summary report of the epri standard radiation monitoring program

15
Summary Report of the EPRI Standard Radiation Monitoring Program Dennis Hussey, EPRI Asian Technical Center ALARA Symposium Yuzawa, Japan October 11-13, 2006

Upload: avram-johnston

Post on 02-Jan-2016

37 views

Category:

Documents


1 download

DESCRIPTION

Summary Report of the EPRI Standard Radiation Monitoring Program. Dennis Hussey, EPRI Asian Technical Center ALARA Symposium Yuzawa, Japan October 11-13, 2006. Overview. History of Standard Radiation Monitoring Program (SRMP) Standard Radiation Monitoring Program Goals - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Summary Report of the EPRI Standard Radiation Monitoring Program

Summary Report of the EPRI Standard Radiation Monitoring Program

Dennis Hussey, EPRIAsian Technical Center ALARA SymposiumYuzawa, JapanOctober 11-13, 2006

Page 2: Summary Report of the EPRI Standard Radiation Monitoring Program

2© 2006 Electric Power Research Institute, Inc. All rights reserved.

Overview

• History of Standard Radiation Monitoring Program (SRMP)

• Standard Radiation Monitoring Program Goals

• Plant Types and Survey Points

• Current Results

– US Responses

– Summary statistics of • loop piping

• channel head surveys

– Difference of cold leg and hot leg measurements

• Conclusions and Recommendations

Page 3: Summary Report of the EPRI Standard Radiation Monitoring Program

3© 2006 Electric Power Research Institute, Inc. All rights reserved.

History of Standard Radiation Monitoring Program (SRMP)

• Started in 1978 to study radiation fields in Westinghouse-designed plants

– Program expanded to include Combustion Engineering (CE) designs

– In 1996, program was suspended because of a lack of industry interest and funding

• In 2003, NEI/INPO/EPRI developed the RP2020 Dose Reduction initiative

– Take Radiation Off the Table

– EPRI was charged to take the technical lead for source term reduction

– First goal was to benchmark PWR performance

Page 4: Summary Report of the EPRI Standard Radiation Monitoring Program

4© 2006 Electric Power Research Institute, Inc. All rights reserved.

Standard Radiation Monitoring Program Goals

• Maintain the history of the program

– Much data have been acquired already

– Locations should not be change

• Make the procedure simple, focused, practical, and routine

– North American Technical Center recommendation

– Help HP staff so that HP staff can help us

• Organize the data to allow correlation to chemistry events and plant design

– PWR Monitoring and Assessment Database

• Encourage consistent sampling techniques

Page 5: Summary Report of the EPRI Standard Radiation Monitoring Program

5© 2006 Electric Power Research Institute, Inc. All rights reserved.

SRMP Monitoring Points

• Workshop held in Charlotte March 7-9, 2006 to discuss– Selection of B&W points– Required vs Recommended points– Procedure clarifications

• Marker Discussions– Emergency Core Coolant System strainers limit

markers with vinyl– New markers made that are etched stainless steel

• Discussed further SRMP plans– Pre-oxidation points– Auxiliary system monitoring– Possible smears

Page 6: Summary Report of the EPRI Standard Radiation Monitoring Program

6© 2006 Electric Power Research Institute, Inc. All rights reserved.

Westinghouse Monitoring Points

Crossover piping and SG Hot leg piping Cold leg piping

Steam Generator Channel Head

Loop piping

Page 7: Summary Report of the EPRI Standard Radiation Monitoring Program

7© 2006 Electric Power Research Institute, Inc. All rights reserved.

Combustion Engineering Monitoring Points

Loop piping

Steam Generator Channel Head

Page 8: Summary Report of the EPRI Standard Radiation Monitoring Program

8© 2006 Electric Power Research Institute, Inc. All rights reserved.

Babcock and Wilcox Monitoring Points

Loop piping

Steam Generator Channel Head

Page 9: Summary Report of the EPRI Standard Radiation Monitoring Program

9© 2006 Electric Power Research Institute, Inc. All rights reserved.

Current US Survey Results

 Parameter/Plant Type W CE B&W Total

Plants 33/48 5/14 5/7 43/69

Total Number of Outages 982 275 180 1437

Loop Dose Rate Measurements 733 60 48 841

Channel Head Dose Rate Measurements

538 27 42 607

% Loop Measurements Received 74.6 21.8 26.7 58.5

% Channel Head Measurements Received

54.8 9.8 23.3 42.2

Page 10: Summary Report of the EPRI Standard Radiation Monitoring Program

10© 2006 Electric Power Research Institute, Inc. All rights reserved.

Summary Statistics: Loop Piping—Hot Leg and Cold Leg

0.00

1.00

2.00

3.00

4.00

5.00

6.00

7.00

8.00

HotLeg

ColdLeg A

ColdLeg B

HotLeg

J-leg A J-LegB

HotLeg

ColdLeg

HotLeg

ColdLeg

CE B&W W 3 loops W 4 Loops

Plant Type/Loop Location

Do

se r

ate

(m

Sv/

hr)

Average (mSv/hr)Standard Deviation (mSv/hr)Max (mSv/hr)Min (mSv/hr)

Page 11: Summary Report of the EPRI Standard Radiation Monitoring Program

11© 2006 Electric Power Research Institute, Inc. All rights reserved.

Summary Statistics: Channel Head Center

0.0

50.0

100.0

150.0

200.0

250.0

300.0

350.0

Point 2 Point 6 Point 2 Point 10 Point 2 Point 10 Point 2 Point 8

CE W 3 Loop W 4 Loop B&W

Plant Type/Location

Dos

e ra

te (

mS

v/hr

)

Average (mSv/hr)

Standard Deviation (mSv/hr)

Max (mSv/hr)

Min (mSv/hr)

Page 12: Summary Report of the EPRI Standard Radiation Monitoring Program

12© 2006 Electric Power Research Institute, Inc. All rights reserved.

Summary Statistics: Channel Head, Cold Leg - Hot Leg Difference

-150

-100

-50

0

50

100

150

200

Pt10-Pt2 Pt10-Pt2 Pt6-Pt2 Pt8-Pt2

W 3 Loops W 4 Loops CE B&W

Plant Type/Points

Cha

nnel

Hea

d D

ose

Rat

e D

iffer

ence

(m

Sv/

hr)

Average (mSv/hr)Standard Deviation (mSv/hr)Max (mSv/hr)Min (mSv/hr)

Page 13: Summary Report of the EPRI Standard Radiation Monitoring Program

13© 2006 Electric Power Research Institute, Inc. All rights reserved.

Conclusions

• The Standard Radiation Monitoring Program has been re-instated

• The procedures have been simplified for the HP staff

• Babcock and Wilcox plants are now included in the program

• The historical measurement points have been maintained for reference

• The data variability is quite large over time

– Westinghouse-designed plants have largest limits, and longest history

– Summary stats are not enough for a quantitative analysis of dose rates

• The trend of the cold leg having higher radiation fields than the hot leg has been confirmed for Westinghouse and CE plants

– Unexpected results obtained for the B&W plants

Page 14: Summary Report of the EPRI Standard Radiation Monitoring Program

14© 2006 Electric Power Research Institute, Inc. All rights reserved.

Recommendations

• Analyze the data to evaluate the change in radiation fields over time

– Time-based data will help understand transient changes in radiation fields

– Effects of system changes will be observable

• Compare the plants by chemistry operations, steam generator materials, and core duty

– SRMP database is combined with the EPRI PWR Chemistry Monitoring and Assessment Database

– Combined database also includes• Steam generator information

• Limited core duty

Page 15: Summary Report of the EPRI Standard Radiation Monitoring Program

15© 2006 Electric Power Research Institute, Inc. All rights reserved.

Acknowledgements

• EPRI Solutions

– Sam Choi, Cara Libby

• PWR ALARA Group

– Leonard Rollins, Dan Stoltz

• North American Technical Center

– David Miller, Scott Schofield

• Romain Bouchacourt