structural detail 2 - mechanical engineeringmech397/palmer events center_v14.pdf · 2015-12-08 ·...
TRANSCRIPT
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
SITE PLAN
N.T.S.
1 8
8/22/2013
MCS
MCS
PV1
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
----
244.800 KWDC
208.080 KWAC
----
----
1. THIS DOCUMENT AND THE IDEAS AND DESIGNS HEREIN ARE AND SHALL REMAIN PROPERTY OF ONTILITY. THESE DOCUMENTS ARE NOT TO BE USED OR
ALTERED IN WHOLE OR IN PART FOR OTHER THAN THE ORIGINAL INTENDED USE; NOR ARE THEY TO BE ASSIGNED TO ANY THIRD PARTY WITHOUT
WRITTEN PERMISSION FROM ONTILITY LLC.
2. THE FOLLOWING DOCUMENTS DO NOT PERMIT CONTRACTOR TO INSTALL THIS SYSTEM AGAINST ANY LOCAL, MUNICIPAL, OR INTERNATIONALLY
RECOGNIZED BUILDING / ELECTRICAL CODE. THE PURPOSE OF THESE DOCUMENTS IS TO PROVIDE AUTHORITIES HAVING JURISDICTION AND UTILITIES A
METHOD FOR INSPECTION.
3. THE FOLLOWING DOCUMENTS ARE PROPERTY OF ONTILITY, LLC, ALL DESIGNS AND INFORMATION CONTAINED WITHIN THE DRAWINGS ARE ONLY FOR THE
SPECIFIED PROJECT AND SHALL NOT BE USED FOR ANY OTHER MEANS, USE OF THE DRAWINGS FOR ANY OTHER PURPOSE IS PROHIBITED WITHOUT
EXPRESSED WRITTEN CONSENT OF ONTILITY, LLC.
4. IN THE EVENT OF A DISCREPANCY IN QUANTITY OR SIZE OF CONDUIT, WIRE, EQUIPMENT, CIRCUIT BREAKERS, GROUND FAULT PROTECTION SYSTEMS,
ETC, (ALL MATERIAL), DEPICTED ON THE DOCUMENTS OR SPECIFICATIONS, THE INSTALLATION CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING
AND INSTALLING ALL MATERIAL AND SERVICE EQUIPMENT IN COMPLIANCE WITH ALL REGULATIONS, LAWS, ORDINANCES, OR AHJ.
5. IN THE EVENT OF CONFLICTING REGULATIONS, LAWS OR ORDINANCES, THE MOST RESTRICTIVE SHALL PREVAIL.
6. ALL ELECTRICAL MATERIALS AND EQUIPMENT SHALL BE NEW AND LISTED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY.
7. AN INVERTER OR AC MODULE IN AN INTERACTIVE SOLAR PV SYSTEM SHALL AUTOMATICALLY DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL
PRODUCTION AND DISTRIBUTION NETWORK UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL
PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED PER NEC 690.61
8. THE CONTRACTOR SHALL VERIFY ALL CONTROLLING FIELD DIMENSIONS BEFORE ORDERING OR FABRICATING ANY MATERIAL.
9. SEE PROVIDED SPEC-SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS.
10. ALL ELECTRICAL EQUIPMENT SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE.
11. THE INSTALLATION CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL COORDINATE ALL INSPECTIONS, TESTING, COMMISSIONING AND
ACCEPTANCE WITH THE CLIENT, UTILITY, AND MUNICIPAL INSPECTORS AS NEEDED.
12. THE INSTALLATION CONTRACTOR SHALL VERIFY THE EXACT LOCATIONS OF SERVICE POINTS AND COMPLY WITH ALL UTILITY REQUIREMENTS.
13. DRAWINGS ARE DIAGRAMMATIC ONLY, ACTUAL INSTALLATION OF ALL ELECTRICAL EQUIPMENT SHALL BE THE DECISION OF INSTALLATION CONTRACTOR
14. IF DISTANCES OF CONDUCTOR RUNS ARE DIFFERENT THAN SHOWN, THE CONTRACTOR SHALL NOTIFY THE SYSTEM DESIGNER TO VALIDATE THE WIRE
SIZE, FINAL DRAWINGS WILL BE REVISED AS APPROPRIATE.
15. THE INSTALLATION CONTRACTOR IS RESPONSIBLE FOR NOTIFICATION AND COORDINATION WITH ALL PROPERTY OWNERS, UTILITIES AND APPROPRIATE
DIG-ALERT UNDERGROUND MARKING AGENCIES. THE CONTRACTOR SHALL ALWAYS USE EXTREME CAUTION WHEN TRENCHING FOR INSTALLATION. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROPER AND APPROVED REPAIR OF ANY AND ALL DAMAGES CAUSED DURING THE INSTALLATION.
CLIENT:
PROJECT:
ADDRESS:
CONTACT:
SYSTEM:
UTILITY:
JEFF, WOLFE 512.904.9006
AUSTIN ENERGY
GENERAL NOTES
208.080 KWAC
244.800 KWDC
AUSTIN, TX 78704
900 BARTON SPRINGS RD
PALMER EVENTS CENTER
CITY OF AUSTIN
PROJECT INFORMATION
SITE
Sheet List Table
Sheet
Number
Sheet Title
PV1 SITE PLAN
PV2 UTILITY SITE PLAN
PV3 STRUCTURAL DETAIL
PV4 STRUCTURAL SITE
PV5 BLOCK DIAGRAM
PV6 ONE LINE ELECTRICAL
PV7 PV LABEL GUIDE
PV8 STRUCTURAL DETAIL 2
SITE
VMP
IMP
VOC
ISC
TC
A
V
P
CU
AL
NEC
OC
RR
PV
AHJ
DC
AC
KW
W
STC
AWG
GEC
DIA
UL
EMT
ENT
FMC
FMT
IMC
LFMC
LFNC
RMC
RNC
POI
AHJ
N
E
MAXIMUM POWER VOLTAGE
MAXIMUM POWER CURRENT
OPEN CIRCUIT VOLTAGE
OPEN CIRCUIT CURRENT
TEMPERATURE COEFFICIENT
AMPERES
VOLTS
POLE
COPPER
ALUMINUM
NATIONAL ELECTRIC CODE
OFF CENTER
ROOF RAFTER
PHOTOVOLTAIC
AUTHORITIES HAVING JURISDICTION
DIRECT CURRENT
ALTERNATING CURRENT
KILOWATT
WATT
STANDARD TESTING CONDITIONS
AMERICAN WIRE GAUGE
GROUNDING ELECTRODE CONDUCTOR
DIAMETER
UNDERWRITERS LABORATORY
ELECTRICAL METALLIC TUBING
ELECTRICAL NON-METALLIC TUBING
FLEXIBLE METALLIC CONDUIT
FLEXIBLE METALLIC TUBING
INTERMEDIATE METAL CONDUIT
LIQUID TIGHT FLEXIBLE METALLIC CONDUIT
LIQUID TIGHT FLEXIBLE NON-METALLIC CONDUIT
RIGID METAL CONDUIT
RIGID NON-METALLIC CONDUIT
POINT OF INTERCONNECTION
AUTHORITY HAVING JURISDICTION
NEW
EXISTING
ABBREVIATIONS
CODE INFORMATION
APPLICABLE CODES, LAWS AND REGULATIONS
NEC 2011
CEC 2010
IBC 2012
PLANS MUST COMPLY WITH LOCAL BUILDING CODES AND
ORDINANCES
3
0
7
'
-
3
"
1'-9.0"
1'-9.0"
5'
(N) SOLAR PV ARRAY
(E) STANDING SEAM
METAL ROOF
(N) CONDUIT (DC SOURCE CIRCUITS)
(SEE ONE LINE DIAGRAM FOR
TYPE/CONDUCTORS)
TO NEW SERVICE
LOCATION
(N) ELECTRICAL RACK ON
EAST WALL (SEE PV6 FOR
EQUIPMENT LAYOUT)
(16) SOLARBOS DISCONNECTING
COMBINERS (24V POWER SUPPLY)
(8) IPV 30kW BIPOLAR
INVERTERS W/ DC DISCONNECT
EACH W/ (2) 80A FUSES
(N) CONDUCTOR TRANSITION
W/ (8) JUNCTION BOXES
CONDUIT RUN TO NEW SERVICE
LOCATION, SEE ONE LINE
ELECTRICAL FOR SPECS
FROM SOLAR INVERTER
AGGREGATE PANEL "E"
TO UTILITY
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
UTILITY SITE PLAN
AS MARKED
2 7
8/22/2013
MCS
MCS
PV2
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
----
244.800 KWDC
208.080 KWAC
----
----
SCALE: 1" = 30'-0"
00 30' 60'
PV SYSTEM GENERAL NOTES
1. SEE ELECTRICAL ONE LINE DIAGRAM FOR ELECTRICAL
SPECIFICATIONS
2. ALL EXTERIOR EQUIPMENT/BOXES/COMBINERS SHALL BE NEMA
3R RATED FOR OUTDOOR USE.
3. WORKING CLEARANCES AROUND THE EXISTING AND NEW
ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE
WITH NEC 110.26 AND AHJ.
4. UTILITY METER, INVERTER AND UTILITY DISCONNECT SHALL BE
INSTALLED IN A LOCATION READILTY ACCESSIBLE BY THE
UTILITY DURING NORMAL BUSINESS HOURS.
5. ALL PV COMPONENTS SHALL BE LISTED UL 1741 OR OTHER
RECOGNIZED TESTING AGENCY
6. ALL PV MODULES AND ASSOCIATED EQUIPMENT AND WIRING
MATERIAL SHALL BE PROTECTED FROM ANY PHYSICAL DAMAGE.
7. NO PIPING, DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL
EQUIPMENT WILL BE LOCATED WITHIN THE DEDICATED SPACE
ABOVE THE ELECTRICAL EQUIPMENT. (NEC 110.26(F))
8. GROUNDING: ALL SERVICES, FEEDERS OR BRANCH CIRCUITS
SUPPLYING A BUILDING SHALL HAVE COMMON GROUNDING
ELECTRODE SYSTEM. (NEC 250.58)
* IF REQUIRED BY AHJ
N
270 90
180
0
KEY PLAN:
SCALE: N.T.S.
NEW SERVICE LOCATION:
SCALE: 1" = 8'
NEW
SERVICE
LOCATION
SOLAR PV ARRAY LOCATION
SOLAR PV ARRAY LOCATION:
SCALE: 1" =30'
NOTE: ALL WORK FROM AGGREGATE PANEL "E" TO BEW SERVICE
LOCATION TO BE COMPLETED BY AUSTIN ENERGY MAINTENANCE CREW
PRO SOLAR RACKING
(ATTACH TO S-5 MINI )
1.5"
STANDING SEAM
3
8
" THREADED STUD
& NUTS
1.0"
1.5"
MODULE FRAMEMODULE FRAME
1
4
" MODULE BOLT &
FLANGE NUT
MID CLAMP
1.5"
STANDING SEAM
PRO SOLAR
(ATTACH TO S-5 MINI)
SCREWS TO BE TORQUED
TO 130-150 IN-LB
0.5" MIN
MODULE FRAME
RACKING/RAIL
END CLAMP
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
STRUCTURAL DETAIL
1" = .0833'
3 7
8/22/2013
MCS
MCS
PV3
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
----
244.800 KWDC
208.080 KWAC
----
----
FRONT VIEW:
SCALE: 6" = 1'
PRO SOLAR RAIL
S-5 MINI ATTACHMENT(S)
MODULE
STRUCTURAL DETAIL:
ARRAY LOCATION
SCALE: 1" = 8'
STRUCTURAL DETAIL:
STRUCTURAL DETAIL:
RACKING
SCALE: 6" = 1'
SIDE VIEW:
SCALE: 6" = 1'
ISOMETRIC VIEW:
SCALE: 3/4" = 1'
11'-7.9"
18'-7.0"
4
6
'
-
2
.
1
"
14'-2.8"
19'-2.1"
4
3
'
-
0
.
9
"
153'-7.7"
153'-7.7"
5'-11.6"
11.4"
3'-6.0"
50'-6.1"
1
3
2
'
-
8
.
2
"
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
STRUCTURAL SITE
1" = 30'
4 7
8/22/2013
MCS
MCS
PV4
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
----
244.800 KWDC
208.080 KWAC
----
----
STRUCTURAL SITE:
ARRAY LOCATION
SCALE: 1" = 30'
KEY PLAN:
SCALE: N.T.S.
SOLAR PV ARRAY LOCATION
(5 X 12)
(5 X 12)
3P, 400A
3P, 50A
1P, 15A
UPPER ROOF
LOCATION
PV LOCATION
(STANDING SEAM ROOF)
NEW SERVICE LOCATION
PARKING GARAGE
(1 OF 8) SOLAR PV SUBARRAYS
FOR (960) TOTAL TALESUN
T660M 255 MODULES
244.800 kWDC = 208.080 kWAC
1AS:
1BS:
TO
UTILITY
WALL PENETRATION, TO
PARKING GARAGE
(2 OF 16) FUSED DISCONNECTING
COMBINERS ONE PER INVERTER POLE
(1 OF 8) IDEAL POWER CONVERTERS
IPV-30kW-480 BIPOLAR INVERTER
(1) INVERTER AGGREGATE PANEL W/
(8) 3P, 50A BREAKERS, (1) 3P, 400A
MAIN BREAKER, & (1) 1P 15A BREAKER
(E) UTILITY REVENUE METER W/ DIRECTORY INDICATING
PRESENCE/LOCATION OF ALTERNATIVE POWER SOURCE
NEW UTILITY TRANSFORMER BY AE
(1) DC CONTACTOR POWER
SUPPLY 480V/24V CONVERTER
(1) 400A FUSED AC DISCONNECT (2) 400A FUSES
TIE INTO EXISTING ELECTRODE IN
ELECTRICAL CLOSET, VIA
ELECTRICAL CHASE
(N) GROUNDING ELECTRODE
CONDUCTOR, FROM EACH INVERTER
CT CAN ENCLOSURE
(1) DC E-STOP
DC AC
(1) COMBINATION SOLAR PRODUCTION
AND UTILITY REVENUE METER
NEW GROUNDING ELECTRODE
INSTALLED @ AC DISCONNECT BY AE
(NOT CONNECTED)
CREATE & TIE INTO NEW GROUNDING
ELECTRODE PER NEC
5
8
" BY 8' CU
GROUND ROD @ EXTRERIOR OF BUILDING
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
BLOCK DIAGRAM
N.T.S.
5 8
8/22/2013
MCS
MCS
PV5
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
----
244.800 KWDC
208.080 KWAC
----
----
ELECTRICAL BLOCK DIAGRAM:
NOTE: ALL WORK FROM AGGREGATE PANEL "E" TO NEW
SERVICE LOCATION TO BE COMPLETED BY AUSTIN
ENERGY MAINTENANCE CREW
(12X)1AS
1AS
1AS
1AS
1AS
COMBINER BOX LOCATION
(LOWER ROOF, SEE EQUIPMENT LAYOUT (PV6))
PV LOCATION (STANDING
SEAM ROOF)
SUB-ARRAY 1A & 1B:
(10) STRINGS
1A
I
TO
UTILITY
2
(12X)
(12X)
(12X)
(12X)
(12X)1BS
1BS
1BS
1BS
1BS
1
(12X)
(12X)
(12X)
(12X)
(12X)2AS
2AS
2AS
2AS
2AS
(12X)
(12X)
(12X)
(12X)
(12X)2BS
2BS
2BS
2BS
2BS
1
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
1
IDEAL POWER
CONVERTERS
IDEAL POWER
CONVERTERS
IDEAL POWER
CONVERTERS
IDEAL POWER
CONVERTERS
IDEAL POWER
CONVERTERS
IDEAL POWER
CONVERTERS
IDEAL POWER
CONVERTERS
IDEAL POWER
CONVERTERS
SUB-ARRAY 2A & 2B:
(10) STRINGS
SUB-ARRAY 3A & 3B:
(10) STRINGS
3AS
3AS
3AS
3AS
3AS
3BS
3BS
3BS
3BS
3BS
4AS
4AS
4AS
4AS
4AS
4BS
4BS
4BS
4BS
4BS
SUB-ARRAY 4A & 4B:
(10) STRINGS
(12X)5AS
5AS
5AS
5AS
5AS
SUB-ARRAY 5A & 5B:
(10) STRINGS
(12X)
(12X)
(12X)
(12X)
(12X)5BS
5BS
5BS
5BS
5BS
1
(12X)
(12X)
(12X)
(12X)
(12X)6AS
6AS
6AS
6AS
6AS
(12X)
(12X)
(12X)
(12X)
(12X)6BS
6BS
6BS
6BS
6BS
1
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
(12X)
(12X)
1
(12X)
(12X)
(12X)
(12X)
1
SUB-ARRAY 6A & 6B:
(10) STRINGS
SUB-ARRAY 7A & 7B:
(10) STRINGS
7AS
7AS
7AS
7AS
7AS
7BS
7BS
7BS
7BS
7BS
8AS
8AS
8AS
8AS
8AS
8BS
8BS
8BS
8BS
8BS
SUB-ARRAY 8A & 8B:
(10) STRINGS
3P,400A
3P,50A
3P,50A
3P,50A
3P,50A
3P,50A
3P,50A
3P,50A
3P,50A
NEW SERVICE - PARKING
GARAGE LOCATION
(EQUIPMENT AND WORK
PROVIDED BY AUSTIN
ENERGY)
DIRECTORY INDICATING PRESENCE
AND LOCATION OF DUAL POWER
SOURCES ON PREMISE
~270FT RUN TO NEW SERVICE IN
PARKING GARAGE
11
3
4
1B
2A
2B
3A
3B
4A
4B
5A
5B
6A
6B
7A
7B
8A
8B
C
D
E
5
DC CONTACTOR CIRCUIT
GROUNDING ELECTRODE
SYSTEM @ NEW ELECTRICAL
TRANSFORMER BY AE
SEE NOTE 1 FOR
SUBARRAY POLARITY
INVERTER LOCATION
(LOWER ROOF)
J
1P,15A
7
DC AC
6
DC CONTACTOR/
480
24
V
POWER SUPPLY FOR
DISCONNECTING COMBINERS
F
GH
480V/24V
CONVERTER
8
NOTE: ALL WORK FROM AGGREGATE PANEL "E" TO NEW
SERVICE LOCATION TO BE COMPLETED BY AUSTIN
ENERGY MAINTENANCE CREW
(4) 250kcmil CONDUCTORS
L1,L2,L3,N & GND (SEE SPEC)
IN EACH CONDUIT
(5) CONDUCTORS: L1 & N TO
H, L1 & N FROM H, AND GND
NOTE: POWER SUPPLY MUST BE DISTRIBUTED TO
EACH DISCONNECTING COMBINER IN PARALLEL.
TIE ONTO (E) GROUND BAR IN ELECTRICAL CHASE CLOSET
(E6.01) AS WELL AS CREATE NEW GROUNDING ELECTRODE
SYSTEM, SEPARATE FROM NEW SERVICE GEC
PREMISE GROUNDING ELECTRODE IN
ELECTRICAL CLOSET (E.601)
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
ONE LINE ELECTRICAL
N.T.S.
6 8
8/22/2013
MCS
MCS
PV6
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
244.800 KWDC
208.080 KWAC
----
----
1. ALL "A" SUB-ARRAYS ARE NEGATIVELY GROUNDED, ALL "B" SUB-ARRAYS ARE
POSITIVELY GROUNDED.
2. EACH DISCONNECTING COMBINER HAS A SOLENOID CONTACTOR POWERED BY 24V
POWER SUPPLY, IF POWER SUPPLY IS INTERRUPTED, EITHER DUE TO POWER
OUTAGE OR E-STOP, ALL COMBINERS ARE DISCONNECTED.
3. ALL CONDUIT ON ROOF SHALL BE MOUNTED AT LEAST 3.5" ABOVE ROOF SURFACE
4. CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT
PER NEC 310.8(D).
5. CONDUCTORS EXPOSED TO WET LOCATIONS SHALL BE SUITABLE FOR USE IN WET
LOCATIONS PER NEC 310.8(C).
6. ALL CONDUCTORS TO BE SIZED PER NEC 310.15(B)(2)(C) AND 310.16 CORRECTION
FACTORS FOR AMBIENT TEMPERATURE. CONDUCTORS SHALL ALSO BE DERATED
PER NEC TABLE 310.15(B)(2)(A) FOR MORE THAN (3) CURRENT CARRYING
CONDUCTORS IN A COMMON RACEWAY (SEE CIRCUIT CALCULATIONS).
7. ALL UNDERGROUND RACEWAYS TO BE SCHEDULE 40 PVC, UNLESS OTHERWISE
NOTED.
8. ALL DC DISCONNECT TO BE 2P OR 3P (AS NOTED), VISIBLE, LOCKABLE, LABELED ,
600VDC, NEMA 3R RATED AND DC RATED FOR MIN 156% OF Isc.
9. ALL CONDUIT FILL (AC AND DC) TO 40% MAXIMUM.
10. PROVIDE AN EQUIPMENT GROUNDING CONDUCTOR IN EACH CONDUIT (BOTH AC AND
DC), SIZED PER NEC 250 AND 690 (SEE SCHEDULE).
* OPTIONAL UNLESS REQUIRED BY AHJ
ONE LINE ELECTRICAL NOTES
(5 X 12)
(5 X 12)
3P, 400A
3P, 50A
1P, 15A
UPPER ROOF
LOCATION
PV LOCATION
(STANDING SEAM ROOF)
NEW SERVICE LOCATION
PARKING GARAGE
(1 OF 8) SOLAR PV SUBARRAYS
FOR (960) TOTAL TALESUN
T660M 255 MODULES
244.800 kWDC = 208.080 kWAC
1AS:
1BS:
TO
UTILITY
WALL PENETRATION, TO
PARKING GARAGE
(2 OF 16) FUSED DISCONNECTING
COMBINERS ONE PER INVERTER POLE
(1 OF 8) IDEAL POWER CONVERTERS
IPV-30kW-480 BIPOLAR INVERTER
(1) INVERTER AGGREGATE PANEL W/
(8) 3P, 50A BREAKERS, (1) 3P, 400A
MAIN BREAKER, & (1) 1P 15A BREAKER
(E) UTILITY REVENUE METER W/ DIRECTORY INDICATING
PRESENCE/LOCATION OF ALTERNATIVE POWER SOURCE
NEW UTILITY TRANSFORMER BY AE
(1) DC CONTACTOR POWER
SUPPLY 480V/24V CONVERTER
(1) 400A FUSED AC DISCONNECT (2) 400A FUSES
TIE INTO EXISTING ELECTRODE IN
ELECTRICAL CLOSET, VIA
ELECTRICAL CHASE
(N) GROUNDING ELECTRODE
CONDUCTOR, FROM EACH INVERTER
CT CAN ENCLOSURE
(1) DC E-STOP
DC AC
(1) COMBINATION SOLAR PRODUCTION
AND UTILITY REVENUE METER
NEW GROUNDING ELECTRODE
INSTALLED @ AC DISCONNECT BY AE
(NOT CONNECTED)
CREATE & TIE INTO NEW GROUNDING
ELECTRODE PER NEC
5
8
" BY 8' CU
GROUND ROD @ EXTRERIOR OF BUILDING
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
PV LABEL GUIDE
N.T.S.
7 8
8/22/2013
MCS
MCS
PV7
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
----
244.800 KWDC
208.080 KWAC
----
----
690.5 (C) ON INVERTER OR NEAR GROUND FAULT INDICATOR
(1 OF 8)
**WARNING**
ELECTRICAL SHOCK HAZARD IF A GROUND
FAULT IS INDICATED, NORMALLY GROUNDED
CONDUCTORS MAY BE UNGROUNDED AND
ENERGIZED
690.17 SWITCHES OR BREAKERS
**WARNING**
ELECTRICAL SHOCK HAZARD DO NOT TOUCH
TERMINALS. TERMINALS ON BOTH LINE AND LOAD
SIDES MAY BE ENERGIZED IN THE OPEN POSITION
690.14(C)(2) PV UTILITY DISCONNECT
PV SYSTEM DISCONNECT
690.64(B)(7)&705.12(D)(7) PV POWER SOURCE BREAKER
WARNING INVERTER OUTPUT CONNECTION DO
NOT RELOCATE THIS OVERCURRENT DEVICE
690.54 AC DISCONNECTING MEANS
MAXIMUM AC OPERATING CURRENT = 288.64A
NOMINAL OPERATING AC VOLTAGE = 480VAC
705.10 MAIN SERVICE ENTRANCE
THIS SERVICE METER IS ALSO SERVED
BY A PHOTOVOLTAIC SYSTEM
705.10 DIRECTORY
A PERMAMENT PLAQUE OR DIRECTORY DENOTING ALL ELECTRICAL POWER
SOURCES ON OR IN THE PREMISES, SHALL BE INSTALLED AT EACH SERVICE
EQUIPMENT LOCATION AND AT LOCATIONS OF ALL ELECTRICAL POWER
PRODUCTION SOURCES CAPABLE OF BEING INTERCONNECTED
L1
L2
L3
L4
L5
L6
L7
690.4 (4) IDENTIFICATION AND GROUPING OF CIRCUITS &
690.31(E)(3) &(4) DC SOURCE AND OUTPUT CIRCUITS INSIDE
A BUILDING
PHOTOVOLTAIC POWER CIRCUIT
WHERE THE CONDUCTORS OF MORE THAN ONE PV SYSTEM OCCUPY THE
SAME JUNCTION BOX OR RACEWAY WITH A REMOVABLE COVER(S), THE AC
AND DC CONDUCTORS OF EACH SYSTEM SHALL BE GROUPED SEPARATELY
BY WIRE TIES OF SIMILAR MEANS AT LEAST ONCE, AND THEN SHALL BE
GROUPED AT INTERVALS NOT TO EXCEED 1.8M (6FT) EXCEPTION: THE
REQUIREMENT FOR GROUPING SHALL NOT APPLY IF THE CIRCUIT ENTERS
FROM A CABLE OR RACEWAY UNIQUE TO THE CIRCUIT THAT MAKES THE
GROUPING OBVIOUS
L9
L8
WARNING.PHOTOVOLTAIC SYSTEM CONNECTED
MAXIMUM OPERATING CURRENT = 288.64A
NOMINAL OPERATING AC VOLTAGE = 480VAC
690.54 & 690.64 (AT MAIN PANEL/POINT OF
INTERCONNECTION)
1. PV EQUIPMENT SHALL BE INSTALLED IN
ACCORDANCE WITH 2011 NEC AND
POSTED WITH APPLICABLE WARNINGS,
SIGNAGE & PLAQUES PER NEC 705-10,
690-17, & 690.64(B)(5)
2. ALL LABELS TO HAVE WHITE LETTERING
ON RED BACKGROUND, MIN 3/8 INCHES
LETTER HEIGHT, CAPITALIZED, ARIAL OR
SIMILAR FONT, NON-BOLD, W/
REFLECTIVE, WEATHER RESISTANT
MATERIAL SUITABLE FOR ENVIRONMENT
(UL-969 WEATHER RATING).
3. CIRCUITS SHALL BE IDENTIFIED AT
POINTS OF TERMINATION, CONNECTION,
AND SPLICE POINTES PER NEC
690.4(B)(2)
LABEL GUIDE NOTES
L1
L10
690.53 DC DISCONNECTING MEANS
(2 OF 16)
MAXIMUM POWER-POINT CURRENT = 41.90A
MAXIMUM POWER-POINT VOLTAGE = 364.80V
MAXIMUM SYSTEM VOLTAGE = 516.48V
MAXIMUM CURRENT = 56.14A
L10
L4
L3
L10
L2
L3
L4
L5
L6
L7
LABEL EACH BREAKER WITH
CORRESPONDING INVERTER
NUMBER (1 THRU 8)
L2
ONTILITY NORTH
2600 LONGHORN BLVD
AUSTIN, TX 78758
PH: 512.904.9006
FAX: 512.394.4914
www.ontility.com
CLIENT INFORMATION
SYSTEM SPECIFICATIONS
INVERTERS: SEE INVERTER SPEC
MODULES: SEE MODULE SPEC
TOTAL SYSTEM SIZE:
DATE:
DRAWN BY:
DESIGNED BY:
PAGE: OF
NO. DATE DESCRIPTION
SCALE:
CITY OF AUSTIN
---- ----
STRUCTURAL DETAIL 2
1" = 30'
8 8
8/22/2013
MCS
MCS
PV8
PALMER EVENTS CENTER
900 BARTON SPRINGS RD
AUSTIN, TX 78704
(8) IPC IPV-30KW-480
----
----
----
(960) TALESUN T660M 255
----
----
----
244.800 KWDC
208.080 KWAC
----
----
STRUCTURAL SITE:
ARRAY LOCATION
SCALE: 1" = 30'
KEY PLAN:
SCALE: N.T.S.
SOLAR PV ARRAY LOCATION