submission bie’s & bdt’s + some proposed new cc’s un/cefact forum, pda supply chain april...

13
Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

Upload: imogen-richards

Post on 17-Dec-2015

215 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

Submission BIE’s & BDT’s+ some proposed new CC’s

UN/CEFACT Forum, PDA Supply Chain

April 2012

Page 2: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX®

ebIX®: European Forum for energy business Information eXchange

European Energy Market: Electricity and Gas Focus on downstream part of the market:

Customer Distribution System Operator (lower voltage grids) Supplier, Metering companies Master data and measured data

Start: mid nineties in Nordic countries as Ediel organization, since 2002 as ebIX® for Europe

Page 3: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX® work

1990’s: Start with Edifact Message Implementtaion Guides (MSCONS, DELFOR, PRODAT, …)

2000-2002: Development of UTILMD and UTILTS UNSM’s

2001: start modeling using UML Around 2005: first draft CC’s 2008-now: next step in modeling

Page 4: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX® modeling since 2008

UML-2 UMM-2 CCTS 3.0 + UPCC 3.0 NDR 3.0 OCL 2.0 Model Driven Architecture paradigm: model in UML +

use of OCL and derive technology dependent elements from UML model

Supported technologies: XML (schema’s based on NDR 3.0) Edifact (UTILMD and UTILTS, yet to be completed) Web services (yet to be developed)

Page 5: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX® model organization

Organized along lines of responsibility: separate modules for different responsibilities

module organization content

UMM-2/UPCC UN/CEFACT Meta model information

Cefact UN/CEFACT CC’s and code & qualifier lists

ebIX® ebIX® CC’s, code lists and additional meta model information

Role model ebIX® , EFET and ENTSO-E

Responsibilities, domains and installations

Business domains Various work groups and organizations

High level <<BusinessArea>>

Page 6: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

Business Requirements

Previous model version used as start for new Business Requirements Specification (BRS)

Business work groups for re-defining BRS “Modeled” in UML Using UMM-2 recommendations for Business

Requirements View Payload for information exchange specified

for synchronous web services Optional additional information for a-

synchronous and “optional” additions

Page 7: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX® BIE’s and BDT’s

Previously: Information clusters acting as draft CC’s in

previous model version as developed from 2005 onwards, have been used as initial guide for clustering new BIE’s

Now: Real clustering based on defining objects and

on normalization; where possible starting from available CC’s

Page 8: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

Messages: header and context

In previous model version use of SBDH version 1

In present UMM-2 model version still intention to use the finalised SBDH version 3.0, but …..

For the time being using own header specification

We have defined an <<ABIE>> for Context to be added to the <<MA>> next to the SBDH in case of a-synchronous message exchange

Page 9: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

Collected Data built from CC

Page 10: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

Present ebIX® header info

Temporary ebIX® header

Context specification as expected to be

required next to ebIX® web service

specification

Page 11: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX® business processes modeled yet

Introduction to ebIX® models Measure Collect Measure for Imbalance Settlement Measure for Labeling Measure for Reconciliation (only BRS, no BIM yet)

Structure Change of Supplier

Page 12: Submission BIE’s & BDT’s + some proposed new CC’s UN/CEFACT Forum, PDA Supply Chain April 2012

ebIX® business processes still to do this year

Measure for Reconciliation (complete BIM) Measure for Billing Measure Determine Switch Read Settle for Reconciliation Structure End of Supply Structure Notify MP master data Structure Change of Metered Data Responsible Structure Change of Balance Responsible Structure End of Metered Data Responsible Structure End of Balance Responsible Structure Change of Customer Structure Change of Meter Structure Notify Meter master data