    GENERAL

    Client/Electrical Inspector for perfect party wall betweenHV and LV rooms.

    Philosophy of distribution of equipments controlled fromeach substation discussed with clients.

    Area of distribution and load considered for deciding thenumber of substations.

    Substation not lie with in classified zone.

    Location of substation with respect to equipmenterection, maneuvering, space for entry and exit of

    cables on trays. Communicate to piping on number of substation and

    space requirement.

    Substation have cellar/trench has to be discussed withclients and civil.

    2/15

  • 5/28/2018 Substation Layout

    3/15

    SUBSTATION SIZING

    List of the Equipments to be housed in the substation

    should be prepared.

    Allocated space for expansion, surprise panels.

    Record of all work sheets for sizing of boards, etcAllow space in vertical height of floor for pressurisation

    ducts.

    Discuss with instrument group, mechanical group for

    space required by them for their panels, pressurisationsystem, etc.

    Preliminary layout for arriving at size of substation and

    prefer to keep 1200 rear, 2000 for LV front and 2500 for

    HV / MV front clearances.3/15

  • 5/28/2018 Substation Layout

    4/15

    7) Space should be allotted for :-

    Electrical engineers office.

    Spares room / store room.

    Convenience requirements like toilet.

    Blower room (when substation is pressurised).

    8) Clients approval is necessary before releasing for

    civil design.

    4/15

    Contn..

  • 5/28/2018 Substation Layout

    5/15

    CELLAR

    Bottom of beam of cellar at minimum of 2100 above

    FFL of cellar.

    Clients concurrence to keep bottom most tray at

    900 above cellar FFL.

    5/15

  • 5/28/2018 Substation Layout

    6/15

    CIVIL /ARCHITECTURAL

    REQUIREMENTS

    Detailed drawing of Door location,

    Window locations

    Ventilators fixed or Z

    Identified Fireproof Walls Rolling shutters. Particular attention for height of rolling

    shutters.

    6/15

  • 5/28/2018 Substation Layout

    7/15

    CIVIL /ARCHITECTURAL

    REQUIREMENTS

    Location of stairs as per requirements.

    Indication of loading bay giving particular attention

    to width of bay, open to sky.

    Indication of opening in wall for. Erection of equipment

    Cable tray entry / exit

    Bus ducts

  • 5/28/2018 Substation Layout

    8/15

    CIVIL /ARCHITECTURAL

    REQUIREMENTS

    Indication of the panel cut-outs with nosing channels forsubstation floor.

    Discussion with civil for expansion joints in case of longsubstation

    Expansion joints is shifted it beyond the largest board layout.

    Marked column / location with respect to requirements

    If specific columns is avoided than mention it.

    If cross beams below panel cut-out is not allowed than

    highlighted it to civil. If lintel beam level / is fixed ,give a hold and inform civil.

    Windows and ventilators and tie beams are not provided intransformer bay to avoid bus duct clash with windows,ventilators. 8/15

  • 5/28/2018 Substation Layout

    9/15

    CIVIL /ARCHITECTURAL

    REQUIREMENTS

    Study tray routing plan in the cellar to give the IP, sleeve

    requirements to the civil group

    Allocation of distance between pipe rack and substation

    tray entries for manoeuvring the cable tray bends, fall of

    trays and again a horizontal bend. Tray route entering substation and mark columns which

    may have to be extended for supporting cable tray

    structures.

    location of columns of cable supporting structure at thedrop / rise outside the Substation and inform civil

    Requirement of a structural stub columns in cellar for

    slab / cable tray support.9/15

  • 5/28/2018 Substation Layout

    10/15

    CIVIL /ARCHITECTURAL

    REQUIREMENTS

    Indication of sleeves for beam and floor marked.

    ARCH. Drawing must have:-

    Insert Plate of ceiling for bus duct support Insert Plate on ceiling for lighting tray support

    Sleeves in beam, put a note that the sleeves shall also

    be provided on any secondary beams

    Floor sleeves for lighting Cable

    Slots along the wall / array of sleeves along wall for any

    future surprise panels

    10/1

    5

  • 5/28/2018 Substation Layout

    11/15

    TRANSFORMER YARD

    Points applicable when transformer yard is part ofsubstation building:-

    Floor finish shall be Pcc(Sheet) with gravel or onlygravel.

    Space provision for NGR / cooling control Cabinets. Decide transformer bay size based on transformer size

    and put limitation on transformer dimensions.

    Prepare transformer foundation drawing based onVendor GA drawing

    Typical foundation drawings for previous projects to bereferred & provide foundation for bus duct support.

    Adequate number of sleeves in the wall betweentransformer yard and substation for HV power and LVcontrol cables.

  • 5/28/2018 Substation Layout

    12/15

    TRANSFORMER YARD

    Trenches in transformer yard for HV Cable andsufficient space for bending and terminating of cablebelow HV Cable box.

    Soak pit / catch pit, interconnection of catch pit and soakpit, as applicable with proper slopes.

    Roof from transformer yard for dusty plants inconsultation with Client / process licensor.

    Isolator arrangement consider in transformer yardwhere essential .

    Pipe rack in front of transformer bay, raise the pipe Civil to match pipe rack

    Columns running near sub-station to be in line with Sub-station columns. 12/1

    5

  • 5/28/2018 Substation Layout

    13/15

    SUBSTATION VENTILATION

    Pressurisation of substation and air-conditioning of

    certain rooms where UPS, VSD, etc. are located

    and inform Civil.

    Mechanical and civil for ventilation requirement of

    the cellar and eq. area.

    Clarification in whose scope exhaust fan will be

    included.

    Specification of exhaust fan with louvers.

    13/1

    5

  • 5/28/2018 Substation Layout

    14/15

    REVIEW OF DRAWINGS

    Design review meeting with mechanical, civil,

    piping, instrument for joint discussion and sign on

    check print of substation drawing.

    Highlight important points as MOM.

    Review all Arch. Drawing & RCC / Structural

    Drawings to check to meet as per requirement.