Superload Move. April 06, 2013 Prasad Nallapaneni & Jonathan Mallard Structure and Bridge, VDOT. Superload - Route. Superload - Details. Total Distance : Approximately 96 Miles Number of Structures: 62 (61 VDOT) Bridges: 25 Culverts: 37 VDOT Structures: Analyzed in-house: 47 - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Superload  Move

Superload MoveApril 06, 2013Prasad Nallapaneni & Jonathan MallardStructure and Bridge, VDOT

Page 2: Superload  Move

2

Superload - Route

Page 3: Superload  Move

3

Superload- DetailsTotal Distance :

Approximately 96 Miles Number of Structures: 62 (61 VDOT)

Bridges: 25Culverts: 37

VDOT Structures:Analyzed in-house: 47Third Party Analysis: 16

Page 4: Superload  Move

4

Superload - DetialsAnalysis Method:

In house: LFR/LRFR – »VIRTIS if available»Compared Simple span moments with HS20 ratings

Third Party: LRFR -16 BridgesVerified hand calculations/ LFR analysis

Structures Jumped: 5 (five)

Page 5: Superload  Move

5

Superload - Permit

Page 6: Superload  Move

6

Superload - Permit

Page 7: Superload  Move

7

Superload - Jump

Page 8: Superload  Move

8

Superload - Restrictions

Page 9: Superload  Move

9

Superload - Crabs

Page 10: Superload  Move

10

Superload

Page 11: Superload  Move

11

Superload

Page 12: Superload  Move

12

SuperloadAttempt Made:

• Run few bridges in 6.5 with Non Standard Gage Vehicle

• Compare with calculations received from Third Party and in-house STAAD runs

Page 13: Superload  Move

13

SuperloadBridge Fed ID: 24505

Page 14: Superload  Move

14

Superload

BrR Model Hand Clacs % Diff Reason

Dead Load Moment (K ft) 1550 1519 2.04% Model has slightly higher

Superimposed loadsCapacity (K Ft) 6271 6221 0.80% Round of errorRating Factor 2.01 2.09 -4.22%  

Live Load (K ft) 2355 2246 4.83%

May be round off error in Distribution Factor. No detail output in BrR for

Live Load.

Bridge Fed ID: 24505Wheel Configuration: Straight

Page 15: Superload  Move

15

SuperloadBridge Fed ID: 25334

Page 16: Superload  Move

16

Superload

BrR Model Hand Clacs % Diff Reason

Dead Load Moment (K ft) 5701 5691 0.18% Round Off

Capacity (K Ft) 15475 15463 0.08% Round OffRating Factor 1.11 1.19 -6.48%  

Live Load (K ft) 8805 8233 6.95%

May be round off error in Distribution Factor. No detail output in BrR for

Live Load.

Bridge Fed ID: 25334Wheel Configuration: Straight

Page 17: Superload  Move

17

SuperloadBridge 24231

Page 18: Superload  Move

18

Superload

BrR Model Hand Clacs % Diff Reason

Dead Load Moment (K ft) 320 320 0.0%

Capacity (K Ft) 1828 1828 0.08%Rating Factor 2.07 2.19 -5.6%  

Live Load (K ft) 729 688 5.93%

May be round off error in Distribution Factor. No detail output in BrR for

Live Load.

Bridge Fed ID: 24231Wheel Configuration: Straight

Page 19: Superload  Move

19

SuperloadDifficulties Faced

• Installation issues with 64 vs. 32 bit• Long time run process• Memory issues• Run only from bridge explorer • Not able to get a detailed LL output.

Page 20: Superload  Move

20

Superload

Page 22: Superload  Move

22

Field OperationsField Surveys• LIDAR survey was taken before and after on 5 long

span structures.• Calculated LL deflections from vehicle were up to 6”• Survey showed before and after elevations of the

bridge deck surface and the bottoms of the girders were within the tolerance of the method used.

• Any post move deflection was undetectable from a survey perspective.

Page 23: Superload  Move

23

Field OperationsStructure 10720, Lee County• Originally designated to be ‘jumped’• Field review of route raised concerns about limited

hospital access for an extended period.• Detour length = 50 miles.• Hauler’s consultants recommended removing a 20 kip

counterweight from each of the tractors.• Tractors effectiveness was limited due to traction

loss.

Page 24: Superload  Move

24

Field OperationsStructure 24362, Norton• Rated by private consultant. Substructure controlled

at pier due to uneven span arrangement• Travel restrictions were issued. • During transport, hydraulic line broke while crossing

the structure. Lead tractor was over critical pier.• After line replacement, vehicle initiated movement

from rear tractor, which was not on bridge.

Page 25: Superload  Move

25

Field OperationsStructure 22454, Norton• Simple Span Plate Girder with partial depth welded

diaphragms• First diaphragm on girder 4 cracked at the base.• Retrofitted by drilling, arrested by next inspection

cycle.

Page 26: Superload  Move

26