![Page 1: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/1.jpg)
Substation Workshop
7th February 2018
1
![Page 2: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/2.jpg)
Agenda
• Welcome and Introductions – Antony White• Substation Design Overview – Andy Moore
Question & Answer Session
Break
• 1500kVA Transformers – James Devriendt & Andy MooreQuestion & Answer Session
• Close / Feedback – Antony White
Lunch 2
![Page 3: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/3.jpg)
Andy MooreLead Design Engineer, LPN
Substation Design Overview
3
![Page 4: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/4.jpg)
UKPN Substation Design
• Ideal Scenario• Drivers behind the current policy• Substation Locations• Key Elements• Requirements for a basement location• UKPN’s preferred basement solution
4Applicable to all areas but predominately an LPN Area guidance
![Page 5: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/5.jpg)
Ideal Scenario
Since 2011; UKPN’s stance regarding ‘new build’ developments has been: “The normal location for a substation, whether in a separate building or integral to a customer owned building, is at ground level”.
This is a similar stance to all other DNOs.
5
![Page 6: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/6.jpg)
Ground Level Location ~ Key Drivers
• 24hr unrestricted access~ OFGEM ‘KPI’: Customer Minutes Lost (CML).
• Manual Handling~ ‘Design-out’ MH of heavy plant wherever possible.
• Working at Height~ ‘Design-out’ WAH wherever possible (e.g. cable entry).
CDM – Designing out risk – installation, maintenance and de-commissioning
6
![Page 7: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/7.jpg)
Substation Location:GRP Enclosure
7
EDS 07-3102_01 Unit or Padmount Substation in GRP Enclosure
![Page 8: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/8.jpg)
Substation Location:Freestanding Brick
8
EDS 07-3102_15 Freestanding Brick-Built Substation for a Transformer up to 1000kVA (Earth Ring)
![Page 9: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/9.jpg)
Substation Location:Ground level Integral
9
EDS 07-3102_20 Integral Substation for a Single Transformer up to 1000kVA
![Page 10: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/10.jpg)
UKPN Substation Design
• Key Elements:• Plant Layout• Ventilation• Cable entry• Personnel access• Plant access
10
![Page 11: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/11.jpg)
UKPN Substation Design
Current requirements are detailed in the UKPN Engineering Design Standard:
‘EDS 07-3102 ~ Secondary Substation Civil Design’ & associated suite of drawings.
Available on the ‘G81’ section of the UKPN website.
11
![Page 12: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/12.jpg)
Substation Location:Basement
12
EDS 07-3102_30 Basement Substation for a Single Transformer up to 1000kVA
![Page 13: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/13.jpg)
When considering basement locations:• Maximum one level below ground floor• 24hr unrestricted UKPN staff access
– Without recourse to a third party (e.g. via Security Guard).– Dedicated ‘normal’ stairway (e.g. no ‘companionway’ ladders).– Dual-locking arrangements (if necessary).
• ‘Direct’ UKPN Plant Access– 24hr unrestricted.– Manual Handling kept to a minimum
• Natural Ventilation Scheme– Open to ‘free air’.– Passive ‘Stack’ principle employed.– Maintenance free. 13
![Page 14: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/14.jpg)
24hr Unrestricted Personnel Access
14
UKPN dedicated stairway >
< Access without 3rd party involvement
![Page 15: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/15.jpg)
Direct Plant Access
15
< Drop zone from above close to substation
< Minimising manual handling
Plant installation via running beam & hatch;
minimising manual handling >
Plant installation via running beam >
& Plant access hatch >
![Page 16: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/16.jpg)
UKPN’s preferred basement solution: The ‘Lightwell’ substation
< Personnel access without 3rd party involvement
Via dedicated stairway >
16
![Page 17: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/17.jpg)
‘Lightwell’ substation cont’d:
17
< Direct plant access via HIAB crane
Direct plant access with minimal manual handling >
Open to ‘free air’ ^Passive ‘stack’ principlesMaintenance free
![Page 18: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/18.jpg)
When things go wrong - Simple
18
![Page 19: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/19.jpg)
When things go wrong - Complex
19
![Page 20: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/20.jpg)
Substation Design Summary:
Although we will always look for a ground level location in the first instance; UKPN will consider substations located in a basement.
A number of aspects need to be considered if we are to meet our own requirements in terms of Health & Safety and network security.
Each project requiring a substation will be assessed on its individual circumstances; providing the mandatory elements can be achieved.
20
![Page 21: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/21.jpg)
Answering your questions
21
![Page 22: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/22.jpg)
1500kVA Transformers
Connections Manager, SPN
22
James Devriendt
& Andy MooreLead Design Engineer, LPN
![Page 23: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/23.jpg)
Context• UK Power Networks charged with stimulating and supporting a
competitive market
• Market share has reduced significantly in majority of relevant market sectors
• Service delivery has demonstrably improved in recent years
• Appetite for more competitive offering is increasing
• Customers want UK Power Networks to be more flexible in offering
2323
![Page 24: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/24.jpg)
Transformers
• 11kV transformer specification has typically been limited to 1MVA– Reduced unit diversity leads to lower unit cost and simpler
maintenance schedule
• Automatic loss of Connections market share to IDNOs, particularly in high land-value / physically constrained locations
• We have reviewed specification options with a number of customers to determine most useful offering
• 1500kVA unit with 2500A LV circuit breakers sourced24
24
![Page 25: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/25.jpg)
Current Status
• Asset Management have reviewed options
• Standard Drawings drafted• Engineering Bulletin issued for
comment (internally)• Relevant standards in the
process of being updated on G81
25
![Page 26: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/26.jpg)
Considerations
• Increased floor loading (compared to 1MVA)• Increased ventilation requirements (compared 1MVA)• ACB must be close coupled to the transformer (e.g. not wall
mounted)• 1m deep cable trenches required (due to close coupled ACB) and
bending radius requirements for 630mm singles• Customer installed back up generation would be strongly
recommended
26
![Page 27: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/27.jpg)
Uses
• Single connected customers (only) includes BNO, TBS and IDNO
27
Outstanding ‘constraints’
• Basement locations currently not approved• GRP locations currently not approved• Refurbishments / upgrades out of scope
![Page 28: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/28.jpg)
Current drawing
28
![Page 29: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/29.jpg)
Answering your questions
29
![Page 30: Substation Workshop Slides 7th Feb 2018 20180206 · UKPN Substation Design • Ideal Scenario • Drivers behind the current policy • Substation Locations • Key Elements • Requirements](https://reader034.vdocument.in/reader034/viewer/2022042121/5e9c07e82dac755bc1136a2d/html5/thumbnails/30.jpg)
Feedback & Thank you!