super kekb project win03 oct 9 th, 2003 nobu katayama kek

Download Super KEKB project WIN03 Oct 9 th, 2003 Nobu Katayama KEK

If you can't read please download the document

Upload: rodger-stafford

Post on 18-Jan-2018

220 views

Category:

Documents


0 download

DESCRIPTION

Octl 9th, 2003Nobu Katayama3 KEKB status 1999/10  2003/7/1 > 50 fb  1 in years 2002, 2003 LER~1.55A HER~1.1A With SRF  cm -2 s fb -1

TRANSCRIPT

Super KEKB project WIN03 Oct 9 th, 2003 Nobu Katayama KEK Octl 9th, 2003Nobu Katayama2 Outline Belle/KEKB status Super KEKB plan Physics Detector study Accelerator study Octl 9th, 2003Nobu Katayama3 KEKB status 1999/10 2003/7/1 > 50 fb 1 in years 2002, 2003 LER~1.55A HER~1.1A With SRF cm -2 s fb -1 Octl 9th, 2003Nobu Katayama4 Best day (May 12 th, 2003) pb -1 /day recorded Octl 9th, 2003Nobu Katayama5 SVD 1 SVD = 54 ladders = 32 ladders SVD1SVD2 R BP 1.5 cm R BP 2.0cm R L1 3.0cm R L1 2.0cm R out 6.0cm R out 8.8cm Octl 9th, 2003Nobu Katayama6 SVD 1.6SVD2.0 R BP / R L1 / R out 20/30/60 mm15/20/90 mm Acceptance 23< e- Injection 2-nd bunch -> e+ production S-band accl. units are replaced with C-band units. Accl. Field 21 -> 41 MV/m e+ Damping Ring for lower emittance Achieved 40 MW (0.5ms, 50pps), > 40 MV/m (1m structure) Goal: 40 MW 40 MV/m Octl 9th, 2003Nobu Katayama39 Summary Belle and KEKB have achieved 1.0610 34 cm 2 s 1 and 158 fb 1 We have installed SVD2, two more RF cavities and come back online in 2 wks We are hoping to upgrade KEKB and Belle to reach luminosity and to accumulate 3000fb 1 before 2010 when LHC starts producing results Simulation tells us that we may reach 5 with head-on collision with crossing angles using the crab cavities