GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018 M. Winkler / Super-FRS Status 1 Mastertitelformat bearbeiten Super-FRS Status M. Winkler NUSTAR Annual Meeting, GSI, Feb.28 – March 2, 2017

Upload: others

Post on 21-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 1

Mastertitelformat bearbeiten

Super-FRS Status

M. WinklerNUSTAR Annual Meeting, GSI, Feb.28 – March 2, 2017

Page 2: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 2

1) Magnets and Testing

2) Local Cryogenics

3) Power Converter

4) Beam Instrumentation

5) Target Area Components

6) Civil Construction

7) Summary

Outline

Page 3: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 3

Magnets I(Status Standard SC Dipole Magnets)

Scope

• 3 units 11°, 18 units 9.75° + support

• Warm iron, SC coil

• Aperture ±190mm x ±70mm

• Weight: 50 to 60 ton

Collaboration with CEA, Saclay:

� TCC signed , includes:

� Detailed design, CDR, Spec, 3D Model

� Technical follow-up

Tender Status :

� Announcement published April 2017

� Qualifying submission closed mid May 2017

� Offers received by mid July 2017

� 1st round negotiation closed mid November 2017

� 2nd round negotiation closed Jan. 22, 2018

� Contract award Feb. 8, 2018

• Kick-off: March, 1, 2018

• FDR expected Q3/2018

• FAT of FoS expected Q2/2019

manufacturing plant ELYTT, Bilbao Spain

Kick-off photo follows tomorrow

H. Müller, E.J. Cho et al.

Page 4: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 4

Magnets II(R&D Branching Dipole Magnets)

Schedule (R&D work):

� Collaboration agreement with CEA/Saclay

� Detailed design, CDR, Spec, 3D Model

� Kick-off meeting 06/2017

� PDR 12/2017

• FDR 05/2018

• Final Report, DS 06/2018

� FAIR tender afterwards

PDR status

• Geometry (yoke, coil, cryostat)

� ∫Bdl achieved, I adopted

� magnetic field quality, chamfers included

• Assembly Scenario

• Thermal behavior after cool -down

• Magnetic forces after energizing

� various configuration of CTWS

� including cryo-stopper

� pole corner radius

• 2 active thermosiphon loops� use heaters to force flow direction

� design modification done

� thermal budget simulated

� thermosiphon experimental mock-up

H. Müller, E.J. Cho et al.

Page 5: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 5

Magnets III(SC Multiplets, Overview)

Schedule FoS SC multiplets

� Contract closed 07/2015 (ASG, Genova)

� Design phase for SM and LM done

� FDR 12/16

� PRR SM 07/17

� PRR LM 12/17

• Construction phase for FoS running

� FAT FoS SM 06/18

� shipment CERN, SAT FoS SM 12/18

Scope:

• 8 short multiplets (PS)

� QS configuration

• 25 long multiplets (mainly MS)

� Quadrupol triplet

• include corrector elements & steerer

≈60 ton

Main characteristics:

• iron dominated, cold iron (up to 37 tons)

• common helium bath

• warm beam pipe (38 cm inner diameter)

• individual powering, max. current <300A

≈25 ton

H. Müller, E.J. Cho et al.

Page 6: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 6

Magnets IV(FoS SM Production)

• All coils produced (quadrupol, sextupol)

� vacuum impregnated

� electrical integrity tests

• Laminations punched (sub-provider)

• Yoke assembly tool manufactured

• Yoke assembled (short quad, sextupole)

• CL prototype qualified (20 bar, M&W)

� CL for FoS SM under production

� Thermal shield manufactured

� LHe vessel manufactured

� Vacuum vessel manufactured

� Assembly bench manufactured (subprovider)

� Connectors for instrumentation under qualification

Page 7: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 7

Cryogenic system

Magets V(Testing@CERN, status)

K. Sugita et al.

• Collaboration between CERN and GSI

� CERN Build. 180: Infrastructures, renovation

• Cold (4K) testing of the SC dipoles and multiplets

� 3 test benches,

� incl. magnetic field measurements

• Addendum to the collaboration agreement

• Covering operation phase 5.5 years

� Signed January 2018

• Facility commissioning ongoing

� FoS multiplet expected for 06/18

� Personnel deployment ongoing (4 FTE from GSI)

• still missing: cryo jumper

Page 8: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 8

Cryogenic system

Magets VI(Testing@CERN impressions)

K. Sugita et al.

Page 9: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 9

Magnets VII(Testing@CERN Cryo Jumpers)

� Spec Released: 18th Nov 2016

� Tendering Started: 21st Feb 2017

� Contract Awarded: 15th May 2017

� Kick-Off Meeting: 31st May 2017

� PDR: 7th Dec 2017

� FDR: 21st Feb 2018

• Manufacturing: Feb-May 2018

• FAT: May 2018

• Delivery to CERN: May 2018

• Installation & SAT: May-June 2018

• Ready for Ops: June 2018 - ...

F. Wamers, M. Chesi, Y. Xiang et al.

design by

vacuum vessel

thermal shield

helium piping

Page 10: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 10

Magnets VIII(Radiation Resistant Magnets)

Installation of NC magnets

within the target-area shielding

• 3 dipole, 3 quadrupole, and 2 sextupole

• Normal conducting magnets using MIC cable

• Remote connectors and alignment

� Prototype dipole built and tested by BINP

� Dedicated support structure constructed

� Dipole: specification released

� FAIR procurement

• tender not yet started, under discussion with RU

• Two further specification in preparation

� DS for QQ (Q2/17)

� DS for QS, includes pump port (Q3/17)

H. Leibrock, T. Blatz, et al.

QS plus pump portQQ after target

chamber

Page 11: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 11

Local Cryogenics(Installation Planning)

F. Wamers, Y. Xiang et al.

Planning driven by installation and

commissioning logistics; basically

1. survey mesh required

2. technical services (TGA)

3. local cryogenics

4. magnet installation

To be defined:

• detailed planning,

• order of checks & tests,

• cold tests before magnets (?),

• order of branches, ...

� Information & experience exchange

with experts at other labs:

• Visit & Workshop at ESS (09/ 17)

• Visit & Workshop at DESY (12/17)

FHF1Big issue: In-kind with Poland missing ����

BB flow diagram

BB re-routing

T-branchlocal cryogenic connection

Page 12: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 12

Power ConverterStatus

� in-kind (Council) of India

� Specifications released (2017)

• Prototype PC under construction

� FAT expected Q3/2017

� SAT 12/2018 (?), at CERN FoS SM

• In-kind contract 12/2018

� India signed for ~600 PC (FAIR)

Scope

• in sum ~250 PC required

� 9 PC with high-power (up to 500 kW)

� other PC medium-power for SC magnets

• Voltage range: from 30V to 745V

• Current range: from 15A to 1.480A

Features

• common topology proposed

• energy recovery system

• all PC are bipolar

• PC include Active Power Correction Factor

• Two different DC voltages for ramp and flat-top

• QD electronics integrated within the PC rack

• Output filter , switching frequency up to 90kHz

� very small current ripple assembly area ECIL

QD electronics

A. Wiest, W. Freisleben et al.

Page 13: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

Beam Instrumentation I(∆∆∆∆E and ToF)

Si-strip prototype

MUSAMP v.2

• MUSIC (energy-loss, Finnish in-kind)

� Specification approved Q1/2017

� 1st IKC for Super-FRS signed !

� Field cage subcontracted to GSI

� Kick-off meeting done

� schematic design presented

� schedule for design phase and FoS development

agreed (ready Q3/19 � beam test if possible)

o PreAmps by CEA Bruyeres

� successfully tested at beam time in 2016

� contract waiting for signature (CEA)

• Time-of-Flight (Russian in-kind, IOFFE StP)

� Specification approved Q3/2016

� IKC drafted Q3/2017

� Response from IOFFE 02/17, many proposed changes,

still under negotiation

• R&D on diamond and silicon ongoing

Dec. 5, 2017

C. NociforoB. Voss, O. Kiselev, et al.

Feb. 15, 2018

Page 14: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

• SEM Grid (profile monitor), Finnish In-kind

� Specifications released

� Beam test at JYFL 11/2017

� C and Ti sample (FERMILAB),

� W sample (GSI)

� FEE POLAND

• IKC in preparation

� Fi continuing design � adopt dimensions

• GEM-TPC (tracking), Finnish in-kind

� Specîfication released

• IKC in preparation

− issue: GMX_2NX board high production wastage

• Beam test at GSI 2018 planned

� test PADI and clock-TDC combination

• Position drive, Finnish in-kind

� combined with SEM on a common drive

� Specification in preparation

Beam Instrumentation II(Position Detectors)

C. Nociforo, A. Prochazka, C. Caesar, et al.

Page 15: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 15

Beam Instrumentation III(Beam Monitors)

• PDC

o combined particle rate detectors (diamond)

and beam current monitors (IC, SEETRAM)

designed at GSI

� Prototypes in-beam test INFN-LNS 05/2017

C12 @ 62MeV/u

� Specification in approval process

• Diamond (intensity monitor, Ru in-kind)

� pcCVD/scCVD sensors by GSI-DL

� PA-20 preamps 20dB (1.5 GHz) tested

� Specification released

� IKC ready for preparation

• SEETRAM

� 3-Al foils (24 µm) produced by GSI

tested and calibrated with DIA

� radiation-hard multi-pin self-aligned

connectors tested (RH)

self-aligned

connectors

C. Nociforo, F. Schirru, S. Schlemme et al.

PA-20 preamps by IFJ (Cracow)

PDC test: IC calibration

PC-DD 20x20x0.3 mm

SEETRAM Ø 100 mm

SCint 100x100x0.25 mm3

Page 16: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 16

Target Area I(Target Chamber)

Status:

� Specification released

� Collab. Contract with KVI-CART

� Design phase running, includes:

• chamber design

• including 5 plugs

o 3 detector plugs

o target wheel plug (2nd target ladder)

o collimator plug

� pillow seal integration

� vacuum system integration

� beam spot diagnostic on target

� CDR report established

� 1:1 plug model built;

� plug guidance successfully verified

Michel Lindemulder, Henk Smit, KVI-CART

H. Weick, C. Karagiannis

Pillow seal

integration

Top shielding

by collars

Pumping duct

integration

Page 17: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 17

Target Plug

Collimator plug

Detector Plug

Target wheel

3990

mm

3948

mm

3900

mm

Target wheel plug (details)

• 4.2 ton (heaviest plug)

• includes target ladder (6 position)

• 2 linear drives + TW motor

• active cooling

Target Area II (Plug System)

Plug test

setup

H. Weick, C. Karagiannis

Page 18: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 18

Target Area III(Beam Catcher Plugs)

• 3 BC station equipped with two absorber each

• Indian in-kind, Collaborator: CMERI Durgapur

• Design running, based on definition report

� absorber geometry optimized

� use C/Cu (fast/slow extraction) � avoid Be

� CDR released 12/17

� build a absorber mock-up verify RH capability

� DS in preparation (Q2/2018)

� in-contract preparation (Q4/2018)

� India started company qualifying phase (Q4/2018)

absorber and assembly sequence (RH)

BC plugs weight: 7.5 ton

Page 19: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 19

Target Area IV(Shielding Flask)

� Specification ready for approval

• all dimensions finalized � interface HC finalized

• internal crane with automatic gripper; load 9 ton

• shielding: design goal is 10µSv/h on surface

• includes traverse platform with shielding plate

� allows for 90° rotation for position adjust

• MoU between Finland, KVI, PS, GSI in preparation

� to be signed Q2/2018

� in-kind contract with Finland to be established

F. Amjad, H. Weick et al.

Traverse platform:dim: 8.700mm x 3.000mm x 300mm weight: 19.5 ton

Page 20: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 20

Civil Construction I(Overview)

Tunnel 103

Build. 018

(Target building)

To CR

Build. 006

(HE cave)

Build. 006b

(LEB cave)

Build. 006a

(Service building)

July 4, 2017

100 m

CC planning Phase 1-4 done

� equivalent to LP5 (execution planning)

� LEB cave integrated to full extend

� interfaces to ‘machine’ defined

Logistic planning & Installation planning running

Construction area south (NUSTAR and other):

• Preparation of tender documents running

� review of contract specifications announced for 04/18

� partly tender already running (e.g. conveyor technique)

Page 21: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

GSI Helmholtzentrum für Schwerionenforschung GmbH Feb. 28, 2018M. Winkler / Super-FRS Status 21

Civil Construction II(Building services)

� Technical services (TGA)

� Cable data base updated 09/17

� Power & ventilation planning

� 1st collision check 01/18

Page 22: Super-FRS Status€¦ · (FoS SM Production) • All coils produced (quadrupol, sextupol) vacuum impregnated electrical integrity tests • Laminations punched (sub-provider) •

Summary

• SC Magnets & Testing (most time critical items):

� Standard dipoles: contract awarded Feb 2018

� Multiplets: design phase done; manufacturing of FoS SM under way

� Testing@CERN: contract addendum signed, commissioning of cryo-facility

running, procurement of last components running; FoS SM expected in 06/2018

• Development and procurement of various other components under way

� PC specification released; prototype PC under development

� First IKC for MUSIC detectors signed; kick-off with provider done

� Specification of various other beam instrumentation components released and

corresponding IKC in preparation (R&D is ongoing

� Target chamber and plug systems ready for CDR

� CDR of beam-catcher system done; DS and IKC expected in 2018

� Shielding flask: specifications ready for approval; MoU between collaborating

parties in preparation

• Civil Construction execution planning finalized; tender documentation in

preparation, building services planning running

3/4/2018M . Winkler / Super-FRS Status 22

Thank you for you attention !