summary report pertaminapbmsj btj-206 hendriksahertian 4august-13august2013
DESCRIPTION
Logging ResultTRANSCRIPT
WELL-TECH
COMPLETION REPORT
OPEN HOLE LOGGING
Well Name : BTJ-206
Report By
HENDRIK JEFRI SAHERTIAN
August-20-2013
WellTech – PT.COSL INDO
WELL-TECH
I. WELL INFORMATION BTJ-206 is the name of the third well of Pertamina PBMSJ in Betung, Jambi. From
the picture below, we can see the location mark with “A”. This location is in Sumatra island.
Coordinat Loacation :
South : 870 5’ 7.176” East : 580 20’ 37.844”
Well and Rig Information.
Well Name BTJ-206 Field BETUNG Area JAMBI Drilling type Vertical Drilling Well Type Development Well Clasification Production Well Target Zone L2, L3, L4, L6, L7, and L8. Benakat Water
Formation Total Depth 535 m Rig Type 350 HP – Land Rig, Mobile Truck Mounted Drilling Floor Level ± 5 m from ground level Ground Level ± 64 m from sea water
WELL-TECH
II. EQUIPMENT INFORMATION
We use Skid Unit with serial number ESSS 9724 in this location. For downhole tools, we can
see the information below : No. Description Serial Number ASSET NUMBER Qty. 1 Insulation Bar EIST63 281014 SY XJ,11-08-
03 SY XJ11-08-04
3 EA
2 Swivel tool EPLT61XA 281016 73678 2 EA
3 Temperature/Tension/Fluid Resistivity Sub
ERMT61XA 292421 260115 2 EA
4 Remote Transmitting Tool ERTT71XA 292411 270003 2 EA
5 Digital Spectra Logging Tool EDST61XA 281276 281277 2 EA
6 Compensated Neutron Logging Tool ECNT62XA 270058 260215 2 EA
7 Litho-Density Logging Tool
EZDT61EA 281295 260180 2 EA
EZDT61MA 281295 260180 2 EA
8 Isolation Sub EIST61XA 281004 281001 2 EA 9
Dual Laterolog Tool EDLT72EA 270082 270086 2 EA
EDLT72MA 270084 2103086 2 EA 10 Micro Spherical Focused Laterolog EMSF61XA 272407 5302908 2 EA
11 Digital Acoustic tool
EDAT61EA 270072 292171 2 EA EDAT61MA 270072 292171 2 EA EDAT61FA 270072 292171 2 EA
12
EDIB Slam Adapter
ESAT61XB
280895
260145
2 EA
13 Collar Locating Logging tool ECCL61XA 270098 270104 2 EA 14 Knuckle tool EKJT61XA 280965 HE0702-
03 2 EA
15 GR/CCL tool(1392XA) GR/CCL
16 Collar Locating Logging tool(2315XA) 2315XA 17 Collar Locating Logging tool(2312XA) 2312XA YN-04 CCL05-
125210 2 EA
18 Neutron tool decentralizer N/A N/A N/A 1 EA
19 ERSC
20 Sink Bar N/A N/A N/A 1 EA
WELL-TECH
For radioactive source we use in this location we can see in table below :
Item Isotope name R/A Substance Intensity Source No Qty. 1 Ice Block Am-241Be 400mCi 7220NN 1ea 2 Neutron Source Am-241Be 18Ci 83464B 1ea 3 Density Source Cs-137 2.5Ci 77794B 1ea 4 GR Calibrator RA-226 2.5μCi DA-377 1ea 5 JIG Block Cs-137 500/40μCi CSII-0275,CS-
0260 1ea
For Total equipment we have in location we can see in table below :
No Description QTY Unit
1 Skid Unit ESSS 9724 1 Ea
2 Power Pack 1 Ea 3 Generator 1 Ea
4 Blue Box 1 Ea
5 Source Container 1 Ea
6 Tool Basket 1 Ea
7 Material Container 1 Ea
8 Compressor 1 Ea
9 Rig Up Equipment Box 1 Ea
10 Cable Drum 1 Ea
11 VSP Box 1 Ea
All equipments are still in good condition when arrived in location. We didn’t get any
problem when we do check tools.
WELL-TECH
III. PREPARATION
After arrived at location, we contact the geologist or company man to get job
programmes so we can know and arrange our plan to all crew before job.
We must do Pre Job Safety Meeting with safety officer in wellsite, we also give them JSA.
Before job we must pay attention to all of our tools condition because if some tools error
when we run logging, it will be big problem for us.
Make sure we check the tools condition for main tools and backup tools. We must use the
tools in best condition. After that give some mark on it, so easy for us to pick those tools
when we want to do our job.
Check the cable head condition (continuity and insulation) and pump some grease to
prevent the water enter into it. If neccesary, make another cable head as a backup.
Make sure diesel oil for our generator is enough until our job finish. Fill the tank until
full. If something happend to our tools, find out the cause of the problem and try to fix it.
Make sure all the auxiliary tools is good condition and ready to use. Put the auxiliary
tools in proper place so we can easy to use when we do our job.
Make sure the radioactive source and calibrator in good condition and place it on the
safe area from people.
As an engineer, we have to make sure our unit inside the cabin in good condition,
check the LSP make sure the insulation and continuity test produce good result. Beside that,
we also make sure for another panel must be in good condition.
Make sure our computer also in good condition, and screen can be used for our job.
After all the stuffs above is done, then we are ready to do our job.
Before job, we must contact the geologist to confirm the sequence and the tools they
need to logging. After confirm we just wait the information from company man to start the
logging job. After we get information from company man, we go straight to location and
prepare the tools and rig up.
We set the skid unit straight to well. Remember the position must be straight, so our
cable can easy to move.
We ask for crane operator to move our tools in basket next to catwalk and pick our
tools from basket one by one and lay those down on catwalk. While doing that another
WELL-TECH
operators can pull the wireline cable from cable drum and form it become “8” on the ground
as much as neccesary.
Move all the rig up equipments to drilling floor, set the upper and lower sheave wheel
and thighten the lower sheave wheel with proper chain on BOP. Make sure the tension cable
on tension device can bring tension information to our computer. Also make sure the speaker
is work. Prepare the clamp, make up table, spaner, and grease and put in proper place on the
drilling floor.
After finish now we can connect our tools to start our job.
Here are JSA when we want to do our Job.
WELL-TECH
46.8 m – 545 m1
V. OPERATION PROCEDURES
Here is the table that show our programme we do in location No
Interval (m)
Bit (inch)
Casing (inch)
Mud Properties
Logging Job
Type SG Visc PV/YP
1 0 - 50 12 ¼ 9-5/8 Pre-Hydrated Gel
8.4 - 8.5 35-40 Not Required
2
50 – 400
8 ½
7
KCL PHPA Polymer
8.4 - 8.6
45-50
15-20/18-25
DLL-MSFL-GR-SP Sonic, Densitiy, Neutron, Caliper, CBL-VDL-GR-CCL
Picture beside show the interval we must do the logging job. There only 1 interval as seen in
the picture.
Section 1
WELL-TECH
SECTION 1
Open Hole Interval : 46 – 535 m
Hole Size : 8 ½ inch
Job : (1) Resistivity Log (DLT & MSFL)
(2) Radioactive Log (ZDT and CNT) and Sonic Log (DAT)
(3) CBL & VDL
Time Of Job : Opeh Hole Job : August/5/2013
CBL Job @ 7” Casing : August/9/2013
Section 1 is 8 ½ in Open Hole. TD is set at 535 m and the previous casing shoe at 46
m. Logging sequence was based on client request start from Resistivity log, Radiocative and
Sonic log, and the last was CBL-VDL.
CBL job was held in defferent time after they set 7” casing along this interval.
(1). Resistivity Log
Here are the list of tools we use when we do resistivity log
Tools Serial Number Asset Number
SP
ESWT
ERMT
ERTT
EDST
EIST(28)
EDLT
EMSFL
EIST63
ESWT61XA
ERMT61XA
ERTT61XA
EDST61XA
EIST61XA
EDLT71XA
EMSFL61XA
SY XJ,11-08-03 / SY XJ11-08-04
3944XB 73678
292421
292411
281276
281004
270082
272407
WELL-TECH
Logger depth @ 533.7 m
While the operator connect the resistivity tools, we load the calibration and
verification data for our tools in ELIS computer. Also we put some data about
Wellsite information and fill some information in Proccessing Parameters. These are
important engineering things we should never forget. Another thing we must ask
report about mud properties from Mud Engineer at wellsite, we also request for
sample of Rm, Rmf and Rmc and after that we must measure those values.
Those data are :
Rm@78°F = 0.48Ω, Rmf@78°F = 0.1Ω and Rmc@78°F = 0.85Ω.
After operator complete the tool string connection, then we can power on our tool
string, make zero point and after that we can start our job.
Logging Job :
From the Record up result, we
get the logger depth at 533.7
m while the driller depth at
535 m. Casing logger and
casing driller at the same
depth 46 m because we make
depth correction at casing
shoe 9 5/8”.
For Repeat Log we start from
465 m until 290 m.
Some of logging results can
be shown like pictures below :
WELL-TECH
Casing logger @ 46 m
From that result we can see that Rmsfl is separated with Rd and Rs. But Rd and Rs
itself have small separation. We can assume the permeability of this formation is not
so good
WELL-TECH
(2). Radioactive and Sonic Log
Here are the list of tools we use when we do radioactive log
Before we do this job, radioactive source must be placed at the proper spot on the drill
floor so is makes easy for operator to install or uninstall the source. Don’t forget to
prepare the cover to prevent something down fall into the hole.
Before install the source, make sure the source chamber of CNT and ZDT in clean
condition. If not, then we must clean it first. The direction of CNT’s decentralizer and
ZDT’s caliper also must be same.
We also put the rubber stand off at EDAT upper and bottom body.
After that, install the source from CNT to ZDT. If uninstall from ZDT to CNT.
Make sure we already set the police line arround the well so nobody can come closer
to the well. Also for operator who install or uninstall the source, he must wearing the
protector to cover his body.
After Install, now we can Power On the tool string, make zero point at ERMT and
after that RIH the tools.
Logging Job
While RIH, we must catch first arrival wave along the cased hole (DT24 arround
57µs/ft) by set the gain and other parameters like search window and threshold to
certain value. After pass cased hole, we also keep to catch first this arrival wave. After
reach TD we open the EZDT caliper and start to record up untill passing casing shoe,
and after reach the cased hole we stop pull out the tools and make verification for
EZDT caliper.
Tools Serial Number Asset Number
ESWT
ERMT
ERTT
EDST
ECNT
EZDT
EDAT
ESWT61XA
ERMT61XA
ERTT61XA
EDST61XA
ECNT73XA
EZDT71XA
EDAT61XA
3944XB 73678
292421
292411
281276
270058
260780
270072
WELL-TECH
Logging Result
From the logging job we get result like some pictures below
From both pictures above we can see there is no crosplot between density-neutron log
along this interval.
Along the collapse hole interval we can see that density is acting like have small
density, but in the smooth hole the value of density become normal again.
Sonic log is stable along this interval because we catch good arrival wave.
WELL-TECH
From bottom interval
the quality of cement
bonding is already
good.
(3). CBL and VDL
Here are the list of tools we use when we do CBL and VDL
After set casing 7” we run CBL and VDL job. We use rubber stand off on EDAT so
the movement of the tools become smooth while rocord up and we can get better data.
After operators connect the tools, we can power on, set zero point and RIH.
Set the Search window at the first wave and observe the AMP3 data along the casing
hole interval.
Before record up fill the data we get in Max Observed Amp and then fill 100 in
Target Amplitude. After that we can start to record up until surface.
Logging Result
Here are some pictures about CBL and VDL
Tools Serial Number Asset Number
ESWT
ERMT
ERTT
EDST
EDAT
ESWT61XA
ERMT61XA
ERTT61XA
EDST61XA
EDAT61XA
8302307
292366
270245
270040
292179
WELL-TECH
Along this interval the cement bonding is
fair
From this interval until top is
bad cement bonding
WELL-TECH
V. TROUBLE ISSUE
Before do the job, we check our downhole tools condition and we found that there is
no problem with our tools. All the tools was in good condition.
The only one problem was bad reading of our cable head, and after checked it comes from
torpedo, one cable already broken, so we make a new torpedo. After that the reading is good
again.
WELL-TECH
VI. CREW EVALUATION Here are the list of Jambi crew member :
Engineer : Hendrik Sahertian
Operator : Qian Jun (Chief)
Bagus
Antoni
Ferdika
Kesyanto
This time after we arrived in Jambi, we strightly go to location because our job will be
start after several hours. All operator actually ready with this condition and even we are tired,
we can do our job correctly.
Before we do our job, we checked our tools condition and found that torpedo is not good,
because bad reading continuity.
I wish Mr Qian can respons quickly to solved this problem because our job will start in a few
moment, but he didnt. Maybe next time, he can do better.
Bagus have good attention to this job, he dirrectly take responsibility to make new torpedo
and helped by Antoni and Dika.
Kesyanto still new and must learn about the whole operation in location. He still looks
confuse about how to do, but i think he learn about this. Me and others already try to explain
how to do our job effectively.
WELL-TECH
VII. CONCLUSIONS, SUGGESTIONS AND RECOMENDATIONS
1. Both open hole and cased hole job is done without any problem. We have good
communication with client and they satisfy with our service.
2. Both Main and Backup computer in Skid Unit ESSS9724 salready in English for
ELIS Software, i wish all of our unit will be like this.
3. From the begining until job finish, there are no injuries among our crew. We have
to pay attention to this and try to do something with safety first so the risk of
injuries is small every time we do our job.