sub zero co-op presentation
TRANSCRIPT
EIGHT MONTHS WITH SUB-ZERO DESIGN ENGINEERING
Jessica Thomas
Mechanical Engineering and English MajorSub-Zero Design Engineer Co-op
January – August 2016
NANO SHELF TESTING• Performed tests on nano shelves
to confirm they met SZE-1027, Bond Strength Specification – UV Cured Adhesive
• Collected, analyzed, and presented data to help determine if adhesive change was necessary
• Edited CAB procedures and updated fixtures
• Marked up drawing with adhesive change and sent to Alex G.
COST REDUCTION: ICE TESTING• Ran tests to determine if Smart water
valve could be replaced by 70cc valve • Performed tests on multiple refer and
freezer models with and without fill tube heaters
• Worked with Brent K. to develop a test method for fill tubes using air instead of water
• Conducted tests with Michelle looking for methods of insulating
the fill tube heaters 31083, BI-48SD: 70cc valve, NO fill tube heater, and original water line
30955, Test 5, Day 4
MULLION CHUTE TESTING• Dispensed ice – a lot of ice• Checked long term units daily
for ice build up in the freezer around the mullion chute
• Installed assemblies with new gaskets on long term units
• Ran mechanical test and inspected parts
PRO 36 AND 48 BUILD• Assembled pre-foam and post-
foam parts for Build 1• Peeled vinyl• Used a rivet gun and clincher• Worked with team from
Goodyear
AIR FLOW TESTING• Collected air flow data
using anemometers• Altered test parameters
to check airflow with different fan speeds, air flow directions, and fan positions
• Got USB hub working
CALORIMETER TESTING• Updated procedure and
worked with Roy S. to confirm accuracy
• Performed tests on evaporators and condensers
BI ENHANCEMENTS• Helped find best PVD and IML color match
and most appropriate luminance and luminous flux of the keypad and well lighting
• Attended field test inspections• Took the Farnsworth-Munsell 100 Hue Color
Test to confirm accurate color vision• Attended supplier visits to Serigraph and TG-
3• Wrote and edited SZCs and SZEs for the
parts • Performed Gage R&R with QA• Prepared master samples with QA according
to QSW-0159• Communicated with QA and both suppliers to
make sure the project continued to progress
DOCUMENTATION WORK• Found duplicates of procedures
and folders of procedures and worked on reducing
• CAB-1002, CAB-1003, CAB-1004, CAB-1025, CAB-1026, CAB-1027, DL-36, QSW-0159, SZC-TEMPLATE
Figure XX. (8) Water heater and chiller. If the water heater or chiller does not have sufficient
water, it will not run. Confirm water levels with the responsible lab technician.
TASKS
SOCIAL ACTIVITIES CO-CHAIR