US Army Corps of Engineers BUILDING STRONG®
STURGIS Barge Decommissioning Project
U.S. Army Corps of Engineers
Nov. 17, 2014
![Page 2: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/2.jpg)
BUILDING STRONG® 2
History of the STURGIS Environmental Assessment Decommissioning
►Waste Segregation ►Safety Measures ►Oversight ►Milestones
Economic Impact Questions
Today’s Presentation
![Page 3: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/3.jpg)
BUILDING STRONG® 3
First Barge Mounted Nuclear Power Plant
The former World War II Liberty Ship, SS Charles H. Cugle, was converted into a nuclear power plant in 1966.
STURGIS was the first barge mounted nuclear plant to regularly supply power to a shore station.
The STURGIS’ nuclear reactor, MH-1A, was used to generate electricity for military and civilian use in the Panama Canal from 1968-1976.
![Page 4: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/4.jpg)
BUILDING STRONG®
The STURGIS is a Historic Property
The STURGIS is considered a historic property eligible for listing in the National Register of Historic Places.
During decommissioning, the Corps will preserve items of historic interest, including an electronic repository of documents
4
Design schematic from 1959
![Page 5: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/5.jpg)
BUILDING STRONG® 5
Fuel Removal and Long-term Storage
In 1977, the STURGIS returned to Fort Belvoir where the nuclear fuel was removed, and the vessel was prepared for safe long-term storage.
The STURGIS has been maintained in James River Reserve Fleet at Joint Base Langley-Eustis, VA since 1978.
The Corps of Engineers has performed quarterly monitoring and periodic maintenance for the past 36 years.
![Page 6: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/6.jpg)
BUILDING STRONG®
Characterization Confirms Very Low Radiation Levels
The vessel’s radiological and chemical contaminants were evaluated in 2001.
The extensive characterization confirmed that radiation levels have decayed to safe working levels.
6
![Page 7: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/7.jpg)
BUILDING STRONG® 7
Characterization
![Page 8: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/8.jpg)
BUILDING STRONG®
8
42α++ Alpha
0-1β
- Beta
00γ
Gamma and X-rays
10n
Neutron
Paper Plastic Lead Concrete
Basic Types of Ionizing Radiation
![Page 9: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/9.jpg)
BUILDING STRONG®
Where Did the Radioactivity Come From?
9
Neutron source
Materials become radioactive
(e.g. Ni-63 & Co-60)
Radiation is emitted
Neutron is emitted
Materials become stable Co-60 > Ni-60 Ni-63 > Cu-63
![Page 10: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/10.jpg)
BUILDING STRONG®
STURGIS Primary Radionuclides
Primary radionuclides are activation products
►Co-60
►Ni-63
Most of the activity is in the form of radioactive metal in the reactor pressure vessel and the primary shield tank
Ni-63 emits low-energy beta radiation
Co-60 emits beta and gamma radiation
10
![Page 11: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/11.jpg)
BUILDING STRONG®
Radionuclide Abbreviation Half-life (years)
Radiation Emitted
% Abundance 12/14
Cobalt-60 Co-60 5.27 Beta/gamma 27.05 %
Nickel-63 Ni-63 100.1 Low-energy beta
72.46%
11
Characteristics of the Important Radionuclides
![Page 12: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/12.jpg)
BUILDING STRONG®
Half life is the time it takes for 1/2 of the atoms to decay.
The half-life of Co-60 is 5.27 yrs.
The half-life of Ni-63 is 100.1 yrs.
12
0 10 20 30 40 50 60 70 80 90
100
0 1 2 3 4 5 6
Number of half-lives
The Half-Life of a Radionuclide
![Page 13: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/13.jpg)
BUILDING STRONG®
Radioactive Decay Since Shutdown
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
1977 1982 1987 1992 1997 2002 2007 2012 2017 2022 2027
Co-60 gamma emitting isotope Ni-63 low energy beta emitting isotope
13
![Page 14: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/14.jpg)
BUILDING STRONG® 14
Environmental Assessment
![Page 15: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/15.jpg)
BUILDING STRONG®
Four Coastal Cities Were Selected for the Assessment
Galveston, TX
Hampton Roads, VA
Baltimore, MD, and
Charleston, SC
15
![Page 16: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/16.jpg)
BUILDING STRONG®
Site Selection Was Based On:
Proximity to the Corps of Engineers’ offices
Proximity to waste disposal facilities, and
Availability of shipyards and ship breaking operations.
16
![Page 17: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/17.jpg)
BUILDING STRONG®
An Environmental Assessment was Conducted in 2013
The purpose of an environmental assessment is to determine the potential environmental impacts associated with each selected site.
17
![Page 18: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/18.jpg)
BUILDING STRONG®
The Environmental Assessment Considered:
► Ecology, including marine mammals, essential fish habitat, benthic communities and protected species
► Cultural resources, including preservation of historical documents
► Water, including bays, estuaries and wetlands
► Air quality, including towing and decommissioning activities
► Waste management, including hazardous and radioactive waste
18
![Page 19: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/19.jpg)
BUILDING STRONG®
The Bottom Line: There are no significant impacts
The environmental assessment concluded there are no significant environmental impacts, including impacts related to transportation.
19
![Page 20: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/20.jpg)
BUILDING STRONG® 20
Decommissioning
![Page 21: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/21.jpg)
BUILDING STRONG®
Primary Objectives
Decommission, then dismantle the vessel.
Remove radioactive material to permit the STURGIS to be released for unrestricted use.
Segregate waste streams.
Ensure wastes are disposed in licensed facilities.
Recycle nonradioactive material.
Terminate the Army Reactor Office permit. 21
![Page 22: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/22.jpg)
BUILDING STRONG®
Path Forward
Inspect STURGIS prior to relocation.
Conduct baseline radiological survey at Malin Shipyard prior to towing.
Prepare STURGIS for towing to Malin Shipyard.
Remove STURGIS' residual radiological and hazardous materials.
22
![Page 23: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/23.jpg)
BUILDING STRONG®
Path Forward All parts and contents of STURGIS and the MH-
1A reactor will be disposed as
►Clean (recycled/land filled) [Estimated ~90%]
• The shipbreaking is planned to be completed in Brownsville, TX
►Radioactive [Estimated ~8%]
►Hazardous [Estimated ~2%]
►Mixed waste (Radioactive and hazardous/ asbestos/universal) [Estimated <1%]
23
![Page 24: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/24.jpg)
24
Towing Route
![Page 25: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/25.jpg)
BUILDING STRONG® 25
Malin Shipyard
TAMU-Galveston
![Page 26: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/26.jpg)
BUILDING STRONG® 26
![Page 27: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/27.jpg)
BUILDING STRONG®
Risk Reduction and Safety The potential risks from radiation sources may
result from
►Internal exposures, or
►External exposures
Different control methods are used depending on the type of exposure
27
![Page 28: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/28.jpg)
BUILDING STRONG®
Internal and External Exposure
28
External Exposure Internal Exposure
Radiation Source
![Page 29: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/29.jpg)
BUILDING STRONG®
Risk Reduction and Safety External radiation protection
- Establishing a security perimeter to control access - Using shielding on components that have higher exposure rates - Minimizing the time any of the higher exposure rate components are
not shielded - Using 3-D laser mapping to facilitate planning
Internal radiation protection - Conduct activities in a contained area of the barge using proven
industry standards - Use contamination control methods such as glove bags, foaming,
and fixatives - Control air flow and emissions using HEPA filtration units
29
![Page 30: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/30.jpg)
BUILDING STRONG®
Hurricane Plan
A detailed hurricane plan will be prepared:
►Double tie the STURGIS in place and make sure it is water tight.
►STURGIS will be left in the shipyard to ride out the storm.
►Consistent with what Malin Shipyard has done before during previous hurricanes.
30
![Page 31: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/31.jpg)
BUILDING STRONG® 31
Project Team and Schedule
![Page 32: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/32.jpg)
BUILDING STRONG®
Contract Award
March 2014, award of $34.6M to CB&I to complete the STURGIS decommissioning in Galveston
Award was based on best value considering technical approach, management, past performance, and cost factors.
32
![Page 33: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/33.jpg)
BUILDING STRONG®
Project Team Members of the project and oversight team include:
►Professional Engineers
►Certified Health Physicists (Radiation Safety)
►Environmental Scientists
►Regulatory Specialists
►Safety Specialists
►Qualified Technicians
33
![Page 34: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/34.jpg)
BUILDING STRONG®
Highly Skilled and Experienced Contractor Team
34
![Page 35: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/35.jpg)
BUILDING STRONG®
Federal Oversight U.S. Army Corps of Engineers will provide
quality assurance over the contractor and their quality control program
Corps of Engineers National Environmental Center of Expertise
Army Reactor Office and Reactor Council
Oak Ridge Associated Universities – Independent Review
35
![Page 36: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/36.jpg)
BUILDING STRONG®
State Oversight Texas Commission on Environmental Quality
►Disposal of Low level Radioactive Waste
►Remediation of Asbestos Containing Materials
Texas Department of State Health Services
►Release of materials
►Materials in transport
►Licensing Asbestos workers
36
![Page 37: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/37.jpg)
BUILDING STRONG®
STURGIS Schedule
Tow STURGIS in 2015 Begin decommissioning in 2015 Decommissioning will take 12-14 months
37
![Page 38: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/38.jpg)
BUILDING STRONG® 38
Economic Impact
![Page 39: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/39.jpg)
BUILDING STRONG®
Economic Impact Employment:
► EnergySolutions and Malin will require 45 people for the job
► EnergySolutions will hire four to six radiation technicians
► Malin Shipyard will hire ten employees: laborers, security officers, riggers, electricians and mechanics
► EnergySolutions – will use union Longshoremen at transload facility for waste shipment
The current estimate of direct economic impact for the City of Galveston is $17,500,000.
39
![Page 40: STURGIS Barge Decommissioning Project · Today’s Presentation . BUILDING STRONG ® 3 First Barge Mounted ... regularly supply power to a shore station. The STURGIS’ nuclear reactor,](https://reader036.vdocument.in/reader036/viewer/2022063017/5fd9225a0795b7030e5d1abc/html5/thumbnails/40.jpg)
BUILDING STRONG®
QUESTIONS?
40