. PLANT TRAINING REPORT
POWER HOUSE
Power house is one where electric power is produced using fuel. The fuels used
are coal and bagasse. Fuel is fired in a closed vessel called as boiler & stem is producedfrom water in it. This steam is utilized to run the turbine & electric power is produced
from alternator coupled to it.
The whole power plant can be divided in to two sections.
Boiler Section
Turbine Section
There are different systems in power plant as-
Fuel handling system for coal & bagasse.
ater!Steam flow system.
"ir flow system.
#as flow system.
"sh handling system.
$ooling system %$ooling tower.
'ubrication oil system for turbine
(ibration indication system in turbine.
P'$!)$S!S$")" System.
*
-
8/10/2019 Sugar and Power Plant Process
2/53
. PLANT TRAINING REPORT
BOILER
+umber of boilers-,
st B'/0 $"P"$T12 *33 tph
P0/SS40/2567g!cm,
T/8P/0"T40/2596$
8":/2 Thermodyne
T1P/2 Top supported; Bidrum; Balanced draft; +atural circulation with pulsating
grate
nd B'/0
$"P"$T12 *7g!cm,
T/8P/0"T40/2596$
8":/2 8itsui Babcoc7 ilco?.
T1P/2 Top supported; Bidrum; Balanced draft; +atural circulation with traveling
grate.
TURBINE
st T40B+/
$"P"$T12*68
0P82>3630P8
ST"#/2=
T1P/2 Bac7 pressure with bleed steam.
8":/2 Triveni
nd T40B+/
$"P"$T12,
-
8/10/2019 Sugar and Power Plant Process
3/53
. PLANT TRAINING REPORT
T1P/2 $ondensate cum st & nd /?traction.
8":/2 Sini +ippon
CYCLES
"T/0!ST/"8 $1$'/
-
8/10/2019 Sugar and Power Plant Process
4/53
. PLANT TRAINING REPORT
#"S $1$'/
5
-
8/10/2019 Sugar and Power Plant Process
5/53
. PLANT TRAINING REPORT
B"#"SS/ $1$'/
6
-
8/10/2019 Sugar and Power Plant Process
6/53
. PLANT TRAINING REPORT
$"' $1$'/
=
-
8/10/2019 Sugar and Power Plant Process
7/53
. PLANT TRAINING REPORT
"0 $1$'/
>
-
8/10/2019 Sugar and Power Plant Process
8/53
. PLANT TRAINING REPORT
BOILER FITTINGS, MOUNTINGS & ACCESSORIES.
FTT+#S2 These parts form boiler body & cannot be separated.
/?2 Steam drum; 8ud drum; Ban7 zone; )own comer tubes; Front header;
0are header; Side header; Boiler tubes; Top headers; 0oof tubes; Screen tubes; 0iser
tubes.
84+T+#S2 These parts are mounted on boiler body & can
separated from it.
/?2 Safety valves; #auge glass; Pressure gauges; Temperature gauges;
Pressure transmitters; Temperature transmitters; Soot blowers; Blow off coc7; Stem stop
valve; non return valve; "ttemperator control valve.
"$$/SS0/S2 These parts are used for the proper functioning
of the boiler. These are the parts apart from boiler body.
/?2 Transfer pump; Feed tan7; Feed pump; )eairator tan7; /conomizer;
Super heater; "ir pre-heater; /SP; F) fan; S" fan; ) fan.
9
-
8/10/2019 Sugar and Power Plant Process
9/53
. PLANT TRAINING REPORT
('(/S & 84+T+#S
SL. NO. ITEM DISCRIPTIONTYPE/MODE OF
OPERATION
* ,- )rum safety valve Spring loaded
, Superheater safety valve Spring loaded
< Feed water control valve Pneumatic operated
5 Feed water isolating valve 8otorized
6 Feed water chec7 valve +0(
= ,-+os of drum safety valve Bi-color
> /lectronic level indicator $onductive type
9 Start up vent valve 8otorized
@8ain steam valve with
integrated by-pass8otorized
*3 "ttemperator control valve Pneumatic operated
**"ttemperator isolating &
by-pass8anual
*,"ll necessary vent; drain &
isolated valve8anual
@
-
8/10/2019 Sugar and Power Plant Process
10/53
. PLANT TRAINING REPORT
TECHNICAL SPECIFICATIONS & MAKE OF
BOILER ACCESSORIES.
T0"+SF/0 P48P2
T1P/ 2$entrifugal pump%5 +os.
'$"T+2"fter 0 tan7.
8":/2 :SB pumps.
*,3m
8T02 *9.6:; *5=
8":/2 Sulzer.
=6m30P8; @97g!cm,
8T02 ,33:; ,@960P8.
8":/2 Siemese
*3
-
8/10/2019 Sugar and Power Plant Process
11/53
. PLANT TRAINING REPORT
AP )S+# P48P2 %For *33tph boilerT1P/ 2Piston pump%, +os.
8":/2 8etachem dosing pump.
S" F"+2 ,+os %For *33tph boiler
8":/2
8T02
8":/2Siemense.
**
-
8/10/2019 Sugar and Power Plant Process
12/53
. PLANT TRAINING REPORT
) F"+2 ,+os %For *33tph boiler8":/2
8T02
8":/2Siemense
B"#"S )048 F//)/02 * T0PF %> +os. %For *33tph boiler
8T02 >.6AP; *5530P8.
8":/2 Siemense.
#/"0 B2
#B002 5,>2*
B"#"S F//)/02 * T0PF %> +os. %For *33tph boiler
T1P/2 Screw type
8T02 :; *5530P8.
8":/2 Siemense.
#/"0 B2
#B002 ,=.6,2*
8":/2 Top gear transmission ltd.
P4'S"T+# #0"T/2 %For *
-
8/10/2019 Sugar and Power Plant Process
13/53
. PLANT TRAINING REPORT
0T"01 #0"T/ %For *6AP; *5530P8 %,+os..
8":/2 Bharat biClee ltd.
#/"0 B2
#B002 ,3332*
8":/2 "''01).
B"#"S )048 F//)/02 , T0PF %6 +os. %For *
-
8/10/2019 Sugar and Power Plant Process
14/53
. PLANT TRAINING REPORT
POWER PLANT COOLING TOWER PUMPS & MOTORS.
$+)/+S0 P48P.
T1P/2 $entrifugal pump%5 +os.
8":/2 8ather & platt pump ltd.
*933m
8T02 ,*6AP; *5530P8.
8":/2 $romton #reaves.
"4''"01 $'+# P48P.
T1P/2 $entrifugal pump%, +os.
8":/2 8ather & platt pump ltd.
=33m
8T02 ,*6AP; *5530P8.
8":/2 $romton #reaves.
*5
-
8/10/2019 Sugar and Power Plant Process
15/53
. PLANT TRAINING REPORT
PRDS (Pressure Reu!"#$ Desu%ere'"#$ se')*
Se!"+#.
From this valve steam pressure & temperature can be maintained at desired value.
+umber of P0)S- 5
st2- =>7g!cm, to 567g!cm,%For *6 8 turbine
nd2- 567g!cm, to >7g!cm,%For distillary
rd2- 567g!cm, to *.67g!cm,%For process
(th2- 567g!cm, to >7g!cm,%For distillary
*6
-
8/10/2019 Sugar and Power Plant Process
16/53
. PLANT TRAINING REPORT
BOILER OPERATION
ST"0T+# F B'/0
-pen all the vent valves.
-8aintain steam drum level 63E
-8aintain feed tan7 level @3E.
-Start the sto7er firing.
-Start ); F); S" Fan.
-Slowly increase the firing.
-"fter reaching the design pressure close all the vent valves.
STPP+# F B'/0
*=
-
8/10/2019 Sugar and Power Plant Process
17/53
-
8/10/2019 Sugar and Power Plant Process
18/53
. PLANT TRAINING REPORT
RO PLANT
Plant capacityG63m
*9
-
8/10/2019 Sugar and Power Plant Process
19/53
. PLANT TRAINING REPORT
B'/0 "T/0 P"0"8/T/0S T B/ 8"+T"+/)
PARTICULARS FEED BOILER CONDENSATE
*@
-
8/10/2019 Sugar and Power Plant Process
20/53
. PLANT TRAINING REPORT
(PPM* WATER
WATER
WATER
PH [email protected] @.6-*3.6 @[email protected]
T+' 'r#ess 3 3 3.3,
TDS ,.6 ,63 -
C '-'"#" - >3 -P '-'"#" - ,3 -
C++ur $lear $lear $lear
Ir+# 3.3, - 3.3,-3.36
O" C+#e# 3 3 3
C+r"e 3 3.6 3.3,
P+s%'e -
-
8/10/2019 Sugar and Power Plant Process
21/53
. PLANT TRAINING REPORT
uice from the mill house is pumped to boiling section where the sucrose contains is
e?tracted by different processes on it.
There are two processes carried out here
. /?traction of sugar from Cuice.
. /?traction of sugar from raw sugar. %0efinery Section
The whole boiling house can be divided as2-
$larification
/vaporation
Pan boiling
$entrifugal
Sugar drying
#odown
PurityG Pole!Bri?
CLARIFICATION
,*
-
8/10/2019 Sugar and Power Plant Process
22/53
. PLANT TRAINING REPORT
E0APORATION
,,
-
8/10/2019 Sugar and Power Plant Process
23/53
-
8/10/2019 Sugar and Power Plant Process
24/53
. PLANT TRAINING REPORT
Syrup from evaporation section is boiled in pan section. The syrup is made to flow
through the pipes & steam is supplied from the shell side. Sugar powder is added as seed.
(acuum is created in pan by condensing the vapor formed in condenser.
There are two types of pans.Batch pan
$ontinuous pan.
B"T$A P"+
+umber of pan2 *,
hite sugar pan2 < %8S material
$apacity2 93tons!hr
0efinery sugar pan2 @ %SS material
$apacity2 >3tons!hr
+umber of tubes2 *,,3
nner dia2 @9mm
uter dia2 *3,mm
'ength2 **33mm
(acuum2 9H
$+T+44S P"+2
+umber of pan2 5 %";B;$;) %* stand by
" & ) $apacity2 *36tons!hr
B & $ $apacity2 96tons!hr
+umber of compartments2*,
nner dia2 @9mmuter dia2 *3,mm
'ength2 *
-
8/10/2019 Sugar and Power Plant Process
25/53
. PLANT TRAINING REPORT
(/0(/ F 8"T/0"' F'2
,6
-
8/10/2019 Sugar and Power Plant Process
26/53
. PLANT TRAINING REPORT
CENTRIFUGALS
,=
-
8/10/2019 Sugar and Power Plant Process
27/53
. PLANT TRAINING REPORT
This is the section where sugar is cured%0ecovered from the mother liIuor%masecute.
The masecute is charged in centrifugal & sugar is separated from heavy & light molasses
due to centrifugal action.
The sugar is separated in bas7et having two meshes.or7ing screen
Supporting screen.
$/+T0F4#"'S 4S/) F0 )FF/0/+T 8"SS/$4T/S.
" centrifugal- = +os.
B centrifugal- 6 +os. Thyssen :rupp made
$ centrifugal- , +os.
0* centrifugal- < +os.
0, centrifugal- , +os. Five$ail-:$P made
0< centrifugal- , +os.
$apacity2 *>63:g!cycle
+umber of cycles2 *9-,3
0P82 **33
,>
-
8/10/2019 Sugar and Power Plant Process
28/53
. PLANT TRAINING REPORT
0:+# F F(/$"'-:$P $/+T0F4#"' %B"T$A
T1P/
P'4#A 4+T %=30P8 )40"T+*. Aood lifting up.
,. Scraper in %Plough rotation
.8T$ %8asecute Thic7ness $ontroller liver n- +
9. 'ower valve is open.
@. 4pper valve open%8asecute charging start
*3. "fter masecute charging 8T$ cutoff.
**. 4pper valve closed.
*,. $hute wash-Five seconds %SA *33$-*63$
*
-
8/10/2019 Sugar and Power Plant Process
29/53
. PLANT TRAINING REPORT
SUGAR DRYING AND GODOWN.
Sugar from the centrifugal section is brought to dryer through screw conveyor.
)01/02
+o of )ryers2 33 933 =33
6 8..$. SS-
-
8/10/2019 Sugar and Power Plant Process
50/53
. PLANT TRAINING REPORT
SL.
NO
.
DISCRIP;
TION
COL.
ANALYSER/
DEGASSER
COL.
PRE;
RECTIFIER
COL.
E.D.
COL.
RECTIFI
;ER
COL.
POLISHI
;NG
COL.
RECO0A
;RY/ F.O
COL.
5)ia.
%mm
,*33!*533 ,*33 *633 *>33 **63 933
6 8..$. SS-
-
8/10/2019 Sugar and Power Plant Process
51/53
. PLANT TRAINING REPORT
SP/+T "SA $'48+S
6*
-
8/10/2019 Sugar and Power Plant Process
52/53
. PLANT TRAINING REPORT
SL.
NO
.
DISCRIPTION
COL.
CAL;
I
CAL;
II
CAL;
III
P;
COND
S;
COND
.
0;
SEP
BAL.
TANK
5)ia.
%mm
*6>3 *6>3 *6>3 *6*6 693 *533 ,*33
6.'ength
%mm*=*@< *=*@< *=*@< =333 =333 5>*6
-
8/10/2019 Sugar and Power Plant Process
53/53
. PLANT TRAINING REPORT
DR
UM
* )ia. %mm ,533 -- -- --
, Aeight %mm *,633 -- -- --
< +o. of trays