Sung Kwang Sweaters Ltd. (11653) Ibrahim Tower, Plot # 313,314,315, Wireless Gate, Chandona, Gazipur
(+23.99159N, 90.39469E)
19.MAY.2014
Identified Priority 1 Concerns
1st Priority 1 Concern
The Building engineer said that shear
links were provided in the flat slab
column joints in construction, but this is
not shown on the Construction
drawings.
Our calculations for punching shear at
the typical column, found that the
shear stress is satisfactory under
gravity load without shear links
required. However, due to the lack of
lateral stability system, an increase in
stress caused by unbalanced moment
due to lateral load needs to be
considered.
Furthermore, the slab is very thin with
respect to its span: the span to
thickness ratio is 6100/184 = 33, more
than the 30:1 ratio usually used to
control deflections.
1st Priority 1 Concern (Continued)
Thinner flat slab will lead to an
increase in short-term and long-term
deflections and reduce the punching
shear resistance as well.
The thin flat slab without drop panel
and perhaps without shear
reinforcement is not sufficient to resist
the punching shear stresses in a
seismic load case, which will cause the
slab to fail suddenly and the building
will collapse subsequently in the event
of a moderate earthquake.
2nd Priority 1 Concern
The raised floor has been built on the
3rd floor; the total superimposed dead
load is 4.7 kPa. This will increase the
superimposed dead load for the floor
by 3.7 kPa (original 1.0kPa allowance
only) Furthermore, the additional load
from machine will make the live load
heavier than the design loading: 5.0
kPa.
250mm
Raised floor with
200mm sand filling
and 50mm screed and
tile
The machine is installed on a raised
floor. There is no information of the
weight of machine, but estimated to
have an operating weight of around
700kg per machine
Identified Priority 2 Concerns
Column to be checked
Based on the load
rundown analysis of the
building, it turns out to be
YELLOW status for all
checked columns that
have similar loading
condition and design.
Which requires that all
floor loadings must be
carefully monitored and
provided loading plan must
be strictly maintained.
Identified Priority 3 Concerns
We require that these items be
investigated in a Detail
Engineering Assessment
The overall structural
arrangement does not appear to
have any rational form of lateral
stability system to resist the
wind or earthquake loads. A
lateral load analysis is required
to be carried out.
The design engineer needs to
check the deflection storey drift,
column beam and slab stresses
under lateral wind and seismic
load.
Overall Stability System
We require that these items be
investigated in a Detail
Engineering Assessment
The overall structural
arrangement does not appear to
have any rational form of lateral
stability system to resist the
wind or earthquake loads. A
lateral load analysis is required
to be carried out.
Priority Actions
Problems Observed Summary
ITEM 1: (1st Priority 1) The flat slab may not be sufficient to resist the punching shear force under lateral load. thin flat slab without drop panel and shear ITEM 2: (2nd Priority 1) The raised floor at level 3 exceeds the design loading. ITEM 3: (1st Priority 2) The typical columns have low factor of safety with respect to their loading capacity. ITEM 4: (1st Priority 3) No lateral load resistance system.f
ITEM 5: (2nd Priority 3) There is no waterproofing provided on the existing roof.
Item No. Observation Recommended Action Plan Recommended Timeline
1The flat slab may not be sufficient to resist the punching
shear force under lateral load.Reduce loads on the floor to a maximum of 2.0 kPa Immediate – Now
2The flat slab may not be sufficient to resist the punching
shear force under lateral load.
Carry out the full analysis of the structure to check all element of the
building under lateral load. Check for punching shear with the un-
balanced moment. Lateral loads (wind and seismic) as per BNBC must
be applied.
Carry out intrusive testing of the structure to determine the actual
concrete and rebar strengths
6-weeks
3The flat slab may not be sufficient to resist the punching
shear force under lateral load.
Carry out the strengthening work to increase the punching shear
capacity.
Carry out the strengthening work to provide the lateral load resistance
system.
6-months
4 The raised floor at level 3 exceeds the design loading.Consider suspending activities in this area or installing props beneath
this floor to spread the load over several slabs.Immediate – Now
5 The raised floor at level 3 exceeds the design loading.Building engineer need to review and re-analysis for this area with the
actual loading and actual rebar on site.6-weeks
6 The raised floor at level 3 exceeds the design loading.
If found necessary to do so, carry out the strengthening work to
support the extra loading or break out the raise floor and take out the
sand filling.
6-months
Item No. Observation Recommended Action Plan Recommended Timeline
7The typical columns have low factor of safety with respect
to their loading capacity.
Factory Engineer to review design, loads and columns stresses in area
identified above.
Verify insitu concrete stresses either by 100mm dia. cores or existing
cylinder strength data.
6-weeks
8The typical columns have low factor of safety with respect
to their loading capacity.
Produce and actively manage a loading plan for all floor plates within
the factory giving consideration to floor capacity and column capacity.6-months
9 No lateral load resistance system.Building engineer to check and provide the solution for lateral resisting
requirements of the structure.6-weeks
10 No lateral load resistance system.As per the results of structural analysis, the building needs to be revised
to accord with BNBC building codes with regard to lateral stability.6-months
11 There is no waterproofing provided on the existing roof. Provide a proper waterproof layer on the roof level. 6-months