substation layout
DESCRIPTION
Details about substation layoutTRANSCRIPT
-
5/28/2018 Substation Layout
1/15
ELECTRICALSUBSTATIONDESIGN1/15
-
5/28/2018 Substation Layout
2/15
GENERAL
Client/Electrical Inspector for perfect party wall betweenHV and LV rooms.
Philosophy of distribution of equipments controlled fromeach substation discussed with clients.
Area of distribution and load considered for deciding thenumber of substations.
Substation not lie with in classified zone.
Location of substation with respect to equipmenterection, maneuvering, space for entry and exit of
cables on trays. Communicate to piping on number of substation and
space requirement.
Substation have cellar/trench has to be discussed withclients and civil.
2/15
-
5/28/2018 Substation Layout
3/15
SUBSTATION SIZING
List of the Equipments to be housed in the substation
should be prepared.
Allocated space for expansion, surprise panels.
Record of all work sheets for sizing of boards, etcAllow space in vertical height of floor for pressurisation
ducts.
Discuss with instrument group, mechanical group for
space required by them for their panels, pressurisationsystem, etc.
Preliminary layout for arriving at size of substation and
prefer to keep 1200 rear, 2000 for LV front and 2500 for
HV / MV front clearances.3/15
-
5/28/2018 Substation Layout
4/15
7) Space should be allotted for :-
Electrical engineers office.
Spares room / store room.
Convenience requirements like toilet.
Blower room (when substation is pressurised).
8) Clients approval is necessary before releasing for
civil design.
4/15
Contn..
-
5/28/2018 Substation Layout
5/15
CELLAR
Bottom of beam of cellar at minimum of 2100 above
FFL of cellar.
Clients concurrence to keep bottom most tray at
900 above cellar FFL.
5/15
-
5/28/2018 Substation Layout
6/15
CIVIL /ARCHITECTURAL
REQUIREMENTS
Detailed drawing of Door location,
Window locations
Ventilators fixed or Z
Identified Fireproof Walls Rolling shutters. Particular attention for height of rolling
shutters.
6/15
-
5/28/2018 Substation Layout
7/15
CIVIL /ARCHITECTURAL
REQUIREMENTS
Location of stairs as per requirements.
Indication of loading bay giving particular attention
to width of bay, open to sky.
Indication of opening in wall for. Erection of equipment
Cable tray entry / exit
Bus ducts
-
5/28/2018 Substation Layout
8/15
CIVIL /ARCHITECTURAL
REQUIREMENTS
Indication of the panel cut-outs with nosing channels forsubstation floor.
Discussion with civil for expansion joints in case of longsubstation
Expansion joints is shifted it beyond the largest board layout.
Marked column / location with respect to requirements
If specific columns is avoided than mention it.
If cross beams below panel cut-out is not allowed than
highlighted it to civil. If lintel beam level / is fixed ,give a hold and inform civil.
Windows and ventilators and tie beams are not provided intransformer bay to avoid bus duct clash with windows,ventilators. 8/15
-
5/28/2018 Substation Layout
9/15
CIVIL /ARCHITECTURAL
REQUIREMENTS
Study tray routing plan in the cellar to give the IP, sleeve
requirements to the civil group
Allocation of distance between pipe rack and substation
tray entries for manoeuvring the cable tray bends, fall of
trays and again a horizontal bend. Tray route entering substation and mark columns which
may have to be extended for supporting cable tray
structures.
location of columns of cable supporting structure at thedrop / rise outside the Substation and inform civil
Requirement of a structural stub columns in cellar for
slab / cable tray support.9/15
-
5/28/2018 Substation Layout
10/15
CIVIL /ARCHITECTURAL
REQUIREMENTS
Indication of sleeves for beam and floor marked.
ARCH. Drawing must have:-
Insert Plate of ceiling for bus duct support Insert Plate on ceiling for lighting tray support
Sleeves in beam, put a note that the sleeves shall also
be provided on any secondary beams
Floor sleeves for lighting Cable
Slots along the wall / array of sleeves along wall for any
future surprise panels
10/1
5
-
5/28/2018 Substation Layout
11/15
TRANSFORMER YARD
Points applicable when transformer yard is part ofsubstation building:-
Floor finish shall be Pcc(Sheet) with gravel or onlygravel.
Space provision for NGR / cooling control Cabinets. Decide transformer bay size based on transformer size
and put limitation on transformer dimensions.
Prepare transformer foundation drawing based onVendor GA drawing
Typical foundation drawings for previous projects to bereferred & provide foundation for bus duct support.
Adequate number of sleeves in the wall betweentransformer yard and substation for HV power and LVcontrol cables.
-
5/28/2018 Substation Layout
12/15
TRANSFORMER YARD
Trenches in transformer yard for HV Cable andsufficient space for bending and terminating of cablebelow HV Cable box.
Soak pit / catch pit, interconnection of catch pit and soakpit, as applicable with proper slopes.
Roof from transformer yard for dusty plants inconsultation with Client / process licensor.
Isolator arrangement consider in transformer yardwhere essential .
Pipe rack in front of transformer bay, raise the pipe Civil to match pipe rack
Columns running near sub-station to be in line with Sub-station columns. 12/1
5
-
5/28/2018 Substation Layout
13/15
SUBSTATION VENTILATION
Pressurisation of substation and air-conditioning of
certain rooms where UPS, VSD, etc. are located
and inform Civil.
Mechanical and civil for ventilation requirement of
the cellar and eq. area.
Clarification in whose scope exhaust fan will be
included.
Specification of exhaust fan with louvers.
13/1
5
-
5/28/2018 Substation Layout
14/15
REVIEW OF DRAWINGS
Design review meeting with mechanical, civil,
piping, instrument for joint discussion and sign on
check print of substation drawing.
Highlight important points as MOM.
Review all Arch. Drawing & RCC / Structural
Drawings to check to meet as per requirement.
14/1
5
-
5/28/2018 Substation Layout
15/15
THANK YOU
15/1
5