subject: operation management guided by: sir siraaj kandhro
TRANSCRIPT
![Page 1: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/1.jpg)
SUBJECT:
OPERATION MANAGEMENT
GUIDED BY: SIR SIRAAJ KANDHRO
TOPIC :CAPACITY AND FACILITIES
![Page 2: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/2.jpg)
TEHNIAT FATIMA SHAH: R/N 74
UROOSA FAROOQUI: R/N 79
AZRA PARVEEN: R/N 20
FARIYAL SABIR : R/N54
PRESENTED BY:
![Page 3: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/3.jpg)
ThemeFacility PlanningCapacity PlanningEfficiency and UtilizationImportance of Capacity DecisionsFacility LayoutFactors affecting layoutTypes of layoutsService Location Strategies
CONTENTS
![Page 4: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/4.jpg)
THEME
Time
Ag
gre
gate
d o
utp
ut
Estimate of current capacity
Forecast demand
Measure aggregate capacity and demand
Identify the alternative capacity plans
Choose the most appropriate capacity plan
![Page 5: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/5.jpg)
CAPACITY: the capacity of an operation is the maximum level of value-added activity over a period of time that the process can achieve under normal operating conditions.
FACILITY: Facilities management involves the management and development of the workplace to integrate people and their work in the operation to achieve the objectives of the organization.
CAPACITY AND FACILITY
![Page 6: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/6.jpg)
HOW MUCH LONG RANGE CAPACITY NEEDEDWHEN MORE CAPACITY IS NEEDEDWHERE FACILITY SHOULD BE LOCATEDHOW FACILITY SHOULD BE ARRANGED
FACILITY PLANING
![Page 7: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/7.jpg)
approach for determining the overall capacity level of capital intensive resources, including facilities,
equipment, and overall labor force size.
Capacity planning
![Page 8: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/8.jpg)
![Page 9: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/9.jpg)
Design capacityMaximum obtainable output
Effective capacity, expected variationsMaximum capacity subject to planned and
expected variations such as maintenance, coffee breaks, scheduling conflicts.
Actual output, unexpected variations and demandRate of output actually achieved--cannot exceed
effective capacity. It is subject to random disruptions: machine break down, absenteeism, material shortages and most importantly the demand.
9
Various Capacities
![Page 10: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/10.jpg)
10
Efficiency and Utilization
Actual outputEfficiency =
Effective capacity
Actual outputUtilization =
Design capacity
![Page 11: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/11.jpg)
Best Operating Level and Size
Alternative 1: Purchase one large facility, requiring one large
initial investment Alternative 2: Add capacity incrementally in smaller
chunks as needed
![Page 12: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/12.jpg)
facilitiesProduct
or services
operations
Human consideration
External forces
process
DETERMINANTS OF EFFECTIVE CAPACITY
![Page 13: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/13.jpg)
Impacts ability to meet future demandsAffects operating costsMajor determinant of initial costsInvolves long-term commitmentAffects competitivenessAffects ease of management
13
Importance of Capacity Decisions
![Page 14: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/14.jpg)
A facility layout is an arrangement of everything needed for production of goods or delivery of services. A facility is an entity that facilitates the performance of any job. It may be a machine tool, a work centre, a manufacturing cell, a machine shop, a department, a warehouse, etc
Facility Layout Definition
![Page 15: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/15.jpg)
material
product
machinery
laborlocation
Factors affecting layout
![Page 16: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/16.jpg)
Related to materialLess material
handling and minimum transportation cost
Less waiting time for in process-inventory
Safe working condition form the point of ventilation ,lighting etc.
Minimum movement of workers
Least chances of accidents.
Proper space for machinery,workers,tools.
Scope of facility layout
Related to work place
![Page 17: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/17.jpg)
Process layout
Product layout
Fixed-positio
n layout
Types of layouts
![Page 18: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/18.jpg)
Car 1
Car 2
Car 3
Process layouts, also known as
functional layouts, group similar
activities together in
departments or work centers
according to the process or
function they perform.
The specialized machines and
equipments are grouped
together one after then other in
order of sequence required in
production process
Process layout:
convyer
![Page 19: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/19.jpg)
Product layouts, better known as assembly lines, arrange activities in a line according to the sequence of operations that need to
be performed to assemble a particular product. Each product or has its own
"line" specifically designed to meet its requirements. The flow of work is orderly
and efficient, moving from one workstation to another down the assembly line until a finished product comes off the end of the
line.
Product layout
![Page 20: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/20.jpg)
Fixed-position layout
Fixed-position
layouts are typical
of projects in
which the product
produced is too
fragile, bulky, or
heavy to move.
Ships, houses, and
aircraft are
examples. In this
layout, the product
remains stationary
for the entire
manufacturing
cycle.
![Page 21: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/21.jpg)
Maximize the volume of business and revenue:Purchasing power of the customer-drawing
area.Service and image compatibility with the
customer-drawing area.Competition in the area.Quality of the competition.Uniqueness of the firm’s and competitor’s
locations. Physical qualities of facilities and neighboring
businesses.Operating policies of the firm.Quality of management.
Service Location Strategies
![Page 22: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/22.jpg)
![Page 23: SUBJECT: OPERATION MANAGEMENT GUIDED BY: SIR SIRAAJ KANDHRO](https://reader035.vdocument.in/reader035/viewer/2022070307/551a87ae550346761a8b539b/html5/thumbnails/23.jpg)