su1212 sealing of stringer rivets on roof p1

3
UPDATE Page 1 of 3 SEALING OF STRINGER RIVETS ON ROOF S E R V I C E U P D A T E S U 1 2 1 2 ‐‐ Models Affected: 2011 thru 2013 All American and Vision Sealing of stringer rivets in roof panel on the rear flange of intermediate bows. See details & instructions below: Warning: Always follow all Federal, State, Local and Shop safety standards and use proper safety equipment when performing these procedures. This procedure requires working from ladders or scaffolds to reach the top of the bus. Observe all safety precautions to secure the bus from rolling and for use of ladders or scaffolds. (1) Park the bus on a level surface, apply parking brakes, turn off engine and remove ignition key. Chock wheels. (2) When a single 56 inch roof panel covers (2) 28 inch body sections, the bow in center of the two body sections is the intermediate bow. (3) On the intermediate bow there is a double row of rivets on each end of roof panel below the radius of the roof, directly above the window line. There should be only (2) rivets in roof panel on top of the bus at the intermediate bow located approximately 18 inches from centerline of roof on curb side and street side of unit in the front flange of the bow. See detailed views on page 2 and page 3. (4) If it is determined that the stringer rivets are installed in the rear flange of the intermediate bow or possibly leaking, seal the rivets using clear sealer. (5) Reference Service Update #SU1203, SEALANT APPLICATION GUIDELINES, for proper steps to prepare surfaces for sealer application, proper steps for actual sealer application, cleanup of surface areas after sealant is applied and information for proper cure times. (6) Return unit to service.

Upload: others

Post on 04-Jan-2022

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SU1212 SEALING OF STRINGER RIVETS ON ROOF P1

UPDATE                    

Page 1 of 3  

SEALING OF STRINGER RIVETS ON ROOF

  S    E    R    V    I    C    E          U    P    D    A    T    E              ‐S   U

   1   2   1   2 ‐‐‐   

 

   

                           

 

 

   

 

 

 

 

 

 

 

 

 

 

 

 

 

Models Affected: 2011 thru 2013 All American and Vision  

Sealing of stringer rivets in roof panel on the rear flange of intermediate bows. See details & instructions below:   

Warning: Always  follow all  Federal,  State,  Local and  Shop  safety  standards and use proper safety equipment when performing these procedures. This procedure requires working from ladders or scaffolds to reach the top of the bus. Observe all safety  precautions  to  secure  the  bus  from  rolling  and  for  use  of  ladders  or scaffolds.   (1) Park the bus on a level surface, apply parking brakes, turn off engine and remove ignition key. Chock 

wheels.  (2)  When a single 56 inch roof panel covers (2) 28 inch body sections, the bow in center of the two body        sections is the intermediate bow.   (3)  On the intermediate bow there is a double row of rivets on each end of roof panel below the radius of             the roof, directly above the window line. There should be only (2) rivets in roof panel on top of the bus           at the intermediate bow located approximately 18 inches from centerline of roof on curb side and                 street side of unit in the front flange of the bow.  See detailed views on page 2 and page 3.     (4) If it is determined that the stringer rivets are installed in the rear flange of the intermediate bow or       possibly leaking, seal the rivets using clear sealer.    (5) Reference Service Update #SU1203, SEALANT APPLICATION GUIDELINES, for proper steps to prepare             surfaces for sealer application, proper steps for actual sealer application, cleanup of surface areas after        sealant is applied and information for proper cure times.        (6) Return unit to service.    

Page 2: SU1212 SEALING OF STRINGER RIVETS ON ROOF P1

UPDATE

‐S   E   R

   V   I   C   E         U   P   D

   A   T   E              ‐          ‐S

   U   1   2   1   2  ‐

 

                         

Page 2 of 3 

SEALING OF STRINGER RIVETS ON ROOF  

 

Stringer rivets on front flange of intermediate bow, both sides of roof. 

Rivets below radius in roof.   

Intermediate Bow. 

Roof panel covering (2) body sections shown. Intermediate bow (center bow shown), does not have a full row of rivets, only below radius of roof on both sides of roof and at the roof stringer on front flange of bow. See page 3 for more details. 

Page 3: SU1212 SEALING OF STRINGER RIVETS ON ROOF P1

UPDATE

‐S   E   R

   V   I   C   E         U   P   D

   A   T   E              ‐          ‐S

   U   1   2   1   2  ‐

 

                         

Page 3 of 3 

SEALING OF STRINGER RIVETS ON ROOF

View of Intermediate Bow & Stringer Rivet w/out Roof Panel  

 

 

Correct location of stringer rivet thru front flange of intermediate bow, both sides of roof. 

If a rivet is installed inside circle, on rear flange of intermediate bow, it must be sealed because no seal tape was installed there, both sides of roof.

Front of unit. 

Intermediate bow.

Rivets below radius in roof, typical on both sides of intermediate bow.