STS-134/ULF6 FD 02 Execute Package MSG Page(s) Title 003B 1 - 13 FD02 Flight Plan Revision 004 14 - 15 FD02 Mission Summary 005 16 Load DAPS 006 17 ULF6 ROBO Flight Note Incorporation 007 18 SSV Troubleshooting 008 19 FD02 Crew Choice Downlink Approved by FAO: T. Clancy HMS Endeavour Apollo 15 Command Module Endeavour Space Shuttle Endeavour (1770) (July 16, 1971) (May 7, 1992) Last Updated: May 17 2011 2:34 AM GMT JEDI (Joint Execute package Development and Integration), v3.0

Upload: others

Post on 26-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

STS-134/ULF6 FD 02 Execute Package

MSG Page(s) Title

003B 1 - 13 FD02 Flight Plan Revision

004 14 - 15 FD02 Mission Summary

005 16 Load DAPS

006 17 ULF6 ROBO Flight Note Incorporation

007 18 SSV Troubleshooting

008 19 FD02 Crew Choice Downlink Approved by FAO: T. Clancy

HMS Endeavour Apollo 15 Command Module Endeavour Space Shuttle Endeavour (1770) (July 16, 1971) (May 7, 1992)

Last Updated: May 17 2011 2:34 AM GMT JEDI (Joint Execute package Development and Integration), v3.0

Page 2: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8
Page 3: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

MSG 003B - FD02 FLIGHT PLAN REVISION

END OF PAGE 1 OF 13, MSG 003B

MSG INDEX 1

2

MSG NO. TITLE 3

003 FD02 Flight Plan Revision 4

004 FD02 Mission Summary 5

005 Load DAPS 6

006 ULF6 ROBO Flight Note Incorporation 7

007 SSV Troubleshooting 8

008 FD02 Crew Choice Downlink 9

10

11

1. Post-Sleep Cryo Config 12

For today's Post-Sleep cryo config, O2 and H2 Tanks 1 and 5 will be active. 13

14

A15 CRYO TK5 HTRS O2,H2 A,B (four) - AUTO 15

16

R1 O2,H2 TK3 HTRS A,B (four) - OFF 17

MANF VLV TK1 (two) - OP (tb-OP) 18

19

2. Pre-Sleep Cryo Config 20

21

√MCC for deltas prior to configuring for Pre-Sleep. 22

23

For tonight's Pre-Sleep cryo config, Manifold 2 will be closed with O2 and H2 Tanks 24

2 and 4 active. 25

26

A11 CRYO TK4 HTRS O2,H2 A,B (four) - AUTO 27

28

A15 CRYO TK5 HTRS O2,H2 A,B (four) - OFF 29

30

R1 O2,H2 TK2 HTRS A,B (four) - AUTO 31

TK1 HTRS A,B (four) - OFF 32

MANF VLV TK2 (two) - CL (tb-CL) 33

34

35

3. The MCC has remotely uplinked the latest HazMat data file to the PGSCs. 36

37

38

4. FD2 EVA Deltas: 39

40

From Taz’s saddlebag, incorporate the hardcopies of 4.120 DCS TREATMENT into 41

both “Brown stripe” and “No Stripe” copies of ISS EVA Systems Checklist. 42

43

Report to MCC-H when complete. 44

45

5. AMS has been successfully activated and we're receiving command and telemetry as 46

expected! The AMS team would like to thank the Shuttle team, MOD and the STS-134 47

crew for our much anticipated arrival on-orbit! 48

49

6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8 THROUGH 3-17. 50

1

Page 4: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

FD02

NC2^

MARK

BOX

SPAN

KY

ROBE

RTO

DREW

TAZ

REPLANNED

2-4

S T S 1 3 4 K U

01

02

03

04

05

06

07

08

09

10

11

12

GMT 05/17/11 (137)

12

13

14

15

16

17

18

19

20

21

22

23

001/00

MET

Day 000

CDR

SLEEP

OMS

BURN

MEAL

M N V R

N O S E

M N V R

P O R T

I M UMDDK XFER PREP

POST SLEEP

L O A D

D A P S

EMU

C/O

N L P

V A C C I N E

A C TPOST SLEEP

M D D K #

I C N C T *

O 2 - I

P O D *

O 2 - T

PLT

SLEEP

OMS

BURN

STBD WING SURVEY

PORT WING SURVEY

MEAL

M N V R

S T B D

POST SLEEP

POST SLEEP

L O G

OMS

POD

SRVY

MS1

SLEEP

OBSS UNBERTH

STBD WING SURVEY

NOSE CAP

SURVEY

EMU C/O

EMU

C/O

PREP

MEAL

M C I U *

POST SLEEP

MS2

SLEEP

OBSS UNBERTH

PORT WING SURVEY

MEAL

MDDK XFER PREP

POST SLEEP

L O G

P / T V 0 9

MS3

SLEEP

STBD WING SURVEY

NOSE CAP

SURVEY

EMU C/O

EMU

C/O

PREP

MEAL

ERG

SETUP

POST SLEEP

MS4

SLEEP

NOSE CAP

SURVEY

PORT WING SURVEY

MEAL

ERG

SETUP

L O G

C U B E 7

C U B E 8

C U B E 8

R O B O

U P D A T E

P L Y B K

O P S

P / T V 0 1

V I D E O

S E T U P

POST

SLEEP

POST SLEEP

CH 2

OCA

CH 3

AMS

AMS

TV

LDRI

DAY/NIGHT

ORBIT

910

11

12

13

14

15

16

TDRS

W E Z

-ZLV -XVV

NC2

STBD

NOSE

PORT

ORB ATT

#STATUS CHECK

*ROMS TO RCS

*B POD HTR RECONFIG

*FILTER CK

NOTES

2-4

FD02

NC2^

MARK

BOX

SPAN

KY

ROBE

RTO

DREW

TAZ

REPLANNED

S T S 1 3 4 K U

01

02

03

04

05

06

07

08

09

10

11

12

GMT 05/17/11 (137)

12

13

14

15

16

17

18

19

20

21

22

23

001/00

MET

Day 000

CDR

SLEEP

OMS

BURN

MEAL

M N V R

N O S E

M N V R

P O R T

I M UMDDK XFER PREP

POST SLEEP

L O A D

D A P S

EMU

C/O

N L P

V A C C I N E

A C TPOST SLEEP

M D D K #

I C N C T *

O 2 - I

P O D *

O 2 - T

PLT

SLEEP

OMS

BURN

STBD WING SURVEY

PORT WING SURVEY

MEAL

M N V R

S T B D

POST SLEEP

POST SLEEP

L O G

OMS

POD

SRVY

MS1

SLEEP

OBSS UNBERTH

STBD WING SURVEY

NOSE CAP

SURVEY

EMU C/O

EMU

C/O

PREP

MEAL

M C I U *

POST SLEEP

MS2

SLEEP

OBSS UNBERTH

PORT WING SURVEY

MEAL

MDDK XFER PREP

POST SLEEP

L O G

P / T V 0 9

MS3

SLEEP

STBD WING SURVEY

NOSE CAP

SURVEY

EMU C/O

EMU

C/O

PREP

MEAL

ERG

SETUP

POST SLEEP

MS4

SLEEP

NOSE CAP

SURVEY

PORT WING SURVEY

MEAL

ERG

SETUP

L O G

C U B E 7

C U B E 8

C U B E 8

R O B O

U P D A T E

P L Y B K

O P S

P / T V 0 1

V I D E O

S E T U P

POST

SLEEP

POST SLEEP

CH 2

OCA

CH 3

AMS

AMS

TV

LDRI

DAY/NIGHT

ORBIT

910

11

12

13

14

15

16

TDRS

W E ZORB ATT

-ZLV -XVV

NC2

STBD

NOSE

PORT

NOTES

#STATUS CHECK

*ROMS TO RCS

*B POD HTR RECONFIG

*FILTER CK

2

Page 5: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

FD02

NC3^

MARK

BOX

SPAN

KY

ROBE

RTO

DREW

TAZ

REPLANNED

2-5

S T S 1 3 4 K U

13

14

15

16

17

18

19

20

21

22

23

05/18

GMT 05/17/11 (137)

001/00

01

02

03

04

05

06

07

08

09

10

11

12

MET

Day 001

CDR

RCS

BURN

M N V R

- Z L V

SLEEP

FLTR CLN

F C P R G

M N V R

- Z L V

CRYO

O2

SNSR

CK

PMC

A/G

FCMS

OPS

PRE SLEEP

W S B *

P R E

S L E E P

V I S I O N

E X A M

R C S *

F U T

M N V R

PLT

OBSS BERTH

RCS

BURN

SLEEP

E L C

G R P L

B I O K I S *

V I S I O N

E X A MPRE

SLEEP

PRE SLEEP

LDRI D/L

MS1

EMU C/O

SLEEP

PRE SLEEP

V I S I O N

E X A MEVA PREP FOR XFER

MS2

OBSS BERTH

SLEEP

D O C K I N G

R I N G

E X TC/L

CMR

INSTL

RNDZ TOOLS

C/O

PRE SLEEP

E L C

G R P L

S S V - 2

S S V - 3

MS3

EMU C/O

SLEEP

S T O R R M

T O O L S

C / OPRE

SLEEP

O C A *

PRE SLEEP

EVA PREP FOR XFER

MS4

SLEEP

C/L

CMR

INSTL

D O C K I N G

R I N G

E X TW L E S

RNDZ TOOLS

C/O

PRE SLEEP

CWC S/U

M D D K #

V I S I O N

E X A M

CH 2

OCA

AMS

CH 3

AMS

LDRI

OCA

DAY/NIGHT

ORBIT

16

17

18

19

20

21

22

23

24

TDRS

W E Z

-ZLV -XVV

NC3

-ZLV -XVV

ORB ATT

*CNTLR SWAP

*I'CNCT TK

SW R-L

*ACT 1

*DOWNLINK RATE

RECONFIG

#STATUS CHECK

NOTES

2-5

FD02

NC3^

MARK

BOX

SPAN

KY

ROBE

RTO

DREW

TAZ

REPLANNED

S T S 1 3 4 K U

13

14

15

16

17

18

19

20

21

22

23

05/18

GMT 05/17/11 (137)

001/00

01

02

03

04

05

06

07

08

09

10

11

12

MET

Day 001

CDR

RCS

BURN

M N V R

- Z L V

SLEEP

FLTR CLN

F C P R G

M N V R

- Z L V

CRYO

O2

SNSR

CK

PMC

A/G

FCMS

OPS

PRE SLEEP

W S B *

P R E

S L E E P

V I S I O N

E X A M

R C S *

F U T

M N V R

PLT

OBSS BERTH

RCS

BURN

SLEEP

E L C

G R P L

B I O K I S *

V I S I O N

E X A MPRE

SLEEP

PRE SLEEP

LDRI D/L

MS1

EMU C/O

SLEEP

PRE SLEEP

V I S I O N

E X A MEVA PREP FOR XFER

MS2

OBSS BERTH

SLEEP

D O C K I N G

R I N G

E X TC/L

CMR

INSTL

RNDZ TOOLS

C/O

PRE SLEEP

E L C

G R P L

S S V - 2

S S V - 3

MS3

EMU C/O

SLEEP

S T O R R M

T O O L S

C / OPRE

SLEEP

O C A *

PRE SLEEP

EVA PREP FOR XFER

MS4

SLEEP

C/L

CMR

INSTL

D O C K I N G

R I N G

E X TW L E S

RNDZ TOOLS

C/O

PRE SLEEP

CWC S/U

M D D K #

V I S I O N

E X A M

CH 2

OCA

AMS

CH 3

AMS

LDRI

OCA

DAY/NIGHT

ORBIT

16

17

18

19

20

21

22

23

24

TDRS

W E ZORB ATT

-ZLV -XVV

NC3

-ZLV -XVV

NOTES

*CNTLR SWAP

*I'CNCT TK

SW R-L

*ACT 1

*DOWNLINK RATE

RECONFIG

#STATUS CHECK

3

Page 6: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

FD02 EZ ACTIVITIES:

√O

CAC

FILT

ER TE

PC (

STAT

US C

HECK

)

(OR

B OP

S, C

REW

SYST

EMS)

CS

A-CP

BAT

TERY

CHA

NGEO

UT CS

A-CP

CHE

CKOU

T AN

D ZE

RO C

ALIB

RATI

ON O

PS

(OR

B OP

S, C

SA-C

P)

HARD

REB

OOT:

STS

-2(W

INDE

COM)

,

STS

-3(K

FX)

& ST

S-4(

RPOP

)

MARK

BOX

SPAN

KY

REPLANNED

3-8

STS-

134/

ULF6

FD

01:00

02:00

03:00

04:00

GMT

Date

05/17

(137)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 9 1 0 1 1

~ ~- Z L V - X V VA T TCDR

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEPS FOR H2O ACCUMULATION

~

PLT

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-8

02

FD02 EZ ACTIVITIES:

√O

CAC

FILT

ER TE

PC (

STAT

US C

HECK

)

(OR

B OP

S, C

REW

SYST

EMS)

CS

A-CP

BAT

TERY

CHA

NGEO

UT CS

A-CP

CHE

CKOU

T AN

D ZE

RO C

ALIB

RATI

ON O

PS

(OR

B OP

S, C

SA-C

P)

HARD

REB

OOT:

STS

-2(W

INDE

COM)

,

STS

-3(K

FX)

& ST

S-4(

RPOP

)

MARK

BOX

SPAN

KY

REPLANNED

STS-

134/

ULF6

FD

01:00

02:00

03:00

04:00

GMT

Date

05/17

(137)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

O R B 9 1 0 1 1

A T T ~ ~- Z L V - X V V

CDR

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEPS FOR H2O ACCUMULATION

PLT

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS1

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

4

Page 7: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

ROBERTO

DREW

TAZ

REPLANNED

3-9

STS-

134/

ULF6

FD

Ku Ch

01:00

02:00

03:00

04:00

GMT

Date

05/17

(137)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R S ~~

~

D / N

O R B 9 1 0 1 1

~ ~- Z L V - X V VA T TMS2

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SLEEP LOGBOOK (ORB OPS, SDBI)

MS3

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

SLEEP

~

SLEEP LOGBOOK (ORB OPS, SDBI)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

2 O C A~ ~

3 A M S~ ~

NOTES

3-9

02

ROBERTO

DREW

TAZ

REPLANNED

STS-

134/

ULF6

FD

Ku Ch

01:00

02:00

03:00

04:00

GMT

Date

05/17

(137)

12:00

13:00

14:00

15:00

16:00

MET

Day 000

WE

Z

T D R SD / N

O R B 9 1 0 1 1

A T T ~ ~- Z L V - X V V

MS2

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SLEEP LOGBOOK (ORB OPS, SDBI)

MS3

~

SLEEP

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

SLEEP LOGBOOK (ORB OPS, SDBI)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

2 ~ ~O C A

3 ~ ~A M S

NOTES

5

Page 8: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

MARK

BOX

SPAN

KY

REPLANNED

3-10

STS-

134/

ULF6

FD

05:00

06:00

07:00

08:00

GMT

Date

05/17

(137)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 1 1 1 2 1 3 1 4

~ - Z L V - X V V N C 2 ~S T B DA T TCDR

ON-ORBIT OMS BURN

(ORB OPS, OMS)

< NC2 TIG (17:26)

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEPS FOR H2O ACCUMULATION

~

CGBA STATUS CHK; GLACIER STATUS CHK (CC)

I'CNCT: R OMS TO RCS (OPCL, RCS)

PLT

ON-ORBIT OMS BURN

(ORB OPS, OMS)

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

~

MNVR (TRK) BIAS +YSI (STBD SURVEY)

TG=4 BV=5 P=0 Y=40 OM=210

A14/AUTO/VERN, OBSS UNBERTH cmplt, Init TRK

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV08 EXTERNAL SURVEY (SETUP) Step 1

P/TV08 EXTERNAL SURVEY (OPS)

(PHOTO/TV, SCENES) OMS Pod Survey - Item 1

Best Lighting (16:44-17:20)

MS1

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

For "√APCU Power" at end of Step 2:

A15 √APCU 2 OUTPUT - OFF

R1: Roberto, R2: Spanky

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

~

L17 Check MCIU filter screen

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

UPDATE

ORBITAL

MNVR PAD

NOTES

3-10

02

MARK

BOX

SPAN

KY

REPLANNED

STS-

134/

ULF6

FD

05:00

06:00

07:00

08:00

GMT

Date

05/17

(137)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 1 1 2 1 3 1 4

A T T ~ - Z L V - X V V N C 2 ~S T B D

CDR

ON-ORBIT OMS BURN

(ORB OPS, OMS)

< NC2 TIG (17:26)

~

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

√HUM SEPS FOR H2O ACCUMULATION

CGBA STATUS CHK; GLACIER STATUS CHK (CC)

I'CNCT: R OMS TO RCS (OPCL, RCS)

PLT

ON-ORBIT OMS BURN

(ORB OPS, OMS)

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

MNVR (TRK) BIAS +YSI (STBD SURVEY)

TG=4 BV=5 P=0 Y=40 OM=210

A14/AUTO/VERN, OBSS UNBERTH cmplt, Init TRK

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV08 EXTERNAL SURVEY (SETUP) Step 1

P/TV08 EXTERNAL SURVEY (OPS)

(PHOTO/TV, SCENES) OMS Pod Survey - Item 1

Best Lighting (16:44-17:20)

MS1

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

For "√APCU Power" at end of Step 2:

A15 √APCU 2 OUTPUT - OFF

R1: Roberto, R2: Spanky

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

L17 Check MCIU filter screen

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

UPDATE

ORBITAL

MNVR PAD

6

Page 9: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

ROBERTO

DREW

TAZ

A All Trays/Syringes except

Tray 2 Syringe 8 per labels

CUBE LAB MODULE8-CRYSTALLIZATION

(ASSY OPS, PAYLOADS)

REPLANNED

3-11

STS-

134/

ULF6

FD

Ku Ch

05:00

06:00

07:00

08:00

GMT

Date

05/17

(137)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R S ~~

~

D / N

O R B 1 1 1 2 1 3 1 4

~ - Z L V - X V V N C 2 ~S T B DA T TMS2

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

For "√APCU Power" at end of Step 2:

A15 √APCU 2 OUTPUT - OFF

R1: Roberto, R2: Spanky

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

~

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

P/TV09 MIDDECK PAYLOADS

(PHOTO/TV, SCENES) Item 7 Video

MS3

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

~

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS4

MEAL

~

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

CUBE LAB MODULE-7 ACTIVATION

(ASSY OPS, PAYLOADS) A

CUBE LAB MODULE-8 ACT (ASSY OPS, PAYLOADS)

ROBO BOOK UPDATE

Ref. MSG 006

DIGITAL VIA VTR

(CUE CARD, DIGITAL PLAYBACK)

Window 4 Minicam

KU TDRE (17:35-18:14)

P/TV01 VIDEO SETUP

(PHOTO/TV, SCENES)

Step 9

SSV TROUBLESHOOTING

Ref. MSG 007

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

2 O C A~ ~

3 A M S~ A M ST V L D R I ~

NOTES

3-11

02

ROBERTO

DREW

TAZ

A All Trays/Syringes except

Tray 2 Syringe 8 per labels

CUBE LAB MODULE8-CRYSTALLIZATION

(ASSY OPS, PAYLOADS)

REPLANNED

STS-

134/

ULF6

FD

Ku Ch

05:00

06:00

07:00

08:00

GMT

Date

05/17

(137)

16:00

17:00

18:00

19:00

20:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 1 1 2 1 3 1 4

A T T ~ - Z L V - X V V N C 2 ~S T B D

MS2

OBSS UNBERTH

(PDRS, OBSS OPERATIONS)

For "√APCU Power" at end of Step 2:

A15 √APCU 2 OUTPUT - OFF

R1: Roberto, R2: Spanky

~

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

P/TV09 MIDDECK PAYLOADS

(PHOTO/TV, SCENES) Item 7 Video

MS3

~

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~MEAL

CYCLE ERGOMETER OPS

(ORB OPS, CREW SYS)

Perform ERGOMETER SETUP

CUBE LAB MODULE-7 ACTIVATION

(ASSY OPS, PAYLOADS) A

CUBE LAB MODULE-8 ACT (ASSY OPS, PAYLOADS)

ROBO BOOK UPDATE

Ref. MSG 006

DIGITAL VIA VTR

(CUE CARD, DIGITAL PLAYBACK)

Window 4 Minicam

KU TDRE (17:35-18:14)

P/TV01 VIDEO SETUP

(PHOTO/TV, SCENES)

Step 9

SSV TROUBLESHOOTING

Ref. MSG 007

POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~POST-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

2 ~ ~O C A

3 ~ A M S A M ST V ~L D R I

NOTES

7

Page 10: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

MARK

BOX

SPAN

KY

REPLANNED

B A14 RCS/OMS HTR L POD - A OFF

- B AUTO

R POD - A OFF

- B AUTO

MEAL

C OCAC PWR - OFF

C5 DIRECT O2 vlv - OP

Perform the following H/W C&W Actions

to inhibit PPO2 A and B:

R13U H/W C&W CH 034,044 (two) - INH

MCC will TMBU all S/W limits

D C5 DIRECT O2 vlv - CL

OCAC PWR - ON

On MCC GO, perform the following H/W C&W

actions to re-enable PPO2 A and B:

R13U H/W C&W CH 034,044 (two) - INH

MCC will TMBU all S/W limits

3-12

STS-

134/

ULF6

FD

09:00

10:00

11:00

12:00

GMT

Date

05/17

(137)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S

~~

~

D / N

O R B 1 4 1 5 1 6

~ S T B D N O S E P O R TA T TCDR

MEAL

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)

TG=4 BV=5 P=330 Y=0 OM=255

A14/AUTO/VERN, RCC SRVY-STBD cmplt, Init TRK

MNVR (TRK) BIAS -YSI (PORT SURVEY)

TG=4 BV=5 P=0 Y=323 OM=240

A14/AUTO/VERN, RCC SURVEY-PORT Step 3 cmplt, Init TRK

IMU STAR OF OPPORTUNITY ALIGN (ORB OPS,GNC)

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

~

LOAD DAPS

Ref. MSG 005

EMU CHECKOUT

(EVA, CHECKOUTS)

NLP ACTIVATION

(ASSY OPS, PAYLOADS)

Activate Vaccine GAPs A-P

O2 REPRESS INIT C

RCS/OMS POD HTR RECONFIG B

O2 REPRESS TERM (On MCC GO) D

PLT

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

~

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1: Box, R2: Roberto, R3: Taz

MS1

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

~

OBSS LDRI/IDC RCC SURVEY - NOSE

(PDRS, OBSS OPERATIONS)

R1: Drew, R2: Taz, R3: Spanky

EMU CHECKOUT

(EVA, CHECKOUTS)

~

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

MEAL

NOTES

3-12

02

MARK

BOX

SPAN

KY

REPLANNED

B A14 RCS/OMS HTR L POD - A OFF

- B AUTO

R POD - A OFF

- B AUTO

MEAL

C OCAC PWR - OFF

C5 DIRECT O2 vlv - OP

Perform the following H/W C&W Actions

to inhibit PPO2 A and B:

R13U H/W C&W CH 034,044 (two) - INH

MCC will TMBU all S/W limits

D C5 DIRECT O2 vlv - CL

OCAC PWR - ON

On MCC GO, perform the following H/W C&W

actions to re-enable PPO2 A and B:

R13U H/W C&W CH 034,044 (two) - INH

MCC will TMBU all S/W limits

STS-

134/

ULF6

FD

09:00

10:00

11:00

12:00

GMT

Date

05/17

(137)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 4 1 5 1 6

A T T ~ S T B D N O S E P O R T

CDR

MEAL

MNVR (TRK) BIAS +XSI (NOSE CAP SURVEY)

TG=4 BV=5 P=330 Y=0 OM=255

A14/AUTO/VERN, RCC SRVY-STBD cmplt, Init TRK

MNVR (TRK) BIAS -YSI (PORT SURVEY)

TG=4 BV=5 P=0 Y=323 OM=240

A14/AUTO/VERN, RCC SURVEY-PORT Step 3 cmplt, Init TRK

IMU STAR OF OPPORTUNITY ALIGN (ORB OPS,GNC)

~

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

LOAD DAPS

Ref. MSG 005

EMU CHECKOUT

(EVA, CHECKOUTS)

NLP ACTIVATION

(ASSY OPS, PAYLOADS)

Activate Vaccine GAPs A-P

O2 REPRESS INIT C

RCS/OMS POD HTR RECONFIG B

O2 REPRESS TERM (On MCC GO) D

PLT

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1: Box, R2: Roberto, R3: Taz

MS1

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

OBSS LDRI/IDC RCC SURVEY - NOSE

(PDRS, OBSS OPERATIONS)

R1: Drew, R2: Taz, R3: Spanky

~

EMU CHECKOUT

(EVA, CHECKOUTS)

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

MEAL

NOTES

8

Page 11: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

ROBERTO

DREW

TAZ

REPLANNED

3-13

STS-

134/

ULF6

FD

Ku Ch

09:00

10:00

11:00

12:00

GMT

Date

05/17

(137)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R S ~~

~

D / N

O R B 1 4 1 5 1 6

~ S T B D N O S E P O R TA T TMS2

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1: Box, R2: Roberto, R3: Taz

MEAL

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

~

MS3

OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

~

OBSS LDRI/IDC RCC SURVEY - NOSE

(PDRS, OBSS OPERATIONS)

R1: Drew, R2: Taz, R3: Spanky

EMU CHECKOUT

(EVA, CHECKOUTS)

~

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

MEAL

MS4

OBSS LDRI/IDC RCC SURVEY - NOSE

(PDRS, OBSS OPERATIONS)

R1: Drew, R2: Taz, R3: Spanky

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1: Box, R2: Roberto, R3: Taz

MEAL

~

2 O C A~ ~

3 L D R I~

NOTES

3-13

02

ROBERTO

DREW

TAZ

REPLANNED

STS-

134/

ULF6

FD

Ku Ch

09:00

10:00

11:00

12:00

GMT

Date

05/17

(137)

20:00

21:00

22:00

23:00

00:00

MET

Day 000

WE

Z

T D R SD / N

O R B 1 4 1 5 1 6

A T T ~ S T B D N O S E P O R T

MS2

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1: Box, R2: Roberto, R3: Taz

MEAL

~

MIDDECK TRANSFER PREP

Ref. FD02 TRANSFER CHOREOGRAPHY

(TRANSFER BOOK, REFERENCE)

MS3

~OBSS LDRI/IDC RCC SURVEY - STBD

(PDRS, OBSS OPERATIONS)

R1: Spanky, R2: Box, R3: Drew

OBSS LDRI/IDC RCC SURVEY - NOSE

(PDRS, OBSS OPERATIONS)

R1: Drew, R2: Taz, R3: Spanky

~

EMU CHECKOUT

(EVA, CHECKOUTS)

EMU CHECKOUT PREP

(EVA, AIRLOCK CONFIG)

MEAL

MS4

OBSS LDRI/IDC RCC SURVEY - NOSE

(PDRS, OBSS OPERATIONS)

R1: Drew, R2: Taz, R3: Spanky

OBSS LDRI/IDC RCC SURVEY - PORT

(PDRS, OBSS OPERATIONS)

R1: Box, R2: Roberto, R3: Taz

~

MEAL

2 ~ ~O C A

3 ~ L D R I

NOTES

9

Page 12: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

EMU CHECKOUT (EVA, CHECKOUTS)

TFL 188

TFL 199

MARK

BOX

SPAN

KY

E MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A14/AUTO/VERN, RCC SRVY-PORT Step 14 cmplt, Init TRK

REPLANNED

3-14

STS-

134/

ULF6

FD

13:00

14:00

15:00

16:00

GMT

Date

05/17

(137)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S

~~ ~~

D / N

O R B 1 6 1 7 1 8 1 9

- Z L V - X V V N C 3 ~- Z L V - X V VA T TCDR

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

< NC3 TIG (02:41)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

FUEL CELL PURGE - MANUAL

(ORB OPS, EPS)

MNVR (TRK) -ZLV -XVV E

CRYO O2 TK HTR SNSR CK

(ORB OPS, EPS)

L9 PS AUD A/G 1,2 (two) - OFF

PRIVATE MEDICAL CONFERENCE, via A/G 2

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

R2 BLR CNTLR/HTR (three) - B

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.

I'CNCT TK SW:FROM R TO L OMS FEED(OPCL,RCS)

FUTURE LOADED MNVR (DUMP)

TG=2 BV=3 OM=290

A1/AUTO/VERN (1/14:15), Init TRK

PLT

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

Skip Step 9

R1: Box, R2: Roberto

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

ELC GRAPPLE

(PDRS, ELC NOMINAL)

BIOKIS OPERATIONS

(ASSY OPS, PAYLOADS) Steps 1 and 2

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DIGITAL VIA VTR

(CUE CARD, DIGITAL PLAYBACK)

LDRI SURVEYS

KU TDRW (03:06-03:34)

TDRE (03:35-03:42)

(03:44-04:02)

MS1

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.

EVA PREP FOR ISS TRANSFER

(EVA, AIRLOCK CONFIG)

Ref. MSG 003 Item 4

NOTES

3-14

02

EMU CHECKOUT (EVA, CHECKOUTS)

TFL 188

TFL 199

MARK

BOX

SPAN

KY

E MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A14/AUTO/VERN, RCC SRVY-PORT Step 14 cmplt, Init TRK

REPLANNED

STS-

134/

ULF6

FD

13:00

14:00

15:00

16:00

GMT

Date

05/17

(137)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 6 1 7 1 8 1 9

A T T - Z L V - X V V N C 3 ~- Z L V - X V V

CDR

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

< NC3 TIG (02:41)

MNVR (TRK) -ZLV -XVV

TG=2 BV=3 OM=0

A1/AUTO/VERN Init TRK

FILTER CLEANING

(IFM, SCHEDULED MAINTENANCE)

FUEL CELL PURGE - MANUAL

(ORB OPS, EPS)

MNVR (TRK) -ZLV -XVV E

CRYO O2 TK HTR SNSR CK

(ORB OPS, EPS)

L9 PS AUD A/G 1,2 (two) - OFF

PRIVATE MEDICAL CONFERENCE, via A/G 2

FC MONITORING SYS (FCMS) OPS

(ORB OPS, EPS)

R2 BLR CNTLR/HTR (three) - B

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.

I'CNCT TK SW:FROM R TO L OMS FEED(OPCL,RCS)

FUTURE LOADED MNVR (DUMP)

TG=2 BV=3 OM=290

A1/AUTO/VERN (1/14:15), Init TRK

PLT

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

Skip Step 9

R1: Box, R2: Roberto

ON-ORBIT +X RCS BURN

(ORB OPS, RCS)

ELC GRAPPLE

(PDRS, ELC NOMINAL)

BIOKIS OPERATIONS

(ASSY OPS, PAYLOADS) Steps 1 and 2

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

DIGITAL VIA VTR

(CUE CARD, DIGITAL PLAYBACK)

LDRI SURVEYS

KU TDRW (03:06-03:34)

TDRE (03:35-03:42)

(03:44-04:02)

MS1

~ ~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.

EVA PREP FOR ISS TRANSFER

(EVA, AIRLOCK CONFIG)

Ref. MSG 003 Item 4

NOTES

10

Page 13: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

ROBERTO

DREW

TAZ

REPLANNED

3-15

STS-

134/

ULF6

FD

Ku Ch

13:00

14:00

15:00

16:00

GMT

Date

05/17

(137)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R S ~ ~

~

~

D / N

O R B 1 6 1 7 1 8 1 9

- Z L V - X V V N C 3 ~- Z L V - X V VA T TMS2

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

Skip Step 9

R1: Box, R2: Roberto

DOCKING MECHANISM INITIALIZATION

DOCKING MECHANISM POWERUP

DOCKING RING EXTENSION

DOCKING MECHANISM POWERDOWN

(RNDZ, APDS)

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

ELC GRAPPLE

(PDRS, ELC NOMINAL)

SSV OUTRATE - 2

SSV OUTRATE - 3

MS3

EMU CHECKOUT

(EVA, CHECKOUTS)

~

After RNDZ TOOLS C/O Step 3 complete, perform

STORRM TOOLS CHECKOUT

(RNDZ, RNDZ STORRM)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PREP FOR ISS TRANSFER

(EVA, AIRLOCK CONFIG)

Ref. MSG 003 Item 4

MS4

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

DOCKING MECHANISM INITIALIZATION

DOCKING MECHANISM POWERUP

DOCKING RING EXTENSION

DOCKING MECHANISM POWERDOWN

(RNDZ, APDS)

WLES RNDZ TOOLS C/O PREP (ORB OPS, WLES)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

SHUTTLE/ISS H2O CONTAINER FILL (HC)

(ORB OPS, ECLS)

Perform EQUIPMENT PREP and

WATER TRANSFER HOSE PURGE

CGBA STATUS CHK; GLACIER STATUS CHK (CC)

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.2 O C A~ ~

3 A M S L D R I ~

NOTES

3-15

02

ROBERTO

DREW

TAZ

REPLANNED

STS-

134/

ULF6

FD

Ku Ch

13:00

14:00

15:00

16:00

GMT

Date

05/17

(137)

00:00

01:00

02:00

03:00

04:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 6 1 7 1 8 1 9

A T T - Z L V - X V V N C 3 ~- Z L V - X V V

MS2

OBSS BERTH

(PDRS, OBSS OPERATIONS)

Record Camera D

Skip Step 9

R1: Box, R2: Roberto

DOCKING MECHANISM INITIALIZATION

DOCKING MECHANISM POWERUP

DOCKING RING EXTENSION

DOCKING MECHANISM POWERDOWN

(RNDZ, APDS)

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

ELC GRAPPLE

(PDRS, ELC NOMINAL)

SSV OUTRATE - 2

SSV OUTRATE - 3

MS3

~EMU CHECKOUT

(EVA, CHECKOUTS)

After RNDZ TOOLS C/O Step 3 complete, perform

STORRM TOOLS CHECKOUT

(RNDZ, RNDZ STORRM)

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

EVA PREP FOR ISS TRANSFER

(EVA, AIRLOCK CONFIG)

Ref. MSG 003 Item 4

MS4

C/L CAMR INSTALL

(PHOTO/TV, C/L CAMR)

DOCKING MECHANISM INITIALIZATION

DOCKING MECHANISM POWERUP

DOCKING RING EXTENSION

DOCKING MECHANISM POWERDOWN

(RNDZ, APDS)

WLES RNDZ TOOLS C/O PREP (ORB OPS, WLES)

RNDZ TOOLS CHECKOUT

(RNDZ, RNDZ TOOLS)

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

SHUTTLE/ISS H2O CONTAINER FILL (HC)

(ORB OPS, ECLS)

Perform EQUIPMENT PREP and

WATER TRANSFER HOSE PURGE

CGBA STATUS CHK; GLACIER STATUS CHK (CC)

VISION EXAM Retrieve Visual Acuity

Charts from MAK, Complete Exam

and Questionnaire with uncorrected vision.2 ~ ~O C A

3 A M S ~L D R I

NOTES

11

Page 14: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

CREW

WAK

E AT

01/

14:0

0

MARK

BOX

SPAN

KY

REPLANNED

3-16

STS-

134/

ULF6

FD

17:00

18:00

19:00

20:00

GMT

Date

05/17

(137)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S

~

~~ ~

D / N

O R B 1 9 2 0 2 1 2 2

~ ~- Z L V - X V VA T TCDR

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

NOTES

3-16

02

CREW

WAK

E AT

01/

14:0

0

MARK

BOX

SPAN

KY

REPLANNED

STS-

134/

ULF6

FD

17:00

18:00

19:00

20:00

GMT

Date

05/17

(137)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 9 2 0 2 1 2 2

A T T ~ ~- Z L V - X V V

CDR

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

PLT

~

SLEEP

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS1

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

NOTES

12

Page 15: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

FLT PLN/134/WORKING

02

CREW

WAK

E AT

01/

14:0

0

ROBERTO

DREW

TAZ

F RECONFIGURE OCA DOWNLINK RATE (48Mbps)

(ORB OPS, PGSC) Part C, Omit step 4

L12 Ku BAND RATE - HI

REPLANNED

O C A

L D R I

3-17

STS-

134/

ULF6

FD

Ku Ch

17:00

18:00

19:00

20:00

GMT

Date

05/17

(137)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R S ~

~

~ ~

D / N

O R B 1 9 2 0 2 1 2 2

~ ~- Z L V - X V VA T TMS2

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

MS3

SLEEP

~

OCA RECONFIG - 48 Mbps F

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

SLEEP

~

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

~

2 ~ A M S ~

3 ~ O C A ~

NOTES

3-17

02

CREW

WAK

E AT

01/

14:0

0

ROBERTO

DREW

TAZ

F RECONFIGURE OCA DOWNLINK RATE (48Mbps)

(ORB OPS, PGSC) Part C, Omit step 4

L12 Ku BAND RATE - HI

REPLANNED

O C A

L D R I

STS-

134/

ULF6

FD

Ku Ch

17:00

18:00

19:00

20:00

GMT

Date

05/17

(137)

04:00

05:00

06:00

07:00

08:00

MET

Day 001

WE

Z

T D R SD / N

O R B 1 9 2 0 2 1 2 2

A T T ~ ~- Z L V - X V V

MS2

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS3

~

SLEEP

OCA RECONFIG - 48 Mbps F

PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

MS4

~

SLEEP

~PRE-SLEEP ACTIVITY

(ORB OPS, CREW SYS)

2 ~ ~A M S

3 ~ ~O C A

NOTES

13

Page 16: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

MSG 004 - FD02 MISSION SUMMARY

END OF PAGE 1 OF 2, MSG 004

Good Morning Endeavour!!! 1

2

What a spectacular launch!!! 3

4

Endeavour never looked so good!!!!! 5

6

7

YOUR CURRENT ORBIT IS: 178 X 175 NM 8

9

NOTAMS - 10

11

EDW - EDW 22L/04R IN USE. EDT 22R/04L EMERGENCY DAY USE ONLY. 12

EDW - LAKEBED RWYS RED. 13

NOR - LAKEBED RWYS GREEN. 14

NTU - RWY 05R/23L CLSD. 15

FFA - NOT USABLE. IN CARETAKER STATUS. 16

LAJ - RWY WIDTH REDUCED TO 154' - EAST SIDE OF RWY CLSD. 17

BEN - NOT USABLE. NOT SUPPORTED. 18

IKF - NOT USABLE. NO AGREEMENT 19

20

NEXT 2 PLS OPPORTUNITIES: 21

22

NOR17 ORB 17 – 1/01:02 SCT250 7 190/13P20 23

KSC15 ORB 31 – 1/22:16 SCT030 7 270/10P15 24

25

OMS TANK FAIL CAPABILITY: 26

27

NO 28

29

LEAKING OMS PRPLT BURN: 30

31

L or R OMS LEAK: ALWAYS BURN RETROGRADE 32

33

OMS QUANTITIES(%) 34

35

L OMS OX = 32.96 R OMS OX = 32.76 36

FU = 32.96 FU = 32.37 37

38

39

DELTA V AVAILABLE: 40

41

OMS 302 FPS 42

ARCS (TOTAL ABOVE QTY1) 33 FPS 43

44

TOTAL IN THE AFT 335 FPS 45

46

ARCS (TOTAL ABOVE QTY2) 62 FPS 47

FRCS (ABOVE QTY 1) 31 FPS 48

49

AFT QTY 1 83 % 50

AFT QTY 2 45 % 51

14

Page 17: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

MSG 004 - FD02 MISSION SUMMARY

END OF PAGE 2 OF 2, MSG 004

1

2

SYSTEM FAILURE IMPACT WORK AROUND Landing/ Decel

Right NLG Tire Press 2 instrumentation was slightly erratic just after liftoff and again post-MECO. It was otherwise nominal.

Right NLG Tire Press 2 (SM SPEC 087, TIRE PRESS NG RIGHT 2) may not be correct.

Right NLG Tire Press 1 can be used for monitoring (SM SPEC 087, TIRE PRESS NG RIGHT 1).

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36

37

38

39

40

15

Page 18: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

MSG 005 - FD02 LOAD DAPS

END OF PAGE 1 OF 1, MSG 005

To load the flight specific DAPs with the initial docked mass properties through AMS 1 grappled by the SSRMS (FD04), perform the following: 2 3 4

GNC 20 DAP CONFIG 5

6

ITEM 3+11 EXEC 8 Permanent Edit DAP A11 with CNTL ACC 8 7

ITEM 68+8 EXEC 9 ITEM 5 EXEC 10 11

ITEM 3+12 EXEC 13 Permanent Edit DAP A12 with CNTL ACC 8 12

ITEM 68+8 EXEC 14 ITEM 5 EXEC 15 16

ITEM 4+12 EXEC 18 Permanent Edit DAP B12 with CNTL ACC 8 17

ITEM 68+8 EXEC 19 ITEM 5 EXEC 20 21

ITEM 4+13 EXEC 23 Permanent Edit DAP B13 with CNTL ACC 8 22

ITEM 68+8 EXEC 24 ITEM 5 EXEC 25

26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

16

Page 19: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

MSG 006 - ULF6 ROBO FLIGHT NOTE INCORPORATION

END OF PAGE 1 OF 1, MSG 006

Retrieve ISS ROBOTICS FS books [Qty 2] from MF71G and Ziplock bag labeled ‘MS4 1 Chamitoff’ containing ROBO procedure 2.340 from MS4 Seat Bag. 2 3 PLT (Y) copy 4 Remove pages 359 thru 364 5 Add pages 359 thru 363e 6

7 MS4 (Br) copy 8 Remove pages 359 thru 364 9 Add pages 359 thru 363e 10

11 Place discarded pages in the STS common trash 12

13 Restow ISS ROBOTICS FS books [Qty 2] in MF71G 14 15 Report completion to MCC-H. 16 17

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

17

Page 20: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

MSG 007 - SSV TROUBLESHOOTING

END OF PAGE 1 OF 1, MSG 007

We are unable to process any SSV images on the ground, and request the status of the 1 following to verify the config of the SSV system. 2

3 SSV PWR LED 4

ENC DATA LED flickering 5 FRAME DATA LED flickering 6 FILL FRAME pulsing 7 8 9 10

On MCC GO: 11 12 Cycle PWR on SSV Compression Encoder 13 SSV PWR - 0 (Off) 14 Wait 5 seconds 15 SSV PWR - 1 (On) 16

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

18

Page 21: STS-134/ULF6 · The AMS team would like to thank the Shuttle team, MOD and the STS-134 48 crew for our much anticipated arrival on-orbit! 49 50 6. REPLACE PAGES 2-4 THROUGH 2-5, 3-8

MSG 008 - FD02 CREW CHOICE DOWNLINK

END OF PAGE 1 OF 1, MSG 008

TDRS  AOS  LOS Delta (min) Notes W-TDW  1/03:06  1/03:26 20  

E-TDS  1/03:35  1/04:02 27 Alpha stop at 1/03:43 E-TDS  1/05:20  1/05:46 26  

W-TDW  1/06:18  1/06:46 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

19