . . . . . . . FullData Rate . . . . . . . . . . . 1200 bpsData, Parity, Stop. . . . . . . 8, 0, 1

Page 64: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Configuration Continued-----------------------------------------------------------------

Event Enabling Alarm Enabling

Critical RFE'S (MMU/TF) . . . . . X ALARM 1 . . . . . . . . . . . XNon-Critical RFE'S (DET/TEST) . . . ALARM 2 . . . . . . . . . . . .Detector Errors . . . . . . . . . . ALARM 3 . . . . . . . . . . . .Coordination Errors . . . . . . . . ALARM 4 . . . . . . . . . . . .MMU Flash Faults. . . . . . . . . X ALARM 5 . . . . . . . . . . . .Local Flash Faults. . . . . . . . X ALARM 6 . . . . . . . . . . . .Preempt . . . . . . . . . . . . . X ALARM 7 . . . . . . . . . . . .Power On/Off. . . . . . . . . . . X ALARM 8 . . . . . . . . . . . .Low Battery . . . . . . . . . . . X ALARM 9 . . . . . . . . . . . . ALARM 10. . . . . . . . . . . . ALARM 11. . . . . . . . . . . . ALARM 12. . . . . . . . . . . . ALARM 13. . . . . . . . . . . . ALARM 14. . . . . . . . . . . . ALARM 15. . . . . . . . . . . . ALARM 16. . . . . . . . . . . .

Supervisor Access Code. . . ****Data Change Access Code . . ****

MMU Compatibility Program (Info Only)

Channel Is Allowed to Time With Channel 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 . . . . . . . . X . . . . X X . . . 2 . . . . . . . . X . X . . X X . . 3 . . . . . . . X . . . X X . . . 4 . . . . . . . X . X . X X . . 5 . . . . . . . . . . X . . . 6 . . . . . . . . X . X . . 7 . . . . . . . . . X . . 8 . . . . . . . X . X . 9 . . . . . . . . X . 10. . . . . . . X . 11. . . . . . . . 12. . . . . . . 13. . . . . . 14. . . . . 15. . . .

Version Info:Software Assy. Part No. VersionBoot 27831 2.83Program 45561 7.2 Application . 3Help 27891 5.83Configuration 27913 C165�

Page 65: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

By-Phase Timing Data-----------------------------------------------------------------

Phase 1 2 3 4 5 6 7 8 9 10 11 12Direction

Minimum Green 7 25 0 12 7 25 0 12 5 5 5 5

Bike Min Green 0 0 0 0 0 0 0 0 0 0 0 0

Cond Serv Min Grn 0 0 0 0 0 0 0 0 0 0 0 0

Walk 0 10 0 12 0 10 0 12 0 10 0 10

Ped Clearance 0 15 0 18 0 15 0 18 0 16 0 16

Veh Extension 3.0 4.5 0.0 4.0 3.0 4.5 0.0 4.0 5.0 5.0 5.0 5.0

Alt Veh Exten 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Max Extension 0 0 0 0 0 0 0 0 0 0 0 0

Max 1 25 40 0 30 25 40 0 30 35 35 35 35

Max 2 40 40 40 40 40 40 40 40 40 40 40 40

Max 3 0 0 0 0 0 0 0 0 0 0 0 0

Det. Fail Max 0 0 0 0 0 0 0 0 0 0 0 0

Yellow Change 3.0 3.3 3.0 3.3 3.0 3.3 3.0 3.3 3.0 3.0 3.0 3.0

Red Clearance 0.0 2.4 0.0 2.6 0.0 2.4 0.0 2.6 1.0 1.0 1.0 1.0

Red Revert 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0

Act. B4 Init 0 0 0 0 0 0 0 0 0 0 0 0

Sec/Actuation 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Max Initial 30 30 30 30 30 30 30 30 30 30 30 30

Time B4 Reduction 0 0 0 0 0 0 0 0 0 0 0 0

Cars Waiting 0 0 0 0 0 0 0 0 0 0 0 0

Time To Reduce 0 0 0 0 0 0 0 0 0 0 0 0

Minimum Gap 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 66: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

No-Serve Phases-----------------------------------------------------------------

Phase Cannot Serve With PhasePhase 12 11 10 9 8 7 6 5 4 3 2 1. . . . . . . . . . . . . . 2. . . . . . . . . . . . . 3. . . . . . . . . . . . 4. . . . . . . . . . . 5. . . . . . . . . . 6. . . . . . . . . 7. . . . . . . . 8. . . . . . . 9. . . . . . 10. . . . . 11. . . .

Page 67: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Ped Carryover-----------------------------------------------------------------

Ped Start Phase Carry Over Phase

1 0

2 0

3 0

4 0

5 0

6 0

7 0

8 0

9 0

10 0

11 0

12 0

Page 68: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Vehicle/Ped Phase as Overlap-----------------------------------------------------------------

Ped Phase As Overlap Ped Consists of Ped PhasesOvlapPhase 1 2 3 4 5 6 7 8 9 10 11 12 1 . . . . . . . . . . . . 2 . . . . . . . . . . . . 3 . . . . . . . . . . . . 4 . . . . . . . . . . . . 5 . . . . . . . . . . . . 6 . . . . . . . . . . . . 7 . . . . . . . . . . . . 8 . . . . . . . . . . . . 9 . . . . . . . . . . . . 10 . . . . . . . . . . . . 11 . . . . . . . . . . . . 12 . . . . . . . . . . . .

Veh Phase As Overlap Veh Consists of Veh PhasesOvlapPhase 1 2 3 4 5 6 7 8 9 10 11 12 1 X . . . . . . . . . . . 2 . X . . . . . . . . . . 3 . . X . . . . . . . . . 4 . . . X . . . . . . . . 5 . . . . X . . . . . . . 6 . . . . . X . . . . . . 7 . . . . . . X . . . . . 8 . . . . . . . X . . . . 9 . . . . . . . . X . . . 10 . . . . . . . . . X . . 11 . . . . . . . . . . X . 12 . . . . . . . . . . . X

Page 69: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Overlap Data-----------------------------------------------------------------

Overlap A Phase: 1 2 3 4 5 6 7 8 9 10 11 12Standard. . . . . . . . . . . . . . . . . . . .Protected . . . . . . . . . . . . . . . . . . .Permitted . . . . . . . . . . . . . . . . . . .Enable Lag. . . . . . . . . . . . . . . . . . .Enable Lead . . . . . . . . . . . . . . . . . .Spare . . . . . . . . . . . . . . . . . . . . .Advance Green Timer . . . . . . . 0.0 Green Yellow RedLag/Lead Timers . . . . . . . . . 0.0 0.0 0.0

Overlap B Phase: 1 2 3 4 5 6 7 8 9 10 11 12Standard. . . . . . . . . . . . . . . . . . . .Protected . . . . . . . . . . . . . . . . . . .Permitted . . . . . . . . . . . . . . . . . . .Enable Lag. . . . . . . . . . . . . . . . . . .Enable Lead . . . . . . . . . . . . . . . . . .Spare . . . . . . . . . . . . . . . . . . . . .Advance Green Timer . . . . . . . 0.0 Green Yellow RedLag/Lead Timers . . . . . . . . . 0.0 0.0 0.0

Overlap C Phase: 1 2 3 4 5 6 7 8 9 10 11 12Standard. . . . . . . . . . . . . . . . . . . .Protected . . . . . . . . . . . . . . . . . . .Permitted . . . . . . . . . . . . . . . . . . .Enable Lag. . . . . . . . . . . . . . . . . . .Enable Lead . . . . . . . . . . . . . . . . . .Spare . . . . . . . . . . . . . . . . . . . . .Advance Green Timer . . . . . . . 0.0 Green Yellow RedLag/Lead Timers . . . . . . . . . 0.0 0.0 0.0

Overlap D Phase: 1 2 3 4 5 6 7 8 9 10 11 12Standard. . . . . . . . . . . . . . . . . . . .Protected . . . . . . . . . . . . . . . . . . .Permitted . . . . . . . . . . . . . . . . . . .Enable Lag. . . . . . . . . . . . . . . . . . .Enable Lead . . . . . . . . . . . . . . . . . .Spare . . . . . . . . . . . . . . . . . . . . .Advance Green Timer . . . . . . . 0.0 Green Yellow RedLag/Lead Timers . . . . . . . . . 0.0 0.0 0.0

Page 70: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Power Start, Remote Flash-----------------------------------------------------------------

Phase 1 2 3 4 5 6 7 8 9 10 11 12Power Start. . . . . . . . X . . . X . . . .External Start . . . . . . X . . . X . . . .Into Remote Flash. . . . . . . . . . . . . .Exit Remote Flash. . . . . . . . . . . . . . OverlapRemote Flash Yellow. . . . . . . . . . . . . A B C DFlash Together . . . . . . . . . . . . . . . . . . .

Initialization Interval:Power Start . . . . . . . . YellowExternal Start. . . . . . . Yellow

Power Start All Red Time. . 0Power Start Flash Time. . . 0

Remote Flash Options:

Out of Flash Yellow . . . . NOOut of Flash All Red. . . . NOMinimum Recall. . . . . . . NOAlternate Flash . . . . . . NOFlash Thru Load Switches. . NOCycle Through Phases. . . . NO

Page 71: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Option Data-----------------------------------------------------------------

Phase 1 2 3 4 5 6 7 8 9 10 11 12Guaranteed Passage . . . . . . . . . . . . . .Call To NonActuated 1 . . X . . . X . . . . . .Call To NonActuated 2 . . . . . . . . . . . . .Dual Entry. . . . . . . . X . X . X . X . . . .Conditional Service . . . . . . . . . . . . . .Conditional Reservice . . . . . . . . . . . . .Actuated Rest in Walk . . X . . . X . . . . . .Flashing Walk . . . . . . . . . . . . . . . . .

Enable Programmable OptionsDual Entry. . . . . . . . . . . ON Backup Protection Group 1 . . . . ONConditional Service . . . . . . OFF Backup Protection Group 2 . . . . ONPed Clearance Protection. . . . OFF Backup Protection Group 3 . . . . OFFSpecial Preempt Overlap Flash . OFF Simultaneous Gap Group 1. . . . . OFFCond Service Det Cross Switch . OFF Simultaneous Gap Group 2. . . . . OFFLock Detectors in Red Only. . . OFF Simultaneous Gap Group 3. . . . . OFF

Five Section Left Turn Control Phases: 5-2 7-4 1-6 3-8 11-10 9-12Left Turn Head. . . . . . . . . .

Page 72: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Recall Data, Dimming-----------------------------------------------------------------

Phase 1 2 3 4 5 6 7 8 9 10 11 12Locking Detector. . . . . . . . . . . . . . . .Vehicle Recall. . . . . . . . . . . . . . . . .Pedestrian Recall . . . . X . . . X . . . . . .Recall To Max . . . . . . . . . . . . . . . . .Soft Recall . . . . . . . . . . . . . . . . . .Don't Rest Here . . . . . . . . . . . . . . . .Ped Dark if No Call . . . . . . . . . . . . . .

Dimming: Load Switch 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Green/Walk. . . . NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NOYellow/Ped Clear. NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NORed/Don't Walk. . NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

Page 73: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Detector Type/Timers-----------------------------------------------------------------

Locking Log Timers Don't ResetDet. Memory Enable Extend Delay Extend Type 1 NO NO 0.0 0 . 0 - Normal 2 NO NO 0.0 0 . 0 - Normal 3 NO NO 0.0 0 . 0 - Normal 4 NO NO 0.0 8 . 1 - Extend/Delay 5 NO NO 0.0 0 . 0 - Normal 6 NO NO 0.0 0 . 0 - Normal 7 NO NO 0.0 0 . 0 - Normal 8 NO NO 0.0 8 . 1 - Extend/Delay 9 NO NO 0.0 0 . 0 - Normal 10 NO NO 0.0 0 . 0 - Normal 11 NO NO 0.0 0 . 0 - Normal 12 NO NO 0.0 0 . 0 - Normal 13 NO NO 0.0 0 . 0 - Normal 14 NO NO 0.0 0 . 0 - Normal 15 NO NO 0.0 0 . 0 - Normal 16 NO NO 0.0 0 . 0 - Normal 17 NO NO 0.0 0 . 0 - Normal 18 NO NO 0.0 0 . 0 - Normal 19 NO NO 0.0 0 . 0 - Normal 20 NO NO 0.0 0 . 0 - Normal 21 NO NO 0.0 0 . 0 - Normal 22 NO NO 0.0 0 . 0 - Normal 23 NO NO 0.0 0 . 0 - Normal 24 NO NO 0.0 0 . 0 - Normal 25 NO NO 0.0 0 . 0 - Normal 26 NO NO 0.0 0 . 0 - Normal 27 NO NO 0.0 0 . 0 - Normal 28 NO NO 0.0 0 . 0 - Normal 29 NO NO 0.0 0 . 0 - Normal 30 NO NO 0.0 0 . 0 - Normal 31 NO NO 0.0 0 . 0 - Normal 32 NO NO 0.0 0 . 0 - Normal

Detector Names

Det 1: Detector 1 Det 17: Detector 17 Det 2: Detector 2 Det 18: Detector 18 Det 3: Detector 3 Det 19: Detector 19 Det 4: Detector 4 Det 20: Detector 20 Det 5: Detector 5 Det 21: Detector 21 Det 6: Detector 6 Det 22: Detector 22 Det 7: Detector 7 Det 23: Detector 23 Det 8: Detector 8 Det 24: Detector 24 Det 9: Detector 9 Det 25: Detector 25 Det 10: Detector 10 Det 26: Detector 26 Det 11: Detector 11 Det 27: Detector 27 Det 12: Detector 12 Det 28: Detector 28 Det 13: Detector 13 Det 29: Detector 29 Det 14: Detector 14 Det 30: Detector 30 Det 15: Detector 15 Det 31: Detector 31 Det 16: Detector 16 Det 32: Detector 32

Page 74: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Detector Type/Timers-----------------------------------------------------------------

33 NO NO 0.0 0 . 0 - Normal 34 NO NO 0.0 0 . 0 - Normal 35 NO NO 0.0 0 . 0 - Normal 36 NO NO 0.0 0 . 0 - Normal 37 NO NO 0.0 0 . 0 - Normal 38 NO NO 0.0 0 . 0 - Normal 39 NO NO 0.0 0 . 0 - Normal 40 NO NO 0.0 0 . 0 - Normal 41 NO NO 0.0 0 . 0 - Normal 42 NO NO 0.0 0 . 0 - Normal 43 NO NO 0.0 0 . 0 - Normal 44 NO NO 0.0 0 . 0 - Normal 45 NO NO 0.0 0 . 0 - Normal 46 NO NO 0.0 0 . 0 - Normal 47 NO NO 0.0 0 . 0 - Normal 48 NO NO 0.0 0 . 0 - Normal 49 NO NO 0.0 0 . 0 - Normal 50 NO NO 0.0 0 . 0 - Normal 51 NO NO 0.0 0 . 0 - Normal 52 NO NO 0.0 0 . 0 - Normal 53 NO NO 0.0 0 . 0 - Normal 54 NO NO 0.0 0 . 0 - Normal 55 NO NO 0.0 0 . 0 - Normal 56 NO NO 0.0 0 . 0 - Normal 57 NO NO 0.0 0 . 0 - Normal 58 NO NO 0.0 0 . 0 - Normal 59 NO NO 0.0 0 . 0 - Normal 60 NO NO 0.0 0 . 0 - Normal 61 NO NO 0.0 0 . 0 - Normal 62 NO NO 0.0 0 . 0 - Normal 63 NO NO 0.0 0 . 0 - Normal 64 NO NO 0.0 0 . 0 - Normal

Detector Names

Det 33: Detector 33 Det 49: Detector 49 Det 34: Detector 34 Det 50: Detector 50 Det 35: Detector 35 Det 51: Detector 51 Det 36: Detector 36 Det 52: Detector 52 Det 37: Detector 37 Det 53: Detector 53 Det 38: Detector 38 Det 54: Detector 54 Det 39: Detector 39 Det 55: Detector 55 Det 40: Detector 40 Det 56: Detector 56 Det 41: Detector 41 Det 57: Detector 57 Det 42: Detector 42 Det 58: Detector 58 Det 43: Detector 43 Det 59: Detector 59 Det 44: Detector 44 Det 60: Detector 60 Det 45: Detector 45 Det 61: Detector 61 Det 46: Detector 46 Det 62: Detector 62 Det 47: Detector 47 Det 63: Detector 63 Det 48: Detector 48 Det 64: Detector 64

Page 75: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Detector Phase Assignment-----------------------------------------------------------------

PhaseDet. 1 2 3 4 5 6 7 8 9 10 11 12 1 X . . . . . . . . . . . 2 . X . . . . . . . . . . 3 . . . X . . . . . . . . 4 . . . X . . . . . . . . 5 . . . . X . . . . . . . 6 . X . . . . . . . . . . 7 . . . X . . . . . . . . 8 . . . X . . . . . . . . 9 . . . . . . . . X . . . 10 . . . . . . . . . X . . 11 . . . . . . . . . . X . 12 . . . . . . . . . . . X 13 . . . . . . . . . . . . 14 . . . . . . . . . . . . 15 . . . . . . . . . . . . 16 . . . . . . . . . . . . 17 . . . . . . . . . . . . 18 . . . . . . . . . . . . 19 . . . . . . . . . . . . 20 . . . . . . . . . . . . 21 . . . . . . . . . . . . 22 . . . . . . . . . . . . 23 . . . . . . . . . . . . 24 . . . . . . . . . . . . 25 . . . . . . . . . . . . 26 . . . . . . . . . . . . 27 . . . . . . . . . . . . 28 . . . . . . . . . . . . 29 . . . . . . . . . . . . 30 . . . . . . . . . . . . 31 . . . . . . . . . . . . 32 . . . . . . . . . . . .

Page 76: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Detector Cross Switching-----------------------------------------------------------------

PhaseDet. 1 2 3 4 5 6 7 8 9 10 11 12 1 . . . . . X . . . . . . 2 . . . . . . . . . . . . 3 . . . . . . . . . . . . 4 . . . . . . . . . . . . 5 . X . . . . . . . . . . 6 . . . . . . . . . . . . 7 . . . . . . . . . . . . 8 . . . . . . . . . . . . 9 . . . . . . . . . . . . 10 . . . . . . . . . . . . 11 . . . . . . . . . . . . 12 . . . . . . . . . . . . 13 . . . . . . . . . . . . 14 . . . . . . . . . . . . 15 . . . . . . . . . . . . 16 . . . . . . . . . . . . 17 . . . . . . . . . . . . 18 . . . . . . . . . . . . 19 . . . . . . . . . . . . 20 . . . . . . . . . . . . 21 . . . . . . . . . . . . 22 . . . . . . . . . . . . 23 . . . . . . . . . . . . 24 . . . . . . . . . . . . 25 . . . . . . . . . . . . 26 . . . . . . . . . . . . 27 . . . . . . . . . . . . 28 . . . . . . . . . . . . 29 . . . . . . . . . . . . 30 . . . . . . . . . . . . 31 . . . . . . . . . . . . 32 . . . . . . . . . . . .

Page 77: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Detector Cross Switching-----------------------------------------------------------------

PhaseDet. 1 2 3 4 5 6 7 8 9 10 11 12 33 . . . . . . . . . . . . 34 . . . . . . . . . . . . 35 . . . . . . . . . . . . 36 . . . . . . . . . . . . 37 . . . . . . . . . . . . 38 . . . . . . . . . . . . 39 . . . . . . . . . . . . 40 . . . . . . . . . . . . 41 . . . . . . . . . . . . 42 . . . . . . . . . . . . 43 . . . . . . . . . . . . 44 . . . . . . . . . . . . 45 . . . . . . . . . . . . 46 . . . . . . . . . . . . 47 . . . . . . . . . . . . 48 . . . . . . . . . . . . 49 . . . . . . . . . . . . 50 . . . . . . . . . . . . 51 . . . . . . . . . . . . 52 . . . . . . . . . . . . 53 . . . . . . . . . . . . 54 . . . . . . . . . . . . 55 . . . . . . . . . . . . 56 . . . . . . . . . . . . 57 . . . . . . . . . . . . 58 . . . . . . . . . . . . 59 . . . . . . . . . . . . 60 . . . . . . . . . . . . 61 . . . . . . . . . . . . 62 . . . . . . . . . . . . 63 . . . . . . . . . . . . 64 . . . . . . . . . . . .

Page 78: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Ped/SD Local Assign,Log Interval-----------------------------------------------------------------

Phase Ped Detector 1 2 3 4 5 6 7 8 9 10 11 12Is Ped Detector No. . . . 1 2 3 4 5 6 7 8 9 10 11 12

*Local System Detector No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16Is Local Detector No. . . 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Detector Log Interval . . 0

*NOTE: System master designations cross referenced to local system detector numbers are: SDA1 = 1 & 9 SDA2 = 2 & 10 SDB1 = 3 & 11 SDB2 = 4 & 12 SDC1 = 5 & 13 SDC2 = 6 & 14 SDD1 = 7 & 15 SDD2 = 8 & 16

Page 79: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Diagnostic Plans/Fail Action-----------------------------------------------------------------

DetectorPlan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 161 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 13 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 18 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1*Fail Action 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DetectorPlan 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 321 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 13 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 18 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1*Fail Action 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

*NOTE: 0 = No Action, 1 = Min Recall, 2 = Max Recall in Effect 3 = Detector Fail Max Tiime from By-Phase Timing Data

Page 80: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Diagnostic Plans/Fail Action-----------------------------------------------------------------

DetectorPlan 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 481 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 13 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 18 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1*Fail Action 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

DetectorPlan 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 641 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 12 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 13 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 14 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 15 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 16 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 17 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 18 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1*Fail Action 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

*NOTE: 0 = No Action, 1 = Min Recall, 2 = Max Recall in Effect 3 = Detector Fail Max Tiime from By-Phase Timing Data

Page 81: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Ped Diagnostic Plans-----------------------------------------------------------------

Plan 1 2 3 4 5 6 7 8 9 10 11 12 1 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 2 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 3 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 4 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 5 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 6 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 7 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1 8 Diagnostic 0 0 0 0 0 0 0 0 0 0 0 0 Scaling 1 1 1 1 1 1 1 1 1 1 1 1

Page 82: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Detector Diagnostic Intervals-----------------------------------------------------------------

Diagnostic *No-Activity *Max Presence Number Diagnostic Interval Diagnostic Interval Erratic Counts

1 0 0 0 2 0 0 0 3 0 0 0 4 0 0 0 5 0 0 0 6 0 0 0 7 0 0 0 8 0 0 0 9 0 0 0 10 0 0 0 11 0 0 0 12 0 0 0 13 0 0 0 14 0 0 0 15 0 0 0 16 0 0 0 17 0 0 0 18 0 0 0 19 0 0 0 20 0 0 0 21 0 0 0 22 0 0 0 23 0 0 0 24 0 0 0 25 0 0 0 26 0 0 0 27 0 0 0 28 0 0 0 29 0 0 0 30 0 0 0 31 0 0 0 32 0 0 0

*NOTE: Scaling is specified in each detector diagnostic plan.

Page 83: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Speed Detectors-----------------------------------------------------------------

Local Speed DetectorOne Detector Speed: 1 2 3 4 5 6 7 8 Local Detector Number. . . . 0 0 0 0 0 0 0 0 Vehicle Length . . . . . . . 0 0 0 0 0 0 0 0 Loop Length. . . . . . . . . 0 0 0 0 0 0 0 0Two Detector Speed: Local Detector Number. . . . 0 0 0 0 0 0 0 0 Speed Trap Length. . . . . . 0 0 0 0 0 0 0 0

Local Speed DetectorOne Detector Speed: 9 10 11 12 13 14 15 16 Local Detector Number. . . . 0 0 0 0 0 0 0 0 Vehicle Length . . . . . . . 0 0 0 0 0 0 0 0 Loop Length. . . . . . . . . 0 0 0 0 0 0 0 0Two Detector Speed: Local Detector Number. . . . 0 0 0 0 0 0 0 0 Speed Trap Length. . . . . . 0 0 0 0 0 0 0 0

Units. . . . . . . . . . . . . Inches

NOTE: Speed Detector 1 = STA, Speed Detector 2 = STB

Page 84: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Coordinator Manual Command and Options-----------------------------------------------------------------

Manual Enable . . . . . Pattern . . . . . . . 0

Split Units . . . . . Percent OffsetUnits . . . . . PercentInterconnect Format . STD Interconnect Source . NICTransition. . . . . . SMOOTH Dwell Period. . . . . 0Resync Count. . . . . 3

Actuated Coord Phase . . . . Actuated Walk Rest . . . XInhibit Max Timing . . . . X Max 2 Select . . . . . . .Floating Force Off . . . . . Multisync. . . . . . . . .

PhaseSplit Demand: Call Time Cyc Count 1 2 3 4 5 6 7 8 9 10 11 12Demand 1 . . 0 0 . . . . . . . . . . . .Demand 2 . . 0 0 . . . . . . . . . . . .

Phase 1 2 3 4 5 6 7 8 9 10 11 12Auto Permissive Min Green . 0 0 0 0 0 0 0 0 0 0 0 0

A B C D E FFree Alternate Sequence . . . . . . . .

Page 85: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Coordination Patterns-----------------------------------------------------------------Pattern 1Cycle Length . . 100 COS . . . . . 701Offset . . . . . 74Vehicle Permissive . . [1] 0 [2] 0Vehicle Perm 2 Displacement 0 Phase Reservice. . NOSplits: Phase 1- 10 2- 53 3- 0 4- 37 Phase 5- 10 6- 53 7- 0 8- 37 Phase 9- 0 10- 0 11- 0 12- 0 Split Sum: 0Split Extension/Ring [1] 0 [2] 0Split Demand Pattern [1] 0 [2] 0XRT Pattern. . . 0 Phase Number: 1 2 3 4 5 6 7 8 9 10 11 12Coord Phases . . . X . . . X . . . . . .Veh Recall . . . . . . . . . . . . . . .Veh Max Recall . . . . . . . . . . . . .Ped Recall . . . . . . . . . . . . . . .Veh Omit . . . . . . . . . . . . . . . .Alt Sequence . . A: . B: . C: . D: . E: . F: . -------------------------------------Pattern 3Cycle Length . . 100 COS . . . . . 703Offset . . . . . 74Vehicle Permissive . . [1] 0 [2] 0Vehicle Perm 2 Displacement 0 Phase Reservice. . NOSplits: Phase 1- 10 2- 53 3- 0 4- 37 Phase 5- 10 6- 53 7- 0 8- 37 Phase 9- 0 10- 0 11- 0 12- 0 Split Sum: 0Split Extension/Ring [1] 0 [2] 0Split Demand Pattern [1] 0 [2] 0XRT Pattern. . . 0 Phase Number: 1 2 3 4 5 6 7 8 9 10 11 12Coord Phases . . . X . . . X . . . . . .Veh Recall . . . . . . . . . . . . . . .Veh Max Recall . . . . . . . . . . . . .Ped Recall . . . . . . . . . . . . . . .Veh Omit . . . . . . . . . . . . . . . .Alt Sequence . . A: . B: . C: . D: . E: . F: . -------------------------------------

Page 86: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Preemptors-----------------------------------------------------------------Preemptor 1Active . . . . . . . . . . . . Det Lock. . . . . . Ped Dark . . . . . .Priority Preemption. . . . . . Yel-Red To Grn. . . Ped Active . . . . .Outputs Only During Hold . . . Flash All Outputs . Zero Ped Clr Time. .Terminate Overlap ASAP . . . . Terminate Phases. . Ped Clr Thru Yel . .Don't Override Flash . . . . . Duration Time. . . 0Flash During Hold. . . . . . . Delay Time . . . . 0No CVM in Flash. . . . . . . . Inhibit Time . . . 0Fast Flash Grn on Hold Phase. . Min Ped Clear. . . 0Enable Max Time. . . . . . . . Max Time . . . . . 0 Exit Max . . . . . 0 Min Hold Time. . . 0 Hold Delay Time. . 0

Green Yellow RedMinimum . . . . . . 0 0.0 0.0Track Clear . . . . 0 0.0 0.0Hold. . . . . . . . 0.0 0.0

Phase/Overlap 1 2 3 4 5 6 7 8 9 10 11 12/ A B C DTerminate Overlap . . . . . . . . . . . . . . . . . . . .Track Clearance Phase . . . . . . . . . . . . . .Hold Phases . . . . . . . . . . . . . . . . . . .Exit Phases . . . . . . . . . . . . . . . . . . .Exit Calls on Phase . . . . . . . . . . . . . . .

Out of Flash Color for Exit Phases . . . . Green ----------------------------------------Preemptor 2Active . . . . . . . . . . . . Det Lock. . . . . . Ped Dark . . . . . .Priority Preemption. . . . . . Yel-Red To Grn. . . Ped Active . . . . .Outputs Only During Hold . . . Flash All Outputs . Zero Ped Clr Time. .Terminate Overlap ASAP . . . . Terminate Phases. . Ped Clr Thru Yel . .Don't Override Flash . . . . . Duration Time. . . 0Flash During Hold. . . . . . . Delay Time . . . . 0No CVM in Flash. . . . . . . . Inhibit Time . . . 0Fast Flash Grn on Hold Phase. . Min Ped Clear. . . 0Enable Max Time. . . . . . . . Max Time . . . . . 0 Exit Max . . . . . 0 Min Hold Time. . . 0 Hold Delay Time. . 0

Green Yellow RedMinimum . . . . . . 0 0.0 0.0Track Clear . . . . 0 0.0 0.0Hold. . . . . . . . 0.0 0.0

Phase/Overlap 1 2 3 4 5 6 7 8 9 10 11 12/ A B C DTerminate Overlap . . . . . . . . . . . . . . . . . . . .Track Clearance Phase . . . . . . . . . . . . . .Hold Phases . . . . . . . . . . . . . . . . . . .Exit Phases . . . . . . . . . . . . . . . . . . .Exit Calls on Phase . . . . . . . . . . . . . . .

Out of Flash Color for Exit Phases . . . . GreenLinked Preemptor . . . . 0 ----------------------------------------

Page 87: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Preemptors-----------------------------------------------------------------Preemptor 3Active . . . . . . . . . . . X Det Lock. . . . . X Ped Dark . . . . . .Priority Preemption. . . . . X Yel-Red To Grn. . . Ped Active . . . . XOutputs Only During Hold . . . Flash All Outputs . Zero Ped Clr Time. .Terminate Overlap ASAP . . . . Terminate Phases. X Ped Clr Thru Yel . XDon't Override Flash . . . . . Duration Time. . . 0Flash During Hold. . . . . . . Delay Time . . . . 0No CVM in Flash. . . . . . . . Inhibit Time . . . 0Fast Flash Grn on Hold Phase. . Min Ped Clear. . . 10Enable Max Time. . . . . . . . Max Time . . . . . 0 Exit Max . . . . . 0 Min Hold Time. . . 10 Hold Delay Time. . 0

Green Yellow RedMinimum . . . . . . 2 4.0 2.0Track Clear . . . . 0 0.0 0.0Hold. . . . . . . . 0.0 0.0

Phase/Overlap 1 2 3 4 5 6 7 8 9 10 11 12/ A B C DTerminate Overlap . . . . . . . . . . . . . . . . . . . .Track Clearance Phase . . . . . . . . . . . . . .Hold Phases . . . . . . . . X . . . X . . . . . .Exit Phases . . . . . . . . X . . . X . . . . . .Exit Calls on Phase . . . . . . . . . . . . . . .

Out of Flash Color for Exit Phases . . . . GreenLinked Preemptor . . . . 0 ----------------------------------------Preemptor 4Active . . . . . . . . . . . X Det Lock. . . . . X Ped Dark . . . . . .Priority Preemption. . . . . X Yel-Red To Grn. . . Ped Active . . . . XOutputs Only During Hold . . . Flash All Outputs . Zero Ped Clr Time. .Terminate Overlap ASAP . . . . Terminate Phases. X Ped Clr Thru Yel . XDon't Override Flash . . . . . Duration Time. . . 0Flash During Hold. . . . . . . Delay Time . . . . 0No CVM in Flash. . . . . . . . Inhibit Time . . . 0Fast Flash Grn on Hold Phase. . Min Ped Clear. . . 10Enable Max Time. . . . . . . . Max Time . . . . . 0 Exit Max . . . . . 0 Min Hold Time. . . 10 Hold Delay Time. . 0

Green Yellow RedMinimum . . . . . . 2 4.0 2.0Track Clear . . . . 0 0.0 0.0Hold. . . . . . . . 0.0 0.0

Phase/Overlap 1 2 3 4 5 6 7 8 9 10 11 12/ A B C DTerminate Overlap . . . . . . . . . . . . . . . . . . . .Track Clearance Phase . . . . . . . . . . . . . .Hold Phases . . . . . . . . . . X . . . X . . . .Exit Phases . . . . . . . . . . X . . . X . . . .Exit Calls on Phase . . . . . . . . . . . . . . .

Out of Flash Color for Exit Phases . . . . GreenLinked Preemptor . . . . 0 ----------------------------------------

Page 88: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Preemptors-----------------------------------------------------------------Preemptor 5Active . . . . . . . . . . . . Det Lock. . . . . . Ped Dark . . . . . .Priority Preemption. . . . . . Yel-Red To Grn. . . Ped Active . . . . .Outputs Only During Hold . . . Flash All Outputs . Zero Ped Clr Time. .Terminate Overlap ASAP . . . . Terminate Phases. X Ped Clr Thru Yel . .Don't Override Flash . . . . . Duration Time. . . 0Flash During Hold. . . . . . . Delay Time . . . . 0No CVM in Flash. . . . . . . . Inhibit Time . . . 0Fast Flash Grn on Hold Phase. . Min Ped Clear. . . 0Enable Max Time. . . . . . . . Max Time . . . . . 0 Exit Max . . . . . 0 Min Hold Time. . . 0 Hold Delay Time. . 0

Green Yellow RedMinimum . . . . . . 0 0.0 0.0Track Clear . . . . 0 0.0 0.0Hold. . . . . . . . 0.0 0.0

Phase/Overlap 1 2 3 4 5 6 7 8 9 10 11 12/ A B C DTerminate Overlap . . . . . . . . . . . . . . . . . . . .Track Clearance Phase . . . . . . . . . . . . . .Hold Phases . . . . . . . . . . . . . . . . . . .Exit Phases . . . . . . . . . . . . . . . . . . .Exit Calls on Phase . . . . . . . . . . . . . . .

Out of Flash Color for Exit Phases . . . . GreenLinked Preemptor . . . . 0 ----------------------------------------Preemptor 6Active . . . . . . . . . . . . Det Lock. . . . . . Ped Dark . . . . . .Priority Preemption. . . . . . Yel-Red To Grn. . . Ped Active . . . . .Outputs Only During Hold . . . Flash All Outputs . Zero Ped Clr Time. .Terminate Overlap ASAP . . . . Terminate Phases. X Ped Clr Thru Yel . .Don't Override Flash . . . . . Duration Time. . . 0Flash During Hold. . . . . . . Delay Time . . . . 0No CVM in Flash. . . . . . . . Inhibit Time . . . 0Fast Flash Grn on Hold Phase. . Min Ped Clear. . . 0Enable Max Time. . . . . . . . Max Time . . . . . 0 Exit Max . . . . . 0 Min Hold Time. . . 0 Hold Delay Time. . 0

Green Yellow RedMinimum . . . . . . 0 0.0 0.0Track Clear . . . . 0 0.0 0.0Hold. . . . . . . . 0.0 0.0

Phase/Overlap 1 2 3 4 5 6 7 8 9 10 11 12/ A B C DTerminate Overlap . . . . . . . . . . . . . . . . . . . .Track Clearance Phase . . . . . . . . . . . . . .Hold Phases . . . . . . . . . . . . . . . . . . .Exit Phases . . . . . . . . . . . . . . . . . . .Exit Calls on Phase . . . . . . . . . . . . . . .

Out of Flash Color for Exit Phases . . . . GreenLinked Preemptor . . . . 0 ----------------------------------------

Page 89: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Bus Preemptors-----------------------------------------------------------------

Bus Preemptor 1 2 3 4

Preemptor Active. . . . . . . . . . . .Detector Lock . . . . . . . . . . . . .Maximum Time. . . . . . . . . . 0 0 0 0Reservice Time. . . . . . . . . 0 0 0 0Delay Time. . . . . . . . . . . 0 0 0 0Inhibit Time. . . . . . . . . . 0 0 0 0Entrance Green. . . . . . . . . 0 0 0 0Entrance Ped Clearance. . . . . 0 0 0 0Entrance Yellow . . . . . . . . 0.0 0.0 0.0 0.0Entrance Red. . . . . . . . . . 0.0 0.0 0.0 0.0Minimum Hold Time . . . . . . . 0 0 0 0

Hold Phases 1 2 3 4 5 6 7 8 9 10 11 12

Preemptor 1 . . . . . . . . . . . . . . . . .Preemptor 2 . . . . . . . . . . . . . . . . .Preemptor 3 . . . . . . . . . . . . . . . . .Preemptor 4 . . . . . . . . . . . . . . . . .

Page 90: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

NIC/TOD Clock/Calendar-----------------------------------------------------------------

Manual NIC Program Step . . . . . . . . 0

Manual TOD Program Step . . . . . . . . 0

NIC Resync Time . . . . . . . . . . . . 0000

Sync Reference is . . . . . . . . . . . Reference Time

Week 1 Begins on 1st Sunday . . . . . . NO If NO, then week containing Jan. 1

Disable Daylight Savings Time . . . . . YES

Daylight SavingsBegins Last Sunday in March . . . . . . NO If NO, then Second Sunday as per 2007 DST Law

Page 91: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

TOD Weekly/Yearly-----------------------------------------------------------------

Weekly Program Numbers 1 2 3 4 5 6 7 8 9 10

Sunday . . . 2 1 1 1 1 1 1 1 1 1 Program No.Monday . . . 1 1 1 1 1 1 1 1 1 1 Program No.Tuesday. . . 1 1 1 1 1 1 1 1 1 1 Program No.Wednesday. . 1 1 1 1 1 1 1 1 1 1 Program No.Thursday . . 1 1 1 1 1 1 1 1 1 1 Program No.Friday . . . 1 1 1 1 1 1 1 1 1 1 Program No.Saturday . . 2 1 1 1 1 1 1 1 1 1 Program No.

Week of Year 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Page 92: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

Holiday Programs-----------------------------------------------------------------

Holiday Type Month Day of Week/ Week of Year/ Program Day of Month Year

1 Fixed 0 0 0 0 2 Fixed 0 0 0 0 3 Fixed 0 0 0 0 4 Fixed 0 0 0 0 5 Fixed 0 0 0 0 6 Fixed 0 0 0 0 7 Fixed 0 0 0 0 8 Fixed 0 0 0 0 9 Fixed 0 0 0 0 10 Fixed 0 0 0 0 11 Fixed 0 0 0 0 12 Fixed 0 0 0 0 13 Fixed 0 0 0 0 14 Fixed 0 0 0 0 15 Fixed 0 0 0 0 16 Fixed 0 0 0 0 17 Fixed 0 0 0 0 18 Fixed 0 0 0 0 19 Fixed 0 0 0 0 20 Fixed 0 0 0 0 21 Fixed 0 0 0 0 22 Fixed 0 0 0 0 23 Fixed 0 0 0 0 24 Fixed 0 0 0 0 25 Fixed 0 0 0 0 26 Fixed 0 0 0 0 27 Fixed 0 0 0 0 28 Fixed 0 0 0 0 29 Fixed 0 0 0 0 30 Fixed 0 0 0 0 31 Fixed 0 0 0 0 32 Fixed 0 0 0 0 33 Fixed 0 0 0 0 34 Fixed 0 0 0 0 35 Fixed 0 0 0 0 36 Fixed 0 0 0 0

Page 93: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

NIC Program Steps-----------------------------------------------------------------

Step Program Step Begins Pattern Override

1 1 0700 1 NO 2 1 0900 0 NO 3 1 1600 3 NO 4 1 1830 0 NO

Page 94: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Dundas St @ Trafalgar Rd (Master) Eighth Line @ Northridge Trail 7/20/2015 16:06

TOD Program Steps-----------------------------------------------------------------

Page 95: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Configuration

-----------------------------------------------------------------

Controller Sequence Priority

1 2 3 4 5 6 7 8 9 10 11 12

Ring 1 Phases . . 1 2 | 3 4 | 9 10 | 0 0 0 0 0 0

Ring 2 Phases . . 5 6 | 7 8 |11 12 | 0 0 0 0 0 0

Phase

1 2 3 4 5 6 7 8 9 10 11 12

In Use. . . . . . X X . X . . . . . . . .

Exclusive Ped . . . . . . . . . . . . . .

Direction . . . .SBLT N/S E/W

Overlap

A B C D

Direction . . .

Load Switch Channel/Driver Group Assign (Info Only):

Load Signal

Switch Driver Group

(MMU) Phase/

Channel Ovlap Ped

1 . . . . . . 1 .

2 . . . . . . 2 .

3 . . . . . . 3 .

4 . . . . . . 4 .

5 . . . . . . A .

6 . . . . . . B .

7 . . . . . . 2 X

8 . . . . . . 4 X

9 . . . . . . 0 .

10 . . . . . . 0 .

11 . . . . . . 0 .

12 . . . . . . 0 .

13 . . . . . . 0 .

14 . . . . . . 0 .

15 . . . . . . 0 .

16 . . . . . . 0 .

Page 96: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Configuration Continued

-----------------------------------------------------------------

Enable BIU: 1 2 3 4 5 6 7 8

Terminal/Facilities. . . . X . . . . . . .

Detector Rack. . . . . . . X . . . . . . .

Type 2 Runs as Type 1. . . .

MMU Disable. . . . . . . . .

Diagnostic Enable. . . . . .

Peer-Peer Comm Enable. . . .

1 2 3 4 5 6 7 8 9 10

Peer To Peer Addresses . . 255 255 255 255 255 255 255 255 255 255

Port 2:

Port 2 Protocol . . . . . . . . Terminal

Port 2 Enable . . . . . . . . . NO

AB3418 Address. . . . . . . . . 0

AB3418 Group Address. . . . . . 0

AB3418 Response Delay . . . . . 0

AB3418 Single Flag Enable . . . NO

AB3418 Drop-Out Time. . . . . . 0

AB3418 TOD SF Select. . . . . . 0

Data Rate . . . . . . . . . . . 1200 bps

Data, Parity, Stop. . . . . . . 8, 0, 1

Port 3:

Port 3 Protocol . . . . . . . . Telemetry

Port 3 Enable . . . . . . . . . YES

Telemetry Address . . . . . . . 23

System Detector 9-16 Address. . 0

Telemetry Response Delay. . . . 8700

AB3418 Address. . . . . . . . . 0

AB3418 Group Address. . . . . . 0

AB3418 Response Delay . . . . . 0

AB3418 Single Flag Enable . . . NO

AB3418 Drop-Out Time. . . . . . 0

AB3418 TOD SF Select. . . . . . 0

Duplex. . . . . . . . . . . . . Full

Data Rate . . . . . . . . . . . 1200 bps

Data, Parity, Stop. . . . . . . 8, 0, 1

Page 97: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Configuration Continued

-----------------------------------------------------------------

Event Enabling Alarm Enabling

Critical RFE'S (MMU/TF) . . . . . X ALARM 1 . . . . . . . . . . . X

Non-Critical RFE'S (DET/TEST) . . . ALARM 2 . . . . . . . . . . . .

Detector Errors . . . . . . . . . . ALARM 3 . . . . . . . . . . . .

Coordination Errors . . . . . . . . ALARM 4 . . . . . . . . . . . .

MMU Flash Faults. . . . . . . . . X ALARM 5 . . . . . . . . . . . .

Local Flash Faults. . . . . . . . X ALARM 6 . . . . . . . . . . . .

Preempt . . . . . . . . . . . . . X ALARM 7 . . . . . . . . . . . .

Power On/Off. . . . . . . . . . . X ALARM 8 . . . . . . . . . . . .

Low Battery . . . . . . . . . . . X ALARM 9 . . . . . . . . . . . .

ALARM 10. . . . . . . . . . . .

ALARM 11. . . . . . . . . . . .

ALARM 12. . . . . . . . . . . .

ALARM 13. . . . . . . . . . . .

ALARM 14. . . . . . . . . . . .

ALARM 15. . . . . . . . . . . .

ALARM 16. . . . . . . . . . . .

Supervisor Access Code. . . ****

Data Change Access Code . . ****

MMU Compatibility Program (Info Only)

Channel Is Allowed to Time With Channel

16 15 14 13 12 11 10 9 8 7 6 5 4 3 2

1 . . . . . . . . . . . . . . X . . .

2 . . . . . . . . . . . . X . X . .

3 . . . . . . . . . . . . . X . .

4 . . . . . . . . . . . X . X .

5 . . . . . . . . . . . . X .

6 . . . . . . . . . . . X .

7 . . . . . . . . . . . .

8 . . . . . . . . . . .

9 . . . . . . . . . .

10. . . . . . . . .

11. . . . . . . .

12. . . . . . .

13. . . . . .

14. . . . .

15. . . .

Version Info:

Software Assy. Part No. Version

Boot 27831 2.83

Program 45561 7.9

Application . 3

Help 27891 6.33

�Configuration 27913 C165

Page 98: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

By-Phase Timing Data

-----------------------------------------------------------------

Phase

1 2 3 4 5 6 7 8 9 10 11 12

Direction SBLT N/S E/W

Minimum Green 7 25 0 10 0 0 0 0 0 0 0 0

Bike Min Green 0 0 0 0 0 0 0 0 0 0 0 0

Cond Serv Min Grn 0 0 0 0 0 0 0 0 0 0 0 0

Walk 0 10 0 10 0 0 0 0 0 0 0 0

Ped Clearance 0 11 0 14 0 7 0 7 0 16 0 16

Veh Extension 2.5 5.0 0.0 3.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Alt Veh Exten 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Max Extension 0 0 0 0 0 0 0 0 0 0 0 0

Max 1 10 40 0 30 0 0 0 0 0 0 0 0

Max 2 20 65 0 45 0 0 0 0 0 0 0 0

Max 3 0 0 0 0 0 0 0 0 0 0 0 0

Det. Fail Max 0 0 0 0 0 0 0 0 0 0 0 0

Yellow Change 3.0 3.3 3.0 3.3 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0

Red Clearance 0.0 2.0 1.0 2.4 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0

Red Revert 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0

Act. B4 Init 0 0 0 0 0 0 0 0 0 0 0 0

Sec/Actuation 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Max Initial 0 0 0 0 0 0 0 0 0 0 0 0

Time B4 Reduction 0 0 0 0 0 0 0 0 0 0 0 0

Cars Waiting 0 0 0 0 0 0 0 0 0 0 0 0

Time To Reduce 0 0 0 0 0 0 0 0 0 0 0 0

Minimum Gap 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Page 99: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Power Start, Remote Flash

-----------------------------------------------------------------

Phase

1 2 3 4 5 6 7 8 9 10 11 12

Power Start. . . . . . X . . . . . . . . . .

External Start . . . . X . . . . . . . . . .

Into Remote Flash. . . X . . . . . . . . . .

Exit Remote Flash. . . X . . . . . . . . . . Overlap

Remote Flash Yellow. . . . . . . . . . . . . A B C D

Flash Together . . . . . . . . . . . . . . . . . . .

Initialization Interval:

Power Start . . . . . . . . Yellow

External Start. . . . . . . Yellow

Power Start All Red Time. . 0

Power Start Flash Time. . . 0

Remote Flash Options:

Out of Flash Yellow . . . . NO

Out of Flash All Red. . . . NO

Minimum Recall. . . . . . . NO

Alternate Flash . . . . . . NO

Flash Thru Load Switches. . NO

Cycle Through Phases. . . . NO

Page 100: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Option Data

-----------------------------------------------------------------

Phase

1 2 3 4 5 6 7 8 9 10 11 12

Guaranteed Passage . . . . . . . . . . . . . .

Call To NonActuated 1 . . X . . . . . . . . . .

Call To NonActuated 2 . . . . . . . . . . . . .

Dual Entry. . . . . . . . . . . . . . . . . . .

Conditional Service . . . . . . . . . . . . . .

Conditional Reservice . . . . . . . . . . . . .

Actuated Rest in Walk . . X . . . . . . . . . .

Flashing Walk . . . . . . . . . . . . . . . . .

Enable Programmable Options

Dual Entry. . . . . . . . . . . OFF Backup Protection Group 1 . . . . ON

Conditional Service . . . . . . OFF Backup Protection Group 2 . . . . ON

Ped Clearance Protection. . . . OFF Backup Protection Group 3 . . . . OFF

Special Preempt Overlap Flash . OFF Simultaneous Gap Group 1. . . . . OFF

Cond Service Det Cross Switch . OFF Simultaneous Gap Group 2. . . . . OFF

Lock Detectors in Red Only. . . OFF Simultaneous Gap Group 3. . . . . OFF

Five Section Left Turn Control

Phases: 5-2 7-4 1-6 3-8 11-10 9-12

Left Turn Head. . . . . . . . . .

Page 101: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Recall Data, Dimming

-----------------------------------------------------------------

Phase

1 2 3 4 5 6 7 8 9 10 11 12

Locking Detector. . . . . . . . . . . . . . . .

Vehicle Recall. . . . . . X . . . . . . . . . .

Pedestrian Recall . . . . X . . . . . . . . . .

Recall To Max . . . . . . . . . . . . . . . . .

Soft Recall . . . . . . . . . . . . . . . . . .

Don't Rest Here . . . . . . . . . . . . . . . .

Ped Dark if No Call . . . . . . . . . . . . . .

Dimming:

Load Switch

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Green/Walk. . . . NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

Yellow/Ped Clear. NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

Red/Don't Walk. . NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO NO

Page 102: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Detector Type/Timers

-----------------------------------------------------------------

Locking Log Timers Don't Reset

Det. Memory Enable Extend Delay Extend Type

1 NO NO 0.0 0 . 0 - Normal

2 NO NO 0.0 0 . 0 - Normal

3 NO NO 0.0 0 . 0 - Normal

4 NO NO 0.0 8 . 0 - Normal

5 NO NO 0.0 0 . 0 - Normal

6 NO NO 0.0 0 . 0 - Normal

7 NO NO 0.0 0 . 0 - Normal

8 NO NO 0.0 8 . 0 - Normal

9 NO NO 0.0 0 . 0 - Normal

10 NO NO 0.0 0 . 0 - Normal

11 NO NO 0.0 0 . 0 - Normal

12 NO NO 0.0 0 . 0 - Normal

13 NO NO 0.0 0 . 0 - Normal

14 NO NO 0.0 0 . 0 - Normal

15 NO NO 0.0 0 . 0 - Normal

16 NO NO 0.0 0 . 0 - Normal

17 NO NO 0.0 0 . 0 - Normal

18 NO NO 0.0 0 . 0 - Normal

19 NO NO 0.0 0 . 0 - Normal

20 NO NO 0.0 0 . 0 - Normal

21 NO NO 0.0 0 . 0 - Normal

22 NO NO 0.0 0 . 0 - Normal

23 NO NO 0.0 0 . 0 - Normal

24 NO NO 0.0 0 . 0 - Normal

25 NO NO 0.0 0 . 0 - Normal

26 NO NO 0.0 0 . 0 - Normal

27 NO NO 0.0 0 . 0 - Normal

28 NO NO 0.0 0 . 0 - Normal

29 NO NO 0.0 0 . 0 - Normal

30 NO NO 0.0 0 . 0 - Normal

31 NO NO 0.0 0 . 0 - Normal

32 NO NO 0.0 0 . 0 - Normal

Detector Names

Det 1: Detector 1 Det 17: Detector 17

Det 2: Detector 2 Det 18: Detector 18

Det 3: Detector 3 Det 19: Detector 19

Det 4: Detector 4 Det 20: Detector 20

Det 5: Detector 5 Det 21: Detector 21

Det 6: Detector 6 Det 22: Detector 22

Det 7: Detector 7 Det 23: Detector 23

Det 8: Detector 8 Det 24: Detector 24

Det 9: Detector 9 Det 25: Detector 25

Det 10: Detector 10 Det 26: Detector 26

Det 11: Detector 11 Det 27: Detector 27

Det 12: Detector 12 Det 28: Detector 28

Det 13: Detector 13 Det 29: Detector 29

Det 14: Detector 14 Det 30: Detector 30

Det 15: Detector 15 Det 31: Detector 31

Det 16: Detector 16 Det 32: Detector 32

Page 103: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Detector Type/Timers

-----------------------------------------------------------------

33 NO NO 0.0 0 . 0 - Normal

34 NO NO 0.0 0 . 0 - Normal

35 NO NO 0.0 0 . 0 - Normal

36 NO NO 0.0 0 . 0 - Normal

37 NO NO 0.0 0 . 0 - Normal

38 NO NO 0.0 0 . 0 - Normal

39 NO NO 0.0 0 . 0 - Normal

40 NO NO 0.0 0 . 0 - Normal

41 NO NO 0.0 0 . 0 - Normal

42 NO NO 0.0 0 . 0 - Normal

43 NO NO 0.0 0 . 0 - Normal

44 NO NO 0.0 0 . 0 - Normal

45 NO NO 0.0 0 . 0 - Normal

46 NO NO 0.0 0 . 0 - Normal

47 NO NO 0.0 0 . 0 - Normal

48 NO NO 0.0 0 . 0 - Normal

49 NO NO 0.0 0 . 0 - Normal

50 NO NO 0.0 0 . 0 - Normal

51 NO NO 0.0 0 . 0 - Normal

52 NO NO 0.0 0 . 0 - Normal

53 NO NO 0.0 0 . 0 - Normal

54 NO NO 0.0 0 . 0 - Normal

55 NO NO 0.0 0 . 0 - Normal

56 NO NO 0.0 0 . 0 - Normal

57 NO NO 0.0 0 . 0 - Normal

58 NO NO 0.0 0 . 0 - Normal

59 NO NO 0.0 0 . 0 - Normal

60 NO NO 0.0 0 . 0 - Normal

61 NO NO 0.0 0 . 0 - Normal

62 NO NO 0.0 0 . 0 - Normal

63 NO NO 0.0 0 . 0 - Normal

64 NO NO 0.0 0 . 0 - Normal

Detector Names

Det 33: Detector 33 Det 49: Detector 49

Det 34: Detector 34 Det 50: Detector 50

Det 35: Detector 35 Det 51: Detector 51

Det 36: Detector 36 Det 52: Detector 52

Det 37: Detector 37 Det 53: Detector 53

Det 38: Detector 38 Det 54: Detector 54

Det 39: Detector 39 Det 55: Detector 55

Det 40: Detector 40 Det 56: Detector 56

Det 41: Detector 41 Det 57: Detector 57

Det 42: Detector 42 Det 58: Detector 58

Det 43: Detector 43 Det 59: Detector 59

Det 44: Detector 44 Det 60: Detector 60

Det 45: Detector 45 Det 61: Detector 61

Det 46: Detector 46 Det 62: Detector 62

Det 47: Detector 47 Det 63: Detector 63

Det 48: Detector 48 Det 64: Detector 64

Page 104: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Detector Phase Assignment

-----------------------------------------------------------------

Phase

Det. 1 2 3 4 5 6 7 8 9 10 11 12

1 X . . . . . . . . . . .

2 . X . . . . . . . . . .

3 . . . . . . . . . . . .

4 . . . X . . . . . . . .

5 . . . . . . . . . . . .

6 . X . . . . . . . . . .

7 . . . . . . . . . . . .

8 . . . X . . . . . . . .

9 . . . . . . . . . . . .

10 . . . . . . . . . . . .

11 . . . . . . . . . . . .

12 . . . . . . . . . . . .

13 . . . . . . . . . . . .

14 . . . . . . . . . . . .

15 . . . . . . . . . . . .

16 . . . . . . . . . . . .

17 . . . . . . . . . . . .

18 . . . . . . . . . . . .

19 . . . . . . . . . . . .

20 . . . . . . . . . . . .

21 . . . . . . . . . . . .

22 . . . . . . . . . . . .

23 . . . . . . . . . . . .

24 . . . . . . . . . . . .

25 . . . . . . . . . . . .

26 . . . . . . . . . . . .

27 . . . . . . . . . . . .

28 . . . . . . . . . . . .

29 . . . . . . . . . . . .

30 . . . . . . . . . . . .

31 . . . . . . . . . . . .

32 . . . . . . . . . . . .

Page 105: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Coordinator Manual Command and Options

-----------------------------------------------------------------

Manual Enable . . . . . Pattern . . . . . . . 0

Split Units . . . . . Percent OffsetUnits . . . . . Percent

Interconnect Format . STD Interconnect Source . TLM

Transition. . . . . . SMOOTH Dwell Period. . . . . 0

Resync Count. . . . . 0

Actuated Coord Phase . . . . Actuated Walk Rest . . . X

Inhibit Max Timing . . . . X Max 2 Select . . . . . . .

Floating Force Off . . . . . Multisync. . . . . . . . .

Phase

Split Demand: Call Time Cyc Count 1 2 3 4 5 6 7 8 9 10 11 12

Demand 1 . . 0 0 . . . . . . . . . . . .

Demand 2 . . 0 0 . . . . . . . . . . . .

Phase

1 2 3 4 5 6 7 8 9 10 11 12

Auto Permissive Min Green . 0 0 0 0 0 0 0 0 0 0 0 0

A B C D E F

Free Alternate Sequence . . . . . . . .

Page 106: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

Coordination Patterns

-----------------------------------------------------------------

Pattern 1

Cycle Length . . 110 COS . . . . . 701

Offset . . . . . 0

Vehicle Permissive . . [1] 0 [2] 0

Vehicle Perm 2 Displacement 0 Phase Reservice. . NO

Splits: Phase 1- 10 2- 60 3- 0 4- 30

Phase 5- 0 6- 0 7- 0 8- 0

Phase 9- 0 10- 0 11- 0 12- 0 Split Sum: 0

Split Extension/Ring [1] 0 [2] 0

Split Demand Pattern [1] 0 [2] 0

XRT Pattern. . . 0

Phase Number: 1 2 3 4 5 6 7 8 9 10 11 12

Coord Phases . . . X . . . . . . . . . .

Veh Recall . . . . . . . . . . . . . . .

Veh Max Recall . . . . . . . . . . . . .

Ped Recall . . . . . . . . . . . . . . .

Veh Omit . . . . . . . . . . . . . . . .

Alt Sequence . . A: . B: . C: . D: . E: . F: .

-------------------------------------

Pattern 2

Cycle Length . . 255 COS . . . . . FREE

Offset . . . . . 0

Vehicle Permissive . . [1] 0 [2] 0

Vehicle Perm 2 Displacement 0 Phase Reservice. . NO

Splits: Phase 1- 0 2- 0 3- 0 4- 0

Phase 5- 0 6- 0 7- 0 8- 0

Phase 9- 0 10- 0 11- 0 12- 0 Split Sum: 0

Split Extension/Ring [1] 0 [2] 0

Split Demand Pattern [1] 0 [2] 0

XRT Pattern. . . 0

Phase Number: 1 2 3 4 5 6 7 8 9 10 11 12

Coord Phases . . . . . . . . . . . . . .

Veh Recall . . . . . . . . . . . . . . .

Veh Max Recall . . . . . . . . . . . . .

Ped Recall . . . . . . . . . . . . . . .

Veh Omit . . . . . . . . . . . . . . . .

Alt Sequence . . A: . B: . C: . D: . E: . F: .

-------------------------------------

Pattern 3

Cycle Length . . 100 COS . . . . . 703

Offset . . . . . 93

Vehicle Permissive . . [1] 0 [2] 0

Vehicle Perm 2 Displacement 0 Phase Reservice. . NO

Splits: Phase 1- 10 2- 60 3- 0 4- 30

Phase 5- 0 6- 0 7- 0 8- 0

Phase 9- 0 10- 0 11- 0 12- 0 Split Sum: 0

Split Extension/Ring [1] 0 [2] 0

Split Demand Pattern [1] 0 [2] 0

XRT Pattern. . . 0

Phase Number: 1 2 3 4 5 6 7 8 9 10 11 12

Coord Phases . . . X . . . . . . . . . .

Veh Recall . . . . X . . . . . . . . . .

Veh Max Recall . . . . . . . . . . . . .

Ped Recall . . . . X . . . . . . . . . .

Veh Omit . . . . . . . . . . . . . . . .

Alt Sequence . . A: . B: . C: . D: . E: . F: .

-------------------------------------

Page 107: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

NIC/TOD Clock/Calendar

-----------------------------------------------------------------

Manual NIC Program Step . . . . . . . . 0

Manual TOD Program Step . . . . . . . . 0

NIC Resync Time . . . . . . . . . . . . 0315

Sync Reference is . . . . . . . . . . . Reference Time

Week 1 Begins on 1st Sunday . . . . . . NO If NO, then week containing Jan. 1

Disable Daylight Savings Time . . . . . NO

Daylight Savings

Begins Last Sunday in March . . . . . . NO If NO, then Second Sunday as per 2007 DST Law

Page 108: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

TOD Weekly/Yearly

-----------------------------------------------------------------

Weekly Program Numbers

1 2 3 4 5 6 7 8 9 10

Sunday . . . 2 1 1 1 1 1 1 1 1 1 Program No.

Monday . . . 1 1 1 1 1 1 1 1 1 1 Program No.

Tuesday. . . 1 1 1 1 1 1 1 1 1 1 Program No.

Wednesday. . 1 1 1 1 1 1 1 1 1 1 Program No.

Thursday . . 1 1 1 1 1 1 1 1 1 1 Program No.

Friday . . . 1 1 1 1 1 1 1 1 1 1 Program No.

Saturday . . 2 1 1 1 1 1 1 1 1 1 Program No.

Week of Year

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53

Prog 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

Page 109: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

NIC Program Steps

-----------------------------------------------------------------

Step Program Step Begins Pattern Override

1 1 0700 1 NO

2 1 0900 2 NO

3 1 1600 3 NO

4 1 1830 2 NO

Page 110: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

UPPER MIDDLE ROAD Direct port 11 EIGHTH LINE & KESTELL BLVD 7/21/2015 10:14

TOD Program Steps

-----------------------------------------------------------------

Page 111: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

APPENDIX B Intersection Capacity Analysis Reports 

Existing (2016) Conditions  

Page 112: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Existing (2016) AM Peak Hour 1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 29 243 111 185 110 302 14 185 22v/c Ratio 0.16 0.66 0.86 0.55 0.31 0.25 0.11 0.21 0.03Control Delay 33.8 34.4 87.0 41.1 32.4 12.5 45.3 16.2 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 33.8 34.4 87.0 41.1 32.4 12.5 45.3 16.2 0.1Queue Length 50th (m) 5.1 32.7 22.3 33.8 19.4 34.2 2.7 21.3 0.0Queue Length 95th (m) 12.1 53.3 #43.2 50.4 38.3 74.4 9.0 35.2 0.0Internal Link Dist (m) 127.9 240.3 537.4 131.0Turn Bay Length (m) 20.0 15.0 20.0 30.0Base Capacity (vph) 302 573 220 569 355 1231 129 881 768Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.10 0.42 0.50 0.33 0.31 0.25 0.11 0.21 0.03

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 113: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Existing (2016) AM Peak Hour 1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 95 131 103 157 15 102 214 67 13 172 20Future Volume (vph) 27 95 131 103 157 15 102 214 67 13 172 20Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 0.99 1.00 1.00 0.96Flpb, ped/bikes 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.91 1.00 0.99 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1774 1684 1762 1821 1805 1804 1805 1863 1554Flt Permitted 0.52 1.00 0.38 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (perm) 973 1684 709 1821 1805 1804 1805 1863 1554Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 29 102 141 111 169 16 110 230 72 14 185 22RTOR Reduction (vph) 0 59 0 0 4 0 0 7 0 0 0 12Lane Group Flow (vph) 29 184 0 111 181 0 110 295 0 14 185 10Confl. Peds. (#/hr) 6 4 4 6 9 1 1 9Heavy Vehicles (%) 1% 2% 1% 2% 3% 0% 0% 1% 1% 0% 2% 0%Turn Type Perm NA Perm NA Prot NA Prot NA PermProtected Phases 4 8 5 2 1 6Permitted Phases 4 8 6Actuated Green, G (s) 18.4 18.4 18.4 18.4 19.7 65.4 1.6 47.3 47.3Effective Green, g (s) 18.4 18.4 18.4 18.4 19.7 65.4 1.6 47.3 47.3Actuated g/C Ratio 0.18 0.18 0.18 0.18 0.20 0.65 0.02 0.47 0.47Clearance Time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Vehicle Extension (s) 4.0 4.0 4.0 4.0 3.0 4.5 3.0 4.5 4.5Lane Grp Cap (vph) 179 309 130 335 355 1179 28 881 735v/s Ratio Prot 0.11 0.10 c0.06 c0.16 c0.01 0.10v/s Ratio Perm 0.03 c0.16 0.01v/c Ratio 0.16 0.60 0.85 0.54 0.31 0.25 0.50 0.21 0.01Uniform Delay, d1 34.3 37.4 39.5 37.0 34.3 7.2 48.8 15.4 14.0Progression Factor 1.00 1.00 1.00 1.00 0.81 1.59 1.00 1.00 1.00Incremental Delay, d2 0.6 3.6 39.8 2.2 2.1 0.5 13.4 0.5 0.0Delay (s) 34.9 41.0 79.3 39.2 29.9 11.9 62.2 16.0 14.0Level of Service C D E D C B E B BApproach Delay (s) 40.3 54.2 16.7 18.7Approach LOS D D B B

Intersection SummaryHCM 2000 Control Delay 31.7 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.40Actuated Cycle Length (s) 100.0 Sum of lost time (s) 14.6Intersection Capacity Utilization 69.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 114: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Existing (2016) AM Peak Hour 2: Coronation Drive/Felhaber Crescent & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopTraffic Volume (vph) 5 163 13 19 214 6 16 2 35 9 1 14Future Volume (vph) 5 163 13 19 214 6 16 2 35 9 1 14Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86Hourly flow rate (vph) 6 190 15 22 249 7 19 2 41 10 1 16

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1Volume Total (vph) 6 205 22 256 62 27Volume Left (vph) 6 0 22 0 19 10Volume Right (vph) 0 15 0 7 41 16Hadj (s) 0.50 0.01 0.52 0.03 -0.31 -0.28Departure Headway (s) 5.5 5.0 5.4 4.9 4.8 4.9Degree Utilization, x 0.01 0.28 0.03 0.35 0.08 0.04Capacity (veh/h) 642 704 643 713 682 660Control Delay (s) 7.3 8.7 7.4 9.4 8.2 8.0Approach Delay (s) 8.7 9.2 8.2 8.0Approach LOS A A A A

Intersection SummaryDelay 8.9Level of Service AIntersection Capacity Utilization 27.0% ICU Level of Service AAnalysis Period (min) 15

Page 115: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Existing (2016) AM Peak Hour 3: Kestell Boulevard & Coronation Drive 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 26 73 97 16 24 40Future Volume (vph) 26 73 97 16 24 40Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85Hourly flow rate (vph) 31 86 114 19 28 47

Direction, Lane # EB 1 WB 1 SB 1Volume Total (vph) 117 133 75Volume Left (vph) 31 0 28Volume Right (vph) 0 19 47Hadj (s) 0.16 -0.04 -0.26Departure Headway (s) 4.4 4.2 4.2Degree Utilization, x 0.14 0.15 0.09Capacity (veh/h) 804 846 807Control Delay (s) 8.1 7.9 7.6Approach Delay (s) 8.1 7.9 7.6Approach LOS A A A

Intersection SummaryDelay 7.9Level of Service AIntersection Capacity Utilization 22.4% ICU Level of Service AAnalysis Period (min) 15

Page 116: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Existing (2016) AM Peak Hour 4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBT WBT NBL NBT SBL SBTLane Group Flow (vph) 45 167 11 474 11 492v/c Ratio 0.14 0.71 0.02 0.38 0.09 0.38Control Delay 11.7 53.1 7.9 8.5 37.8 12.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.7 53.1 7.9 8.5 37.8 12.2Queue Length 50th (m) 0.5 30.9 0.6 30.1 2.1 57.1Queue Length 95th (m) 9.1 49.1 3.6 78.3 m6.2 82.0Internal Link Dist (m) 113.1 251.4 115.9 537.4Turn Bay Length (m) 20.0 25.0Base Capacity (vph) 423 327 567 1255 125 1300Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.51 0.02 0.38 0.09 0.38

Intersection Summarym Volume for 95th percentile queue is metered by upstream signal.

Page 117: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Existing (2016) AM Peak Hour 4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 2 1 37 125 2 22 10 334 88 10 435 3Future Volume (vph) 2 1 37 125 2 22 10 334 88 10 435 3Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.4 5.4 5.3 5.3 3.0 5.3Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 0.97 0.99 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 0.99 0.99 1.00 1.00 1.00Frt 0.87 0.98 1.00 0.97 1.00 1.00Flt Protected 1.00 0.96 0.95 1.00 0.95 1.00Satd. Flow (prot) 1610 1720 1778 1787 1787 1861Flt Permitted 0.99 0.73 0.43 1.00 0.95 1.00Satd. Flow (perm) 1593 1307 813 1787 1787 1861Peak-hour factor, PHF 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89Adj. Flow (vph) 2 1 42 140 2 25 11 375 99 11 489 3RTOR Reduction (vph) 0 35 0 0 7 0 0 7 0 0 0 0Lane Group Flow (vph) 0 10 0 0 160 0 11 467 0 11 492 0Confl. Peds. (#/hr) 7 5 5 7 5 19 19 5Heavy Vehicles (%) 0% 0% 0% 3% 0% 0% 1% 2% 0% 1% 2% 0%Turn Type Perm NA Perm NA Perm NA Prot NAProtected Phases 4 4 2 1 2Permitted Phases 4 4 2Actuated Green, G (s) 17.4 17.4 67.5 67.5 1.4 67.5Effective Green, g (s) 17.4 17.4 67.5 67.5 1.4 67.5Actuated g/C Ratio 0.17 0.17 0.68 0.68 0.01 0.68Clearance Time (s) 5.4 5.4 5.3 5.3 3.0 5.3Vehicle Extension (s) 3.0 3.0 5.0 5.0 2.5 5.0Lane Grp Cap (vph) 277 227 548 1206 25 1256v/s Ratio Prot 0.26 c0.01 c0.26v/s Ratio Perm 0.01 c0.12 0.01v/c Ratio 0.04 0.71 0.02 0.39 0.44 0.39Uniform Delay, d1 34.3 38.9 5.4 7.2 48.9 7.2Progression Factor 1.00 1.00 1.00 1.00 0.83 1.42Incremental Delay, d2 0.1 9.6 0.1 0.9 8.5 0.9Delay (s) 34.4 48.5 5.4 8.1 49.1 11.1Level of Service C D A A D BApproach Delay (s) 34.4 48.5 8.0 11.9Approach LOS C D A B

Intersection SummaryHCM 2000 Control Delay 16.3 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.46Actuated Cycle Length (s) 100.0 Sum of lost time (s) 13.7Intersection Capacity Utilization 48.4% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 118: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Existing (2016) PM Peak Hour1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 15 278 65 165 156 304 22 272 55v/c Ratio 0.07 0.73 0.57 0.46 0.46 0.26 0.17 0.30 0.07Control Delay 30.7 40.1 53.9 35.9 38.7 17.0 46.1 17.4 3.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.7 40.1 53.9 35.9 38.7 17.0 46.1 17.4 3.4Queue Length 50th (m) 2.5 42.2 12.1 27.6 28.7 17.8 4.3 33.0 0.0Queue Length 95th (m) 7.5 64.8 25.1 43.6 #64.2 87.2 12.0 51.3 5.5Internal Link Dist (m) 127.9 240.3 537.4 131.0Turn Bay Length (m) 20.0 15.0 20.0 30.0Base Capacity (vph) 339 582 187 570 340 1181 133 898 779Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.04 0.48 0.35 0.29 0.46 0.26 0.17 0.30 0.07

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 119: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Existing (2016) PM Peak Hour1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 125 145 63 128 32 151 215 80 21 264 53Future Volume (vph) 15 125 145 63 128 32 151 215 80 21 264 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.92 1.00 0.97 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1800 1739 1805 1806 1805 1810 1805 1900 1576Flt Permitted 0.58 1.00 0.32 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (perm) 1092 1739 603 1806 1805 1810 1805 1900 1576Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97Adj. Flow (vph) 15 129 149 65 132 33 156 222 82 22 272 55RTOR Reduction (vph) 0 48 0 0 11 0 0 9 0 0 0 29Lane Group Flow (vph) 15 230 0 65 154 0 156 295 0 22 272 26Confl. Peds. (#/hr) 2 2 2 3 3 2Heavy Vehicles (%) 0% 1% 0% 0% 2% 0% 0% 0% 0% 0% 0% 0%Turn Type Perm NA Perm NA Prot NA Prot NA PermProtected Phases 4 8 5 2 1 6Permitted Phases 4 8 6Actuated Green, G (s) 19.2 19.2 19.2 19.2 18.9 63.0 3.2 47.3 47.3Effective Green, g (s) 19.2 19.2 19.2 19.2 18.9 63.0 3.2 47.3 47.3Actuated g/C Ratio 0.19 0.19 0.19 0.19 0.19 0.63 0.03 0.47 0.47Clearance Time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Vehicle Extension (s) 4.0 4.0 4.0 4.0 3.0 4.5 3.0 4.5 4.5Lane Grp Cap (vph) 209 333 115 346 341 1140 57 898 745v/s Ratio Prot c0.13 0.09 c0.09 0.16 0.01 c0.14v/s Ratio Perm 0.01 0.11 0.02v/c Ratio 0.07 0.69 0.57 0.45 0.46 0.26 0.39 0.30 0.03Uniform Delay, d1 33.1 37.6 36.6 35.7 36.0 8.2 47.4 16.2 14.1Progression Factor 1.00 1.00 1.00 1.00 0.87 1.84 1.00 1.00 1.00Incremental Delay, d2 0.2 6.3 7.5 1.3 4.1 0.5 4.3 0.9 0.1Delay (s) 33.3 44.0 44.1 37.0 35.3 15.6 51.7 17.1 14.2Level of Service C D D D D B D B BApproach Delay (s) 43.4 39.0 22.3 18.8Approach LOS D D C B

Intersection SummaryHCM 2000 Control Delay 28.9 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.42Actuated Cycle Length (s) 100.0 Sum of lost time (s) 14.6Intersection Capacity Utilization 72.6% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 120: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Existing (2016) PM Peak Hour2: Coronation Drive/Felhaber Crescent & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopTraffic Volume (vph) 8 159 23 32 195 10 9 0 13 5 1 3Future Volume (vph) 8 159 23 32 195 10 9 0 13 5 1 3Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 9 171 25 34 210 11 10 0 14 5 1 3

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1Volume Total (vph) 9 196 34 221 24 9Volume Left (vph) 9 0 34 0 10 5Volume Right (vph) 0 25 0 11 14 3Hadj (s) 0.50 -0.06 0.52 0.00 -0.24 -0.09Departure Headway (s) 5.3 4.7 5.2 4.7 4.7 4.9Degree Utilization, x 0.01 0.26 0.05 0.29 0.03 0.01Capacity (veh/h) 671 749 669 748 696 666Control Delay (s) 7.1 8.1 7.3 8.4 7.9 7.9Approach Delay (s) 8.1 8.3 7.9 7.9Approach LOS A A A A

Intersection SummaryDelay 8.2Level of Service AIntersection Capacity Utilization 30.5% ICU Level of Service AAnalysis Period (min) 15

Page 121: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Existing (2016) PM Peak Hour3: Kestell Boulevard & Coronation Drive 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 33 84 56 13 6 34Future Volume (vph) 33 84 56 13 6 34Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86Hourly flow rate (vph) 38 98 65 15 7 40

Direction, Lane # EB 1 WB 1 SB 1Volume Total (vph) 136 80 47Volume Left (vph) 38 0 7Volume Right (vph) 0 15 40Hadj (s) 0.06 -0.08 -0.44Departure Headway (s) 4.1 4.0 3.9Degree Utilization, x 0.16 0.09 0.05Capacity (veh/h) 855 871 863Control Delay (s) 7.9 7.4 7.1Approach Delay (s) 7.9 7.4 7.1Approach LOS A A A

Intersection SummaryDelay 7.6Level of Service AIntersection Capacity Utilization 22.9% ICU Level of Service AAnalysis Period (min) 15

Page 122: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Existing (2016) PM Peak Hour4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBT WBT NBL NBT SBL SBTLane Group Flow (vph) 26 99 51 570 15 437v/c Ratio 0.12 0.49 0.07 0.39 0.12 0.30Control Delay 2.8 28.4 5.3 6.2 43.2 5.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 2.8 28.4 5.3 6.2 43.2 5.1Queue Length 50th (m) 0.0 7.9 1.8 25.8 2.5 8.7Queue Length 95th (m) 1.8 23.4 8.1 75.8 m7.4 62.7Internal Link Dist (m) 113.1 251.4 115.9 537.4Turn Bay Length (m) 20.0 25.0Base Capacity (vph) 433 377 723 1449 127 1472Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.06 0.26 0.07 0.39 0.12 0.30

Intersection Summarym Volume for 95th percentile queue is metered by upstream signal.

Page 123: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Existing (2016) PM Peak Hour4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 3 0 22 73 0 20 48 431 104 14 407 4Future Volume (vph) 3 0 22 73 0 20 48 431 104 14 407 4Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.4 5.4 5.3 5.3 3.0 5.3Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00Frt 0.88 0.97 1.00 0.97 1.00 1.00Flt Protected 0.99 0.96 0.95 1.00 0.95 1.00Satd. Flow (prot) 1627 1734 1794 1844 1805 1878Flt Permitted 0.97 0.75 0.49 1.00 0.95 1.00Satd. Flow (perm) 1586 1359 923 1844 1805 1878Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94Adj. Flow (vph) 3 0 23 78 0 21 51 459 111 15 433 4RTOR Reduction (vph) 0 24 0 0 53 0 0 5 0 0 0 0Lane Group Flow (vph) 0 2 0 0 46 0 51 565 0 15 437 0Confl. Peds. (#/hr) 1 1 1 1 5 5Heavy Vehicles (%) 2% 0% 0% 2% 0% 1% 0% 0% 0% 0% 1% 0%Turn Type Perm NA Perm NA Perm NA Prot NAProtected Phases 4 4 2 1 2Permitted Phases 4 4 2Actuated Green, G (s) 9.0 9.0 74.4 74.4 2.9 74.4Effective Green, g (s) 9.0 9.0 74.4 74.4 2.9 74.4Actuated g/C Ratio 0.09 0.09 0.74 0.74 0.03 0.74Clearance Time (s) 5.4 5.4 5.3 5.3 3.0 5.3Vehicle Extension (s) 3.0 3.0 5.0 5.0 2.5 5.0Lane Grp Cap (vph) 142 122 686 1371 52 1397v/s Ratio Prot c0.31 c0.01 0.23v/s Ratio Perm 0.00 c0.03 0.06v/c Ratio 0.02 0.38 0.07 0.41 0.29 0.31Uniform Delay, d1 41.5 42.9 3.5 4.7 47.5 4.3Progression Factor 1.00 1.00 1.00 1.00 0.95 0.91Incremental Delay, d2 0.0 2.0 0.2 0.9 2.1 0.6Delay (s) 41.5 44.8 3.7 5.6 47.1 4.4Level of Service D D A A D AApproach Delay (s) 41.5 44.8 5.5 5.9Approach LOS D D A A

Intersection SummaryHCM 2000 Control Delay 9.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.40Actuated Cycle Length (s) 100.0 Sum of lost time (s) 13.7Intersection Capacity Utilization 61.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 124: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

APPENDIX C Intersection Capacity Analysis Reports 

Future (2021) Background Conditions  

Page 125: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Background AM Peak Hour 1: Eighth Line & North Ridge Trail 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 29 249 111 193 110 327 14 210 22v/c Ratio 0.14 0.70 0.46 0.36 0.24 0.31 0.11 0.36 0.04Control Delay 33.7 37.9 31.2 28.5 28.5 20.0 45.3 28.8 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 33.7 37.9 31.2 28.5 28.5 20.0 45.3 28.8 0.1Queue Length 50th (m) 5.1 35.1 16.9 30.4 18.5 32.6 2.7 33.0 0.0Queue Length 95th (m) 12.2 57.3 27.6 45.0 37.5 94.7 9.0 53.5 0.0Internal Link Dist (m) 127.9 240.3 537.4 131.0Turn Bay Length (m) 20.0 15.0 20.0 30.0Base Capacity (vph) 369 571 240 770 456 1046 129 583 586Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.44 0.46 0.25 0.24 0.31 0.11 0.36 0.04

Intersection Summary

Page 126: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Background AM Peak Hour 1: Eighth Line & North Ridge Trail 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 100 131 103 165 15 102 237 67 13 195 20Future Volume (vph) 27 100 131 103 165 15 102 237 67 13 195 20Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.9 5.9 4.5 5.9 3.0 5.7 3.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.98 1.00 1.00 1.00 1.00 1.00 1.00 0.96Flpb, ped/bikes 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.92 1.00 0.99 1.00 0.97 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1773 1688 1768 1822 1805 1810 1805 1863 1554Flt Permitted 0.64 1.00 0.28 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (perm) 1188 1688 530 1822 1805 1810 1805 1863 1554Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 29 108 141 111 177 16 110 255 72 14 210 22RTOR Reduction (vph) 0 56 0 0 4 0 0 7 0 0 0 15Lane Group Flow (vph) 29 193 0 111 189 0 110 320 0 14 210 7Confl. Peds. (#/hr) 6 4 4 6 9 1 1 9Heavy Vehicles (%) 1% 2% 1% 2% 3% 0% 0% 1% 1% 0% 2% 0%Turn Type Perm NA pm+pt NA Prot NA Prot NA PermProtected Phases 4 3 8 5 2 1 6Permitted Phases 4 8 6Actuated Green, G (s) 17.8 17.8 28.8 28.8 25.3 55.0 1.6 31.3 31.3Effective Green, g (s) 17.8 17.8 28.8 28.8 25.3 55.0 1.6 31.3 31.3Actuated g/C Ratio 0.18 0.18 0.29 0.29 0.25 0.55 0.02 0.31 0.31Clearance Time (s) 5.9 5.9 4.5 5.9 3.0 5.7 3.0 5.7 5.7Vehicle Extension (s) 4.0 4.0 3.0 4.0 3.0 4.5 3.0 4.5 4.5Lane Grp Cap (vph) 211 300 233 524 456 995 28 583 486v/s Ratio Prot c0.11 c0.03 0.10 0.06 c0.18 c0.01 c0.11v/s Ratio Perm 0.02 0.11 0.00v/c Ratio 0.14 0.64 0.48 0.36 0.24 0.32 0.50 0.36 0.01Uniform Delay, d1 34.6 38.2 27.8 28.3 29.7 12.3 48.8 26.6 23.7Progression Factor 1.00 1.00 1.00 1.00 0.85 1.53 1.00 1.00 1.00Incremental Delay, d2 0.4 5.2 1.5 0.6 1.2 0.8 13.4 1.7 0.1Delay (s) 35.0 43.4 29.4 28.9 26.3 19.6 62.2 28.3 23.8Level of Service D D C C C B E C CApproach Delay (s) 42.5 29.0 21.3 29.8Approach LOS D C C C

Intersection SummaryHCM 2000 Control Delay 29.5 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.42Actuated Cycle Length (s) 100.0 Sum of lost time (s) 19.1Intersection Capacity Utilization 67.3% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 127: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Background AM Peak Hour 2: Coronation Drive/Felhaber Crescent & North Ridge Trail 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopTraffic Volume (vph) 5 171 13 19 225 6 16 2 35 9 1 14Future Volume (vph) 5 171 13 19 225 6 16 2 35 9 1 14Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86Hourly flow rate (vph) 6 199 15 22 262 7 19 2 41 10 1 16

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1Volume Total (vph) 6 214 22 269 62 27Volume Left (vph) 6 0 22 0 19 10Volume Right (vph) 0 15 0 7 41 16Hadj (s) 0.50 0.01 0.52 0.03 -0.31 -0.28Departure Headway (s) 5.5 5.0 5.4 4.9 4.8 4.9Degree Utilization, x 0.01 0.30 0.03 0.37 0.08 0.04Capacity (veh/h) 640 702 642 712 673 651Control Delay (s) 7.3 8.9 7.4 9.6 8.3 8.1Approach Delay (s) 8.8 9.4 8.3 8.1Approach LOS A A A A

Intersection SummaryDelay 9.0Level of Service AIntersection Capacity Utilization 27.0% ICU Level of Service AAnalysis Period (min) 15

Page 128: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Background AM Peak Hour 3: Kestell Boulevard & Coronation Drive 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 26 77 102 16 24 40Future Volume (vph) 26 77 102 16 24 40Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85Hourly flow rate (vph) 31 91 120 19 28 47

Direction, Lane # EB 1 WB 1 SB 1Volume Total (vph) 122 139 75Volume Left (vph) 31 0 28Volume Right (vph) 0 19 47Hadj (s) 0.16 -0.04 -0.26Departure Headway (s) 4.4 4.2 4.2Degree Utilization, x 0.15 0.16 0.09Capacity (veh/h) 802 844 801Control Delay (s) 8.1 8.0 7.6Approach Delay (s) 8.1 8.0 7.6Approach LOS A A A

Intersection SummaryDelay 7.9Level of Service AIntersection Capacity Utilization 22.6% ICU Level of Service AAnalysis Period (min) 15

Page 129: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Background AM Peak Hour 4: Eighth Line & Kestell Boulevard 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBT WBT NBL NBT SBL SBTLane Group Flow (vph) 45 167 11 514 11 548v/c Ratio 0.14 0.71 0.02 0.41 0.09 0.42Control Delay 11.7 53.1 8.0 8.9 41.9 7.9Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.7 53.1 8.0 8.9 41.9 7.9Queue Length 50th (m) 0.5 30.9 0.6 33.9 2.0 35.9Queue Length 95th (m) 9.1 49.1 3.6 87.5 m5.4 93.1Internal Link Dist (m) 113.1 251.4 115.9 537.4Turn Bay Length (m) 20.0 25.0Base Capacity (vph) 423 327 522 1258 125 1300Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.51 0.02 0.41 0.09 0.42

Intersection Summarym Volume for 95th percentile queue is metered by upstream signal.

Page 130: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Background AM Peak Hour 4: Eighth Line & Kestell Boulevard 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 2 1 37 125 2 22 10 369 88 10 485 3Future Volume (vph) 2 1 37 125 2 22 10 369 88 10 485 3Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.4 5.4 5.3 5.3 3.0 5.3Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 0.97 0.99 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00Frt 0.87 0.98 1.00 0.97 1.00 1.00Flt Protected 1.00 0.96 0.95 1.00 0.95 1.00Satd. Flow (prot) 1610 1720 1779 1793 1787 1861Flt Permitted 0.99 0.73 0.40 1.00 0.95 1.00Satd. Flow (perm) 1593 1307 747 1793 1787 1861Peak-hour factor, PHF 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89Adj. Flow (vph) 2 1 42 140 2 25 11 415 99 11 545 3RTOR Reduction (vph) 0 35 0 0 7 0 0 6 0 0 0 0Lane Group Flow (vph) 0 10 0 0 160 0 11 508 0 11 548 0Confl. Peds. (#/hr) 7 5 5 7 5 19 19 5Heavy Vehicles (%) 0% 0% 0% 3% 0% 0% 1% 2% 0% 1% 2% 0%Turn Type Perm NA Perm NA Perm NA Prot NAProtected Phases 4 4 2 1 2Permitted Phases 4 4 2Actuated Green, G (s) 17.4 17.4 67.5 67.5 1.4 67.5Effective Green, g (s) 17.4 17.4 67.5 67.5 1.4 67.5Actuated g/C Ratio 0.17 0.17 0.68 0.68 0.01 0.68Clearance Time (s) 5.4 5.4 5.3 5.3 3.0 5.3Vehicle Extension (s) 3.0 3.0 5.0 5.0 2.5 5.0Lane Grp Cap (vph) 277 227 504 1210 25 1256v/s Ratio Prot 0.28 c0.01 c0.29v/s Ratio Perm 0.01 c0.12 0.01v/c Ratio 0.04 0.71 0.02 0.42 0.44 0.44Uniform Delay, d1 34.3 38.9 5.4 7.4 48.9 7.5Progression Factor 1.00 1.00 1.00 1.00 0.92 0.83Incremental Delay, d2 0.1 9.6 0.1 1.1 8.4 1.1Delay (s) 34.4 48.5 5.4 8.4 53.6 7.3Level of Service C D A A D AApproach Delay (s) 34.4 48.5 8.4 8.2Approach LOS C D A A

Intersection SummaryHCM 2000 Control Delay 14.4 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.49Actuated Cycle Length (s) 100.0 Sum of lost time (s) 13.7Intersection Capacity Utilization 50.8% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 131: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Background PM Peak Hour1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 15 284 65 171 156 333 22 303 55v/c Ratio 0.07 0.73 0.56 0.47 0.47 0.28 0.17 0.34 0.07Control Delay 30.3 40.6 53.5 36.1 39.1 17.7 46.1 17.9 3.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 30.3 40.6 53.5 36.1 39.1 17.7 46.1 17.9 3.4Queue Length 50th (m) 2.5 43.8 12.1 28.9 28.9 20.7 4.3 37.4 0.0Queue Length 95th (m) 7.5 66.3 25.0 45.0 #65.1 96.4 12.0 57.4 5.5Internal Link Dist (m) 127.9 240.3 537.4 131.0Turn Bay Length (m) 20.0 15.0 20.0 30.0Base Capacity (vph) 333 581 184 570 334 1179 133 898 779Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.05 0.49 0.35 0.30 0.47 0.28 0.17 0.34 0.07

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 132: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Background PM Peak Hour1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 131 145 63 134 32 151 243 80 21 294 53Future Volume (vph) 15 131 145 63 134 32 151 243 80 21 294 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.92 1.00 0.97 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1800 1742 1805 1808 1805 1818 1805 1900 1576Flt Permitted 0.56 1.00 0.31 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (perm) 1071 1742 592 1808 1805 1818 1805 1900 1576Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97Adj. Flow (vph) 15 135 149 65 138 33 156 251 82 22 303 55RTOR Reduction (vph) 0 47 0 0 10 0 0 8 0 0 0 29Lane Group Flow (vph) 15 237 0 65 161 0 156 325 0 22 303 26Confl. Peds. (#/hr) 2 2 2 3 3 2Heavy Vehicles (%) 0% 1% 0% 0% 2% 0% 0% 0% 0% 0% 0% 0%Turn Type Perm NA Perm NA Prot NA Prot NA PermProtected Phases 4 8 5 2 1 6Permitted Phases 4 8 6Actuated Green, G (s) 19.6 19.6 19.6 19.6 18.5 62.6 3.2 47.3 47.3Effective Green, g (s) 19.6 19.6 19.6 19.6 18.5 62.6 3.2 47.3 47.3Actuated g/C Ratio 0.20 0.20 0.20 0.20 0.18 0.63 0.03 0.47 0.47Clearance Time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Vehicle Extension (s) 4.0 4.0 4.0 4.0 3.0 4.5 3.0 4.5 4.5Lane Grp Cap (vph) 209 341 116 354 333 1138 57 898 745v/s Ratio Prot c0.14 0.09 c0.09 0.18 0.01 c0.16v/s Ratio Perm 0.01 0.11 0.02v/c Ratio 0.07 0.70 0.56 0.46 0.47 0.29 0.39 0.34 0.03Uniform Delay, d1 32.8 37.4 36.3 35.5 36.4 8.5 47.4 16.5 14.1Progression Factor 1.00 1.00 1.00 1.00 0.86 1.81 1.00 1.00 1.00Incremental Delay, d2 0.2 6.5 7.3 1.3 4.3 0.6 4.3 1.0 0.1Delay (s) 33.0 44.0 43.6 36.8 35.6 16.0 51.7 17.5 14.2Level of Service C D D D D B D B BApproach Delay (s) 43.4 38.7 22.2 19.0Approach LOS D D C B

Intersection SummaryHCM 2000 Control Delay 28.6 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.45Actuated Cycle Length (s) 100.0 Sum of lost time (s) 14.6Intersection Capacity Utilization 72.9% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 133: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Background PM Peak Hour2: Coronation Drive/Felhaber Crescent & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopTraffic Volume (vph) 8 167 23 32 205 10 9 0 13 5 1 3Future Volume (vph) 8 167 23 32 205 10 9 0 13 5 1 3Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 9 180 25 34 220 11 10 0 14 5 1 3

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1Volume Total (vph) 9 205 34 231 24 9Volume Left (vph) 9 0 34 0 10 5Volume Right (vph) 0 25 0 11 14 3Hadj (s) 0.50 -0.06 0.52 0.00 -0.24 -0.09Departure Headway (s) 5.3 4.7 5.3 4.7 4.7 4.9Degree Utilization, x 0.01 0.27 0.05 0.30 0.03 0.01Capacity (veh/h) 670 747 668 747 688 658Control Delay (s) 7.2 8.3 7.3 8.6 7.9 8.0Approach Delay (s) 8.2 8.4 7.9 8.0Approach LOS A A A A

Intersection SummaryDelay 8.3Level of Service AIntersection Capacity Utilization 30.9% ICU Level of Service AAnalysis Period (min) 15

Page 134: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Background PM Peak Hour3: Kestell Boulevard & Coronation Drive 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 33 88 59 13 6 34Future Volume (vph) 33 88 59 13 6 34Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86Hourly flow rate (vph) 38 102 69 15 7 40

Direction, Lane # EB 1 WB 1 SB 1Volume Total (vph) 140 84 47Volume Left (vph) 38 0 7Volume Right (vph) 0 15 40Hadj (s) 0.05 -0.08 -0.44Departure Headway (s) 4.1 4.1 3.9Degree Utilization, x 0.16 0.09 0.05Capacity (veh/h) 854 869 857Control Delay (s) 7.9 7.5 7.2Approach Delay (s) 7.9 7.5 7.2Approach LOS A A A

Intersection SummaryDelay 7.7Level of Service AIntersection Capacity Utilization 23.1% ICU Level of Service AAnalysis Period (min) 15

Page 135: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Background PM Peak Hour4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBT WBT NBL NBT SBL SBTLane Group Flow (vph) 26 99 51 622 15 485v/c Ratio 0.12 0.49 0.07 0.43 0.12 0.33Control Delay 2.8 28.4 5.4 6.6 42.9 5.2Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 2.8 28.4 5.4 6.6 42.9 5.2Queue Length 50th (m) 0.0 7.9 1.8 29.6 2.6 10.0Queue Length 95th (m) 1.8 23.4 8.2 86.1 m7.1 65.7Internal Link Dist (m) 113.1 251.4 115.9 537.4Turn Bay Length (m) 20.0 25.0Base Capacity (vph) 433 377 681 1452 127 1472Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.06 0.26 0.07 0.43 0.12 0.33

Intersection Summarym Volume for 95th percentile queue is metered by upstream signal.

Page 136: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Background PM Peak Hour4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 3 0 22 73 0 20 48 480 104 14 452 4Future Volume (vph) 3 0 22 73 0 20 48 480 104 14 452 4Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.4 5.4 5.3 5.3 3.0 5.3Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00Frt 0.88 0.97 1.00 0.97 1.00 1.00Flt Protected 0.99 0.96 0.95 1.00 0.95 1.00Satd. Flow (prot) 1627 1734 1795 1849 1805 1879Flt Permitted 0.97 0.75 0.46 1.00 0.95 1.00Satd. Flow (perm) 1586 1359 869 1849 1805 1879Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94Adj. Flow (vph) 3 0 23 78 0 21 51 511 111 15 481 4RTOR Reduction (vph) 0 24 0 0 53 0 0 4 0 0 0 0Lane Group Flow (vph) 0 2 0 0 46 0 51 618 0 15 485 0Confl. Peds. (#/hr) 1 1 1 1 5 5Heavy Vehicles (%) 2% 0% 0% 2% 0% 1% 0% 0% 0% 0% 1% 0%Turn Type Perm NA Perm NA Perm NA Prot NAProtected Phases 4 4 2 1 2Permitted Phases 4 4 2Actuated Green, G (s) 9.0 9.0 74.4 74.4 2.9 74.4Effective Green, g (s) 9.0 9.0 74.4 74.4 2.9 74.4Actuated g/C Ratio 0.09 0.09 0.74 0.74 0.03 0.74Clearance Time (s) 5.4 5.4 5.3 5.3 3.0 5.3Vehicle Extension (s) 3.0 3.0 5.0 5.0 2.5 5.0Lane Grp Cap (vph) 142 122 646 1375 52 1397v/s Ratio Prot c0.33 c0.01 0.26v/s Ratio Perm 0.00 c0.03 0.06v/c Ratio 0.02 0.38 0.08 0.45 0.29 0.35Uniform Delay, d1 41.5 42.9 3.5 4.9 47.5 4.4Progression Factor 1.00 1.00 1.00 1.00 0.94 0.88Incremental Delay, d2 0.0 2.0 0.2 1.1 2.1 0.6Delay (s) 41.5 44.8 3.7 6.0 46.7 4.5Level of Service D D A A D AApproach Delay (s) 41.5 44.8 5.8 5.8Approach LOS D D A A

Intersection SummaryHCM 2000 Control Delay 9.5 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.44Actuated Cycle Length (s) 100.0 Sum of lost time (s) 13.7Intersection Capacity Utilization 61.0% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 137: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

APPENDIX D 2011 TTS Data Analysis 

Page 138: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

TTS Analysis for Iroquois Ridge

Transit excluding GO rail

Cycle Auto driverGO rail only

Joint GO rail and local transit

MotorcycleAuto 

passengerSchool bus

Taxi passenger Walk TOTAL

4025 138 0 8611 859 284 0 1040 0 14 194 111404032 180 0 4835 226 82 0 955 66 36 66 64464033 509 46 11780 631 317 18 1216 0 23 0 145404034 0 0 3471 186 54 0 406 0 0 0 4117TOTAL 827 46 28697 1902 737 18 3617 66 73 260 36243

2% 0% 79% 5% 2% 0% 10% 0% 0% 1%

10%10%Non‐Auto Model Reduction

Page 139: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

APPENDIX E Intersection Capacity Analysis Reports 

Future (2021) Total Traffic Conditions   

Page 140: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Total AM Peak Hour1: Eighth Line & North Ridge Trail 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 29 252 113 213 110 328 15 210 22v/c Ratio 0.14 0.70 0.47 0.40 0.24 0.33 0.12 0.36 0.04Control Delay 33.5 38.4 31.2 29.1 28.5 22.5 45.4 28.8 0.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 33.5 38.4 31.2 29.1 28.5 22.5 45.4 28.8 0.1Queue Length 50th (m) 5.1 36.1 17.2 33.9 18.6 34.7 2.9 33.0 0.0Queue Length 95th (m) 12.1 58.1 27.7 49.2 37.7 95.0 9.4 53.5 0.0Internal Link Dist (m) 127.9 240.3 537.4 131.0Turn Bay Length (m) 20.0 15.0 20.0 30.0Base Capacity (vph) 362 571 240 770 453 1006 129 583 586Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.08 0.44 0.47 0.28 0.24 0.33 0.12 0.36 0.04

Intersection Summary

Page 141: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Total AM Peak Hour1: Eighth Line & North Ridge Trail 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 27 103 131 105 181 17 102 237 68 14 195 20Future Volume (vph) 27 103 131 105 181 17 102 237 68 14 195 20Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.9 5.9 4.5 5.9 3.0 5.7 3.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00 1.00 1.00 0.96Flpb, ped/bikes 0.99 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.92 1.00 0.99 1.00 0.97 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1774 1690 1768 1821 1805 1809 1805 1863 1554Flt Permitted 0.62 1.00 0.28 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (perm) 1167 1690 526 1821 1805 1809 1805 1863 1554Peak-hour factor, PHF 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Adj. Flow (vph) 29 111 141 113 195 18 110 255 73 15 210 22RTOR Reduction (vph) 0 54 0 0 4 0 0 7 0 0 0 15Lane Group Flow (vph) 29 198 0 113 209 0 110 321 0 15 210 7Confl. Peds. (#/hr) 6 4 4 6 9 1 1 9Heavy Vehicles (%) 1% 2% 1% 2% 3% 0% 0% 1% 1% 0% 2% 0%Turn Type Perm NA pm+pt NA Prot NA Prot NA PermProtected Phases 4 3 8 5 2 1 6Permitted Phases 4 8 6Actuated Green, G (s) 18.0 18.0 29.0 29.0 25.1 53.4 3.0 31.3 31.3Effective Green, g (s) 18.0 18.0 29.0 29.0 25.1 53.4 3.0 31.3 31.3Actuated g/C Ratio 0.18 0.18 0.29 0.29 0.25 0.53 0.03 0.31 0.31Clearance Time (s) 5.9 5.9 4.5 5.9 3.0 5.7 3.0 5.7 5.7Vehicle Extension (s) 4.0 4.0 3.0 4.0 3.0 4.5 3.0 4.5 4.5Lane Grp Cap (vph) 210 304 233 528 453 966 54 583 486v/s Ratio Prot c0.12 c0.03 0.11 c0.06 c0.18 0.01 c0.11v/s Ratio Perm 0.02 0.11 0.00v/c Ratio 0.14 0.65 0.48 0.40 0.24 0.33 0.28 0.36 0.01Uniform Delay, d1 34.5 38.1 27.7 28.5 29.9 13.2 47.4 26.6 23.7Progression Factor 1.00 1.00 1.00 1.00 0.84 1.53 1.00 1.00 1.00Incremental Delay, d2 0.4 5.4 1.6 0.7 1.2 0.9 2.8 1.7 0.1Delay (s) 34.9 43.5 29.3 29.1 26.3 21.1 50.2 28.3 23.8Level of Service C D C C C C D C CApproach Delay (s) 42.6 29.2 22.4 29.2Approach LOS D C C C

Intersection SummaryHCM 2000 Control Delay 29.8 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.42Actuated Cycle Length (s) 100.0 Sum of lost time (s) 19.1Intersection Capacity Utilization 67.8% ICU Level of Service CAnalysis Period (min) 15c Critical Lane Group

Page 142: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Total AM Peak Hour2: Coronation Drive/Felhaber Crescent & North Ridge Trail 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopTraffic Volume (vph) 5 171 18 23 225 6 36 2 40 9 1 14Future Volume (vph) 5 171 18 23 225 6 36 2 40 9 1 14Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.25 0.86Hourly flow rate (vph) 6 199 21 27 262 7 42 2 47 10 4 16

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1Volume Total (vph) 6 220 27 269 91 30Volume Left (vph) 6 0 27 0 42 10Volume Right (vph) 0 21 0 7 47 16Hadj (s) 0.50 -0.01 0.52 0.03 -0.18 -0.25Departure Headway (s) 5.6 5.1 5.5 5.1 5.0 5.0Degree Utilization, x 0.01 0.31 0.04 0.38 0.13 0.04Capacity (veh/h) 624 685 626 692 652 632Control Delay (s) 7.4 9.2 7.6 9.9 8.7 8.3Approach Delay (s) 9.1 9.7 8.7 8.3Approach LOS A A A A

Intersection SummaryDelay 9.3Level of Service AIntersection Capacity Utilization 32.8% ICU Level of Service AAnalysis Period (min) 15

Page 143: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Total AM Peak Hour3: Kestell Boulevard & Coronation Drive 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 29 77 102 16 26 47Future Volume (vph) 29 77 102 16 26 47Peak Hour Factor 0.85 0.85 0.85 0.85 0.85 0.85Hourly flow rate (vph) 34 91 120 19 31 55

Direction, Lane # EB 1 WB 1 SB 1Volume Total (vph) 125 139 86Volume Left (vph) 34 0 31Volume Right (vph) 0 19 55Hadj (s) 0.16 -0.04 -0.27Departure Headway (s) 4.4 4.2 4.2Degree Utilization, x 0.15 0.16 0.10Capacity (veh/h) 796 836 801Control Delay (s) 8.2 8.0 7.7Approach Delay (s) 8.2 8.0 7.7Approach LOS A A A

Intersection SummaryDelay 8.0Level of Service AIntersection Capacity Utilization 23.3% ICU Level of Service AAnalysis Period (min) 15

Page 144: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Total AM Peak Hour4: Eighth Line & Kestell Boulevard 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBT WBT NBL NBT SBL SBTLane Group Flow (vph) 45 175 11 518 11 550v/c Ratio 0.14 0.74 0.02 0.41 0.09 0.43Control Delay 11.6 54.2 8.0 9.1 41.9 8.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 11.6 54.2 8.0 9.1 41.9 8.1Queue Length 50th (m) 0.5 32.5 0.6 35.2 2.0 36.6Queue Length 95th (m) 9.1 51.3 3.6 88.5 m5.4 93.9Internal Link Dist (m) 113.1 251.4 115.9 537.4Turn Bay Length (m) 20.0 25.0Base Capacity (vph) 423 326 515 1250 125 1293Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.11 0.54 0.02 0.41 0.09 0.43

Intersection Summarym Volume for 95th percentile queue is metered by upstream signal.

Page 145: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Total AM Peak Hour4: Eighth Line & Kestell Boulevard 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 2 1 37 132 2 22 10 370 91 10 487 3Future Volume (vph) 2 1 37 132 2 22 10 370 91 10 487 3Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.4 5.4 5.3 5.3 3.0 5.3Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 0.97 1.00 1.00 0.99 1.00 1.00Flpb, ped/bikes 1.00 0.99 1.00 1.00 1.00 1.00Frt 0.87 0.98 1.00 0.97 1.00 1.00Flt Protected 1.00 0.96 0.95 1.00 0.95 1.00Satd. Flow (prot) 1610 1721 1779 1792 1787 1861Flt Permitted 0.99 0.73 0.40 1.00 0.95 1.00Satd. Flow (perm) 1593 1305 741 1792 1787 1861Peak-hour factor, PHF 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89Adj. Flow (vph) 2 1 42 148 2 25 11 416 102 11 547 3RTOR Reduction (vph) 0 35 0 0 7 0 0 6 0 0 0 0Lane Group Flow (vph) 0 10 0 0 168 0 11 512 0 11 550 0Confl. Peds. (#/hr) 7 5 5 7 5 19 19 5Heavy Vehicles (%) 0% 0% 0% 3% 0% 0% 1% 2% 0% 1% 2% 0%Turn Type Perm NA Perm NA Perm NA Prot NAProtected Phases 4 4 2 1 2Permitted Phases 4 4 2Actuated Green, G (s) 17.8 17.8 67.1 67.1 1.4 67.1Effective Green, g (s) 17.8 17.8 67.1 67.1 1.4 67.1Actuated g/C Ratio 0.18 0.18 0.67 0.67 0.01 0.67Clearance Time (s) 5.4 5.4 5.3 5.3 3.0 5.3Vehicle Extension (s) 3.0 3.0 5.0 5.0 2.5 5.0Lane Grp Cap (vph) 283 232 497 1202 25 1248v/s Ratio Prot 0.29 c0.01 c0.30v/s Ratio Perm 0.01 c0.13 0.01v/c Ratio 0.04 0.73 0.02 0.43 0.44 0.44Uniform Delay, d1 34.0 38.8 5.5 7.6 48.9 7.7Progression Factor 1.00 1.00 1.00 1.00 0.92 0.84Incremental Delay, d2 0.1 10.7 0.1 1.1 8.4 1.1Delay (s) 34.1 49.5 5.6 8.7 53.6 7.5Level of Service C D A A D AApproach Delay (s) 34.1 49.5 8.6 8.4Approach LOS C D A A

Intersection SummaryHCM 2000 Control Delay 14.9 HCM 2000 Level of Service BHCM 2000 Volume to Capacity ratio 0.50Actuated Cycle Length (s) 100.0 Sum of lost time (s) 13.7Intersection Capacity Utilization 51.2% ICU Level of Service AAnalysis Period (min) 15c Critical Lane Group

Page 146: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Total AM Peak Hour5: Coronation Drive & Site Access 12/02/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 25 9 3 53 33 9Future Volume (Veh/h) 25 9 3 53 33 9Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 27 10 3 58 36 10PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 105 41 46vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 105 41 46tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 97 99 100cM capacity (veh/h) 896 1036 1575

Direction, Lane # EB 1 NB 1 SB 1Volume Total 37 61 46Volume Left 27 3 0Volume Right 10 0 10cSH 930 1575 1700Volume to Capacity 0.04 0.00 0.03Queue Length 95th (m) 1.0 0.0 0.0Control Delay (s) 9.0 0.4 0.0Lane LOS A AApproach Delay (s) 9.0 0.4 0.0Approach LOS A

Intersection SummaryAverage Delay 2.5Intersection Capacity Utilization 15.2% ICU Level of Service AAnalysis Period (min) 15

Page 147: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Total PM Peak Hour1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBL EBT WBL WBT NBL NBT SBL SBT SBRLane Group Flow (vph) 15 304 66 183 156 336 24 303 55v/c Ratio 0.07 0.75 0.56 0.47 0.51 0.29 0.18 0.34 0.07Control Delay 29.1 41.6 51.8 35.0 42.0 18.8 46.3 17.9 3.4Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 29.1 41.6 51.8 35.0 42.0 18.8 46.3 17.9 3.4Queue Length 50th (m) 2.5 49.0 12.1 30.6 29.2 22.0 4.7 37.4 0.0Queue Length 95th (m) 7.3 71.9 24.8 46.9 #71.0 96.9 12.8 57.4 5.5Internal Link Dist (m) 127.9 240.3 537.4 131.0Turn Bay Length (m) 20.0 15.0 20.0 30.0Base Capacity (vph) 323 578 175 570 307 1150 134 898 779Starvation Cap Reductn 0 0 0 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0 0 0 0Reduced v/c Ratio 0.05 0.53 0.38 0.32 0.51 0.29 0.18 0.34 0.07

Intersection Summary# 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles.

Page 148: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Total PM Peak Hour1: Eighth Line & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 15 150 145 64 145 33 151 243 82 23 294 53Future Volume (vph) 15 150 145 64 145 33 151 243 82 23 294 53Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 0.99 1.00 1.00 0.98Flpb, ped/bikes 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00Frt 1.00 0.93 1.00 0.97 1.00 0.96 1.00 1.00 0.85Flt Protected 0.95 1.00 0.95 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (prot) 1801 1751 1805 1810 1805 1816 1805 1900 1576Flt Permitted 0.55 1.00 0.30 1.00 0.95 1.00 0.95 1.00 1.00Satd. Flow (perm) 1041 1751 564 1810 1805 1816 1805 1900 1576Peak-hour factor, PHF 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97Adj. Flow (vph) 15 155 149 66 149 34 156 251 85 24 303 55RTOR Reduction (vph) 0 40 0 0 9 0 0 9 0 0 0 29Lane Group Flow (vph) 15 265 0 66 174 0 156 327 0 24 303 26Confl. Peds. (#/hr) 2 2 2 3 3 2Heavy Vehicles (%) 0% 1% 0% 0% 2% 0% 0% 0% 0% 0% 0% 0%Turn Type Perm NA Perm NA Prot NA Prot NA PermProtected Phases 4 8 5 2 1 6Permitted Phases 4 8 6Actuated Green, G (s) 21.0 21.0 21.0 21.0 17.1 61.1 3.3 47.3 47.3Effective Green, g (s) 21.0 21.0 21.0 21.0 17.1 61.1 3.3 47.3 47.3Actuated g/C Ratio 0.21 0.21 0.21 0.21 0.17 0.61 0.03 0.47 0.47Clearance Time (s) 5.9 5.9 5.9 5.9 3.0 5.7 3.0 5.7 5.7Vehicle Extension (s) 4.0 4.0 4.0 4.0 3.0 4.5 3.0 4.5 4.5Lane Grp Cap (vph) 218 367 118 380 308 1109 59 898 745v/s Ratio Prot c0.15 0.10 c0.09 0.18 0.01 c0.16v/s Ratio Perm 0.01 0.12 0.02v/c Ratio 0.07 0.72 0.56 0.46 0.51 0.29 0.41 0.34 0.03Uniform Delay, d1 31.7 36.8 35.4 34.5 37.6 9.2 47.4 16.5 14.1Progression Factor 1.00 1.00 1.00 1.00 0.86 1.78 1.00 1.00 1.00Incremental Delay, d2 0.2 7.3 6.9 1.2 5.4 0.6 4.5 1.0 0.1Delay (s) 31.8 44.0 42.3 35.7 37.9 17.1 51.9 17.5 14.2Level of Service C D D D D B D B BApproach Delay (s) 43.5 37.4 23.7 19.2Approach LOS D D C B

Intersection SummaryHCM 2000 Control Delay 29.2 HCM 2000 Level of Service CHCM 2000 Volume to Capacity ratio 0.46Actuated Cycle Length (s) 100.0 Sum of lost time (s) 14.6Intersection Capacity Utilization 73.9% ICU Level of Service DAnalysis Period (min) 15c Critical Lane Group

Page 149: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Total PM Peak Hour2: Coronation Drive/Felhaber Crescent & North Ridge Trail 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsSign Control Stop Stop Stop StopTraffic Volume (vph) 8 167 46 37 205 10 22 0 15 5 1 3Future Volume (vph) 8 167 46 37 205 10 22 0 15 5 1 3Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93Hourly flow rate (vph) 9 180 49 40 220 11 24 0 16 5 1 3

Direction, Lane # EB 1 EB 2 WB 1 WB 2 NB 1 SB 1Volume Total (vph) 9 229 40 231 40 9Volume Left (vph) 9 0 40 0 24 5Volume Right (vph) 0 49 0 11 16 3Hadj (s) 0.50 -0.12 0.52 0.00 -0.08 -0.09Departure Headway (s) 5.3 4.7 5.3 4.8 5.0 5.0Degree Utilization, x 0.01 0.30 0.06 0.31 0.06 0.01Capacity (veh/h) 661 747 658 735 657 642Control Delay (s) 7.2 8.5 7.5 8.7 8.3 8.1Approach Delay (s) 8.5 8.5 8.3 8.1Approach LOS A A A A

Intersection SummaryDelay 8.5Level of Service AIntersection Capacity Utilization 31.1% ICU Level of Service AAnalysis Period (min) 15

Page 150: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Total PM Peak Hour3: Kestell Boulevard & Coronation Drive 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT WBT WBR SBL SBRLane ConfigurationsSign Control Stop Stop StopTraffic Volume (vph) 40 88 59 15 7 39Future Volume (vph) 40 88 59 15 7 39Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86Hourly flow rate (vph) 47 102 69 17 8 45

Direction, Lane # EB 1 WB 1 SB 1Volume Total (vph) 149 86 53Volume Left (vph) 47 0 8Volume Right (vph) 0 17 45Hadj (s) 0.06 -0.09 -0.44Departure Headway (s) 4.2 4.1 4.0Degree Utilization, x 0.17 0.10 0.06Capacity (veh/h) 848 865 850Control Delay (s) 8.0 7.5 7.2Approach Delay (s) 8.0 7.5 7.2Approach LOS A A A

Intersection SummaryDelay 7.7Level of Service AIntersection Capacity Utilization 23.5% ICU Level of Service AAnalysis Period (min) 15

Page 151: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

Queues Future (2021) Total PM Peak Hour4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Lane Group EBT WBT NBL NBT SBL SBTLane Group Flow (vph) 26 104 51 631 15 486v/c Ratio 0.11 0.51 0.08 0.44 0.12 0.33Control Delay 2.8 29.6 5.5 6.8 44.3 5.1Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0Total Delay 2.8 29.6 5.5 6.8 44.3 5.1Queue Length 50th (m) 0.0 8.9 1.8 30.1 2.6 9.7Queue Length 95th (m) 1.8 25.0 8.3 89.5 m6.9 66.3Internal Link Dist (m) 113.1 251.4 115.9 537.4Turn Bay Length (m) 20.0 25.0Base Capacity (vph) 433 377 678 1447 127 1468Starvation Cap Reductn 0 0 0 0 0 0Spillback Cap Reductn 0 0 0 0 0 0Storage Cap Reductn 0 0 0 0 0 0Reduced v/c Ratio 0.06 0.28 0.08 0.44 0.12 0.33

Intersection Summarym Volume for 95th percentile queue is metered by upstream signal.

Page 152: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Signalized Intersection Capacity Analysis Future (2021) Total PM Peak Hour4: Eighth Line & Kestell Boulevard 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBRLane ConfigurationsTraffic Volume (vph) 3 0 22 78 0 20 48 482 111 14 453 4Future Volume (vph) 3 0 22 78 0 20 48 482 111 14 453 4Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900Total Lost time (s) 5.4 5.4 5.3 5.3 3.0 5.3Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00Frpb, ped/bikes 0.98 1.00 1.00 1.00 1.00 1.00Flpb, ped/bikes 1.00 1.00 0.99 1.00 1.00 1.00Frt 0.88 0.97 1.00 0.97 1.00 1.00Flt Protected 0.99 0.96 0.95 1.00 0.95 1.00Satd. Flow (prot) 1627 1735 1795 1847 1805 1879Flt Permitted 0.97 0.75 0.46 1.00 0.95 1.00Satd. Flow (perm) 1586 1356 867 1847 1805 1879Peak-hour factor, PHF 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94Adj. Flow (vph) 3 0 23 83 0 21 51 513 118 15 482 4RTOR Reduction (vph) 0 24 0 0 53 0 0 5 0 0 0 0Lane Group Flow (vph) 0 2 0 0 51 0 51 626 0 15 486 0Confl. Peds. (#/hr) 1 1 1 1 5 5Heavy Vehicles (%) 2% 0% 0% 2% 0% 1% 0% 0% 0% 0% 1% 0%Turn Type Perm NA Perm NA Perm NA Prot NAProtected Phases 4 4 2 1 2Permitted Phases 4 4 2Actuated Green, G (s) 9.2 9.2 74.2 74.2 2.9 74.2Effective Green, g (s) 9.2 9.2 74.2 74.2 2.9 74.2Actuated g/C Ratio 0.09 0.09 0.74 0.74 0.03 0.74Clearance Time (s) 5.4 5.4 5.3 5.3 3.0 5.3Vehicle Extension (s) 3.0 3.0 5.0 5.0 2.5 5.0Lane Grp Cap (vph) 145 124 643 1370 52 1394v/s Ratio Prot c0.34 c0.01 0.26v/s Ratio Perm 0.00 c0.04 0.06v/c Ratio 0.02 0.41 0.08 0.46 0.29 0.35Uniform Delay, d1 41.3 42.9 3.5 5.0 47.5 4.5Progression Factor 1.00 1.00 1.00 1.00 0.97 0.85Incremental Delay, d2 0.0 2.2 0.2 1.1 2.1 0.6Delay (s) 41.3 45.1 3.8 6.1 48.2 4.5Level of Service D D A A D AApproach Delay (s) 41.3 45.1 6.0 5.8Approach LOS D D A A

Intersection SummaryHCM 2000 Control Delay 9.7 HCM 2000 Level of Service AHCM 2000 Volume to Capacity ratio 0.45Actuated Cycle Length (s) 100.0 Sum of lost time (s) 13.7Intersection Capacity Utilization 61.3% ICU Level of Service BAnalysis Period (min) 15c Critical Lane Group

Page 153: STRATEGY 4 INC. - Welcome to the Town of Oakville planning/da-141020...Strategy 4 Inc. Iroquois Ridge #2 – Proposed Residential Development Traffic Impact Study TR16-0587 (December

HCM Unsignalized Intersection Capacity Analysis Future (2021) Total PM Peak Hour5: Coronation Drive & Site Access 12/01/2016

TR16-0587 Strategy_IroquoisRidge-TIS_Oakville Synchro 9 ReportCole Engineering

Movement EBL EBR NBL NBT SBT SBRLane ConfigurationsTraffic Volume (veh/h) 15 6 9 22 56 28Future Volume (Veh/h) 15 6 9 22 56 28Sign Control Stop Free FreeGrade 0% 0% 0%Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92Hourly flow rate (vph) 16 7 10 24 61 30PedestriansLane Width (m)Walking Speed (m/s)Percent BlockageRight turn flare (veh)Median type None NoneMedian storage veh)Upstream signal (m)pX, platoon unblockedvC, conflicting volume 120 76 91vC1, stage 1 conf volvC2, stage 2 conf volvCu, unblocked vol 120 76 91tC, single (s) 6.4 6.2 4.1tC, 2 stage (s)tF (s) 3.5 3.3 2.2p0 queue free % 98 99 99cM capacity (veh/h) 870 985 1504

Direction, Lane # EB 1 NB 1 SB 1Volume Total 23 34 91Volume Left 16 10 0Volume Right 7 0 30cSH 902 1504 1700Volume to Capacity 0.03 0.01 0.05Queue Length 95th (m) 0.6 0.2 0.0Control Delay (s) 9.1 2.2 0.0Lane LOS A AApproach Delay (s) 9.1 2.2 0.0Approach LOS A

Intersection SummaryAverage Delay 1.9Intersection Capacity Utilization 18.3% ICU Level of Service AAnalysis Period (min) 15