Taylor Thomson Whitting (NSW) Pty Ltd (ACN 113 578 377) as trustee for the Taylor Thomson Whitting NSW Trust (ABN 59 514 956 558) I Consulting Engineers Level 3, 48 Chandos Street, St Leonards NSW 2065 Structural SSDA Report Mosman High School Prepared for Multiplex Australasia / 30 March 2021 201635

Upload: others

Post on 30-Dec-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Structural SSDA Report

Taylor Thomson Whitting (NSW) Pty Ltd (ACN 113 578 377) as trustee for the Taylor Thomson Whitting NSW Trust

(ABN 59 514 956 558) I Consulting Engineers Level 3, 48 Chandos Street, St Leonards NSW 2065

Structural SSDA Report

Mosman High School

Prepared for Multiplex Australasia / 30 March 2021

201635

Page 2: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 2 of 10

Contents

1.0 Introduction ......................................................................................................................... 3

2.0 Site Description ................................................................................................................... 3

3.0 Geotechnical ....................................................................................................................... 5

4.0 Structure ............................................................................................................................. 5

4.1 Footings .................................................................................................................... 5

4.2 Gravity Load Resisting Systems................................................................................. 5

4.2.1 Ground Floor Slab ......................................................................................... 5

4.2.2 Suspended Floors ......................................................................................... 5

4.2.3 Roofs ............................................................................................................ 6

4.2.4 Columns ........................................................................................................ 6

4.2.5 Transfer Truss over Sports Hall ..................................................................... 6

4.2.6 Stairs............................................................................................................. 7

4.2.7 Walkways ...................................................................................................... 7

4.2.8 Interface with Existing Structures ................................................................... 7

4.3 Lateral Load Resisting Systems ................................................................................. 7

5.0 Future Coordination Items ................................................................................................... 8

Appendix A .................................................................................................................................... 10

Page 3: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 3 of 10

1.0 Introduction

TTW has been engaged by Multiplex Australasia to provide structural engineering services for the schematic design of the proposed facility at Mosman High School. The new facility has 3 storeys above ground floor, including an accessible roof. The proposed facility does not have a basement.

The building has multiples uses including areas for administration, multipurpose gym/hall, library, canteen, general and senior learning units, health and performing arts unit, learning support, amenities, and a roof top multi-court.

The structural concepts presented in this SSDA Report and associated schematic design drawings enclosed in Appendix A have been developed in conjunction with Multiplex and the design team led by Woods Bagot (Architect).

2.0 Site Description

Mosman High School is located at 745 Military Road, LOT:1 DP: 1268793, Mosman, NSW and is bounded by Belmont Road and Avenue Road in the North-South direction, and by Military Road and Gladstone Avenue in the East-West direction. The high school facility currently contains a variety of brick buildings up to 3 storeys, playgrounds, and carpark areas.

The site is generally sloping approximately 3% to the west with the highest part of the site along Military Road, falling to the lowest section of site along Gladstone Avenue.

The works will require the demolition of existing Blocks, B, C, and partial demolition of Block E. Blocks A and D, are to be retained.

The construction of the new facility with be within a live school site. Careful staged planning of the works will be required to ensure daily functions of the school remain safely unhindered and with minimal disruptions.

The proposed area under development is a 3,000 m2 site situated at the Eastern boundary along Military Road.

Figure 1 Analysis Model

Page 4: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 4 of 10

Figure 3 Proposed Demolition Plan

Figure 2 Site Plan

Page 5: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 5 of 10

3.0 Geotechnical

A geotechnical investigation has been carried out by Coffey Services Australia (Report 754-SYDGE233510), dated 28 August 2020. The investigation indicates that the site is classified as Class A based on AS1170 – 2011 “Residential Slabs and Footings”. The investigation encountered a subsurface profile comprising residual soil/fill layer to a depth of up to 0.9m; over weathered rock (Class V-IV) for a depth of up to 1.35m; over rock (Class III).

There was an absence of groundwater throughout the geotechnical investigation, and Coffey have suggested that the site will not encounter groundwater.

It is also suggested that the site has no known occurrence of acid sulfate soils, and that the soil aggressivity is non-aggressive and suitable for concrete or steel foundations.

4.0 Structure

4.1 Footings

All columns and walls need to be founded on similar materials to reduce the potential for differential settlement and consequential structural damage. Columns on ground floor supported by pad footings, founded on Class IV rock or better, is the proposed footing system. Any uplift forces at the base of the pad footings in bracing locations are proposed to be dealt with using rock anchors. Rock anchor requirements are to be confirmed in the next stage of the design. There is an option to pile under a number of columns, where deep excavations would be required to meet rock level.

There are no basements proposed for this project, so shallow excavations are required for the pad footings. Having no basement structure results in the elimination of permanent retaining walls for the building. However, some retaining walls may be required for landscaping, but will be confirmed in the next stage of the design.

Existing services and foundations of existing buildings are expected to be encountered on site. The anticipated services include, but are not limited to power, gas, fibre optic, water, sewerage, and telecommunications. Care must be taken to ensure no damage occurs to these services during or resulting from construction.

4.2 Gravity Load Resisting Systems

The gravity load resisting system comprises slab, beams, and columns.

4.2.1 Ground Floor Slab

Ground floor slab will be a conventional slab on ground (not suspended) and prepared in accordance with the recommendations in the geotechnical report. Any cast in fixings in the sports hall area are to be confirmed during the next stage of design.

4.2.2 Suspended Floors

The current schematic design provides post-tensioned concrete (PT) slab sizes, which is typically used throughout. Post-tensioned concrete usually becomes cost competitive for structures over 3 stories. PT is well suited to achieving fast and economical construction with floor structures of minimal thickness and minimal deflections. The flat plate has been used in design for is speed of construction, and ability for services reticulation.

The proposed Level 1 – Level 3 floors comprise 230mm – 320mm thick PT flat plate, supported on concrete columns. The gym/hall area is to be steel framed with steel-concrete composite slab, with a steel transfer truss below the library on Level 3.

Page 6: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 6 of 10

4.2.3 Roofs

The roof structure will consist of a 280mm thick PT flat plate for the basketball court featuring an additional acoustic slab to limit noise and vibration to the library area below. A light steel roof at the northern end for the PV panels supported on steel columns to the slab under.

4.2.4 Columns

In situ reinforced concrete columns are proposed but can be substituted with precast concrete columns with similar size. The columns would be either rectangular or square in shape, to suit architectural requirements.

Steel columns are proposed in the gym/hall area. These will support the steel-concrete composite slab, and support the large spanning steel truss.

Steel columns will be required at the bracing locations throughout the site.

Steel columns are proposed to support the walkway between the new development and the existing.

4.2.5 Transfer Truss over Sports Hall

A change in layout between floors and the requirement for large open space on ground floor necessitates a transfer element below the library floor, and above the sports hall. The open space, circa 20m span results in a steel truss being the most pragmatic solution.

Figure 4 - Transfer Truss

Page 7: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 7 of 10

4.2.6 Stairs

The stairs are to be constructed from either steel, reinforced concrete with conventional formwork, or reinforced concrete with permanent formwork – stair form system or similar. The construction of the stairs is to be confirmed in the next design stage.

4.2.7 Walkways

The walkways are to be constructed either from in situ concrete, or steel concrete composite. The construction of the walkways is to be confirmed in the next design stage.

4.2.8 Interface with Existing Structures

A site survey is required for the interface between the new and existing structures. This is particularly important around the walkway between the new construction (Block G), and Block E.

4.3 Lateral Load Resisting Systems

The structure is required to withstand wind and earthquake loads through the lateral force resisting system. The proposed bracing system is a concentrically braced steel frame comprising of steel beams, braces, and columns on each level of structure and connected into the foundations. Attention must be paid to the interface details between the concrete slab and the steel bracing.

Figure 5 Indicative Connection

Holes in the steel plates will be require for reinforcement to pass through, in addition the shear studs along the top flange of the steel beam to ensure full transfer of force through the system.

A concentrically braced steel frame has been proposed in lieu of conventional reinforced concrete shear walls due to the recent changes to AS 3600 “Concrete Structures”. Conventional reinforced concrete walls can be used, but these will require additional reinforcement and thicker walls to be structurally viable.

Page 8: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 8 of 10

Typical location of the bracing on ground floor is shown in the following image. These locations continue generally up the height of the building.

Figure 6 Typical Bracing Locations

5.0 Future Coordination Items

The following list outlines some items that require coordination in the next design stage.

• Stair construction method

• Stair transition details

• Walkway construction and finishes

• Set downs for balcony and wet areas

• Floor and roof build-up

• Façade details

• Operable walls, folding or top hung doors along hall

• Construction of theatre including acoustic requirements

• Stage requirements

• Cast ins for gym/hall

• Planter zones

• Connection to existing walkways

• Roof top sub faming, netting and equipment requirements

• Roof plant area – steel platforms

• Retaining walls for landscaping

Please note this list is not exhaustive and other elements not listed will require coordination.

Page 9: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 9 of 10

Prepared by Authorised By

TAYLOR THOMSON WHITTING (NSW) PTY LTD in its capacity as trustee for the TAYLOR THOMSON WHITTING NSW TRUST

TAYLOR THOMSON WHITTING (NSW) PTY LTD in its capacity as trustee for the TAYLOR THOMSON WHITTING NSW TRUST

Tim Allen Kevin Berry Senior Engineer Director

P:\2020\2016\201635\Reports\TTW\Structural\210330_SSDA Report\210330_SSDA Report.docx

Page 10: Structural SSDA Report

Multiplex Australasia 30 March 2021 Structural SSDA Report 201635

Taylor Thomson Whitting (NSW) Pty Ltd © 2021 Taylor Thomson Whitting Page 10 of 10

Appendix A

Schematic Structural Drawings

Page 11: Structural SSDA Report

75 m

76

m

76 m

78 m

79 m

76 m

77 m

77 m

23201

LARGE EQUIP STR

AV.RK

AC WC

OUTDOOR STR

STF WC

CHANGE ROOM M

CHANGE ROOM F

CTRL

F.AIDLECTURE UNIT STORE

SPORTS EQUIP.

CANTEEN

BU

LK S

TR

GA

RD

EN S

TR

COMM

CHAIR STORE

STAGE

GYM / HALL

RL 78000

RL 77550

ACC WC

WC. M WC. F

STOREUTILITY

EXECDEPUTYPRINCIPAL

6192

8735

INTV. RM

INTV. RM

INTV. RM

CLERICAL

CLN B CLN G

INTV. RM

INTV. RMINTV. RM

INTV. RM

VISITOR

MSR

ACC WC CLEAN DIS.

WC. FEMALE

WC. MALE

6922

5657

WAITING AREA

RL 77000

RL 76867

RL 76457

EXISTINGBUILDING A

EXISTINGBUILDING E

RL 76880

EXISTINGBUILDING D

CW

/RW

PLT

M I L I T A R Y R O A D

B E

L M

O N

T

R

O A

D

A V E N

U E R

O A

D

13201

33201

SUBSTATION

BOOSTER/ PUMP

RL 78000

RL 78000

RL 78900

RL 78000

TEA

OFFICE

RL 78000

RL 78000

RL 77550

RL 78000

RL 76552RL 77400

RL 78000

THEATRE

LAWN

LAWN

EXISTINGENTRY

STUDENTENTRY

VISITORENTRY

WALKWAY ABOVE

RL 77660

RL 78000

RL 77200

STAIR 1

STA

IR 2

STAIR 3

MESH FENCEIN FRONT OFGLAZING

MESH FENCEIN FRONT OF GLAZING

Copyright © Woods Bagot 2018All Rights ReservedNo material may be reproduced without prior permission

Contractor must verify all dimensions on site before commencing work or preparing shop drawings.

Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Issuer

Size check

Project

Client

Notes

# Description DateStatusRecent revision history

Date generated

1 : 200

C:\Users\sydzxl\Documents\Autodesk\Revit\RAC2020\121468_Mosman High_Central_R20_zie.liu.rvt10/03/2021 9:49:09 PM

PRELIMINARY

121468

Checker Approver

SCHOOL INFRASTRUCTURE NSW

MOSMAN HIGH SCHOOL

2201DA-

GROUND FLOOR PLAN

500x500 RC COLUMNS TYP.REO RATE 300 kg/m3

BRACING TYP.

TYPICAL PERIMETER PAD FOOTING2000 x 2000 x 800DREO RATE 80 kg/m3

TYPICAL INTERNAL PAD FOOTING2000 x 2000 x 1200DREO RATE 80 kg/m3

120 SLAB ON GROUNDW/ SL82 TOP MESHSLAB JOINTS AT 6m CTS

WALKWAY PAD FOOTING500 x 500 x 500DREO RATE 65 kg/m3

TYPICAL STRIP FOOTING UNDER BRACING9000 x 2000 x 800DREO RATE 60 kg/m3ROCK ANCHORS REQUIRED FOR 1,000 kN TENSION LOADSAT ALL BRACING LOCATION UNO

GROUND FLOOR

LEVEL 1

LEVEL 2

LEVEL 3

ROOF

SECTION A-AOPEN ALONG GROUND FLOOR FOR DOORS

AA

TENSION ROD HANGERS

W-B CONFIRM PRODUCT ANDWEIGHT OF DOORS

W-B CONFIRM LOCATIONS OF ANYOPERABLE WALLS, FOLDING, ORTOP-HUNG DOORS

W-B CONFIRM STAIR DESIGN INTENT. MPX CONFIRM PREFERRED CONSTRUCTION METHOD FOR STAIRS

W-B CONFIRM REQUIREMENTSIN STAGE AREA

W-B TO CONFIRM ANY REQUIREMENTS FORCAST-IN'S IN HALL/GYM GROUND FLOOR SLAB.REMOVABLE NET OR RING SUPPORTS?

W-B TO CONFIRM FACADETYPES. TYPICAL

LOCATION OF EXISTING FOUNDATIONS TO BELOCATED. ENSURE EXISTING FOUNDATIONSARE NOT UNDERMINED OR DAMAGED DURINGCONSTURCTION

MPX TO CONFIRM IF STRIPFOOTING OR BORED PIERS

LOCATION OF EXISTING FOUNDATIONS TO BELOCATED. ENSURE EXISTING FOUNDATIONSARE NOT UNDERMINED OR DAMAGED DURINGCONSTURCTION

200 RC

190 CORE FILLED BLOCKWORKWALL. PAD FOOTING SIZE TBCLIFT DIMENSIONS. ALLOW FOR500 THICKS RC PAD

OFFSET FOOTINGS INSIDE BUILDINGFOOTPRINT TO MINIMISE ENCROACHMENTON TREE PROTECTION ZONE.

NOT TO BE USED FOR CONSTRUCTIONPRELIMINARY

Job Name :

Job Number:Sketch No. :

Sketch Title:

Blank:Blank:

Date:

By:

Ground Floor Plan Layout

Mosman High School

201635

SK-210330-1

30/03/2021

TA

ROCK ANCHORS FOR2,500 kN TENSION LOAD

ROCK ANCHORS FOR2,500 kN TENSION LOAD

VERTICAL BRACE ORMOMENT FRAME

RC STAIR

Page 12: Structural SSDA Report

23201

COMM

CH

AN

GE

F

CHANGE M

FIT. PERF. STORE

ZOO/BOTANY

SEMINAR

SCIENCE GLS SCIENCE GLS

SCIENCE GLS SCIENCE GLS

INFORMAL LEARNING

PERFORMING ARTS LAB

FITNESS/DANCE LAB

OUTDOOR LEARNING

FITNESS GLS FITNESS GLS

PERF. ARTS GLS

PERF. ARTS GLS

Prac Prac Prac Prac

INFORMAL LEARNING

Sat Comm

ACC WCCLN

WC. MALE

WC. FEMALE

THEATRE

CONTROL

EXISTINGBUILDING A

EXISTINGBUILDING E

EXISTINGBUILDING D

RL 81045RL 80990

RL 80600

M I L I T A R Y R O A D

B E

L M

O N

T

R

O A

D

A V E N

U E R

O A

D

13201

33201

VOID

VOID

RL 81870

RL 81870

COVERED WALKWAY

COVERED WALKWAY

CO

VER

ED W

ALK

WA

Y

CO

VER

ED W

ALK

WA

Y

COVERED WALKWAY

STAIR 1

STA

IR 2

STAIR 3

Copyright © Woods Bagot 2018All Rights ReservedNo material may be reproduced without prior permission

Contractor must verify all dimensions on site before commencing work or preparing shop drawings.

Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Issuer

Size check

Project

Client

Notes

# Description DateStatusRecent revision history

Date generated

1 : 200

C:\Users\sydzxl\Documents\Autodesk\Revit\RAC2020\121468_Mosman High_Central_R20_zie.liu.rvt10/03/2021 9:49:12 PM

PRELIMINARY

121468

Checker Approver

SCHOOL INFRASTRUCTURE NSW

MOSMAN HIGH SCHOOL

2202DA-

LEVEL 1 FLOOR PLAN

260 PT

STEEL WALKWAY250UB BEAMS89x6 SHS COLUMNSWALKWAY TBC

PRIMARY BEAM 460UB75

SECONDARY BEAM 360UB45W 25mm PRECAMBER

450 x 450 OR 800 x 350RC COLUMNSREO RATE 240 kg/m3

RC TIERED SEATINGOPTION FOR PRECAST STAIRUNITS ON STEEL BEAMS

230 PT5 kg/m2 PT50 kg/m3 REBAR

W-B TO CONFIRM WALKWAYBUILD-UP/FINISHES

INTERFACE DETAIL BETWEEN NEW ANDEXISTING STRUCTURES TO BE CONFIRMEDFOLLOWING SITE INVESTIGATION

NOTE: STEEL COLUMNS AND STEEL BEAM INBRACED BAYS. ALLOW FOR SHEAR STUDS

130 BONDEK SLAB 1.0 BMTREO RATE 50 kg/m3

SHEAR STUDS AT 200 CTS

W-B CONFIRM FACADE BUILD-UPAROUND SPORTS HALL.ADDTIONAL COLUMNS POSSIBLYREQUIRED. MAKE ALLOWANCEFOR SECONDARY STEEL

W-B TO CONFIRM ACOUSTIC DETAILREQUIREMENTS TO THEATRE SPACE, TOSEATING, WALLS AND ROOF

W-B TO CONFIRM TREATMENT TO EDGEOF WALKWAYS. TYPICAL

EXISTING WALKWAY. SURVEYREQUIRED FOR EXTENT ANDEXISTING MEMBER SIZES

230 PT

260 PT5 kg/m2 PT50 kg/m3 REBAR

EXISTING CONCRETE WALKWAY

NOT TO BE USED FOR CONSTRUCTIONPRELIMINARY

Job Name :

Job Number:Sketch No. :

Sketch Title:

Blank:Blank:

Date:

By:

First Floor Plan Layout

Mosman High School

201635

SK-210330-2

30/03/2021

TA

0

OPTION FOR CANTILEVERED WALKWAY310UB40 W/ MOMENT CONNECTION TOSTEEL COLUMN

MPX AND W-B TO CONFIRMOPTION FOR CANTILEVER

Page 13: Structural SSDA Report

23201

COMM

STAFF

GLS SENIOR GLS

GLS SENIOR GLS SENIOR GLS SENIOR GLSSENIOR GLS

SLS & PAA

SEM

INA

R

SMRSLS & PAA

SENIOR GLS SENIOR GLS

SENIOR GLSSENIOR GLS

OUTDOOR LEARNING

ACC WC CLN

Sat Comm

WC. MALE

WC. FEMALE

PREP/PRINT STF WCSTF WC

STF WCINTV. RM INTV. RMINTV. RM

EXISTINGBUILDING A

EXISTINGBUILDING E

EXISTINGBUILDING D

7.74°

INDC

. SBJ

FUR

THER

DES

IGN

M I L I T A R Y R O A D

B E

L M

O N

T

R

O A

D

A V E N

U E R

O A

D

13201

33201

VOID

ROOF OVER COVERED WALKWAY

COVERED WALKWAY

CO

VER

ED W

ALK

WA

Y

CO

VER

ED W

ALK

WA

Y

STAIR 1

STA

IR 2

STAIR 3

RL 85740

Copyright © Woods Bagot 2018All Rights ReservedNo material may be reproduced without prior permission

Contractor must verify all dimensions on site before commencing work or preparing shop drawings.

Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Issuer

Size check

Project

Client

Notes

# Description DateStatusRecent revision history

Date generated

1 : 200

C:\Users\sydzxl\Documents\Autodesk\Revit\RAC2020\121468_Mosman High_Central_R20_zie.liu.rvt10/03/2021 9:49:15 PM

PRELIMINARY

121468

Checker Approver

SCHOOL INFRASTRUCTURE NSW

MOSMAN HIGH SCHOOL

2203DA-

LEVEL 2 FLOOR PLAN

TRUSS

TRANSFER TRUSS OVER STAGE BELOW.MEMEBER SIZES TO MATCH LIBRARYFLOOR TRUSS

230 PTSIZE AND SPACING OF PERIMETERMEMEBERS TBC

450 x 450 OR 800 x 300RC COLUMNSREO RATE 240 kg/m3

SECONDARY360UB51 W 20mm PRECAMBER

PRIMARY610UB125

STEEL WALKWAY ROOF150 PURLINS200UB RAFTERS89x6 SHS COLUMNS

W-B TO CONFIRM WALKWAY ROOFBUILD-UP/FINISHES

W-B TO CONFIRM STAIRTRANSITION DETAIL

W-B TO CONFIRM ANY REQUIREMENTS IN HALL AREA FORSUB-FRAMING. NETTING? OPERABLE BASKETBALL RINGS?

130 BONDEK SLAB 1.0 BMTREO RATE 50 kg/m3

SHEAR STUDS AT 200 CTS

250 PT

250 PT SLAB5 kg/m2 PT50 kg/m3 REBAR

NOT TO BE USED FOR CONSTRUCTIONPRELIMINARY

Job Name :

Job Number:Sketch No. :

Sketch Title:

Blank:Blank:

Date:

By:

Second Floor Plan Layout

Mosman High School

201635

SK-210330-3

30/03/2021

TA

LIGHT STEEL ROOF200Z PURLINS LAPPED3100UB RAFTERS100 x 6 SHS STRUTS150 x 100 RHS WIND HEADERS100 x 6 SHS COLUMNS100 x 8 EA VERTICAL BRACING75x6 HORIZONTAL BRACING

ROOF TO TIE INTO MAINCONCRETE STRUCTURE

W-B TO CONFIRM ACOUSTIC DETAILREQUIREMENTS TO THEATRE SPACE, TOSEATING, WALLS AND ROOF

230 PT5 kg/m2 PT50 kg/m3 REBAR

Page 14: Structural SSDA Report

23201

STAFF

COMM

SEMINAR SEMINAR SEMINAR SEMINAR

COMPUTER STUDY SENIOR STUDY

LIBRARY ADMIN

STF WC

STF WC

OFF

ICE-

CA

OFF

ICE-

SA

LIBRARY MAIN AREA

ENTRY

OUTDOOR LEARNING

ROOF INFORMAL PLAY

PLANT BASE B

ACC WC CLN

Sat Comm

WC. MALE

WC. FEMALE

PRINT

CO

MP

STR

PREP/PRINTSTF WC STF WC

INTV. RM

EXISTINGBUILDING A

EXISTINGBUILDING E

EXISTINGBUILDING D

M I L I T A R Y R O A D

B E

L M

O N

T

R

O A

D

A V E N

U E R

O A

D

13201

33201

CO

VER

ED W

ALK

WA

Y

PV

STAIR 1

STA

IR 2

STAIR 3

RL 89610

RL 89610

Copyright © Woods Bagot 2018All Rights ReservedNo material may be reproduced without prior permission

Contractor must verify all dimensions on site before commencing work or preparing shop drawings.

Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Issuer

Size check

Project

Client

Notes

# Description DateStatusRecent revision history

Date generated

1 : 200

C:\Users\sydzxl\Documents\Autodesk\Revit\RAC2020\121468_Mosman High_Central_R20_zie.liu.rvt10/03/2021 9:49:17 PM

PRELIMINARY

121468

Checker Approver

SCHOOL INFRASTRUCTURE NSW

MOSMAN HIGH SCHOOL

2204DA-

LEVEL 3 FLOOR PLAN

SECONDARY BEAMS360UB57 W 20mmPRECAMBER

230 PT

450 x 450 OR 600 x 300RC COLUMNSREO RATE 200 kg/m3

STEEL TRUSSREFER SECTION FOR SIZES

410UB60

410UB60RC COLUMN OVERSTEEL COLUMN UNDER

W-B TO CONFIRM ANY PLANTER ZONES REQUIRED,ANY ANY OTHER ARCHITECTURAL FEATURES ONROOFS (METAL/TERRACOTTA FINS?)

W-B TO CONFIRM TREATMENTTO EDGE OF ROOFS. TYPICAL

W-B TO CONFIRM ROOFFINISHES, TYPICALLY

130 BONDEK SLAB 1.0 BMTREO RATE 50 kg/m3

SHEAR STUDS AT 200 CTS

CONCRETE COLUMN OVER

200 BONDEK SLAB LOCALLY UNDER PLANTER1.0 BMTREO RATE 50 kg/m3

SHEAR STUDS AT 200 CTS

SECONDARY BEAM 360UB57WITH 20mm PRECAMBER

TRANSFER BEAM FOR COLUMN ABOVE700WB OR400WC361NO PENETRATIONS ALLOWED

2200x2200x1000 DEEPPLANTER WITH TREE

200 BONDEKUNDER PLANTER

TRANSFER TRUSS

PRIMARY BEAM460UB75

320 PT8 kg/m2 PT55 kg/m3 REBAR

320 PT

2200 x 2200 x 1000DPLANTER WITH TREE

NOT TO BE USED FOR CONSTRUCTIONPRELIMINARY

Job Name :

Job Number:Sketch No. :

Sketch Title:

Blank:Blank:

Date:

By:

Third Floor Plan Layout

Mosman High School

201635

SK-210330-4

30/03/2021

TA

500 DEEP PLANTER

BB

SECTION B-B

230 PT5 kg/m2 PT50 kg/m3 REBAR

Page 15: Structural SSDA Report

23201

ROOF PLAYCOURT

EXISTINGBUILDING A

4.00° FALL

4.00°

FAL

L

M I L I T A R Y R O A D

B E

L M

O N

T

R

O A

D

A V E N

U E R

O A

D

ROOF INFORMAL PLAY

13201

33201

PV

STAIR 1

STA

IR 2

STAIR 3

RL 93860

Copyright © Woods Bagot 2018All Rights ReservedNo material may be reproduced without prior permission

Contractor must verify all dimensions on site before commencing work or preparing shop drawings.

Do not scale drawings.

Revision

Status

Sheet number

Sheet title

Scale

Project number

Checked Approved

25mm

Sheet sizeA1

Issuer

Size check

Project

Client

Notes

# Description DateStatusRecent revision history

Date generated

1 : 200

C:\Users\sydzxl\Documents\Autodesk\Revit\RAC2020\121468_Mosman High_Central_R20_zie.liu.rvt10/03/2021 9:49:20 PM

PRELIMINARY

121468

Checker Approver

SCHOOL INFRASTRUCTURE NSW

MOSMAN HIGH SCHOOL

2205DA-

LEVEL 4 FLOOR PLAN

NOT TO BE USED FOR CONSTRUCTIONPRELIMINARY

Job Name :

Job Number:Sketch No. :

Sketch Title:

Blank:Blank:

Date:

By:

Level 4 Plan Layout

Mosman High School

201635

SK-210330-5

30/03/2021

TA

450 x 450 OR 600 x 250RC COLUMNSREO RATE 150 kg/m3

LIGHT STEEL ROOF250Z PURLINS LAPPED310UB RAFTERS100 x 6 SHS STRUTS150 x 100 RHS WIND HEADERS100 x 6 SHS COLUMNS100 x 8 EA VERTICAL BRACING75x6 HORIZONTAL BRACING

ACOUSTIC ZONE FOR 150 BONDEK,AIR GAP AND PEDESTALS

450 x 450 RC COLUMNS UNDER

W-B TO CONFIRM ROOFFINISHES. TYPICAL

W-B TO CONFIRM REQUIREMENT ANDPROPOSED SYSTEM FOR NETTING OVERINFORMAL OUTDOOR PLAY COURT AREA

W-B TO CONFIRM IF PLANT TO BE ON STEELPLATFORMS, OR ON COMPOSITE STEELCONCRETE SLAB? CONFIRM PLANT LOADS

FRAMING OVER STAIR TBC

130 BONDEK SLAB 1.0 BMTREO RATE 50 kg/m3

FRAMING OVER STAIR TBC

FRAMING OVER STAIR TBC

FRAMING OVER LIFT TBC

280 PT SLAB

CONFIRM RAMPBUILD UP

CONFIRM FALLSFOR ROOF SLAB

NO STEP INSTRUCTURAL SLAB

280 PT SLAB8 kg/m2 PT55 kg/m3 REBAR

280 PT

2200x2200x1000 DEEPPLANTER WITH TREE

Page 16: Structural SSDA Report

RL. 89.61

5500

RL. 78.00

CHAIRSTR

HALL

2750

RL. 89.61

RL. 81.87

6500

BD

Y

3870

7260

RL. 81.87

RL. 93.86

RL. 78.00

4250

STAFFRL. 85.74

LIBRARY

RL. 93.86

OUTDOORPLAY

3870

RL. 85.74

3870

STAGE

GAMES COURT NET

GROUND FLOOR

ROOF

LEVEL 3

LEVEL 2

LEVEL 1

NOT TO BE USED FOR CONSTRUCTIONPRELIMINARY

Job Name :

Job Number:Sketch No. :

Sketch Title:

Blank:Blank:

Date:

By:

Truss Elevation

Mosman High School

201635

SK-210330-6

30/03/2021

TA

CONCRETE COLUMNSSHOWN DASHED

CONCRETE SLABACOUSTIC SLAB NOT SHOWN

400WC270

20.5m

ASSUMED RESTRAINT MID HEIGHT. NOPORTAL ACTION - ASSUMED BRACEDAT LEVEL 3

350WC230310UC158

500WC290

LEVEL 3 STEEL TRANSFERBEAM FOR COLUMN ABOVE700WB OR 400WC

Page 17: Structural SSDA Report

NOT TO BE USED FOR CONSTRUCTIONPRELIMINARY

Job Name :

Job Number:Sketch No. :

Sketch Title:

Blank:Blank:

Date:

By:

Bracing Elevation

Mosman High School

201635

SK-210330-7

30/03/2021

TA

9m

GROUND FLOOR

ROOF

LEVEL 3

LEVEL 2

LEVEL 1

3.86

m200x6

SHS200x6 SHS

250x6 S

HS

250x6 S

HS

250x6 SHS

250x6 SHS

250x8 SHS250x8 S

HS

400W

C21

240

0WC

181

400W

C18

140

0WC

144

400W

C21

240

0WC

181

400W

C18

140

0WC

144

400WC270

400WC270

400WC270

400WC270

INDICATIVE CONNECTION AT COLUMNINDICATIVE CONNECTION AT BEAM

ALLOW FOR HOLES IN PLATE FORREINFORCEMENT CONTINUITY