structure of electricity distribution charges welcome and introduction

27
July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland

Upload: chelsey

Post on 10-Jan-2016

34 views

Category:

Documents


0 download

DESCRIPTION

Structure of Electricity Distribution Charges Welcome and Introduction. Charles Gallacher Deputy Director, Scotland. Format and objectives. Main purposes of the workshop: -overview of Ofgem’s June 2003 consultation ‘Structure of electricity distribution charges: Initial conclusions’ - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Structure of Electricity Distribution ChargesWelcome and Introduction

Charles GallacherDeputy Director, Scotland

Page 2: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Format and objectives

Main purposes of the workshop:- overview of Ofgem’s June 2003 consultation ‘Structure of electricity distribution charges: Initial conclusions’ - facilitate open debate about the future of the project- opportunity for wider audience to influence the debate

London workshop held 15 July

Page 3: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Agenda

10.40Structure of electricity distribution charges – Proposals and implementation

James Richardson 11.00DPCR 4 and incentives for distributed generation

Martin Crouch 11.15Q&A session 12.00Lunch 12:45Workgroup session 15:00 Close

Page 4: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Workgroup Session

Connection charging issues Introducing generator distribution use of system

(GDUoS) charges Change management and co-ordination Impact of proposals on Scotland AoB

Page 5: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Promoting choice and value for all gas and electricity customers

Page 6: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Structure of Electricity Distribution ChargesProposals and Implementation

James RichardsonDistribution Policy Team

Page 7: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Introduction

Background

June 2003 ‘Initial conclusions’ document – key proposals

Links with other work

Implementation

Page 8: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Background

The structure of charges project has three key aims:

To review the charging principles established by the Electricity Council in the early 1980s;

To establish a transparent and consistent boundary between connection and use of system charges for all network users; and

To establish a robust framework for generator distribution use of system (‘GDUoS’) charges.

Page 9: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Background - continued

December 2000 – initial consultation document setting out the main background and key themes

March 2002 – proposals on interim measures for DG October 2002 – structure of charges update document February 2003 – industry workshop June 2003 – ‘Initial conclusions’ document

Page 10: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Background - continued

Workshops - 15 July in London- 24 July in

Glasgow

Responses to June 2003 document requested by 8 August

Project enters ‘implementation’ stage

Page 11: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

15 July London Workshop - key outcomes

- Review has delivered sound proposals- Now is the time to move from ‘Review’ to

‘Implementation’

Major challenges:- Designing and implementing GDUoS regime- Timescales: introducing SoC proposals by April 2005

Page 12: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

‘Initial conclusions’ document

Key themes: Charging principles Charging methodologies Connection boundary Use of system Transitional arrangements Implementation Regulatory impact assessment

Page 13: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

‘Initial conclusions’ document

Charging principles October 2002 document proposed that common charging

principles should be recognised and applied across similar networks:- cost reflectivity;- simplicity;- ease of implementation;- transparency; and- predictability

Responses to the document supported these principles

Page 14: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

‘Initial conclusions’ document

Charging methodologies June document proposes that DNOs should be required by

licence to set out a methodology that:- facilitates competition in the generation, transmission, distribution and supply of electricity;- leads to changes which, as far as reasonably practicable (taking into account implementation costs and the impact on competition) reflect the costs and benefits incurred by DNOs in such a way as to encourage efficient decisions by network users; and- is capable of evolution over time to reflect changing network characteristics and commercial arrangements

Page 15: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

‘Initial conclusions’ document

Connection Boundary Previous consultation responses have indicated strong support

from industry for: - common boundary applying to all connections- shallower connection charges for DG

Guided by the common principles, the June document proposes:- ‘shallow’ charges for EHV (33kV and above) connections and locationally varying use of system tariffs- ‘shallowish’ charges for HV and LV (less than 33kV) connections – retaining locational signals – and simple use of system tariffs

Page 16: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Boundary with transmission network

Boundary with connectee

Transformer

Transformer

Transformer

Transformer

HV

LV

Full cost“Deep”

Partial cost“Shallowish”

Sole user cost“Shallow”

Zero cost

New

assetsR

einforcem

ent

New

assetsR

einfor

cemen

tG

eneral system

New

assetsG

eneral system

Gen

eral system

Page 17: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

‘Initial conclusions’ document

Connection Boundary – Issues: Define reinforcement contribution rule for ‘shallowish’

connections- de minimis rule e.g. if connectee does not exceed 25% of

existing capacity no reinforcement contribution- when de minimis rule exceeded:

- connectee charged for the proportion it uses of marginal increase in capacity?

- connectee charged for the proportion it uses of the total capacity?

- other? Need for contribution rules for other impacts e.g. upon fault

level? Abolish Tariff Support Allowance and Capitalised Operation &

Maintenance

Page 18: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

‘Initial conclusions’ document

Use of system Shallower charges will require the remainder of the connection

and O&M charges to be recovered via ongoing use of system charges

June document proposes the introduction of use of system charges for generation (‘GDUoS’)

Issues who pays – suppliers or generators? No change to the balance

except where cost reflective network services – what services should GDUoS recover? should charges reflect forward or backward looking costs?

Page 19: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

‘Initial conclusions’ document

Transitional arrangements Options for a transitional regime

- no exemptions after April 2005- exempt pre-existing generators for a period

of time e.g. until 2010 or for 15 years

- make pre-existing generators liable for GDUoS from April 2005, but offset the charge with a lump sum or annualised rebate of the reinforcement and capitalised O&M elements of their connection charge

- another option?

Page 20: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Links with other work

DPCR4- structure of charges proposals will affect DPCR 4 decisions

Distributed Generation Co-ordination Group- joint Ofgem/DTI group that is aiming to facilitate the achievement of the Government’s targets for renewable generation and CHP

Page 21: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Implementation

Important interaction with DPCR4 – structure of charges proposals scheduled to come into effect April 2005

‘Implementation Steering Group’ (ISG) to be established in August and to hold first meeting in September

Ofgem’s October 2003 ‘Initial decision’ document will firm up the proposals in the June document, and discuss the issues of GDUoS, transitional arrangements and implementation in detail

Page 22: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Implementation Timetable

8 August – Responses due August 2003 – ISG formed September & October 20003 – First and second

meetings of ISG October 2003 – ‘Initial decision’ document published July 2004 – ‘Implementation update’ document

published April 2005 – new regime implemented

Page 23: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Implementation Steering Group

Group to be chaired by Ofgem Aim of the ISG will be to steer the implementation

stage of the project - generating ideas, discussing proposals and making recommendations

ISG will provide a forum for discussion, but will not act as a formal decision making body and will not preclude a full consultation on the issues

Ideally group will consist of approximately 12 individuals (plus Ofgem), representing all industry sectors and representatives of all DNO groups

Page 24: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Implementation Steering Group

First meeting of the group in September 2003 – Agenda

• Terms of reference• DNOs to set out proposed approach• All parties to discuss requirements of Ofgem

Second meeting in October 2003 Thereafter group to meet approximately bi-monthly Possible expert ‘sub-groups’ to support ISG Draft terms of reference given in June 2003

document

Page 25: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Change and Co-ordination

Licence modifications

Introduction of GDUoS agreements?

Revised industry governance arrangements?

Page 26: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Implications of the proposals on Scotland

Proposals will facilitate the development of DG in Scotland

Different network characteristics – geographically and voltage level

BETTA

Page 27: Structure of Electricity Distribution Charges Welcome and Introduction

July 2003

Promoting choice and value for all gas and electricity customers