substation retrofit project

2

Upload: carole-lucido

Post on 26-Mar-2016

228 views

Category:

Documents


0 download

DESCRIPTION

This article explains the benefits and the process of retrofitting a 4160 volt substation with nine Magna-Blast circuit breakers. It was written by Carole Lucido and published in the Electro-Gram, a company newsletter for Electro-Test, Inc. in 1993. Electro-Test, Inc. was purchased by Emerson Electric in 2000.

TRANSCRIPT

Page 1: Substation Retrofit Project
Page 2: Substation Retrofit Project