sunesis construction 6,951,117.00 kokosing construction...

33
Sunesis Construction bid read at Bid Opening was $6,963,245.00 John R. Jurgensen Co. bid read at Bid Opening was $7,722,897.99 Bid Sale Start Date: 9/25/2014 Bid Opening Date: 10/09/2014 Engineer’s Estimate of Cost: $7,664,200.00 Summary of Bids Received For MSD ID: 11242843_R CSO 12 Sewer Separation Phase A.4a (Re-bid) General Trade: Firm Name Bid Total $ Sunesis Construction 6,951,117.00 Kokosing Construction Company, Inc. 7,593,951.49 John R. Jurgensen Company 7,722,305.14 MAC Construction & Excavating Inc. 8,448,637.60 Page 1 of 33 "UP" = Unit Price 10/9/2014 4:08 PM

Upload: lamtu

Post on 09-Mar-2018

218 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Sunesis Construction bid read at Bid Opening was $6,963,245.00 John R. Jurgensen Co. bid read at Bid Opening was $7,722,897.99 Bid Sale Start Date: 9/25/2014 Bid Opening Date: 10/09/2014 Engineer’s Estimate of Cost: $7,664,200.00

Summary of Bids Received For

MSD ID: 11242843_R

CSO 12 Sewer Separation Phase A.4a (Re-bid)

GeneralTrade:

Firm Name Bid Total $Sunesis Construction 6,951,117.00

Kokosing Construction Company, Inc. 7,593,951.49

John R. Jurgensen Company 7,722,305.14

MAC Construction & Excavating Inc. 8,448,637.60

Page 1 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 2: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Bid Item Total $Firm Labor (UP) $ Materials (UP) $ Combined Unit $Bid Item Quantity Unit Bidders

Maintaining Traffic 1 LS1 John R. Jurgensen Company 476,403.99 142,921.20 333,482.79 476,403.99Kokosing Construction Company, Inc.

200,000.00 90,809.00 109,191.00 200,000.00

MAC Construction & Excavating Inc.

80,000.00 70,000.00 10,000.00 80,000.00

Sunesis Construction 40,000.00 15,898.00 24,102.00 40,000.00

Pavement for Maintaining Traffic, As per Plan

835 SY2

John R. Jurgensen Company 60,362.15 21.19 51.10 72.29Kokosing Construction Company, Inc.

50,100.00 41.00 19.00 60.00

MAC Construction & Excavating Inc.

33,400.00 25.50 14.50 40.00

Sunesis Construction 35,905.00 9.00 34.00 43.00

Dust Control 50 M GAL3 John R. Jurgensen Company 4,150.00 24.90 58.10 83.00Kokosing Construction Company, Inc.

3,500.00 62.00 8.00 70.00

MAC Construction & Excavating Inc.

2,500.00 50.00 0.00 50.00

Sunesis Construction 1,075.00 21.50 0.00 21.50

Construction Layout Stakes

1 LS4

John R. Jurgensen Company 103,374.00 31,012.20 72,361.80 103,374.00Kokosing Construction Company, Inc.

35,000.00 23,450.00 11,550.00 35,000.00

MAC Construction & Excavating Inc.

30,000.00 30,000.00 0.00 30,000.00

Sunesis Construction 1,420.00 0.00 1,420.00 1,420.00

Page 2 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 3: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Mobilization 1 LS5 John R. Jurgensen Company 200,000.00 60,000.00 140,000.00 200,000.00Kokosing Construction Company, Inc.

200,000.00 134,000.00 66,000.00 200,000.00

MAC Construction & Excavating Inc.

180,000.00 180,000.00 0.00 180,000.00

Sunesis Construction 113,774.00 51,876.00 61,898.00 113,774.00

Geotechnical Instrumentation

15 MO6

John R. Jurgensen Company 45,000.00 900.00 2,100.00 3,000.00Kokosing Construction Company, Inc.

15,000.00 963.00 37.00 1,000.00

MAC Construction & Excavating Inc.

105,000.00 7,000.00 0.00 7,000.00

Sunesis Construction 129,420.00 628.00 8,000.00 8,628.00

Project Sign 1 LS7 John R. Jurgensen Company 1,100.00 330.00 770.00 1,100.00Kokosing Construction Company, Inc.

2,500.00 1,119.00 1,381.00 2,500.00

MAC Construction & Excavating Inc.

1,500.00 1,000.00 500.00 1,500.00

Sunesis Construction 575.00 0.00 575.00 575.00

Stormwater Pollution Prevention Plan (SWPPP, NOI & NOT)

1 LS8

John R. Jurgensen Company 10,330.00 3,099.00 7,231.00 10,330.00Kokosing Construction Company, Inc.

24,312.99 18,202.99 6,110.00 24,312.99

MAC Construction & Excavating Inc.

25,000.00 20,000.00 5,000.00 25,000.00

Sunesis Construction 4,675.00 0.00 4,675.00 4,675.00

Clearing and Grubbing 1 LS9 John R. Jurgensen Company 30,196.00 9,058.80 21,137.20 30,196.00

Page 3 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 4: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

20,000.00 12,170.00 7,830.00 20,000.00

MAC Construction & Excavating Inc.

15,000.00 15,000.00 0.00 15,000.00

Sunesis Construction 7,990.00 0.00 7,990.00 7,990.00

Walk Removed 7,740 SF10 John R. Jurgensen Company 6,192.00 0.24 0.56 0.80Kokosing Construction Company, Inc.

14,319.00 1.85 0.00 1.85

MAC Construction & Excavating Inc.

12,384.00 1.45 0.15 1.60

Sunesis Construction 7,740.00 0.72 0.28 1.00

Concrete Driveway Removed

240 SY11

John R. Jurgensen Company 4,320.00 5.40 12.60 18.00Kokosing Construction Company, Inc.

6,000.00 24.00 1.00 25.00

MAC Construction & Excavating Inc.

5,520.00 20.00 3.00 23.00

Sunesis Construction 2,280.00 5.36 4.14 9.50

Curb Removed 1,212 LF12 John R. Jurgensen Company 4,242.00 1.05 2.45 3.50Kokosing Construction Company, Inc.

6,060.00 5.00 0.00 5.00

MAC Construction & Excavating Inc.

7,878.00 6.25 0.25 6.50

Sunesis Construction 4,848.00 3.00 1.00 4.00

Inlet Removed 12 EA13 John R. Jurgensen Company 5,928.00 148.20 345.80 494.00Kokosing Construction Company, Inc.

4,320.00 302.00 58.00 360.00

MAC Construction & Excavating Inc.

7,920.00 560.00 100.00 660.00

Sunesis Construction 4,080.00 256.00 84.00 340.00

Page 4 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 5: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Pavement Removed 659 SY14 John R. Jurgensen Company 13,180.00 6.00 14.00 20.00Kokosing Construction Company, Inc.

29,655.00 42.00 3.00 45.00

MAC Construction & Excavating Inc.

9,226.00 13.00 1.00 14.00

Sunesis Construction 5,931.00 6.00 3.00 9.00

Pipe Removed, 24" and Under

76 LF15

John R. Jurgensen Company 4,484.00 17.70 41.30 59.00Kokosing Construction Company, Inc.

1,900.00 15.00 10.00 25.00

MAC Construction & Excavating Inc.

21,280.00 190.00 90.00 280.00

Sunesis Construction 1,292.00 14.00 3.00 17.00

Seal and Abandoned (12" and Under)

1 LS16

John R. Jurgensen Company 12,177.00 3,653.10 8,523.90 12,177.00Kokosing Construction Company, Inc.

1,200.00 860.00 340.00 1,200.00

MAC Construction & Excavating Inc.

10,000.00 9,000.00 1,000.00 10,000.00

Sunesis Construction 2,350.00 1,335.00 1,015.00 2,350.00

Fill, Seal, and Abandon (Greater than 12")

5 CY17

John R. Jurgensen Company 6,140.00 368.40 859.60 1,228.00Kokosing Construction Company, Inc.

4,500.00 663.00 237.00 900.00

MAC Construction & Excavating Inc.

2,500.00 450.00 50.00 500.00

Sunesis Construction 650.00 17.00 113.00 130.00

Manhole Removed 5 EA18

Page 5 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 6: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

John R. Jurgensen Company 3,830.00 229.80 536.20 766.00Kokosing Construction Company, Inc.

1,500.00 289.00 11.00 300.00

MAC Construction & Excavating Inc.

6,000.00 950.00 250.00 1,200.00

Sunesis Construction 3,250.00 486.00 164.00 650.00

Fence Removed 1,319 LF19 John R. Jurgensen Company 2,638.00 0.60 1.40 2.00Kokosing Construction Company, Inc.

6,595.00 3.00 2.00 5.00

MAC Construction & Excavating Inc.

2,638.00 2.00 0.00 2.00

Sunesis Construction 2,638.00 0.00 2.00 2.00

Removal, Misc.: Remove, Store and Replace Existing Fence

186 LF20

John R. Jurgensen Company 8,184.00 13.20 30.80 44.00Kokosing Construction Company, Inc.

7,440.00 22.00 18.00 40.00

MAC Construction & Excavating Inc.

8,137.50 35.00 8.75 43.75

Sunesis Construction 8,137.50 0.00 43.75 43.75

Removal, Misc.: Building Demolished

1 LS21

John R. Jurgensen Company 47,838.00 14,351.40 33,486.60 47,838.00Kokosing Construction Company, Inc.

49,500.00 27,720.00 21,780.00 49,500.00

MAC Construction & Excavating Inc.

50,000.00 48,000.00 2,000.00 50,000.00

Sunesis Construction 40,000.00 0.00 40,000.00 40,000.00

Removal, Misc.: Remove and Store Signage

1 LS22

John R. Jurgensen Company 1,500.00 450.00 1,050.00 1,500.00

Page 6 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 7: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

2,000.00 1,926.00 74.00 2,000.00

MAC Construction & Excavating Inc.

2,000.00 2,000.00 0.00 2,000.00

Sunesis Construction 2,500.00 0.00 2,500.00 2,500.00

Removal, Misc.: Remove and Replace Power Pole (ALLOWANCE)

1 94000.23

John R. Jurgensen Company 94,000.00 0.00 94,000.00 94,000.00Kokosing Construction Company, Inc.

94,000.00 0.00 94,000.00 94,000.00

MAC Construction & Excavating Inc.

94,000.00 0.00 94,000.00 94,000.00

Sunesis Construction 94,000.00 0.00 94,000.00 94,000.00

Removal, Misc.: Gas Line Removed

335 LF24

John R. Jurgensen Company 21,775.00 19.50 45.50 65.00Kokosing Construction Company, Inc.

2,680.00 8.00 0.00 8.00

MAC Construction & Excavating Inc.

10,385.00 21.00 10.00 31.00

Sunesis Construction 3,015.00 7.00 2.00 9.00

Removal, Misc.: Commuter Rail Tracks Removed

210 LF25

John R. Jurgensen Company 6,510.00 9.30 21.70 31.00Kokosing Construction Company, Inc.

10,500.00 48.00 2.00 50.00

MAC Construction & Excavating Inc.

36,750.00 168.00 7.00 175.00

Sunesis Construction 6,405.00 12.50 18.00 30.50

Page 7 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 8: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Removal, Misc.: Remove, Store and Replace Existing Light Pole

4 EA26

John R. Jurgensen Company 3,000.00 225.00 525.00 750.00Kokosing Construction Company, Inc.

12,700.00 1,778.00 1,397.00 3,175.00

MAC Construction & Excavating Inc.

6,000.00 1,500.00 0.00 1,500.00

Sunesis Construction 10,000.00 0.00 2,500.00 2,500.00

Full Depth Pavement Sawing

272 LF27

John R. Jurgensen Company 816.00 0.90 2.10 3.00Kokosing Construction Company, Inc.

2,040.00 6.50 1.00 7.50

MAC Construction & Excavating Inc.

272.00 1.00 0.00 1.00

Sunesis Construction 680.00 0.59 1.91 2.50

Fence, Type CL 982 LF28 John R. Jurgensen Company 24,550.00 7.50 17.50 25.00Kokosing Construction Company, Inc.

19,640.00 11.00 9.00 20.00

MAC Construction & Excavating Inc.

24,304.50 12.00 12.75 24.75

Sunesis Construction 24,550.00 0.00 25.00 25.00

Gate, Type CL, Overhead Sliding

1 EA29

John R. Jurgensen Company 11,270.00 3,381.00 7,889.00 11,270.00Kokosing Construction Company, Inc.

10,000.00 5,600.00 4,400.00 10,000.00

MAC Construction & Excavating Inc.

11,270.00 4,770.00 6,500.00 11,270.00

Sunesis Construction 11,300.00 0.00 11,300.00 11,300.00

Gate, Type CL, Sliding 2 EA30

Page 8 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 9: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

John R. Jurgensen Company 5,670.00 850.50 1,984.50 2,835.00Kokosing Construction Company, Inc.

10,000.00 2,800.00 2,200.00 5,000.00

MAC Construction & Excavating Inc.

5,670.00 1,035.00 1,800.00 2,835.00

Sunesis Construction 5,700.00 0.00 2,850.00 2,850.00

Gate, Type CLT, Swinging 1 EA31

John R. Jurgensen Company 1,485.00 445.50 1,039.50 1,485.00Kokosing Construction Company, Inc.

1,500.00 840.00 660.00 1,500.00

MAC Construction & Excavating Inc.

1,485.00 685.00 800.00 1,485.00

Sunesis Construction 1,500.00 0.00 1,500.00 1,500.00

Drinking Fountain & Hose Bibb

1 EA32

John R. Jurgensen Company 5,500.00 1,650.00 3,850.00 5,500.00Kokosing Construction Company, Inc.

6,100.00 1,640.00 4,460.00 6,100.00

MAC Construction & Excavating Inc.

5,500.00 2,300.00 3,200.00 5,500.00

Sunesis Construction 6,150.00 1,496.00 4,654.00 6,150.00

Topsoil Furnished & Placed

972 CY33

John R. Jurgensen Company 28,188.00 8.70 20.30 29.00Kokosing Construction Company, Inc.

48,600.00 13.00 37.00 50.00

MAC Construction & Excavating Inc.

36,936.00 22.00 16.00 38.00

Sunesis Construction 44,712.00 21.00 25.00 46.00

Seeding & Mulching, Class 1

8,504 SY34

John R. Jurgensen Company 8,504.00 0.30 0.70 1.00

Page 9 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 10: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

9,779.60 0.65 0.50 1.15

MAC Construction & Excavating Inc.

9,779.60 0.65 0.50 1.15

Sunesis Construction 10,630.00 0.00 1.25 1.25

Commercial Fertilizer 800 LB35 John R. Jurgensen Company 400.00 0.15 0.35 0.50Kokosing Construction Company, Inc.

400.00 0.30 0.20 0.50

MAC Construction & Excavating Inc.

400.00 0.25 0.25 0.50

Sunesis Construction 400.00 0.00 0.50 0.50

Bio-Retention Area 1, As Per Plan

1 LS36

John R. Jurgensen Company 115,000.00 34,500.00 80,500.00 115,000.00Kokosing Construction Company, Inc.

95,000.00 41,986.00 53,014.00 95,000.00

MAC Construction & Excavating Inc.

130,000.00 80,000.00 50,000.00 130,000.00

Sunesis Construction 70,000.00 16,327.00 53,673.00 70,000.00

Bio-Retention Area 2, As Per Plan

1 LS37

John R. Jurgensen Company 80,000.00 24,000.00 56,000.00 80,000.00Kokosing Construction Company, Inc.

70,000.00 32,144.00 37,856.00 70,000.00

MAC Construction & Excavating Inc.

80,000.00 50,000.00 30,000.00 80,000.00

Sunesis Construction 56,600.00 12,196.00 44,404.00 56,600.00

Establishment 1 LS38 John R. Jurgensen Company 5,000.00 1,500.00 3,500.00 5,000.00Kokosing Construction Company, Inc.

5,000.00 2,800.00 2,200.00 5,000.00

MAC Construction & Excavating Inc.

5,000.00 5,000.00 0.00 5,000.00

Page 10 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 11: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Sunesis Construction 12,000.00 0.00 12,000.00 12,000.00

Low Visibility Paving System, As Per Plan

254 SY39

John R. Jurgensen Company 25,908.00 30.60 71.40 102.00Kokosing Construction Company, Inc.

15,240.00 33.00 27.00 60.00

MAC Construction & Excavating Inc.

25,400.00 60.00 40.00 100.00

Sunesis Construction 14,478.00 10.00 47.00 57.00

Concrete Pipe Encasement, 24" DIP Sanitary

30 LF40

John R. Jurgensen Company 3,900.00 39.00 91.00 130.00Kokosing Construction Company, Inc.

4,800.00 85.00 75.00 160.00

MAC Construction & Excavating Inc.

3,750.00 75.00 50.00 125.00

Sunesis Construction 2,070.00 17.00 52.00 69.00

Concrete Pipe Encasement, 8" PVC Sanitary

10 LF41

John R. Jurgensen Company 5,000.00 150.00 350.00 500.00Kokosing Construction Company, Inc.

1,800.00 128.00 52.00 180.00

MAC Construction & Excavating Inc.

1,200.00 70.00 50.00 120.00

Sunesis Construction 680.00 16.00 52.00 68.00

12' x 12' Conduit, Type A, 706.05 as Per Plan B

8 LF42

John R. Jurgensen Company 34,992.00 1,312.20 3,061.80 4,374.00Kokosing Construction Company, Inc.

32,000.00 1,638.00 2,362.00 4,000.00

MAC Construction & Excavating Inc.

40,000.00 3,800.00 1,200.00 5,000.00

Page 11 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 12: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Sunesis Construction 34,560.00 2,267.00 2,053.00 4,320.00

12' x 10' Conduit, Type A 706.05 as Per Plan B

735 LF43

John R. Jurgensen Company 3,013,500.00 1,230.00 2,870.00 4,100.00Kokosing Construction Company, Inc.

2,793,000.00 2,003.00 1,797.00 3,800.00

MAC Construction & Excavating Inc.

3,528,000.00 3,300.00 1,500.00 4,800.00

Sunesis Construction 2,940,000.00 2,125.00 1,875.00 4,000.00

12' x 10' Conduit, Type B 706.05 as Per Plan A

110 LF44

John R. Jurgensen Company 475,530.00 1,296.90 3,026.10 4,323.00Kokosing Construction Company, Inc.

440,000.00 2,156.00 1,844.00 4,000.00

MAC Construction & Excavating Inc.

660,000.00 3,300.00 2,700.00 6,000.00

Sunesis Construction 556,160.00 2,820.00 2,236.00 5,056.00

36" Storm Conduit, Type B

270 LF45

John R. Jurgensen Company 127,170.00 141.30 329.70 471.00Kokosing Construction Company, Inc.

159,300.00 329.00 261.00 590.00

MAC Construction & Excavating Inc.

91,800.00 190.00 150.00 340.00

Sunesis Construction 150,660.00 136.00 422.00 558.00

30" Storm Conduit, Type C

55 LF46

John R. Jurgensen Company 7,590.00 41.40 96.60 138.00Kokosing Construction Company, Inc.

13,750.00 112.00 138.00 250.00

MAC Construction & Excavating Inc.

12,375.00 125.00 100.00 225.00

Sunesis Construction 14,630.00 134.00 132.00 266.00

Page 12 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 13: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

30" Storm Conduit, Type B

44 LF47

John R. Jurgensen Company 8,624.00 58.80 137.20 196.00Kokosing Construction Company, Inc.

13,200.00 141.00 159.00 300.00

MAC Construction & Excavating Inc.

11,440.00 140.00 120.00 260.00

Sunesis Construction 10,164.00 95.00 136.00 231.00

24" Storm Conduit, Type B

116 LF48

John R. Jurgensen Company 39,092.00 101.10 235.90 337.00Kokosing Construction Company, Inc.

33,640.00 107.00 183.00 290.00

MAC Construction & Excavating Inc.

46,400.00 285.00 115.00 400.00

Sunesis Construction 40,252.00 123.00 224.00 347.00

24" Storm Conduit, Type C

96 LF49

John R. Jurgensen Company 22,944.00 71.70 167.30 239.00Kokosing Construction Company, Inc.

26,880.00 205.00 75.00 280.00

MAC Construction & Excavating Inc.

115,200.00 1,100.00 100.00 1,200.00

Sunesis Construction 40,704.00 310.00 114.00 424.00

15" Storm Conduit, Type B

137 LF50

John R. Jurgensen Company 29,318.00 64.20 149.80 214.00Kokosing Construction Company, Inc.

30,140.00 69.00 151.00 220.00

MAC Construction & Excavating Inc.

26,030.00 100.00 90.00 190.00

Sunesis Construction 28,907.00 64.00 147.00 211.00

Page 13 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 14: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

12" Storm Conduit, Type B

596 LF51

John R. Jurgensen Company 84,632.00 42.60 99.40 142.00Kokosing Construction Company, Inc.

89,400.00 72.00 78.00 150.00

MAC Construction & Excavating Inc.

83,440.00 80.00 60.00 140.00

Sunesis Construction 65,560.00 33.00 77.00 110.00

12" Storm Conduit, Type C

155 LF52

John R. Jurgensen Company 24,335.00 47.10 109.90 157.00Kokosing Construction Company, Inc.

10,850.00 45.00 25.00 70.00

MAC Construction & Excavating Inc.

10,385.00 42.00 25.00 67.00

Sunesis Construction 11,005.00 38.00 33.00 71.00

24" Sanitary Conduit, Type B, Ductile Iron Pipe

175 LF53

John R. Jurgensen Company 78,750.00 135.00 315.00 450.00Kokosing Construction Company, Inc.

70,000.00 123.00 277.00 400.00

MAC Construction & Excavating Inc.

84,000.00 220.00 260.00 480.00

Sunesis Construction 70,525.00 94.00 309.00 403.00

8" Sanitary Conduit, Type B

598 LF54

John R. Jurgensen Company 239,200.00 120.00 280.00 400.00Kokosing Construction Company, Inc.

221,260.00 144.00 226.00 370.00

MAC Construction & Excavating Inc.

158,470.00 145.00 120.00 265.00

Sunesis Construction 157,872.00 112.00 152.00 264.00

8" Sanitary Conduit, Type C

389 LF55

Page 14 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 15: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

John R. Jurgensen Company 54,460.00 42.00 98.00 140.00Kokosing Construction Company, Inc.

50,570.00 82.00 48.00 130.00

MAC Construction & Excavating Inc.

33,065.00 65.00 20.00 85.00

Sunesis Construction 26,841.00 41.00 28.00 69.00

6" Sanitary Conduit, Type B, as Per Plan

254 LF56

John R. Jurgensen Company 81,280.00 96.00 224.00 320.00Kokosing Construction Company, Inc.

50,800.00 100.00 100.00 200.00

MAC Construction & Excavating Inc.

69,850.00 157.00 118.00 275.00

Sunesis Construction 66,802.00 103.00 160.00 263.00

6" Storm Conduit, Type C, as per Plan (Downspouts)

14 LF57

John R. Jurgensen Company 392.00 8.40 19.60 28.00Kokosing Construction Company, Inc.

700.00 22.00 28.00 50.00

MAC Construction & Excavating Inc.

1,750.00 95.00 30.00 125.00

Sunesis Construction 1,414.00 51.00 50.00 101.00

6" Storm Conduit, Unclassified Underdrains, as per Plan (Bio-Retention Areas)

215 LF58

John R. Jurgensen Company 6,020.00 8.40 19.60 28.00Kokosing Construction Company, Inc.

4,300.00 12.00 8.00 20.00

MAC Construction & Excavating Inc.

7,310.00 22.00 12.00 34.00

Sunesis Construction 2,042.50 4.50 5.00 9.50

Page 15 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 16: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Connect Prop. 36" Storm to Ex. 90" Brick, as Per Plan

1 LS59

John R. Jurgensen Company 7,909.00 2,372.70 5,536.30 7,909.00Kokosing Construction Company, Inc.

12,500.00 10,976.00 1,524.00 12,500.00

MAC Construction & Excavating Inc.

40,000.00 30,000.00 10,000.00 40,000.00

Sunesis Construction 10,230.00 5,692.00 4,538.00 10,230.00

Connect Prop. 8" Sanitary to Ex. 84" Brick, as Per Plan

1 LS60

John R. Jurgensen Company 2,500.00 750.00 1,750.00 2,500.00Kokosing Construction Company, Inc.

3,150.00 2,750.00 400.00 3,150.00

MAC Construction & Excavating Inc.

3,500.00 3,000.00 500.00 3,500.00

Sunesis Construction 2,500.00 1,762.00 738.00 2,500.00

24" Storm Plug 2 EA61 John R. Jurgensen Company 2,218.00 332.70 776.30 1,109.00Kokosing Construction Company, Inc.

900.00 302.00 148.00 450.00

MAC Construction & Excavating Inc.

2,000.00 500.00 500.00 1,000.00

Sunesis Construction 3,340.00 382.00 1,288.00 1,670.00

12" Storm Plug 1 EA62 John R. Jurgensen Company 1,108.00 332.40 775.60 1,108.00Kokosing Construction Company, Inc.

400.00 290.00 110.00 400.00

MAC Construction & Excavating Inc.

175.00 100.00 75.00 175.00

Sunesis Construction 330.00 245.00 85.00 330.00

Catch Basin, No. 2-2B 3 EA63 John R. Jurgensen Company 3,870.00 387.00 903.00 1,290.00

Page 16 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 17: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

9,000.00 1,560.00 1,440.00 3,000.00

MAC Construction & Excavating Inc.

5,400.00 1,150.00 650.00 1,800.00

Sunesis Construction 3,435.00 540.00 605.00 1,145.00

Catch Basin, No. 2-3 1 EA64 John R. Jurgensen Company 1,889.00 566.70 1,322.30 1,889.00Kokosing Construction Company, Inc.

3,500.00 1,903.00 1,597.00 3,500.00

MAC Construction & Excavating Inc.

2,600.00 1,600.00 1,000.00 2,600.00

Sunesis Construction 2,280.00 971.00 1,309.00 2,280.00

Inlet, Misc.: Type DGI-MH 3 EA65

John R. Jurgensen Company 18,498.00 1,849.80 4,316.20 6,166.00Kokosing Construction Company, Inc.

16,500.00 1,923.00 3,577.00 5,500.00

MAC Construction & Excavating Inc.

10,800.00 1,600.00 2,000.00 3,600.00

Sunesis Construction 11,910.00 1,164.00 2,806.00 3,970.00

Inlet, Misc.: Type DGI 5 EA66 John R. Jurgensen Company 18,475.00 1,108.50 2,586.50 3,695.00Kokosing Construction Company, Inc.

22,500.00 1,927.00 2,573.00 4,500.00

MAC Construction & Excavating Inc.

16,000.00 1,600.00 1,600.00 3,200.00

Sunesis Construction 13,250.00 776.00 1,874.00 2,650.00

Inlet, Misc.: Type SGI 1 EA67 John R. Jurgensen Company 2,835.00 850.50 1,984.50 2,835.00Kokosing Construction Company, Inc.

3,900.00 1,990.00 1,910.00 3,900.00

MAC Construction & Excavating Inc.

2,500.00 1,300.00 1,200.00 2,500.00

Sunesis Construction 2,200.00 773.00 1,427.00 2,200.00

Page 17 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 18: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Manhole, Misc.: Type P, Storm

8 EA68

John R. Jurgensen Company 57,544.00 2,157.90 5,035.10 7,193.00Kokosing Construction Company, Inc.

68,000.00 5,446.00 3,054.00 8,500.00

MAC Construction & Excavating Inc.

52,000.00 4,000.00 2,500.00 6,500.00

Sunesis Construction 59,440.00 4,828.00 2,602.00 7,430.00

Manhole, MH No. 3, as Per Plan, Storm

5 EA69

John R. Jurgensen Company 38,410.00 2,304.60 5,377.40 7,682.00Kokosing Construction Company, Inc.

55,000.00 6,731.00 4,269.00 11,000.00

MAC Construction & Excavating Inc.

37,500.00 4,700.00 2,800.00 7,500.00

Sunesis Construction 44,250.00 6,216.00 2,634.00 8,850.00

Manhole, Misc.: Type S, Sanitary

8 EA70

John R. Jurgensen Company 64,000.00 2,400.00 5,600.00 8,000.00Kokosing Construction Company, Inc.

44,000.00 2,966.00 2,534.00 5,500.00

MAC Construction & Excavating Inc.

54,400.00 4,400.00 2,400.00 6,800.00

Sunesis Construction 33,440.00 2,310.00 1,870.00 4,180.00

Manhole, Misc.: Type S, Sanitary (Outside Drop)

1 EA71

John R. Jurgensen Company 30,000.00 9,000.00 21,000.00 30,000.00Kokosing Construction Company, Inc.

8,500.00 4,174.00 4,326.00 8,500.00

MAC Construction & Excavating Inc.

10,000.00 6,500.00 3,500.00 10,000.00

Sunesis Construction 8,000.00 4,500.00 3,500.00 8,000.00

Page 18 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 19: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Manhole, Misc.: Sanitary Remodel

2 EA72

John R. Jurgensen Company 10,000.00 1,500.00 3,500.00 5,000.00Kokosing Construction Company, Inc.

2,200.00 937.00 163.00 1,100.00

MAC Construction & Excavating Inc.

3,000.00 1,200.00 300.00 1,500.00

Sunesis Construction 6,260.00 2,324.00 806.00 3,130.00

Manhole, Misc., Box Risers

2 EA73

John R. Jurgensen Company 6,304.00 945.60 2,206.40 3,152.00Kokosing Construction Company, Inc.

2,800.00 400.00 1,000.00 1,400.00

MAC Construction & Excavating Inc.

18,000.00 5,300.00 3,700.00 9,000.00

Sunesis Construction 4,760.00 466.00 1,914.00 2,380.00

Curb Cut Drain Assembly, as Per Plan

5 EA74

John R. Jurgensen Company 9,680.00 580.80 1,355.20 1,936.00Kokosing Construction Company, Inc.

15,000.00 608.00 2,392.00 3,000.00

MAC Construction & Excavating Inc.

24,000.00 3,400.00 1,400.00 4,800.00

Sunesis Construction 54,850.00 4,322.00 6,648.00 10,970.00

Junction Chamber No. 4, as Per Plan

1 LS75

John R. Jurgensen Company 547,598.00 164,279.40 383,318.60 547,598.00Kokosing Construction Company, Inc.

1,026,350.00 486,350.00 540,000.00 1,026,350.00

MAC Construction & Excavating Inc.

815,000.00 465,000.00 350,000.00 815,000.00

Sunesis Construction 745,000.00 195,910.00 549,090.00 745,000.00

Sanitary Cleanout 2 EA76

Page 19 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 20: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

John R. Jurgensen Company 1,600.00 240.00 560.00 800.00Kokosing Construction Company, Inc.

3,600.00 966.00 834.00 1,800.00

MAC Construction & Excavating Inc.

2,600.00 900.00 400.00 1,300.00

Sunesis Construction 1,650.00 446.00 379.00 825.00

Bypass Pumping 1 LS77 John R. Jurgensen Company 75,000.00 22,500.00 52,500.00 75,000.00Kokosing Construction Company, Inc.

20,000.00 11,200.00 8,800.00 20,000.00

MAC Construction & Excavating Inc.

80,000.00 80,000.00 0.00 80,000.00

Sunesis Construction 23,040.00 1,915.00 21,125.00 23,040.00

Temporary Bulkhead (12'x12')

1 Ea78

John R. Jurgensen Company 12,890.00 3,867.00 9,023.00 12,890.00Kokosing Construction Company, Inc.

20,000.00 5,018.00 14,982.00 20,000.00

MAC Construction & Excavating Inc.

25,000.00 9,000.00 16,000.00 25,000.00

Sunesis Construction 20,600.00 3,403.00 17,197.00 20,600.00

Remove Temporary Bulkhead (12'x10')

1 EA79

John R. Jurgensen Company 4,155.00 1,246.50 2,908.50 4,155.00Kokosing Construction Company, Inc.

2,000.00 1,670.00 330.00 2,000.00

MAC Construction & Excavating Inc.

8,000.00 8,000.00 0.00 8,000.00

Sunesis Construction 20,800.00 3,558.00 17,242.00 20,800.00

Excavation 2,010 CY80 John R. Jurgensen Company 98,490.00 14.70 34.30 49.00Kokosing Construction Company, Inc.

100,500.00 48.00 2.00 50.00

Page 20 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 21: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

MAC Construction & Excavating Inc.

50,250.00 25.00 0.00 25.00

Sunesis Construction 64,320.00 15.00 17.00 32.00

Embankment 76 CY81 John R. Jurgensen Company 2,280.00 9.00 21.00 30.00Kokosing Construction Company, Inc.

5,700.00 72.00 3.00 75.00

MAC Construction & Excavating Inc.

3,800.00 50.00 0.00 50.00

Sunesis Construction 1,216.00 16.00 0.00 16.00

Asphalt Pavement Replacement

2,285 CY82

John R. Jurgensen Company 109,680.00 14.40 33.60 48.00Kokosing Construction Company, Inc.

95,832.90 25.94 16.00 41.94

MAC Construction & Excavating Inc.

95,970.00 22.00 20.00 42.00

Sunesis Construction 70,835.00 1.00 30.00 31.00

Subgrade Compaction 4,162 SY83 John R. Jurgensen Company 6,243.00 0.45 1.05 1.50Kokosing Construction Company, Inc.

35,377.00 8.50 0.00 8.50

MAC Construction & Excavating Inc.

16,648.00 4.00 0.00 4.00

Sunesis Construction 12,486.00 3.00 0.00 3.00

Asphalt Concrete Base 629 CY84 John R. Jurgensen Company 96,866.00 46.20 107.80 154.00Kokosing Construction Company, Inc.

97,495.00 87.00 68.00 155.00

MAC Construction & Excavating Inc.

95,608.00 42.00 110.00 152.00

Sunesis Construction 97,495.00 0.00 155.00 155.00

Page 21 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 22: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Aggregate Base 629 CY85 John R. Jurgensen Company 41,514.00 19.80 46.20 66.00Kokosing Construction Company, Inc.

59,755.00 54.00 41.00 95.00

MAC Construction & Excavating Inc.

50,320.00 38.00 42.00 80.00

Sunesis Construction 38,369.00 23.00 38.00 61.00

Tack Coat, 702.13 1,249 GAL86 John R. Jurgensen Company 7,494.00 1.80 4.20 6.00Kokosing Construction Company, Inc.

2,498.00 1.00 1.00 2.00

MAC Construction & Excavating Inc.

2,498.00 0.50 1.50 2.00

Sunesis Construction 2,498.00 0.00 2.00 2.00

Pavement Markings 1 LS87 John R. Jurgensen Company 1,883.00 564.90 1,318.10 1,883.00Kokosing Construction Company, Inc.

3,689.00 2,066.00 1,623.00 3,689.00

MAC Construction & Excavating Inc.

2,000.00 1,000.00 1,000.00 2,000.00

Sunesis Construction 1,883.00 0.00 1,883.00 1,883.00

Asphalt Concrete Surface Course, Type 1, Medium Traffic

175 CY88

John R. Jurgensen Company 40,950.00 70.20 163.80 234.00Kokosing Construction Company, Inc.

45,500.00 146.00 114.00 260.00

MAC Construction & Excavating Inc.

44,100.00 32.00 220.00 252.00

Sunesis Construction 43,750.00 0.00 250.00 250.00

Asphalt Concrete Surface Course, Type 1, Medium Traffic

39 CY89

Page 22 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 23: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

John R. Jurgensen Company 14,313.00 110.10 256.90 367.00Kokosing Construction Company, Inc.

11,700.00 168.00 132.00 300.00

MAC Construction & Excavating Inc.

9,828.00 32.00 220.00 252.00

Sunesis Construction 11,700.00 0.00 300.00 300.00

Asphalt Concrete Intermediate Course, Type 2, Medium Traffic

175 CY90

John R. Jurgensen Company 39,200.00 67.20 156.80 224.00Kokosing Construction Company, Inc.

28,000.00 90.00 70.00 160.00

MAC Construction & Excavating Inc.

28,000.00 30.00 130.00 160.00

Sunesis Construction 28,000.00 0.00 160.00 160.00

7" Non-Reinforced Concrete Driveway, as Per Plan

297 SY91

John R. Jurgensen Company 14,553.00 14.70 34.30 49.00Kokosing Construction Company, Inc.

26,730.00 51.00 39.00 90.00

MAC Construction & Excavating Inc.

24,057.00 56.00 25.00 81.00

Sunesis Construction 16,038.00 4.00 50.00 54.00

9" Non-Reinforced Concrete Base, as Per Plan

690 SY92

John R. Jurgensen Company 43,470.00 18.90 44.10 63.00Kokosing Construction Company, Inc.

55,200.00 25.00 55.00 80.00

MAC Construction & Excavating Inc.

51,750.00 43.00 32.00 75.00

Sunesis Construction 46,920.00 4.00 64.00 68.00

5' Concrete Walk 9,262 SF93

Page 23 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 24: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

John R. Jurgensen Company 46,310.00 1.50 3.50 5.00Kokosing Construction Company, Inc.

64,834.00 4.00 3.00 7.00

MAC Construction & Excavating Inc.

83,358.00 7.00 2.00 9.00

Sunesis Construction 53,256.50 1.17 4.58 5.75

ADA Curb Ramps, as Per Plan

11 EA94

John R. Jurgensen Company 3,685.00 100.50 234.50 335.00Kokosing Construction Company, Inc.

10,450.00 592.00 358.00 950.00

MAC Construction & Excavating Inc.

20,900.00 1,500.00 400.00 1,900.00

Sunesis Construction 6,523.00 216.00 377.00 593.00

Curb, Misc.: Concrete Curb, Type S-1

2,057 LF95

John R. Jurgensen Company 28,798.00 4.20 9.80 14.00Kokosing Construction Company, Inc.

55,539.00 19.00 8.00 27.00

MAC Construction & Excavating Inc.

61,710.00 25.00 5.00 30.00

Sunesis Construction 33,940.50 2.00 14.50 16.50

Curb, Misc.: Concrete Curb, Type P-5

32 LF96

John R. Jurgensen Company 1,120.00 10.50 24.50 35.00Kokosing Construction Company, Inc.

2,560.00 70.00 10.00 80.00

MAC Construction & Excavating Inc.

1,280.00 35.00 5.00 40.00

Sunesis Construction 1,280.00 3.50 36.50 40.00

Curb, Misc.: Concrete Curb/Wall, as Per Plan

75 LF97

John R. Jurgensen Company 6,900.00 27.60 64.40 92.00

Page 24 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 25: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

9,000.00 107.00 13.00 120.00

MAC Construction & Excavating Inc.

8,625.00 65.00 50.00 115.00

Sunesis Construction 9,300.00 98.00 26.00 124.00

Furnishing & Laying 6" Ductile Iron Pipe and Fittings

46 LF98

John R. Jurgensen Company 13,800.00 90.00 210.00 300.00Kokosing Construction Company, Inc.

11,040.00 148.00 92.00 240.00

MAC Construction & Excavating Inc.

16,100.00 225.00 125.00 350.00

Sunesis Construction 14,720.00 151.00 169.00 320.00

Furnishing & Laying 8" Ductile Iron Pipe and Fittings

879 LF99

John R. Jurgensen Company 219,750.00 75.00 175.00 250.00Kokosing Construction Company, Inc.

158,220.00 84.00 96.00 180.00

MAC Construction & Excavating Inc.

219,750.00 145.00 105.00 250.00

Sunesis Construction 154,704.00 56.00 120.00 176.00

Furnishing & Laying 16" Ductile Iron Pipe and Fittings

90 LF100

John R. Jurgensen Company 27,000.00 90.00 210.00 300.00Kokosing Construction Company, Inc.

35,100.00 170.00 220.00 390.00

MAC Construction & Excavating Inc.

42,750.00 245.00 230.00 475.00

Sunesis Construction 34,380.00 88.00 294.00 382.00

Page 25 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 26: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Furnishing & Laying 20" Ductile Iron Pipe and Fittings

10 LF101

John R. Jurgensen Company 10,000.00 300.00 700.00 1,000.00Kokosing Construction Company, Inc.

26,000.00 1,360.00 1,240.00 2,600.00

MAC Construction & Excavating Inc.

18,000.00 1,200.00 600.00 1,800.00

Sunesis Construction 20,550.00 506.00 1,549.00 2,055.00

Hauling Water Work Material

1 TON102

John R. Jurgensen Company 500.00 150.00 350.00 500.00Kokosing Construction Company, Inc.

600.00 578.00 22.00 600.00

MAC Construction & Excavating Inc.

850.00 850.00 0.00 850.00

Sunesis Construction 374.00 186.00 188.00 374.00

Furnishing & Installing 18" Steel Casing

46 LF103

John R. Jurgensen Company 10,350.00 67.50 157.50 225.00Kokosing Construction Company, Inc.

6,900.00 38.00 112.00 150.00

MAC Construction & Excavating Inc.

11,500.00 200.00 50.00 250.00

Sunesis Construction 3,174.00 14.00 55.00 69.00

Furnishing & Installing 30" Steel Casing

37 LF104

John R. Jurgensen Company 12,025.00 97.50 227.50 325.00Kokosing Construction Company, Inc.

9,250.00 48.00 202.00 250.00

MAC Construction & Excavating Inc.

9,620.00 150.00 110.00 260.00

Sunesis Construction 5,994.00 26.00 136.00 162.00

Concrete, Class C 10 CY105

Page 26 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 27: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

John R. Jurgensen Company 1,000.00 30.00 70.00 100.00Kokosing Construction Company, Inc.

6,000.00 465.00 135.00 600.00

MAC Construction & Excavating Inc.

5,000.00 400.00 100.00 500.00

Sunesis Construction 1,420.00 19.00 123.00 142.00

Hauling and Installing Fire Hydrant

3 EA106

John R. Jurgensen Company 7,500.00 750.00 1,750.00 2,500.00Kokosing Construction Company, Inc.

16,500.00 1,391.00 4,109.00 5,500.00

MAC Construction & Excavating Inc.

17,400.00 2,400.00 3,400.00 5,800.00

Sunesis Construction 9,900.00 812.00 2,488.00 3,300.00

Fire Hydrant Removed 3 EA107 John R. Jurgensen Company 1,500.00 150.00 350.00 500.00Kokosing Construction Company, Inc.

1,350.00 433.00 17.00 450.00

MAC Construction & Excavating Inc.

2,250.00 750.00 0.00 750.00

Sunesis Construction 975.00 325.00 0.00 325.00

Furnishing & Installing 6" Fire Hydrant Extension

3 EA108

John R. Jurgensen Company 2,100.00 210.00 490.00 700.00Kokosing Construction Company, Inc.

3,900.00 586.00 714.00 1,300.00

MAC Construction & Excavating Inc.

1,650.00 375.00 175.00 550.00

Sunesis Construction 1,875.00 298.00 327.00 625.00

Furnishing & Installing Valve Box, Complete

14 EA109

John R. Jurgensen Company 3,850.00 82.50 192.50 275.00

Page 27 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 28: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

11,900.00 231.00 619.00 850.00

MAC Construction & Excavating Inc.

6,160.00 240.00 200.00 440.00

Sunesis Construction 4,900.00 95.00 255.00 350.00

Furnishing & Installing Valve Box w/1" Air Release Complete

4 EA110

John R. Jurgensen Company 3,000.00 225.00 525.00 750.00Kokosing Construction Company, Inc.

4,400.00 462.00 638.00 1,100.00

MAC Construction & Excavating Inc.

5,200.00 900.00 400.00 1,300.00

Sunesis Construction 4,300.00 628.00 447.00 1,075.00

Furnishing & Installing Valve Box w/2" Air Release Complete

2 EA111

John R. Jurgensen Company 5,400.00 810.00 1,890.00 2,700.00Kokosing Construction Company, Inc.

5,000.00 698.00 1,802.00 2,500.00

MAC Construction & Excavating Inc.

5,000.00 1,700.00 800.00 2,500.00

Sunesis Construction 5,200.00 876.00 1,724.00 2,600.00

Additional Excavation (Contingency Item)

10 CY112

John R. Jurgensen Company 250.00 7.50 17.50 25.00Kokosing Construction Company, Inc.

500.00 45.00 5.00 50.00

MAC Construction & Excavating Inc.

750.00 75.00 0.00 75.00

Sunesis Construction 480.00 32.00 16.00 48.00

Exploratory Excavation (Contingency Item)

10 CY113

John R. Jurgensen Company 250.00 7.50 17.50 25.00

Page 28 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 29: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

600.00 55.00 5.00 60.00

MAC Construction & Excavating Inc.

1,000.00 100.00 0.00 100.00

Sunesis Construction 480.00 32.00 16.00 48.00

Removing Existing Manhole Curb & Cover

5 EA114

John R. Jurgensen Company 1,250.00 75.00 175.00 250.00Kokosing Construction Company, Inc.

1,750.00 242.00 108.00 350.00

MAC Construction & Excavating Inc.

2,500.00 500.00 0.00 500.00

Sunesis Construction 750.00 95.00 55.00 150.00

Removing Existing Valve Box

4 EA115

John R. Jurgensen Company 520.00 39.00 91.00 130.00Kokosing Construction Company, Inc.

280.00 67.00 3.00 70.00

MAC Construction & Excavating Inc.

600.00 150.00 0.00 150.00

Sunesis Construction 384.00 96.00 0.00 96.00

Changing 8" and Under Pipe Sewer (Contingency Item)

50 LF116

John R. Jurgensen Company 50.00 0.30 0.70 1.00Kokosing Construction Company, Inc.

2,000.00 32.00 8.00 40.00

MAC Construction & Excavating Inc.

7,500.00 100.00 50.00 150.00

Sunesis Construction 2,650.00 13.00 40.00 53.00

Changing 10" thru 24" Pipe Sewer (Contingency Item)

50 LF117

John R. Jurgensen Company 50.00 0.30 0.70 1.00

Page 29 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 30: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Kokosing Construction Company, Inc.

3,000.00 37.00 23.00 60.00

MAC Construction & Excavating Inc.

8,750.00 115.00 60.00 175.00

Sunesis Construction 6,400.00 13.00 115.00 128.00

Furnishing, Installing and Connecting 3/4" Copper Service Pipe, with Aqua-Shield

50 LF118

John R. Jurgensen Company 3,500.00 21.00 49.00 70.00Kokosing Construction Company, Inc.

4,500.00 56.00 34.00 90.00

MAC Construction & Excavating Inc.

2,500.00 35.00 15.00 50.00

Sunesis Construction 4,450.00 37.00 52.00 89.00

Furnishing, Installing and Connecting 2" Copper Service Pipe, with Aqua-Shield

56 LF119

John R. Jurgensen Company 7,280.00 39.00 91.00 130.00Kokosing Construction Company, Inc.

5,600.00 51.00 49.00 100.00

MAC Construction & Excavating Inc.

3,080.00 25.00 30.00 55.00

Sunesis Construction 6,216.00 36.00 75.00 111.00

Reconnecting Existing 3/4" Service Branch

1 EA120

John R. Jurgensen Company 800.00 240.00 560.00 800.00Kokosing Construction Company, Inc.

1,450.00 1,229.00 221.00 1,450.00

MAC Construction & Excavating Inc.

1,000.00 850.00 150.00 1,000.00

Sunesis Construction 1,030.00 609.00 421.00 1,030.00

Page 30 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 31: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Furnishing and Installing Curb and Roadway Box (Renew)

2 EA121

John R. Jurgensen Company 400.00 60.00 140.00 200.00Kokosing Construction Company, Inc.

600.00 151.00 149.00 300.00

MAC Construction & Excavating Inc.

1,800.00 500.00 400.00 900.00

Sunesis Construction 276.00 62.00 76.00 138.00

Relocating Existing 3/4" Frost-Proof Meter Setting

1 EA122

John R. Jurgensen Company 2,500.00 750.00 1,750.00 2,500.00Kokosing Construction Company, Inc.

1,400.00 1,194.00 206.00 1,400.00

MAC Construction & Excavating Inc.

900.00 800.00 100.00 900.00

Sunesis Construction 875.00 596.00 279.00 875.00

Relocating Existing 5/8" Frost-Proof Meter Setting

1 EA123

John R. Jurgensen Company 3,000.00 900.00 2,100.00 3,000.00Kokosing Construction Company, Inc.

1,350.00 1,175.00 175.00 1,350.00

MAC Construction & Excavating Inc.

900.00 800.00 100.00 900.00

Sunesis Construction 875.00 596.00 279.00 875.00

Relocating existing 2" Frost-Proof Meter Setting

1 EA124

John R. Jurgensen Company 4,000.00 1,200.00 2,800.00 4,000.00Kokosing Construction Company, Inc.

1,450.00 1,189.00 261.00 1,450.00

MAC Construction & Excavating Inc.

900.00 800.00 100.00 900.00

Sunesis Construction 1,750.00 1,192.00 558.00 1,750.00

Page 31 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 32: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Removing Curb and Roadway Box

1 EA125

John R. Jurgensen Company 120.00 36.00 84.00 120.00Kokosing Construction Company, Inc.

80.00 77.00 3.00 80.00

MAC Construction & Excavating Inc.

300.00 300.00 0.00 300.00

Sunesis Construction 96.00 96.00 0.00 96.00

Reinforcing Steel (Contingency Item)

500 LB126

John R. Jurgensen Company 1,000.00 0.60 1.40 2.00Kokosing Construction Company, Inc.

1,500.00 1.00 2.00 3.00

MAC Construction & Excavating Inc.

500.00 0.50 0.50 1.00

Sunesis Construction 750.00 1.00 0.50 1.50

Brick Masonry (Contingency Item)

1 CY127

John R. Jurgensen Company 50.00 15.00 35.00 50.00Kokosing Construction Company, Inc.

600.00 483.00 117.00 600.00

MAC Construction & Excavating Inc.

750.00 550.00 200.00 750.00

Sunesis Construction 314.00 57.00 257.00 314.00

Sheeting and Bracing Ordered Left in Place (Contingency Item)

1 MBF128

John R. Jurgensen Company 100.00 30.00 70.00 100.00Kokosing Construction Company, Inc.

10,000.00 1,000.00 9,000.00 10,000.00

MAC Construction & Excavating Inc.

40,000.00 2,000.00 38,000.00 40,000.00

Sunesis Construction 1.00 0.00 1.00 1.00

Page 32 of 33"UP" = Unit Price10/9/2014

4:08 PM

Page 33: Sunesis Construction 6,951,117.00 Kokosing Construction ...msdgc.org/cip/2005/downloads/bidtabs11242843_R.pdf · Sunesis Construction bid read at Bid Opening was $6,963,245.00 John

Performance Bond 1 LS129

John R. Jurgensen Company 33,304.00 9,991.20 23,312.80 33,304.00Kokosing Construction Company, Inc.

66,000.00 26,000.00 40,000.00 66,000.00

MAC Construction & Excavating Inc.

65,000.00 0.00 65,000.00 65,000.00

Sunesis Construction 36,000.00 0.00 36,000.00 36,000.00

Page 33 of 33"UP" = Unit Price10/9/2014

4:08 PM