![Page 1: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/1.jpg)
Sucessful PV Application in Indonesia
Case Study
Chayun Budiono
PT Gerbang Multindo Nusantara
![Page 2: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/2.jpg)
Renewable energy systems for every need
Drinking Water TelecommuniactionNavigation Aid
BioenergyHybrid System Microhydro Solar Process Heat
Solar Home Systems
GMN is currently focusing on off grid market…
![Page 3: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/3.jpg)
Why off-grid….?
Est. un-electrified rural households:
11 Million
Approx: 2.5 GW
Rural 60%
Urban 40%
Electrification Ratio
64%
Total households (December 2009) :
58 Million
If only 5% eligible for PV
10 MWp PV market is generated every year
![Page 4: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/4.jpg)
0
2
4
6
8
10
12
14
16
18
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,5001979
1981
1983
1985
1987
1989
1991
1993
1995
1997
1999
2001
2003
2005
2007
2009
Co
mm
ula
tive
Ins
talle
d C
ap
acit
y (M
Wp
)
Ye
arl
y P
V S
ys
tem
In
sta
lle
d (k
Wp
/a)
Year
PV Market Development
- How much is the system costs and structure?
- How many installations are operating to date?
- What are the typical failures?
- Any measures for improvements?
Questions:
![Page 5: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/5.jpg)
Resistances for PV Utilization
• High up-front cost
But, there are many competitive applications for PV system in
Indonesia if correctly assessed.
• Dominated by Import Components
PV modules or cells are imported, but it is no longer
dominating the life-cycle system cost
• Significant project failures
- Project is generally designed based on “budget” and “one-
shoot” approaches;
- A thorough assessment during project planing often ignored;
- Missing soft components to meet sustainable utilization:
community, institution, after market services, etc.
![Page 6: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/6.jpg)
Off-grid PV Cost & Profiles
System failures
Life-cycle Cost
PV-D Hybrid
On-grid Cost:
Germany: 4 USD/WpThailand : 3 USD/Wp
![Page 7: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/7.jpg)
RES vs DGS Competition
0
500
1000
1500
2000
2500
Subsidized Oil Market Oil Price Level 1 RES Level 2 RES Level 3 RES
Ge
ne
rati
ng
Co
st
(ID
R/k
Wh
)
Competitivenes Category of Generating Plant
Financial Comparison Economic Comparison
Diesel Generating Set (DGS) Renewable Energy System (RES)
Competition at non-subsidized oil price
Competition at subsidized oil price
Mini- and
micro-hydro
- Biomass
- Small package and remote PV
- Small wind
- Large and Urban PV
MV Jawa-Bali Grid
![Page 8: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/8.jpg)
Energy Market Failures
Relying on fossil sources, while ignoring many externalities:
• Resource scarcity and opportunity cost
• Politically strategic (e.g. oil embargo 1973)
• Greenhouse gas emissions and acid rain
• Avoided cost that inherent to fuel transport and losses
• Avoided cost due to transmission and distribution loss of
electricity
• Price distortion due to fossil fuel and electricity subsidy
Let’s go green…
![Page 9: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/9.jpg)
TELECOMMUNICATION APPLICATIONS
Case Study
![Page 10: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/10.jpg)
Design Chart of PV-Diesel Hybrid System
Current system size ~ 12 kWp
![Page 11: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/11.jpg)
Typical Performace BTS PV-D Hybrid
Current system size ~ 12 kWp
![Page 12: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/12.jpg)
Base Transceiver Station Installations
Tongkeng Island 4.8 kWpMaratua Island 12 kWp
![Page 13: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/13.jpg)
Stand-aloneTelecom Repeater Station
![Page 14: Sucessful PV Application in Indonesia Case Study - AHKindonesien.ahk.de/fileadmin/ahk_indonesien/PAST_EVENTS/RENERGY… · Sucessful PV Application in Indonesia Case Study ... Electrification](https://reader030.vdocument.in/reader030/viewer/2022021515/5b16f2027f8b9a79458b5f75/html5/thumbnails/14.jpg)
Thank youPT Gerbang Multindo Nusantara
Jl. Sapta Taruna Raya 16, Jakarta 12310
Tel. 021.7651824 ; Fax. 021.75912023
Email: [email protected]