summary of the fee session christian j. schmidt jinr, dubna, oct. 17 th 2008
TRANSCRIPT
Summary
of the
FEE Session
Christian J. Schmidt
JINR, Dubna, Oct. 17th 2008
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Activities
n-XYTER front end boards and hybrid technologies
Status of the n-XYTER engineering run
CBM-Dedicated Chip Developments
Preliminary observations on radiation hardness of the
chip technology (UMC 0.180)
Status of chip development work
CBM-XYTER Family Planning
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
"Simple" FEB for the n-XYTER Starter Kit
Allow development of the DAQ chain
Allow the readout of various detector prototypes
The September beam time has shown the whole signal chain operative!
Silicon Strip / GEM Gas Detectors --- n-XYTER --- SysCore DAQ System
After several iterations, technology seems to get straight:
FEB-Rev D will be distributable at the end of the year!
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Other Versions for other applications in production
2 chips on n-XYTER-GEM (FoPi GEM-TPC)
4 chips on n-XYTER-Quattro (CBM-STS test)
Rafal Lalik (AGH Krakow/GSI) has realized FEBs for several applications
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Future hybrid technology, very promising options
Bump bonding may be the technology for our STS hybrid assembly!
Hybrid assembly with Si-based circuit board very dense assemblies
cooling from both sides possible
devices may be stacked
One dummy module populated with 52 chipsNo failures !Christian Kreidl, ZITI Heidelberg
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Activities in Heidelberg: n-XYTER engineering run preparation
Engineering Run of the n-XYTER will supply chips for detector prototyping activities! Hans K.Soltveit, Physik. Inst.
Heidelberg
Some modifications included:
Annoying temp. coefficient addressed
Rearrangement of bond-pads for better interconnect
Two different versions of dynamic range in one submission: 120 000 e and 1000 000 e.
Extensive simulations realized (corners analysis)
Schematics review in November 2008
Layout review in January, submission to follow
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
TEMPERATURE SENSITIVITYTEMPERATURE SENSITIVITY
FA
ST
-SH
AP
ER
OU
TP
UT
DC
-LE
VE
L
TEMP(°C)
Old TEMP.COEFF. ~29 mV/°C
Config for negative input signals NEW: TEMP.COEFF. ~0.7 mV/°C
Config. for positive input signals NEW: TEMP.COEFF. ~0.5 mV/°C
Hans K.Soltveit, Physik. Inst. Heidelberg
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Radiation Hardness Tests on UMC 0.180µ
ZITI current mode logic (Ivan Peric)
single DEPFET pixel
chip with manyDEPFET pixels
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Irradiation Campaign up to 7.5 MRad
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Very promising observations: Damage does anneal!
Very promising observations!
Very similar results observed by Sven Loechner GSI on test transistors
Valuable support from Valeriy Shunkov (Inst. for System Studies) towards modelling effects
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Building blocks for the CBM-XYTER at ZITI Heidelberg
Concentrated ADC expertise at ZITI David Muthers ADC resurrected
(Kaiserslautern)
New Current Mode ADC (Ivan Peric, ZITI) Design study very promising
9 bit, 25 MHz, 4.5 mW (0.36 pJ/conv.)
Simple Serial Data Driver Prestudy towards a serial chip data-
interface
CMOS standard cells yield 1.9 GHz
DEPFET Pixel with 2 ADC
Size x: 180µmSize y: 110µm
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Second Front End Test Chip Submitted at ZITI Heidelberg
26 channel charge sensitive amplifier
scaling: multiple parallel amplifier cells to meet overall noise specs
study various pulse injection circuits
study current mode logic based discriminator
Work by Tim Armbruster, ZiTi Heidelberg
Chips expected Jan. 2009
More Building blocks for the CBM-XYTER
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
NIHAM Bucharest: TRD Front-End Test Chip close to Submission
Particular emphasis on high counting rates TRD needs peaking times adapted to high
counting rate TRD
analogue baseline restauration
particularly fast return to baseline from overload
choice of peaking time (20ns, 40ns)
fast peak detector
Vasile Catanescu, NIHAM Bucharest
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
The Dedicated CBM-XYTER, Family Planning
STS-XYTER minimize power
dc-leakage compensation
compact, high channel density
MIP sensitivity in Si
dense mounting
4 to 5 bit res.
TRD-XYTER high resolution needs
(8 to 9 bit)
lower channel density
next neighbor forced trigger logic?
ion tail cancellation facilities
baseline restauration
lower occupancy
MUCH needs are somewhere in
between.Preferably adopt
these specs within one of the two!
MUCH needs are somewhere in
between.Preferably adopt
these specs within one of the two!
R. Szczygiel, P. GrybosAGH KrakowRealization in TOT architecure
P. Fischer ZITI Uni-HeidelbergArchitecture/specs not yet settled
Common process 0.180nm UMC, on-chip infrastructure, rad. hard libraries but different architectural specifics
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Discussion on CBM TRD electronics needs started
Mihai Petrovici, NIHAM Bucharest
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Discussion on CBM MUCH electronics needs started
V. Nikulin agreed to help out with thoughts on MUCH electronics needs!
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008
Towards Specs for TRD and MUCH-XYTER
Workshop planned early Dec. 2008 Get electronics- and detector-experts together
Work-out the architectural needs and specifications for both detectors
Principle questions to be answered:
Can we subsum MUCH and TRD electronics needs within one chip?
Specifications for the TRD-XYTER chip
Chip-System design may start from there
12th CBM Collaboration Meeting, Dubna, Oct. 17th 2008