| {~' h p2 %9 ' \ UNITED STATES / N''Cl.I AH REGULATORY COMMISSION f i 7 , * WASHINGTON, D. C. * 0%5 / g , Pt;d January 8,1981 ' e \ j .... -~ Docket No. 50-336 -5 . ' ~ Millstone Nuclear Power Station, Unit No. 2 (MNPS-2) FACILITY: LICENSEE: Northeast Nuclear Energy Company (NfiEC0) SUBJECT: SUMMARY OF DECEMBER 12, 1980 MEETING WITH NNEC0 ON MNPS-2 STEAM GENERATOR INSPECTION RESULTS Introduction: NNECO had requested this meeting to present the results of the recent steam generator (SG) eddy -current test (ECT) and profilometer inspection (PI) for the two MNPS-2 SGs. Enclosure 1 is a list of the NRC, NNECO and Combustion Engineering Company (CE) attendees. Summary: After opening remarks by the NRC (Conner), the meeting was turned over to NNEC0 and CE who presented and discussed the Enclosure 2 viewgraphs. P. F. Santoro (NNECO) covered the first 9 viewgraphs, J. M. Fackelmann (NNECO) the next 13 and W. J. Heilker the remaining 14 viewgraphs. Significant connients made in relationship to a certain viewgraph were: 2. The PI is supplementary to ECT and allows determinations of the ovality of dents at the egg crates; 7. No major changes seen at this one elevation. 8. The large jump in the number of tubes plugged in 1978 was , preventive maintenance; 9. Highlighted the importance of the condensate polishing systems to reduce chlorides; 9. All volatile control since day one; 10. B&W profilometer probe has 8 fingers that contact the tube. Zetec probe gives same data without contacting tube (ECT type); 12. The present average of all dents is about 10 mills; 18. The calculated strain is greater at the inside surface than at the outside surface; 19. Viewgraph shows agreement between B&W and Zetec probes; 20. The SG inspection program took a total of 3 days; 20. The profilometer measurements versus ECT data; 21. Data shows no change in the last year of measured dent size; 22. Important conclusions; 25. The analysis takes no credit for the vertical supports or partial detached grid plates; 30. The LOCA + SSE analysis results are conservative since the support provided by the vertical supports and partial detached grid plates is neglected; 81012 90 "| } Q J -

Upload: others

Post on 21-Oct-2021

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Summary of 801212 meeting w/util re facility steam

| {~' hp2 %9 '

\ UNITED STATES /N''Cl.I AH REGULATORY COMMISSIONf i 7

,* WASHINGTON, D. C. * 0%5/

g ,

Pt;d January 8,1981' e

\ j....

-~

Docket No. 50-336-5

.

'~

Millstone Nuclear Power Station, Unit No. 2 (MNPS-2)FACILITY:

LICENSEE: Northeast Nuclear Energy Company (NfiEC0)

SUBJECT: SUMMARY OF DECEMBER 12, 1980 MEETING WITH NNEC0 ON MNPS-2

STEAM GENERATOR INSPECTION RESULTS

Introduction:NNECO had requested this meeting to present the results of the recentsteam generator (SG) eddy -current test (ECT) and profilometer inspection(PI) for the two MNPS-2 SGs.

Enclosure 1 is a list of the NRC, NNECOand Combustion Engineering Company (CE) attendees.

Summary:After opening remarks by the NRC (Conner), the meeting was turned overto NNEC0 and CE who presented and discussed the Enclosure 2 viewgraphs.P. F. Santoro (NNECO) covered the first 9 viewgraphs, J. M. Fackelmann(NNECO) the next 13 and W. J. Heilker the remaining 14 viewgraphs.Significant connients made in relationship to a certain viewgraph were:

2. The PI is supplementary to ECT and allows determinations ofthe ovality of dents at the egg crates;

7. No major changes seen at this one elevation.8. The large jump in the number of tubes plugged in 1978 was ,

preventive maintenance;9. Highlighted the importance of the condensate polishing systems

to reduce chlorides;

9. All volatile control since day one;

10. B&W profilometer probe has 8 fingers that contact the tube.Zetec probe gives same data without contacting tube (ECT type);

12. The present average of all dents is about 10 mills;18. The calculated strain is greater at the inside surface than at

the outside surface;19. Viewgraph shows agreement between B&W and Zetec probes;20. The SG inspection program took a total of 3 days;20. The profilometer measurements versus ECT data;21. Data shows no change in the last year of measured dent size;22. Important conclusions;25. The analysis takes no credit for the vertical supports or

partial detached grid plates;30. The LOCA + SSE analysis results are conservative since the

support provided by the vertical supports and partial detachedgrid plates is neglected;

81012 90 "| } Q J-

Page 2: Summary of 801212 meeting w/util re facility steam

.. . . . . _ . .

, ,

Meeting Summary for| Millstone -2-

|

33. The main steam line break + SSE analysis results are lessthan LOCA + SSE; and

37. Conclusion reached from analysis.

In the concluding remarks, Mr. Santoro stated that profilometer inspectiongives better definition of what is occuring at the egg-crate supportsthan ECT. The analysis results can be used in the selection of which SGtubes should be plugged. This is a considerable improvement over thego-no-go gage (ECT probe) presently used. NNECO intends to continuethe use of PI along with ECT in future SG inspections.

E. L. onner, Project ManagerOperating Reactors Branch #3Division of Licensing, NRR

Enclosures:As stated

cc: w/ enclosures#ee next page

.

6

Page 3: Summary of 801212 meeting w/util re facility steam

|

MEETING SUfe%RY DISTRIBUTION

|

(Licensee: Northeast Nuclear Energy Company)

i

o Copies also sent to those people on service (cc) list for subject plant (s).

-. .

Docket File. NRC PDR

L PORTERAHSICORB RdaNRR RdgHDentonECaseOEisenhutRPurpl eRTedescoTNovakGlainasRReidTIppolitoSVargaDCrutchfield -

RAClarkORB Project Manager "

Licensing AssistantOELDAE00 - JHeltemesIE-3

SShowe (PWR) or CThayer (BWR), IE

RFraley, ACRS (16)Program Support BranchGZech

.01shinskiBGrimes , DEPSheldon Schwartz, DEPFPagano , EPLBSteve Ramos, EPDBMtg. Summary Dist.ERC Participants

EConnerRGambleJGrant

,

EMurphy

DHuangRAClark

Page 4: Summary of 801212 meeting w/util re facility steam

Northeast Nuclear Energy Company ,

-

.

cc: Mr. John ShedloskyWilliam H. Cuddy, Esquire Resident Inspector / MillstoneDay, Berry & Howard c/o U.S. NRC

j

Counselors at Law P. O. Drawer KK )One Constitution Plaza Niantic, CT 06357Hartford, Connecticut 06103

Anthony Z. Roisman Mr. Charles B. Brinkman|

Natural Resources Defense Council Manager Washington Nuclearj

917 15th Street, N.W. CjPWashington, D.C. 20005 Po r stems -

k"e le -1" "

Mr. Lawrence Bettencourt. First Selectnan elBethesda, Maryland 20014~i at "

g eg d - 200 Boston Post RoadWaterford, Connecticut 06385

Northeast Nuclear Energy CompanyATTN: Superintendent

Millstone PlantPost Office Box 128

Connecticut Energy AWaterford, Connecticut 06385 ATTN: Assistant Dir cto , Research

and Policy DevelopmentDepartment of Planning and Energy

Director, Criteria and Standards Division PolicyOffice of Radiation Programs (ANR-460) 20 Grand StreetU.S. Envirorinental Protection Agency Hartford, Connecticut 06106Washington, D.C. 20460

U. S. Environmental Protection AgencyRegion 1 Of ficeATTN: EIS COORDINATORJohn F. Kennedy Federal BuildingBoston, tussachusetts 02203

WaterfoM Public LibraryRope Ferry Road, Route 156Waterford, Connecticut 06385

Northeast Utilities Service CompanyMr. James R. HimmelwrightATTN: Nuclear Engineering and Operations

P. O. Box 270Hartford, Connecticut 06101

|.

.p

- -___-___- _ - -___.

Page 5: Summary of 801212 meeting w/util re facility steam

Enclosure 1

MILLSTONE - 2

STEAM GENERATOR TUBE INSPECTION

MEETING - DECEMBER 12, 1980

NAME POSITION _

NRC-0RB#3E. ConnerNUSCOP. Santoro

J. Fackelmann NUSCO

W. Heilker CE-Component Eng.NUSCO-Generation Engineering

G. Johnson NUSCO-Generation EngineeringL. StarnerNRC-ORB #3R. Clark Florida Power & Light Co.

R. Acosta Florida Power & Light Co.T. Grozan

CEE. KennedyCE-BethesdaC. Brinkman

R. Gamble NRC-MTEBNRC-MTEBJ. GrantNRC-MTEBE. MurphyNRC-MTEBD. HuangNUSCOM. CassCER. Jacques

A. Sudduth Duke Power Co.

J. Jandovitz Consumer Power Co.

_ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _

Page 6: Summary of 801212 meeting w/util re facility steam

.

1

Enclosure 2

MILLSf0NE UNIT NO. 2

STEAM GENERATOR REVIEW

INTRODUCTION -- NUSCO

PROFILOMETER INSPECTION -- NUSCO

STRUCTURAL ANALYSIS -- CE

SUMi1ARY -- NUSC0

|

I

|

1

.

1. |*

| *_ _

Page 7: Summary of 801212 meeting w/util re facility steam

___- _ ___ _ _ - - - _ - - - _ _

k

CliRON0 LOGY OF EVENTS

DECEMBER 1975 COMMERCIAL OPERATION

MAY 1977 CONDENSER RETUBING

DENTING DETECTION TSPL'S

IMPROVED CHENISTRY

NOVEf1BER 1977 EGG CRATE INl>ICATIONS BY ECT

RIM CUT

PREVENTATIVE TUBE-PLUGGING

CONDENSATE POLISHING

f1 ARCH 1979 PROFIL0 METER f1EASUREt1ENTS, 2 TUBES

AUGUST 1980 PROFIL0t1ETER INSPECTION, 300 TUBES

!

!1 .

|i

2 i.- - - - - - - - - - - - - -

-

Page 8: Summary of 801212 meeting w/util re facility steam

TJ

.

.

w Ec|a}h, '

C{\JJ""{'QIS ,

,UV Ax Lo.u ,

,

.

.

~.

-;-m

' N .

Y$ |$ * >' 5 |EE < E Z

< a w ~ w .. O --

m m O n_ go O I <

Og M |. Qm dz DE o*4 - .

' gm> g3g ma g :

S - m- mw 03 p sch" ex2 cx2

5 f h-E ax2 m UCDO \ g* -\ -

- [ m ,=mms s -..s - s

caN _l. - /. .| ,1

-

. ,

(5O !- .. g

/" ii i I/ q 12,

',

& \ f 1- | 49 / En.I

m - ssss g g$ ssssssss 9 dH ' n, ; e, x

i

- -W ;t|wD >:- s' "

D\ 5l | '

O 4 ,s*

- O .#. M E. '

-s

O, $ 5 .' I k 3 E"

7- s ._ss s sss s s g g 'g g , gi<

$w_N O - .

d5o = -.

>}i* ? 5'' 8

_,.i i

. _. "*

i sb UW Q Z$d' E " o abrm <> E Z oJMO C< O -

< gz.

z- A g e '-mog g5 <= 6S

-

mf E.. =r w

k w *

g o.

w.

**e

* C,

* .

O

*.

e*

.

e

e

e

-- --- _ _ _ _ _ __

Page 9: Summary of 801212 meeting w/util re facility steam

|

12 0 *

hNOO 53h s ;,

,'

Go* | f

[. '

A '

h. s.

. .,

s|N; 4 Ls

{is,s|

tt

1,

'

r ,

' ( /N i ,

| 1

|J( ., ,

!!,;i $q/Ng-

'|

.i la l

|, |- ,

4jl,

l

1 .

|

|.

STEAM GENERATOR |

|

'- POWER

[ '7 SYSTEMS EGGCRATE TUBE' SUPPORT BETAILS|!

Page 10: Summary of 801212 meeting w/util re facility steam

_ _ _ _ _ _

.-m nnM@@N; f \\$\W\\dnW h

. . q~, . a -.Q.- ), -- --

f, ,, .y . . ...' .

.b ,.., .

'' ' ?, . , -

, , , .

2.Q%.%,e,,. . . . *.. *'

. :-

3 ;, 4g hh-

. . . -

{ f?? g:. }$$$$f''N<a. ;. -;. s . s.., ...

. .- *

4/ ,Q ? '. ;s , .;- e n ,. , f.P|y .

L,%t 'i : -;. .::: - , , qG. \,,*: <., yF .'

' ,.%.,.g.,p,v :x.

.

' . . . . ,. . *, .. .,.s. >

y;.w ' a

. .

..

,., c. s =- ;

q .

.y.'

: x. . 4 i.O. , . .

.r. %., w ,. ,i.

..i . a.

7..- . . 4 s .e c. < s,

u . y y.,. ,, .(a[. }-

, :,,..3 :. ,*

1|.- . . . .. y-.. . . A ,>

g {er *t).I.f %,*.f*g* f f w4 ? ' +

,

.-d ', 'y o R) \

' ' ~ *'

h,.

,

'

: ;,;. $'%$|3-,k |. ;

j i,

-- '

, [j'..f.L :.3 ;s &

R. i-

I .

:

.,, , #. a,. +.-, .

t i4 . a. .y.r-

... o U ; . :ro :. o. . g'

8? . k e ei : ' '. ' N ,If!'.if,yg j 1;..u u, ; 4 vcg(,. '.i[k

,

7.{b '

1 ; iq;.r.; ,p .f.

, ci v': p r 1

J)j $ ' . , . , - $1 '

E'$.jYq n t

U :. ,

'D i.t- - 1L'at: .i( i

!,

..i

l

4,i- '.

'

1 1 % ;

c.W. % ..cgH Ji j .? -'

\. .k k h , .:. ;U'[l

'Or ,43

M.:,-

i ~1 ' e-m , . . :n

.4. ii s **

1 i [(l

M |r;i% 4 J.T6.0; -_ C 4r

.

t . e-

Q; ' T. L ilt' m r,y. , n

; *:,8..c;;:(,h~

,

$bo,'$,

Iv< . ..

V ,&I D

.

' b,

. %,-A. .,c.

r: c .r ,- q q- i , . y..

f 19{!,,c0Q O.:,-l

$ f 9 , , . :'.ky c ~' ./*';,. ; }r; % .76:u 1 D8i ,,i . . ,

N.' , . .< m

. \ .4y nP!s 2>, j ; j ' ' 4 A ''4. . '',y|e' h }pp,,gyG y

+

I. * '

''.. .s,

('. ,,.

}y,,-

6; ..

*.::r. P.:c'. W-a,.

p?. . p%. Ad. qy c

,

v % i, .

,q&q,3.

, e . .s. ;; i a- -

gI(r

b 1.

If'- ;

. ':.': ., '0[h q ,. .

rr..h,f(.*<. *

g.,. { .,I : k, , h,

#.N .; k. k1

, -' 4 j . i.. 2. r.J-

-

f '.,. . , s 9 g.

i Y

t. :,l.'.u ,:- d 3Q.

,,

3y 8. .. .

, *{ ; g u| . ', : h > *. -

* ' _ , ,7,1 b s.

; , *..s.

;-

,. r . Jj s Q*-. . ;

q);]-

...

f 3. .' .} ,-

e.. -o

f! ' .i $

.-

.

.:: m.p%aggg,. tag,.

tcq,e.-w).

,

,

e.....' y , ~., 4 ,, . j a - ...: .;o. ,.o a;s.,,. .Ws..e. gy.,j.: s.

,' -,,

..

g. ,-. e. -<-.4

; , .;7.. ;f q, . -v .e.

.j ...,..;,, .g,- . . ,. . r

% . . q ; ,y . ., ,g.,O ,

4 r . 3.) j' , Q'v ' .' 4.y! '

*

,f n.i.'*.? ,:.g-.,

;.,7.,., ,, J. ) f " > <;'s ' ::.|' .+ 3Ol ' .h %*.

",

J ' ta .. f , C,

e* s 1::,- 1.

. c. .A*

o .. [) U , . [ . ,!,. . p.- -

. . ._M )

g . .i '* '

L ! e I .' h'.,

y. '*

( y g,

_,

_ _ _ - _ _ ____

Page 11: Summary of 801212 meeting w/util re facility steam

. _.

|

| 7| can.nnnnrannne nnrann_n

( ljN/IlsTIRUI IGIOI $3NIMNll

P -

._ ,. .: .g.y y.-,

- -'

1'

.n .%pA- -

, .

\

:t:nifN?.'b

''

e., <. m,: :.v.s;ji ', f;-|-

.

:.:.u_

..

. . . . , _.r:. ; $. .n> .

e p

. ~. .a . ...a.Q'i?'! :',f& |

.

Y * g . + . .. * : ,v' .;y;::'

.

.' ? U?T g+;,; .,

.;,fS;O?....Qkh,'.'

-: i-'

. .J.. a 6. ;;' ' . ', . . i. .;

h.

* - ' *

') |-

,

'" ';'.| 4.x: ,,Q hf? '}f{@ ''i'' ,:

". .i.

s .- :.: .. e: n' f ~ * ^wr

.. ' ;.~ 6. .| ),

- r .7 'p,;.- ..4; f|7,,

_ , . ' , .};t '.. . .n

. s, t ,;,c'T ,; y . . . : $ .* '

[ ,;. T'.qe'q.g[.g' ' h* (

c,,g ,,' c .i t.,.

. .

)y,, .g.. . 4

j,f;9 ,. y .

.m ..

i. .y .

9* . . ; y., ,

nH; - ''P . . rx- Ov <

.7: .u . ' J*.. i 4,k, T (4

, , ..;'

4's r%

. t i

, <. ,.

p .'f,/ ,9'sq; t' *W v':; ;_ 'q |, ,.

A, ;r. y t. n4,

.;.. p j. :.sa;'

. ' 'i.Q. ,(|r '*. 'l;4 . < )g

;. . a , |- | |'m. 1-

., - s .v 1., u 1,., < , .

k, .V,a . g '.I5' ' " . J - / .'' ', *5

i

-

L> . * . |rI.. . |;*(*n 0; f s,.%;.

it.

s [).-.: e. >- :. s i.

''"

f* ,1 >'

_j ' ,' d. . :_- il. p8 .A .f'

''-

;, . .r ,

$;n. h . ;i'.',

, $ (. ] !

,

5-.

. . ' i; '. >J.*.i ;. ..

p . r: ..e n. , .-

o g

't !;Y*:,{% ?f f c',f b ' - } kq

*

,,,

y .. .f ?ie ... z.y+.;

'

: ty. ..:!;- . @. \

'

J ..y.p s.- . : yi.0, f -{ s~

u., u .a .. ,* f # .z . w/r '.

q- ,{

, e t. .

i. . - . . 7

, i' "' . : *.'1. . .. ,.. :

T 1. r.'

* ,. ,, , 9. *

;j -*. * e . ),; * -f *

.,,

p. =. .~d N g'

,

,

t k I,

/ , -: ..;;., -(7 (, f . 3. /. .

14..

h, |,!'g

/r. $ $ y. ,

N ;|I? 't'.

' .T | j,' - '

1 Oi.r. M <

i|3.' m.; ;, .

viru; .,

Rh., u: .., d

q)M .|. @j't. * ;'<7s .< ..>. , ,

l . .pp. . e. g m; .

,%"pcq 9 ; I

.I c.uc A A 1 1 . .i i

s.

.?p.q'-

;.. r .,; r .

':- 3 s.: ,h PN|g .gr -

,.

. '.:..}.) 0,W .0 d, a,

e ;.,

' ji :ini:, e.+'

. '. '

' '':: \..

,. ,.m .. g , . ,_=:'?,rg,i,. y f 7.h's s",.w. ..'/ .i '- b.p j }.:;f4 d.,. j*

i , , ' .,

, , . . = . , - - -

. u, m y. .

..

Iy. ._. ya.

.

r '. I.' ' ' FI .' . .*#. */k-[;[h*..t'tg . , rI .,y 'y '.., ., ,,

.'/'h. f;iff .= ,.

.,,

'," # M U h !.k h p} h )Q . ,.. .... I' . 7..

M.,n m, M n.mgwgW .V W2% ,_n .w

( ,

Page 12: Summary of 801212 meeting w/util re facility steam

- - - - _ _ _

:

I '

N #' Y M Ee- 'it h;',1t.M/1i1

..

. ..~

~

/ ,

f | I.

$ef gd ,

c' /~

'

3 ..3

( 4,.

gg.,

~

- - _ _ ---_

,d

"

/ w ,. e- . 1 --

-=

, s-

-

. .: _. , _ - _ . - -

1

..

_m

. ** - - - _ _ _

* w esess e e e as

o

* 48 - . . . .

.

. w oa At.m

7- - - - - _ - - - - _ - - - - - . _ - _ _

Page 13: Summary of 801212 meeting w/util re facility steam

- - - - - - - - _ - - _ _ . _--_ __

ECT DATA hDENT / PLUGGING PROGRESSION

MILLSTONE UNIT NO. 2STEAM GENERATORS 1 & 2

|

'T /I DENT SIZEg, ,

TSPL'S NOS.10-11HL & CL (794) (799) (800)

8. g goo j. ,s .

$ PLUGGED TUBES h2_ 7. g.

w m!S o[ 6. P

. ..O ;

5 0O e5. 3. ,

< c

E o4 . 600. .

e&n~ 23 .

DENT SIZEEGG CRATE2 too. . .

NOS.1-9. HL

1. O--. --

y - -

o: : ; ;

1977 1978 1979 1980

YEAR I

_ - _ _ _ _ _ _ _ _ _ . - __.

Page 14: Summary of 801212 meeting w/util re facility steam

,

l

{|

f MILLSTO.NE. UNIT N0. 2

| STEAM GENERATOR INSPEC110N

AUGUST 1980 OUTAGE

||

| VISUAL INSPECTION

|

f ESSENTIALLY UNCHANGED

| RIM cut CLEARANCE INTACT

||

| EDDY CURRENT TEST SUMMARY

|

f140% TSPL, 13% EGG CRATES

ONE (1) BLOCKED IUBE

| ONE (1) IUBE PLUGGED

NO DENT PROGRESSION *

NO DEFECTS

||

CORRECTIVE ACTIONS STABILIZED DENTING

CONDENSER RETUBING - MAY 1977

RIM Cur, NOVEMBER 1977

PREVENTATIVE TUBE PLUGGING, NOVEMBER 1977

CONDENSATE POLISHING, NOVEMBER 1977

CHEMISTRY CONTROL: 0.6 PPM CHLORIDE

(12/75 TO 5/77)

0 (N.D.) CHLORIDE,

~ (5/77 TO PRESENT)

|

|

*WITHIN IEST ACCURACY|

Page 15: Summary of 801212 meeting w/util re facility steam

_-_-___-

STEAM GENERATOR PROFIL0 METER INSPECTION

| MILLSTONE UNIT N0. 2

l'

AUGUST 1980 OUTAGE

f'

OBJECTIVES

DEFINE EGG CRATE INDICAT. IONS

ESTABLISH DATA BASE FOR IMPROVING IUBE PLUGGING CRITERION

IMPROVE DEFINITION OF DENT EFFECTS

TEST PROGRAMi

STEAM GENERATOR NO. 1: 157 TUBES (B&W PROBE)

STEAM GENERATOR NO. 2: 143 TUBES (2ETEC PROBE)i

STEAM GENERATOR NO. 1: BOTH PROBES, 18 IUBES|

|

e

lo

Page 16: Summary of 801212 meeting w/util re facility steam

_ _ _ _ - _ _ _ _

w."

TUBE DENTING AT EGG CRATE

COMPRESSION 1 EXPANSION ,

y 3

- -

r ,, ,

f TOP 0F EGG CRATE

. . . . . .

_

-

, -,

7(MINIMUMDIAMETER-

0.610 IN,)/_

.

I' *

.

~

8 RADIIDENT SIZE

OVALITYCALCULATED PROFILES

- - -

TENSILE STRAIN, I.D.j

BOTT0ft 0F EGG CRATETENSILE STRAIN, 0.D.

MAXIMUM VALUES

MAXIMUM LOCATI0ils

\ _ _ _ _ _ - --__-__- -__-_ _

Page 17: Summary of 801212 meeting w/util re facility steam

-----

.

9

0

'.

.

|

* .

.

m O

u) C".3 C.3*

.""O

$% DsO = = v3 -o. ct e -* *-* LLJ I-=

bUOr-cQo

Q- LLJ LAJ U3 u) .> - J.

G. N >--.

m&m - m ._. - r cLLJ >- .-.J U us u) -

mB<J2EXME5WWE2*g

->-.<Ct:3=-

=

g a.U3LLJ

C13 -- I HD Q- .

>-- U2 *m L1-"

.EO

. . >-- -:

ELL. -

E,N oO DCL- E OO LI) O*

- = "dro...n

ZO

- ~ e A*-'m _ . ,

-

a i'

O. t .

M S- - - % _ . p .LLJ

$.g-==

t

Z t'

. _ . _ _.

O

v3 N_*

-; .y .

'E' Nw 4, /-a .g ... "

1P_

-_

Page 18: Summary of 801212 meeting w/util re facility steam

CT -

<

a-

xDb!

1 &.

a

w

$.=

W

dg .

.

a,

mg .......... . _ _ , , ,

/_

LLJ .

e

l.

.

o

9

0

.

|-

.

- _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _

Page 19: Summary of 801212 meeting w/util re facility steam

_ _ _ _ _ _ _ _ - _ - _ -

.

RELATIONSHIP BETWEEN MAXIMUM DIAMETER REDUCTION AND ELEVATION'

MILLSTONE UNIT NO. 2 -- STEAM GENERATOR NO1

AUGUST 1980 OUTAGE -- B&W PROFIL0 METER

DIAMETER

REDUCTION (MILS) STANDARD

ELEVATION NO. OF TESTS AVG. MAX. DEVIATION

1 157 24 71 17

2 157 35 72 16

3 157 38 76 15

4 157 30 70 15

5 157 29 87 16

6 157 18 59 12

7 110 15 52 12

8 30 6 32 6

9 13 3 6 2

1-9 1095 27 87 14

.

.

.

e

e

14

Page 20: Summary of 801212 meeting w/util re facility steam

PRELATIONSillP BETWEEN FRACTION OF MAXIMUM DENTS >20 MILS

(DIATIETRAL) AND ELEVATION

tilLLSTONE UNIT N0. 2; STEAM GENERATOR NO. 1

AUGUST 1980 OUTAGE -- B8W PROFIL0 METER

MAX. DENTS

ELEVATION NO. OF TESTS >20 fMLS, %

1 157 46

2 157 82

3 157 84

4 157 73

5 157 66

6 157 38

7 110 31

8 30 3'

9 13 0

1-9 1095 59

.

15

Page 21: Summary of 801212 meeting w/util re facility steam

RELATIONSHIP 0F MAXIMUM DIAMETER REDUCTION TO ELEVATION

MILLSTONE UNIT NO. 2; STEAM GENERATOR NO. 2

AUGUST 1980 OUTAGE -- ZETEC PROFILOMETER|

|-

'

DIAMETER

REDUCTION (MILS) STANDARD

ELEVATION NO. OF TEST AVG. MAX. DEVIATION

1 143 27 56 13

2 143 18 57 12

3 142 22 55 12

4 141 15 42 10

5 142 16 60 12

6 137 7 37 6

7 124 9 47 8

8 21 5 24 6

9 0 - - -

1-9 994 16 60 13 l

,

'

|

f4_ - - -

Page 22: Summary of 801212 meeting w/util re facility steam

<

( 4

$

REL TIONSHIP BETWEEN FRACTION OF (1AXI(1UM DENTS >20 MILS

(DIAi1ETRAL) AND ELEVATION

T1ILLSTONE UNIT NO. 2; STEAM GENERATOR N0. 2

AUGUST 1980 OUTAGE -- ZETEC PROFIL0 METER.

.

MAX. DENTS

ELEVATION NO, OF TESTS >20 tills, %

1 143 70

2 143 35

3 142 50.

4 141 30

5 142 27 -

66 137 '

7 124 10'

8 21 5'

9 0 0'~

1-9 994 33

.

t

i7'_

Page 23: Summary of 801212 meeting w/util re facility steam

1 .s c: -

!

Cl)EFFECT OF ELEVATION ON "ID" TENSILE STRAIN

.

MILLSTONE UNIT N0. 2 -- STEAM GENERATOR NO. 2,

AUGUST 1980 OUTAGE -- ZETEC PROFILOMETER

.

TENSILE STRAIN,'%

INSIDE DIAMETER STANDARD

ELEVATION NO. OF TESTS MAX. AVG (2) DEVIATION

1 143 1.6 0.77 0.35

2 143 1.5 0.56 0.30

3 142 1.9 0.71 0.34

4 141 2.0 0.55 0.36

5 142 1.5 0.50 0.30

6 137 1.1 0.26 0.22

7 124 1.7 0.37 0.32

8 21 0.9 0.21 0.23

9 0 - - -

1-9 994 2.0 0.54 0.36

1. IN DENTED INTERSECTIONS

2. OF MAXIMUM VALUES'

' i8

Page 24: Summary of 801212 meeting w/util re facility steam

v,H-

.

P.R,OBE.. M.EASUREMENT COM_PARISON ..!,. ; . .-- ._ ._ . . ,.

t .; . MINIMUM DIAMETER .' .- ;,s~

iL' i: ! DIFFERENCE (B & WW ZETEC)' ' '

-~

f |.:Q MILLSTONE UNIT NO. 2 J.' , "7, . y. 3-

L' STEAM GENERATOR NO.1%.:4.Y '. f\M, ,|n; ;y'a. . AUGUST 1980 QUTAGE,,CGgbyh6,

. .

-

.-- - ,. .=:_....,c

40 =

c/3 P

in iVO ;;j -

Z K+ s 3LLS

'..

L

@ 30 a, m - ,

,

.

* C- s

O : :

0 20 = !'

2

'

A -. A

,

NE<

ms .

|

3 _,-

!' - r+ m :ceO M =: : ':* : -: *W W W * _v * W W- W W I W i W W 5

- 15. . .~10. 5 .0, 5 10 15 * 20 25.. 30 35 40...s .4 5 MICS. .- 5. . .30. 25 . 203..40

-

...a. . .

MIN. DIAMETER DIFFERENCE

.

%.

~_ _ _ _ _ _ _ . _ _ . _ _ _ _ _ . _ _

Page 25: Summary of 801212 meeting w/util re facility steam

4 ...

COMPARIS0N CONVENT 10flAL EDDY CURRENT VERSUS PROFIL0 METER

MEASUREMENT OF DENT EFFECTS

filLLSTONE UNIT NO. 2

AUGUST 1980 OUTAGE

.

PROFIL0t1ETER, MILS

ECT, Mits SUPPORT AVG. aR MAX. AR f1AX. AD~

0 EC 0.5 6 7

0.5 EC 0.5 9 10

2 EC 4.5 44 68

10 TSPL 12 46 55

.

4

-

$

e

'

20"

. ._- ._

Page 26: Summary of 801212 meeting w/util re facility steam

4 .

.1

PROFIL0 METER MEASUREMENTS OF DENT PROGRESSION IN EGG CRATES

filLLSTONE IlNIT NO. 2, STEAM GENERATOR NO. 2

MAX A DIA., MILS MAX. I.D. STRAIN, %

EGG CRATE NO. 1979 1980 1979 1980

L 107 R 41

1 23 17 0.4 1.1

2 42 35 1.2 0.6

3 10 39 3.5 1.1

4 39 35 1.9 1.4

5 16 17 0.8 0.6

6 40 37 1.0 0.5

L 107 R 43

1 48 43 1.0 1.4

2 18 15 1.0 0.4

3 14 9 0.5 0.6

4 10 7 0.6 0.4

5 23 22 0.7 0.8

6 18 15 0.9 0.6.

AVERAGE-

BOTH TUBES-

1-6 25 24 1.1 0.8

r

!

+ 2

2L\,

'

.

Page 27: Summary of 801212 meeting w/util re facility steam

.. - - _ _ _ _ _ _ - -

. .

.

SUMMARY

.

1. MOST Eco CRATE INTERSECTIONS DENTED, AS MANIFESTED

BY ONE OR MORE AD OF 10 MILS OR MORE, WITH AN'

ASSOCIATED OVALIZATION.

2. FREQUENCY AND MAGNITUDE OF DENTS LOWER AT UPPER

- ELEVATIONS.,

3. AXISYMMETRIC EFFECTS ASSOCI ATED WITH Eso CRATE DENTS

SMALLER THAN WITH TSPL DENTS.'

,

4. Ecs CRATE IUBE STRAINS LOW COMPARED TO STRAINS

ASSOCIATED WITH IUBE EAILURE IN-SERVICE.

5, DENTING ESSENTIALLY STABILIZED BASED ON NO SIGNIFICANT

PROGRESSION BETWEEN MARCH 1979 AND AucuST 1980.

.

>

22-

-_ _ ___ _- . . - .

Page 28: Summary of 801212 meeting w/util re facility steam

-.. .

.

.

STEAM GENERATOR STRUCTURAL ANALYSIS

FOR "EGGCRATE" OVALIZATION

ACCIDENT ANALYSIS OF TUBES PER

REGULATORY GUIDE 1.121

1. RELEVANT TUBE SUPPORT GE'OMETRY.

2. TUBE SUPPORT ASSUMPTIONS BASED ON . INSPECTION DATA

3. LOCA + SSE EVALUATION OF BEND REGION

k.MSLB+SSEEVALUATIONOFBENDREGION'

5. SSE EVALUATION OF VERTICAL RISER REGION.

6. CONCLUSIONS

-- .

4

i-

|\

-

|.

|

~

l!

.

|

. .

-

Page 29: Summary of 801212 meeting w/util re facility steam

I. .

.'

-

I: , -

.

1;

Separat:rs-

-

II |

|. .

|' Riser Section'

b |] Ill Il-

'

Drilled '.

,$.

Plates j'

'.

i .i / i'

Cowncemer*

Dend Sucoorts g.

,

l- | 9

|. 3

[ 3 ' 'N.~,N 5 enc Regicn4

. "|".---Partial

l. ;Eggerates 7.,

i i

i I i

,

i i c .,

![ ! '! Straight Region*

fulleggcrates /h. . i i : 3- :).

! ! | !'\ 1

: # i

r g |i .

I

! Is !-i'

__

'

| | i | .

Hot side. i | !, |! Cold Side- ,,

,! - '2 *

~~

; ;,

9$

f i. ..

|| | 5 | Downccmer Initt'

I! |: i

! 1 - I I | I Tubesheet5, i

r ,""A JN M.[n[AlD fD1 *I D) F

~

h n-

2Y_ _ _

Page 30: Summary of 801212 meeting w/util re facility steam

a A - 4-

6 e

.

' g..

* L L.J 3' 9 to w u,~Y 'N-

<s i.:o

I $... .

*

g- ny- -4( ,.

, ,

\ //6'

. ' .'. . *

.- 11 0'

,

\.,. . _ _ _ _ ,...

S- 90

. % , |N ,

4: '__ \.

,.9

=, ,- 46',

5

\. i-

.,, . ,

4

N 36v .f.N

k 28*

g,

f In e

L :'"

. AT ig . . / .

.

'' 'I

'

\ .-; ,

j- .. .,

| .i

.

-...

I.s *'m

,'

'r: ---- - - - - -- - '3'

*~

u.

,|.

.L -.= = - =_ r-- - -

.

1

-'

1.,

a >,

L ._

i ii 1- -| r_

.

' 9

.

I

4_ - -- .

Page 31: Summary of 801212 meeting w/util re facility steam

. ._ . - _ _ - - _ - _ _ _ _

. 4,

e

.

.

- ,

/2O

'

ou.: a ~

'! ;gn j3 sGb l

'

|<

.

b) qQ) o 1' -

N NL l

\i \

l'

}1; .

!! 1 E.

\ d- '

| |||-

.

m

/ I

i ; 3 -d /q

'

;, .

D !' IL )-

i,

.

Qr =

! E gPOWER | ST EA?1.GENERAT OR'

* GE b SYSTEMS EGGCRATE TUEE SUPPORT DETAILS

2G'

_- _- -_ _

Page 32: Summary of 801212 meeting w/util re facility steam

. .

1

!'..-

.

PERCENT OF INTERSECTIONS INSPECTEDWITH DIAMETRICAL DENTS) 20 m!!s VERSUS

ELEVATION MILLSTONE UNkT NO. 2

AUGUST 1980 OUTAGE90 -

^

80 --

70 -

-

6 STEAM GENERATOR60 -

y NO.1 ,.

mM 50 -

E |

!40 .-

i

30 -

! 20 STEAD GENERATOR-

NO. 2 '

: 10 -

!

l f f f f f f ,*

1 2 3 4 5 6 7 8 9|

ELEVATION,,

27. _ _ _ _ _ _. _ . _ - -

Page 33: Summary of 801212 meeting w/util re facility steam

e 'O

a-

* * O

._ 9 0

. -*

1r e/- - , , , ,

V'. - *. N N N,~

P .. /..n O

. ,s,

Y 5),@ '

i ,-, . - //~ - .r:n r-+g _ g,CD _ =/-

___.r m//, .

/,. , . .

WN -

L. , CD.

_ . .

-yi a --- -

t-1 O*U

a _r _.::

'I

h /0 "'",,,#' W N A M 'VI y @N W A'uW e D a AH

|*:=$ 7' M I e

p 4 3 I m *|

g_ .

-

0O'- '

'O4

'

fms,+ e,. v/s -

s s ~ ~/ t cs % 0 u*

y. p. .ijg n /3

/,v._-., w .-->

, - ,_ - a .,-

- . . -m _

. . ., .-- ,- u. , ..

, . . .; F / , ,~ v. y w ~m 4* ,, f . . .- / . .

Ql l Y/' /

'

[qs-

/y g w~4.e- C '2._2 J ' q ~;

. |.c .e .e .e -e e

. 2./ %>2 .,0- ti 9t

.. %, , .e .e. .s w. !

.. eom ~ , - .-

/_s

|. k\w w w

A 1_

i. S j .

Page 34: Summary of 801212 meeting w/util re facility steam

. .

'

TUSE REIPONSE TO RAREFACTIO!! LOAD*

CAUSED BY LOCA

'

1

FrFp = 37 etute To

ir

( "

Fv

>4 >f

.

e

.

>< e. <

/*NFLOW FLC'd.

sf

FLUID FCECES ACI::3 C;I TUBE D:AGGE.%TED LT !J:.CTICH.

.

. . . . ..

.

1 *" Icedfng

- . 3'e..d i ..g'

4e*10 g Stress\

I \ SS *

/f | \ S''

~n I" $ -.

y f 20to i IT l\ Direct e

-

I I 1 \ f \(1 - stress 513 | \i \== s gj

\ l g/ g >< % \-~_i i \ <' \. ro a

i gg " ,4 a-i

), ,I \ l \-

, ,O ,

g 12 o iso too z.ao

Time Se c. 19 -'O,,-

' */O*10

* /.'.'

e

|

F.AREFACTICH LOAD AND STRESS VS TIP.E '

.

i

'

.

Page 35: Summary of 801212 meeting w/util re facility steam

. .

.

-

.

LOCA + SSE ANALYSIS RESULTS.

FOR BEND REGION

1. MAXIMUM RAREFACTION LOAD ACROSS THE-

TUBE BENDS OCCURRED IN TUBE R0w 140:

F = 53.5 LBS. a 0,02 SECONDSmax

'2. MAXIMUM STRESS OCCURRED AT SUPPORT

ELEVATION NUMBER 9 (TOP PARTIAL -

"EGGCRATE"):

(I + T = 44.3 KS1( 7g B MAX 4ttow

.

WHERE EI = 1. 56 ( 7 S ) = 75.9 KS1ALLOW u:

'

ABOVE STRESS CONSIDERS LOADS DUE TO:. .

1) LOCA-RAREFACTION

2) LOCA IMPULSE RESPONSE..

3) SSE RESPONSE (HORIZONTAL)

4) INTERNAL PRESSURE

|

.

i

e

e

30. . . .

Page 36: Summary of 801212 meeting w/util re facility steam

. .

..

.

.

D*"D *

TT(L.A.Q-

.

saoo

CoNr*Arpp: -

.2.s-. . .. . . . . .

.

, , , , , ,

;. .

--

/-

. . . . .

@~ E is '

-

~

'

s. .., .

*

3 . w . .. .

OOOO '

NE.

(_O308 . .. 3,4@ . . . ..

?_ _ _

.. . . . ... .

|_-

. , . . . ._ .... . .,. .

,

: . _.i-

... ..,, ,, ,,, -

.

t.

.

, - t.

2 $$ @$$. .

Q[d . ! ; p*

b;Es--@I

..l

S0 22 I.

.

23 ..

1* .;\ (ih r ,-

i w- ..r - - -. -

.z. i : r-...

@p;-- ,- --

. ...

gwA--e (V.)-1-.+ L/ .

. . ..

!&L[ L _e n l e L L:. .-C

-. .- . .

' -

@ .- .

io .'

@ W - _ - - - m -- - = . . . . . . .

@ -

ii . . . ..

__ _,/e, . ; ... ....

-, *W * =

O/7 5 s .,.,a =

_ _ _ - m , q g,; m A --~_g r-

I IL* .

. . .

/3. . . .k__a n

.

17a.|| /4 13 26 ' ' '-

. nii.,.s/i,,-

. .- ._... - x .

iS & ''.

n,-<>---, ,

W [s>vmL 27''

i is1

. ~

.

S. G. SECONDARN SINE FLASH MODFLING-

31

Page 37: Summary of 801212 meeting w/util re facility steam

_. . - - . . - -- . - . . -. -

.

M..

Mt -.

), Pcs.

-

. .

*

.-.

.- .. -,

n , rFf"F7_^ " t | |I

' IAP/I!!CII I

I

I I

I |~'

co e m ,-

.

II

II

ig

I -

g

I. !'I

M"d .,

.

'

YF fry~ ~

r,

t .

'

SECONDA1W FLO'<l AND - . .

TUBE IllTERACTION FORCES < 3,XAGGERATED 1)EFLECTIOliACTIllG Oil TUBE

Till1E DEFf.KCTIO!! DUM TO MSJ.h ACCJ1 Et1T l'lew.

'.

"

e - e

*

--____ - --_-

Page 38: Summary of 801212 meeting w/util re facility steam

-_. . ._

,

'

.-

~

-

..

- ,

MSLB + SSE ANALYSIS RESULTS

FOR BEND REGION

.

1. MAXIMUM PRESSURE DROP ACROSS THE TUBE BEND.

DUE TO SECONDARY SIDE BLOWDOWN WAS 32 PSI.

DISTRIBUTED LOAD ON TUBE IN R0W 140 WAS:

.

F/L = 0.232 LBS./IN. OR F = 33.4 LBS..

2. MAXIMUM STRESS OCCURRED IN THE TUBE BEND AND

WAS:.

= 22.4 KS1 'C '0'M+ B MAX 3ttow

~

WHERE = 1.356 (.7 S ) ""75.9 KS1ALLOW u

' -

ABOVE STRESS CONSIDERS LOADS DUE TO:

1) MSLB BLOWDOWN_

2) SSE RESPONSE (VERYlCAL-).

3) INTERNAL PRESSURE.

.

.

.

. . . .-

Page 39: Summary of 801212 meeting w/util re facility steam

. . _ . _ . ._

o s

,. ..,

.

- ,.

',

SupportN0DAi.Elevations

POINTS

234.625 EC7 cm 29 dr--

O 27

197.625 EC6 a 25 :=

.

O 23-

162.875 EC5 === = c=

O.

O 19 O

| O,130.875 EC4 :== =s c=

| |.

! TYPICAL.

0 15,

.

E93.875 EC3 c=='

i

11

59.125 EC2 c.m t== TUBE R0W 36.,.

:'

07 **

27.125 EC1 c=, es,

-

!.

!

G3

~ j-f); i i o , i i , i io i i - -- ia

1

SSE EVALUATION OF VERTICAL RISER REGION

. . .

s

e a we-- p r m r* * e 'w w Y

Page 40: Summary of 801212 meeting w/util re facility steam

. . - __ _

, w !' *

/7 Dawde-SSE*

*-

.

TUs I i.Ii,e 6 i o i!Isi 3 e iii i

1 !A i (*e i I;a6i i e i i . 6 : : eiei IIilli I i i *I I I I I Ill

I !f a i [I i id | 1 | I ll| | 1 l ill i I '

"|| ill i I i i 111 \| - i i il

~

|| | I / _ ..\ II __i l_._

_.

I l .

n .s* ,(.*'-

.,

. . - / -.. .

*

/-

.

/.1a-

f ei4 i , 4 . . . .i . ..... - . .

* l' i et eii /r i i e i e ie i I\ i e i ei

,. I I t ili / e i e i eIi il I l\ l I |ist,

i, I | i l i l/ | | | || | | U | 0.45-. . . .

f l|||| | | | $ I | |||'

: I * Ii *

I;.,

.

I

,i . _ ._ . . _. _ . -_. . . . . - - ._._ .. ..,_

_I

.

.

NOR/2 )M7~.?L D/Rf U/CN,

I|'l11i i i-el . . . . . . i .e >eii . . . . . . . .4

I u e iei , i i i e ieis i i . i ei .

I I e a 11 I I I I I I I l'l i I I I i II|| | |||| | | | || ||. | | l' | | | |!

'

!I lill | I l li I | | |||--

| |||| ||'

..

.--.- - _- - . . . - - . . - . .- -

. , ,

o01- .

d - .. o. .. .

= = o o-

,

-e .a t i

* FREQUENCY (CPS) #- N 'd/8'

'

i9ds. u>'

s>. / t i. . .

3fi

. .

Page 41: Summary of 801212 meeting w/util re facility steam

. .. _-. .

. .

. ..

.

SSE ANALYSIS RESULTS

FOR VERTICAL RISER REGION.

1. LOADING RECORDING TO RESPONSE SPECTRUM FOR

VARIOUS ASSUMPTIONS:

2. SUPPORT EFFECTIVE CI MAXIMUM (KSI)B

(FOR ALL I'iODES)

IN-PLANE OUT-OF-PLANE

NO. 7 & TBSHT. 16.1 *- 15,8 -

NO. 6 & TBSHT. 11.0 12.9

NOS 6, 7 & TBSHT. 12.6 12.0

. NOS 5 - 7 & TBSHT. 13.0 9.8,

NOS. 4 - 7 & TBSHT. 13.6 13.1

NOS. 3 - 7 & TBSH.T. 16.1 *- 15.8'

NOS. 2 - 7 & TBSHT. 12.9 7.2.

,

THE ABOVE STRESSES ARE COMBINED WITH INTERNAL;

PRESSURE STRESS. -

(7 = 21.5 KSI 6M B MAX 4ttow

WHER'E U' ALLOW = 1. 356 ( .'7 S ) = 75.9 xS Iu,

.

O e

e

:

1 , -

Page 42: Summary of 801212 meeting w/util re facility steam

s .-

e.

4

CONCLUS10tlS

.

1. BASED ON PROFILOMETRY DATA, SOME VERY CONSERVA-

TIVE ASSUMPTIONS WERE MADE RELATIVE TO EFFECTIVE

TUBE SUPPORTS.

2. HIGHEST ACCIDENT STRESS OCCURS FOR LOCA + SSE:

4.3 KSI <( U~3ttaw = 75.9 KSI=

max,

.

3. EXPECTED WORST CASE VIBRATORY STRESSES DURING

NORMAL OPERATION:

CT = 0. 5 KS I.

4. ANALYTICAL AND EXPERIMENTAL ON-GOING WORK TO

BETTER QUANTIFY MARGINS. MARGINS ARE ANTICIPATED.