Page 1: Sul de Gato do Mato · 2020. 11. 16.  · Ecopetrol / 20% Total SGM PSC2 50% Shell / 30% ... COVID) into early 2021 FPSO Exploration and Appraisal GDM 3 delivered beyond best in class,

Sul de Gato do Mato

Gary Knaresborough

Gerente Geral de Desenvolvimento de Ativos da SHELL e Representante do Comitê Operacional de Sul de Gato do Mato

SHELL BRASIL PETRÓLEO Ltda.

Page 2: Sul de Gato do Mato · 2020. 11. 16.  · Ecopetrol / 20% Total SGM PSC2 50% Shell / 30% ... COVID) into early 2021 FPSO Exploration and Appraisal GDM 3 delivered beyond best in class,

Gato do Mato……not the typical pre-salt asset

2

Covers blocks BM-S-54 and Sul de Gato do Mato, located 200km offshore, 20 km off Iracema,

at ~2000m water depth, in the Santos Basin.

Pre-Salt discovery (2010) in BMS-54, Sul de Gato do Mato acquired in PSC2 (2017): same

partners as BMS-54 with Ecopetrol joining in 2020

Gas/condensate (41°API, GOR of 2500-4000), low contaminants (<1% CO2/N2, <30ppm H2S)

Condensate development first with option for gas export later

BASE OF SALT

SURFACE

C.I. 100m

BM-S-54

Sul de Gato do Mato

BMS-54 Concession:

50% Shell / 30% Ecopetrol / 20%

Total

SGM PSC250% Shell / 30% Ecopetrol / 20%

Total + PPSA

CONFIDENTIAL

Page 3: Sul de Gato do Mato · 2020. 11. 16.  · Ecopetrol / 20% Total SGM PSC2 50% Shell / 30% ... COVID) into early 2021 FPSO Exploration and Appraisal GDM 3 delivered beyond best in class,

Strategy for Gato do Mato….

3

Appraise volumes AND costs

Create options to accelerate project

Efficient execution learning from our and others experience

Seamless integration with the team, our contractors and our partners

Page 4: Sul de Gato do Mato · 2020. 11. 16.  · Ecopetrol / 20% Total SGM PSC2 50% Shell / 30% ... COVID) into early 2021 FPSO Exploration and Appraisal GDM 3 delivered beyond best in class,

Fasttracking the cat........But needed to react to COVID

4

Early identification of FPSO options

Worked on range of options with vendors

Vendor and Partner engagement on

optionsEarly in parallel

tender with exploration phase

Re-focused tender post GdM 3 and 4 results, Bid

delivery (delayed with COVID) into early 2021

FPSO

Exploration

and

Appraisal

GDM 3 delivered beyond best in class, appraisal

successfully targeted field

upside

Rapid GDM 4 follow up with fast turnaround from identification to drillingOBN seismic executed and Fastrack survey

received

2018 2019 2020 2021Exploration and

development work closely on bid and rapid

exploration to development strategy, team set up across 3 continents

Strengths of existing virtual setup and new digital tools helped transition team to

new normal ways of working during COVID

Development plan, moving to execution readiness,

FPSO award

Risked approach to appraisal and FPSO sourcing has reduced critical path to first oil

Page 5: Sul de Gato do Mato · 2020. 11. 16.  · Ecopetrol / 20% Total SGM PSC2 50% Shell / 30% ... COVID) into early 2021 FPSO Exploration and Appraisal GDM 3 delivered beyond best in class,

Gato do Mato set a new Drilling Benchmark in the pre-salt

5

0

25

50

75

100

125

150

1500 2000 2500 3000 3500 4000 4500 5000 5500 6000

Day

s (S

pud

to T

D)

Drilled Interval (m)

GdM3 Petrobras GdM1 Epitonium GdM North

GdM1

GdM3

GdM 2

Epitonium

GdM4

PLANNING PHASE – Competitive Scoping, Risked Based Decision Making

and Applying our Non-operated Experience to operated portfolio

EXECUTION PHASE = Integration and ONE Team Behaviours across Wells,

Development, Projects, Contracting and Procurement and Logistics

PRE-PLANNING PHASE – Leveraging our global capabilities by building ONE

integrated TEAM between Rio, London and Houston

OBJECTIVE: After a 5 year gap from drilling in Brasil, we will drill a well that reduces costs by 1/3, with a team that is spread across 3

continents.

Page 6: Sul de Gato do Mato · 2020. 11. 16.  · Ecopetrol / 20% Total SGM PSC2 50% Shell / 30% ... COVID) into early 2021 FPSO Exploration and Appraisal GDM 3 delivered beyond best in class,

Delivery for Gato do Mato….

6

Appraise volumes AND costs 2 additional exploration wells and OBN

Tender for FPSO in place for early 2021

Create options to accelerate project Worked exploration, appraisal and tenders in parallel

Efficient execution learning from our and others experience 2 ´beyond best in class´ wells

OBN top quartile

Seamless integration with the team, our contractors and our partners The real success story, working and learning inside and outside Shell

Thanks to PPSA, Total, Ecopetrol, Constellation, Haliburton and many others who

worked as ONETEAM to deliver this so far….now the hard work begins….

����

����

����

����

����

GdM3

Inj04

Inj11

GdM4

GdM7

GdM1

Prod8

GdM2Inj07

Gas Export

Inj012

GdM9

����

Page 7: Sul de Gato do Mato · 2020. 11. 16.  · Ecopetrol / 20% Total SGM PSC2 50% Shell / 30% ... COVID) into early 2021 FPSO Exploration and Appraisal GDM 3 delivered beyond best in class,