suborbital and special orbital projects directorate · 2003-07-08 · suborbital and special...

16
SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments Debbie Fairbrother June 30, 2003

Upload: others

Post on 28-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

SUBORBITAL AND SPECIAL ORBITAL PROJECTS

DIRECTORATE

Balloon Working Group

Balloon Program Technology DevelopmentsDebbie Fairbrother

June 30, 2003

Page 2: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

Aerobots&

Airships

Applic

ation

Specif

ic

R&D

Balloons

ApplicationSpecific

R&DTethered Vehicles

ApplicationSpecific

R&D

Common Enabling Technologies &

Tools

Page 3: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 3Balloon Technology, NASA Balloon Working Group

Technology Resources

Balloon Program Office− 3 Technology Mangers with 4th starting mid-July− Maintain WFF Balloon Research and Development Laboratory− Numerous development projects being conducted by PSL and

NASA− University Grants

University of North Texas – MaterialsGeorge Washington University – Structural AnalysisNorth Carolina State University – Fiber Protection

Small Business Innovative Research (SBIR)− 1 Phase I, 2 Phase II’s, negotiating on 2 Phase III’s

Internal GSFC− IR&D and B&P

Page 4: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 4Balloon Technology, NASA Balloon Working Group

Technology Focus Areas

• Materials• Vehicle Design & Development• Structural Analysis• Operations & Support Systems• Performance Modeling• Planetary Balloons

Page 5: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 5Balloon Technology, NASA Balloon Working Group

Balloon Research & Development Laboratory

The Balloon Research & Development Laboratory has evolved into a specialized facility for the testing of thin films. The

flight environment of scientific balloon imposes some unique testing considerations.

Cold Brittleness Test ChamberPermeability Testing Toughness Tester

Page 6: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 6Balloon Technology, NASA Balloon Working Group

The ULDB Technology Developments

New Balloon DesignNew Construction TechniquesNew Coextruded Balloon Film New PBO Load Tendons

Page 7: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 7Balloon Technology, NASA Balloon Working Group

The “Big 60” – A New NASA Balloon

The “Big 60”, a 60 million cubic foot balloon, was designed and built in response to a science need to reach

a higher altitude than obtainable with current NASA standard balloons. The thin co-extruded film used was a

spin-off from the ULDB development.

Flight SpecificationsLaunch Site: Lynn Lake, CAN

Launch Date: 8-26-02

Float Altitude: 160.3 kft (GPS)

Flight Time: 22 hrs, 22 minutes

Suspended Wt: 1546 lbs

Science Wt: 452 lbs

Balloon SpecificationsVolume: 1.69 MCM (59.84 MCF)

Gore Length: 228.6 m (750.14 ft)

# of Gores: 202

Shell: 10 µm (0.4 mil)

Cap: 13 µm x 2 (0.52 mil x 2)

Balloon Wt: 1248.3 kg (2752 lbs)

Page 8: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 8Balloon Technology, NASA Balloon Working Group

Iridium Electronics Package

The Iridium Electronic Package was developed to enableglobal communications to and from a balloon platform

through the Iridium constellation of satellites.

Advantages:Global CoverageLow CostCompact and Light WeightReliable

ULDB Pathfinder Project

90 kg to 30-33.5 km

Page 9: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 9Balloon Technology, NASA Balloon Working Group

Remote Autonomous Instrument Data Acquisition System (RAIDAS)

The Remote Autonomous Instrument Data Acquisition System is an independent “add-on” box for any LDB or

ULDB mission to collect data from a specific sensor.

RAIDAS Spec’s

– Eppley’s Precision Infrared Radiometer (PIR) Pyrgeometer

– Thermistors

– Power

– Data Acquisition & Storage

– GPS Integration in process

Flight 498N – May 26, 2001

Page 10: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 10Balloon Technology, NASA Balloon Working Group

Balloon Trajectory

Rio de Janeiro,Sao Paulo

Johannesburg, Pretoria

Mean Float Path

Alice Springs

Mean Float Path for Alice Springs Launch

Page 11: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 11Balloon Technology, NASA Balloon Working Group

Trajectory Control System

Global AerospaceStratosail TCS

TCS Mounted on Representative Gondola (TIGER) Beneath 20 MCF Balloon

Page 12: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 12Balloon Technology, NASA Balloon Working Group

Ballooning at Mars

A superpressure pumpkin balloon is being developed to satisfy the science need for an aerial platform at Mars.

The aerial deployment and inflation of the balloon while descending on a parachute imposes some unique

challenges to the development effort.

Page 13: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 13Balloon Technology, NASA Balloon Working Group

Flight Testing from Hawaii

Page 14: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

June 2003 Page 14Balloon Technology, NASA Balloon Working Group

Aerial Deployment Video

Page 15: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

CDR

Advanced Solar Power Systems

Modular Ballooncraft Bus PDR Demo

Cryogenic Cooling System

Standard Fine Pointing System

Next Generation Bus

Lightweight Gondola Systems

Solar Independent Power Systems

Power Systems

Systems

Bus

Heavy ULDB Validation (CREAM Mission)

Medium ULDB

Extreme Altitude ULDB

40H MCF Operational

Extreme Altitude Zero-Pressure

Super Heavy Lift Zero-Pressure

Next Generation ULDB

LDB/ULDB Hybrid Class

Airship Evaluation & Demo

Airship Test Flight

Tethered Evaluation

Tethered Platform Demonstration

Zero-Pressure

Hybrid

ULDB

Airships & Tethered

VehiclesSystems

Ballooncraft Systems

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Page 16: SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE · 2003-07-08 · SUBORBITAL AND SPECIAL ORBITAL PROJECTS DIRECTORATE Balloon Working Group Balloon Program Technology Developments

Pumpkin Inflations

Mars

End-to-End Test Flight

Mars Scout 2011 AO

First Possible Mars Balloon Mission

Titan

Venus

Cassini- Huygens Probe Released

Materials Development

Model Atmosphere

Materials Development

Model Atmosphere

Airship Evaluation

StratosailDemo

Propeller Demo

Shock Reduction

Dispersion Reduction

Operational System Flight

Mission Safety Tools

Trajectory Control Systems

Mechanical Systems Enhancements

Demonstration Test Bed

Operational Workstation

Guided Parafoil

Operational and Safety

Support Systems

Planetary Vehicles

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012