NAME OF WORK:- CONSTRUCTION OF SUPER PASSES AT R.D.1000m of silor disty. Of GIP
(Masonry linned canal)
A DRAIN DATA :-
Discharge 0.944 cumec = sqkm= 0.15 Sq mile
Bed width 1.00 m Nalla Bed (N.S.L.) m
F.S.D. 0.80 m H.F.L. in Nalla m
Free Board 0.30 m F.S.D ( Nalla) m
Bed slope 1 in 5000 m
C.B.L. mF.S.L. m 0.30
T.B.L. m 0.80
M.W.D. m
1 Canal section :- 1.00 x 1.10 m
Adopt section for superpasses = 1.00 x 1.10 m
2 Hydraulic Design for nalla section :-
Flood discharge as per dicken's formula.
Q = C x A3/2
Q = 1800 x( 0.15 )3/4
Q = 426.2 cusec
Q = 12.06 Cumec
Area required for passing required dicharge of nalla
2.00 meter/ sec
262.760
261.760
GOVERMENT OF RAJASTHAN
WATER RESOURCES DEPARTMENT GARARDA IRRIGATION PROJECT
CANAL DATA :-
Catchments area of Nalla. 0.38
1.00
0.50
Assume Valocity of nalla limited to
1.101.00
Free Board (nalla)
260.875261.675
261.975
-
7/28/2019 Super+Passes++in+Masonry+Section
2/20
y
:1
* * 2
* * 1
* *
* * *
* * *
* * ** * *
* *
* *
* *
* * A A
* *
* *
* *
* *
* *
*
*
* *
* *
* *
* *
* *:1
** * *
* * *
* *
* *
CONSTRUCTIONOF
SUPERPA
0.50
1.50
1.30
0.60
6.703.00
6.70
14.39
CBL
0.30
0.33
2
260.875
NallaB.L.
1.60
1.50
0.60
0.50
0.50
2.50
3.006.00
6.10
262.760
3 00
1.45
1
2.80
0.50
1.00
NAMEOFWORK:-
3.00
1.000.25
6.00
13.09
263.2
60
259.6
75
1.50
1.10
260.575
NallaTBL
7.09
2.50
261.760
NallaHFL
262.7
60
1
NallaHFL
U/SFSL
1.5
0
R.L.
R.L.
U/STBL
260.8
75
259.9
75
261.6
75
261.9
75
U/SCBL
-
7/28/2019 Super+Passes++in+Masonry+Section
3/20
Top bars Top &bttom Distribution bars
c/c 10mm F
M
Main reinforcement Bottom Plain barsc/c c/c
Detail of Reinforcement in Super passes (for slab)
m
0.3
10 mm F 250
300c/c
0.24
1688150 150
415 1960160
0.3 2.00
mm 8512
10 300mm F
-
7/28/2019 Super+Passes++in+Masonry+Section
4/20
NAME OF WORK:- 0
n Perticulars Qty unit
1
Hard soil mixed with kankar /boulder morrum
Abutment block 1 x 14.39 x 3.90 x 2.10 = 117.90
Wing Wall 4 x 4.70 x 1.80 x 2.10 = 71.10
Return wall 4 x 3.00 x 1.80 x 2.10 = 45.40
Total = 234.40 cum
25 cum
for 1 Nos = 59.00 cum
2
B. E/w in D/R rock 25 cum
for 1 Nos = 59.00 cum
C.H/R not required blasting 25 cumfor 1 Nos = 59.00 cum
D. E/w in phylites &other rock requaring nominal blasting 25 cum
for 1 Nos = 59.00 cum
3
GOVERNMENT OF RAJASTHAN
WATER RESOURCES DEPARTMENT
GARARDA IRRGATION PROJECT
DETAILED ESTIMATE
0
Detail
% of above =
Earth work in excavation including loading
disposal and dressing of excavate rock
with in initial leads of 50m and lift 1.5 m in
dry and moist including dressing of
excavated area, dewatering wherever
required and all applicable taxes and levies
etc. complete in all respect
Cement concrete (1:3:6) M 10 well mixed
% of above =
59.00
59.00
59.00
Earth work in excavation including loading
disposal and dressing of excavate earth
with in initial leads of 50m and lift 1.5 m in
dry and moist including dressing of
excavated area, dewatering wherever
required and all applicable taxes and leviesetc. complete in all respect
% of above =
% of above =
59.00
-
7/28/2019 Super+Passes++in+Masonry+Section
5/20
2
Return wall 4 x 3.00 x 2.25 x 1.50 x 0.90 = 14.18 cum
2
total 68.23 cum
for 1 Nos = 68.30 cum
5
Abutment 2 x 8.09 + 7.44 x 1.30 + 0.6 x 0.90 = 13.28cu
m
2 2
Wing Wall 4 x 4.70 + 3.20 x 1.50 + 0.50 x 2.90 = 45.82 cum
2 2
Return wall 4 3.00 + 2.25 x 1.50 + 0.50 x 2.90 = 30.45 cum
2 2
total 89.55 cum
for 1 Nos = 89.60 cum
6
for slabe 1 x 8.09 x 1.60 12.94 sqm
for 1 Nos = 13.00 cum
7
side of slabe 2 x 8.09 x 0.35 = 5.70 sqm
side of slabe 2 x 1 60 x 0 35 = 1 10 sqm
R.R stone masonry (using R.R.stone
where 75% stones to be not less than 15 in
size in any directon and weighing not less
than 23kg.)in superstrucuture including
curing all leads of construction materials &
all taxes and with initial lift \delift of 5m
from ground level etc complete in cement
sand mortar 1:5
Side shuttring including proping
etc.complete (to achive finish 2)for block
joints of foundation stillins basins, buckets
aprons etc. (non suspeted horizentally laidmass concrete)
Centring shuttring for slabs, beams, lintels,
coloumns troughs, with or without caps and
base including proping and removing.
-
7/28/2019 Super+Passes++in+Masonry+Section
6/20
10
for parapet wall 2 x 21.0 x 1.00 + 0.50 x 1.50 = 47.10 cum
2for 1 Nos = 47.10 cum
11
Length of slabe = 9.6 m
width of slabe = 1.60 m
Depth of slabe = 0.3 m
(As per IRC SP 20) for clear span 2.00m
main crank bars bottom (cross) # x 9.60 / 0.085 = 114 = 289 x 0.888 257
bottom plain bars (cross) # x 1.60 / 0.25 = 6 = 58 x 0.785 45
top bars (cross) # x 9.60 / 0.30 = 32 = 74 x 0.785 58
top bars (long) # x 1.60 / 0.30 = 5 = 48 x 0.785 38
Botttom bars (long) # x 1.60 / 0.30 = 5 = 48 x 0.785 38
435
5% for cutting wastage 22
Total weight (kg.)= 457
Total weight (T) = 0.46
for 1 Nos = 0.50 ton12
Tot
al
wei
Couresd stone / kharanja masonry (using
hammer dressed stone to be not less than
20 cm in any direction and at least 50 %
stone to be more than 23 cm in depth ) for
superstructure (upto 0.5m thickness)
including curing etc.including all leads of all
construction matarials complete.in cement
sand mortar1:5
galleries, arch covers, bed plates, sluice
capstan bases etc.
lengthweight/
m= x
2.54
9.60
Nos.
Total weight (kg) =
9.60
Cement concrete (1:2:4) M-15 well mixed
and laid in - position complete including all
leads of all construction materials
including curing and finishing having well
9.60
2.30
number required
length
of cc
c/c
space=
Supply of M S .reinforcement including
labour charges for bending binding and
placing in position all reinfocement as per
drawing including cost of binding wire and
all leads and lifts using.tor or ribed barsTota
l
leng
i
-
7/28/2019 Super+Passes++in+Masonry+Section
7/20
for parapet wall 4 x 21.00 x 1.50 = 126.00 sqm
for parapet end wall 4 x 1 x 1.50 = 3.98 sqm
Total 129.98 sqm
for 1 Nos = 130.00 cum
15
50 % of item no 1 118.00 cum
(Rate as per irrigation BSR2006Ch 5/8c)
Rehandling of excaveted matrial inlcuding
loading unloading and dressing within inial
lead of 50 m and lift 1.5 m with cost of
dewatering wherever required and all
applicable taxes and lavies etc. complete
in all respect mixed strata muck.
cement sand mortar 1:3
-
7/28/2019 Super+Passes++in+Masonry+Section
8/20
-
7/28/2019 Super+Passes++in+Masonry+Section
9/20
-
7/28/2019 Super+Passes++in+Masonry+Section
10/20
NAME OF WORK:- 0 0
(BSR 2008)
Sno Perticulars Qty Rate Unit Amount
1
Hard soil mixed with kankar /boulder morrum 59.00 47.00 p /cum 2773.00(Rate as per irrigation BSR2008 Ch 5/1c) cum
2
(Rate as per irrigation BSR2008 Ch 5/2 )
B. E/w in D/R rock 59.00 78.00 p /cum 4602.00cum
C.H/R not required blasting 59.00 121.00 p /cum 7139.00
cum
D. E/w in phylites &other rock requaring nominal blasting 59.00 166.00 p /cum 9794.00
cum
3
(a) Maximum size up to 20mm 34.00 2105.00 p /cum 71570.00
(Rate as per irrigation BSR2008 Ch 7/6d) cum
4
Cement concrete (1:3:6) M-10 well mixed and laid in -
position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of
R R stone masonry (using R R stone where 75% stones
GOVERNMENT OF RAJASTHAN
WATER RESOURCES DEPARTMENT
GARARDA IRRGATION PROJECT
Earth work in excavation including loading disposal and
dressing of excavate rock with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect
Earth work in excavation including loading disposal and
dressing of excavate earth with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect
-
7/28/2019 Super+Passes++in+Masonry+Section
11/20
7
13.80 90.00 P sqm 1242.00
sqm
(Rate as per irrigation BSR2008 Ch 10/1b)
8
(a) Maximum size up to 20mm 7.00 2951.00 p /cum 20657.00
(Rate as per irrigation BSR2008 Ch 7/4d) cum
9
7.00 111.00 p /cum 777.00
(Rate as per irrigation BSR2008 Ch 10/11b)
cum
10
47.10 2003.00 p /cum 94342.00
cum
11
(As per IRC SP 20) for clear span 2.00m 500.00 55.00 P /Kg 27500.00
kg
Side shuttring including proping etc.complete (to achive
finish F2 Top or intermidiate bed platein between
masonry of piers,abutments sluice well etc.
Cement concrete (1:1.5:3) M-10 well mixed and laid in -
position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of
Extra labour charges for obstructration in laying andplacing the reinforced cement concrete due to
reinforcement.
(b) Colomns, Slabs, Cantilevers projections staircase,
lintels , beams, chajjas, Retaining walls, piers,
abutments, galleries, arch covers, bed plates, sluice
capstan bases etc.
Couresd stone / kharanja masonry (using hammer
dressed stone to be not less than 20 cm in any directionand at least 50 % stone to be more than 23 cm in depth
) for superstructure (upto 0.5m thickness) including
curing etc.including all leads of all construction matarials
complete.in cement sand mortar1:5
Supply of M S .reinforcement including labour charges
for bending binding and placing in position all
reinfocement as per drawing including cost of bindingwire and all leads and lifts using.tor or ribed bars
-
7/28/2019 Super+Passes++in+Masonry+Section
12/20
118.00 29.00 p /cum 3422.00
(Rate as per irrigation BSR2006Ch 5/8c)
Total 576775.00
3 % contengency 17303.25
594078.25
Say Rs. 5.95 lacs
applicable taxes and lavies etc. complete in all respect
mixed strata muck.
G total
-
7/28/2019 Super+Passes++in+Masonry+Section
13/20
0 0
1 NIT No. 7/2008-09 S.No.32
2 NIT Amount Rs. 0 lacs
3 Earnest money 1.Regd. Contractor @1/2%Rs. 0.00
2.Other Contractor @ 2%Rs. 0.00
4 Tender cost Rs. 200
5 Date of Selling Tender 15.09.08 to 22.09.08
6 Date of Receiving Tender 24.09.08 upto 3.00 PM
7 Date of Opening Tender 24.09.08 At 4.00 PM
8 Time of completion 4 Month9 B.S.R. Irrigation BSR 2008
Sno. Item Qty Rate Unit Amount
1
59.00 47.00 p /cum 2773.00
Hard soil mixed with kankar /boulder morrum cum
2
B. E/w in D/R rock 59.00 78.00 p /cum 4602.00
cum
C.H/R not required blasting 59.00 121.00 p /cum 7139.00
cum
D E/w in phylites &other rock requaring nominal blasting 59 00 166 00 p /cum 9794 00
SCHEDULE "G"
Earth work in excavation including loading disposal and
dressing of excavate earth with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect
Earth work in excavation including loading disposal and
dressing of excavate rock with in initial leads of 50m
and lift 1.5 m in dry and moist including dressing of
excavated area, dewatering wherever required and all
applicable taxes and levies etc. complete in all respect
-
7/28/2019 Super+Passes++in+Masonry+Section
14/20
89.60 1660.00 p /cum 148736.00
cum
6
13.00 131.00 P sqm 1703.00
sqm
7
13.80 90.00 P sqm 1242.00
sqm
8
(a) Maximum size up to 20mm 7.00 2951.00 p /cum 20657.00
cum
9
7.00 111.00 p /cum 777.00
cum
10
47.10 2003.00 p /cum 94342.00
cum
11 Supply of M S reinforcement including labour charges
Centring shuttring for slabs, beams, lintels, coloumns
troughs, with or without caps and base including
proping and removing.
Side shuttring including proping etc.complete (to achive
finish F2 Top or intermidiate bed platein between
masonry of piers,abutments sluice well etc.
Cement concrete (1:1.5:3) M-10 well mixed and laid in -position complete including all leads of all construction
materials including curing and finishing having well
graded broken stone aggregate of
Extra labour charges for obstructration in laying and
placing the reinforced cement concrete due to
reinforcement.
(b) Colomns, Slabs, Cantilevers projections staircase,lintels , beams, chajjas, Retaining walls, piers,
abutments, galleries, arch covers, bed plates, sluice
capstan bases etc.
Couresd stone / kharanja masonry (using hammer
dressed stone to be not less than 20 cm in any direction
and at least 50 % stone to be more than 23 cm in depth
) for superstructure (upto 0.5m thickness) including
curing etc.including all leads of all construction
matarials complete.in cement sand mortar1:5
taxes and with initial lift \delift of 5m from ground level
etc complete in cement sand mortar 1:5
-
7/28/2019 Super+Passes++in+Masonry+Section
15/20
sqm
15
118.00 29.00 p /cum 3422.00
Total 576775.00
Rehandling of excaveted matrial inlcuding loading
unloading and dressing within inial lead of 50 m and lift
1.5 m with cost of dewatering wherever required and all
applicable taxes and lavies etc. complete in all respect
mixed strata muck.
-
7/28/2019 Super+Passes++in+Masonry+Section
16/20
62 nos main bars Distribution bars 86 nos main bars Distribution bars
12mm F 120 c/c 8mm F 160 c/c 12mm F 85 c/c 10mm F 250 c/c
Wearing coat 75mm thicko o o o o o o o o o o o o
o o o o o o o o o o o o o o o o o o o o o o
Cross section of culvert
60 nos main bars Distribution bars 1.50 m span 2.00 m span
16mm F 125 c/c 10mm F 175 c/c
71 nos main bars Distribution bars
16mm F 105 c/c 12mm F 200 c/co o o o o o o o
o o o o o o o o o o o o o o o o
o o o o o o o o o o
o o o o o o o o o o o o o o o o o o
3.00 m span
4.00 m span
53 nos main bars Distribution bars 65 nos main bars Distribution bars
20mm F 140 c/c 12mm F 175 c/c 20mm F 115 c/c 12mm F 150 c/c
o o o o o o o o o o o o o o o o o o o o o o
o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o
5.00 m span 6.00 m spanNOTES:-
1 Concrete:- M-25 2 Steel:- HSDY as per IS-1786 3 Cover:- 20mmat bottom & 40mm at side
4 In 1.5M, 2.0M &3.0M span only one Bar is to be crankedin each side in four bars in all other span crank alternative bars.
5 All bars cranked one end onl these are placed ith crank on left side and right side alternati el
450
7500 450
6600
416
300 3001500
150 1256
150
150
300
375
150
2000 300160 1960
210 240
1688
130 1575
300
150
150 2508
150
506220 2810
300
3330150
370300 3000 300
150 4040
150
150
4000 300
590290 3650
430 480
4840
890
400 400400 5000
790320 4570
150
6000 400400 5360
-
7/28/2019 Super+Passes++in+Masonry+Section
17/20
93 nos main bars Distribution bars
20mm F 90 c/c 12mm F 125 c/c
o o o o o o o o o o o o
o o o o o o o o o o o o o o o o o o o o o o o o
8.00 m span
62 nos main bars Distribution bars25mm F 120 c/c 12mm F 110 c/c
o o o o o o o o o o o o o o o o o o o o o o o o o o
o o o o o o o o o o o o o o o o o o o o o o o o o o
10.00 m span
600
400 8000 400
150 6680
150
400 10000 400
1120520 7280
150 8400
1260670 8990
150
750
-
7/28/2019 Super+Passes++in+Masonry+Section
18/20
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1.5 0.21 0.3 12 120 375 130 1575 8 160 10 300 10 300 1256
2 0.24 0.3 12 85 415 160 1960 10 250 10 300 10 300 1688
3 0.3 0.3 16 125 506 220 2810 10 175 10 300 10 300 2508
4 0.37 0.3 16 105 590 290 3650 12 200 10 300 10 300 3330
5 0.43 0.4 20 140 790 320 4570 12 175 10 300 10 300 4040
6 0.48 0.4 20 115 890 400 5360 12 150 10 300 10 300 4840
8 0.6 0.4 20 90 1120 520 7280 12 125 10 300 10 300 6680
10 0.75 0.4 25 120 12 670 7280 12 125 10 300 10 300 8400
bottom
(mm)
Dia
meter of
bars
(mm)
top steel where main not available
center
Length
Top reinfrocement
x - side
Dia meter
of bars
(mm)
Center
to center
distance
(mm)
Bed blok
length(m)
Main Reinforcement
LengthDia
meter of
bars
(mm)
Center to
center
distance
(mm)
y - side
top
porsion
(mm)
crank
(mm)
Dia meter
of bars
(mm)
Center to
center
distance
(mm)
Center
to
center
distance
Span
(M)
Bottonm reinforcement
y - sidex - side
thickness
of slab
(m)
-
7/28/2019 Super+Passes++in+Masonry+Section
19/20
-
7/28/2019 Super+Passes++in+Masonry+Section
20/20