    NAME OF WORK:- CONSTRUCTION OF SUPER PASSES AT R.D.1000m of silor disty. Of GIP

    (Masonry linned canal)

    A DRAIN DATA :-

    Discharge 0.944 cumec = sqkm= 0.15 Sq mile

    Bed width 1.00 m Nalla Bed (N.S.L.) m

    F.S.D. 0.80 m H.F.L. in Nalla m

    Free Board 0.30 m F.S.D ( Nalla) m

    Bed slope 1 in 5000 m

    C.B.L. mF.S.L. m 0.30

    T.B.L. m 0.80

    M.W.D. m

    1 Canal section :- 1.00 x 1.10 m

    Adopt section for superpasses = 1.00 x 1.10 m

    2 Hydraulic Design for nalla section :-

    Flood discharge as per dicken's formula.

    Q = C x A3/2

    Q = 1800 x( 0.15 )3/4

    Q = 426.2 cusec

    Q = 12.06 Cumec

    Area required for passing required dicharge of nalla

    2.00 meter/ sec

    262.760

    261.760

    GOVERMENT OF RAJASTHAN

    WATER RESOURCES DEPARTMENT GARARDA IRRIGATION PROJECT

    CANAL DATA :-

    Catchments area of Nalla. 0.38

    1.00

    0.50

    Assume Valocity of nalla limited to

    1.101.00

    Free Board (nalla)

    260.875261.675

    261.975

  • 7/28/2019 Super+Passes++in+Masonry+Section

    2/20

    y

    :1

    * * 2

    * * 1

    * *

    * * *

    * * *

    * * ** * *

    * *

    * *

    * *

    * * A A

    * *

    * *

    * *

    * *

    * *

    *

    *

    * *

    * *

    * *

    * *

    * *:1

    ** * *

    * * *

    * *

    * *

    CONSTRUCTIONOF

    SUPERPA

    0.50

    1.50

    1.30

    0.60

    6.703.00

    6.70

    14.39

    CBL

    0.30

    0.33

    2

    260.875

    NallaB.L.

    1.60

    1.50

    0.60

    0.50

    0.50

    2.50

    3.006.00

    6.10

    262.760

    3 00

    1.45

    1

    2.80

    0.50

    1.00

    NAMEOFWORK:-

    3.00

    1.000.25

    6.00

    13.09

    263.2

    60

    259.6

    75

    1.50

    1.10

    260.575

    NallaTBL

    7.09

    2.50

    261.760

    NallaHFL

    262.7

    60

    1

    NallaHFL

    U/SFSL

    1.5

    0

    R.L.

    R.L.

    U/STBL

    260.8

    75

    259.9

    75

    261.6

    75

    261.9

    75

    U/SCBL

  • 7/28/2019 Super+Passes++in+Masonry+Section

    3/20

    Top bars Top &bttom Distribution bars

    c/c 10mm F

    M

    Main reinforcement Bottom Plain barsc/c c/c

    Detail of Reinforcement in Super passes (for slab)

    m

    0.3

    10 mm F 250

    300c/c

    0.24

    1688150 150

    415 1960160

    0.3 2.00

    mm 8512

    10 300mm F

  • 7/28/2019 Super+Passes++in+Masonry+Section

    4/20

    NAME OF WORK:- 0

    n Perticulars Qty unit

    1

    Hard soil mixed with kankar /boulder morrum

    Abutment block 1 x 14.39 x 3.90 x 2.10 = 117.90

    Wing Wall 4 x 4.70 x 1.80 x 2.10 = 71.10

    Return wall 4 x 3.00 x 1.80 x 2.10 = 45.40

    Total = 234.40 cum

    25 cum

    for 1 Nos = 59.00 cum

    2

    B. E/w in D/R rock 25 cum

    for 1 Nos = 59.00 cum

    C.H/R not required blasting 25 cumfor 1 Nos = 59.00 cum

    D. E/w in phylites &other rock requaring nominal blasting 25 cum

    for 1 Nos = 59.00 cum

    3

    GOVERNMENT OF RAJASTHAN

    WATER RESOURCES DEPARTMENT

    GARARDA IRRGATION PROJECT

    DETAILED ESTIMATE

    0

    Detail

    % of above =

    Earth work in excavation including loading

    disposal and dressing of excavate rock

    with in initial leads of 50m and lift 1.5 m in

    dry and moist including dressing of

    excavated area, dewatering wherever

    required and all applicable taxes and levies

    etc. complete in all respect

    Cement concrete (1:3:6) M 10 well mixed

    % of above =

    59.00

    59.00

    59.00

    Earth work in excavation including loading

    disposal and dressing of excavate earth

    with in initial leads of 50m and lift 1.5 m in

    dry and moist including dressing of

    excavated area, dewatering wherever

    required and all applicable taxes and leviesetc. complete in all respect

    % of above =

    % of above =

    59.00

  • 7/28/2019 Super+Passes++in+Masonry+Section

    5/20

    2

    Return wall 4 x 3.00 x 2.25 x 1.50 x 0.90 = 14.18 cum

    2

    total 68.23 cum

    for 1 Nos = 68.30 cum

    5

    Abutment 2 x 8.09 + 7.44 x 1.30 + 0.6 x 0.90 = 13.28cu

    m

    2 2

    Wing Wall 4 x 4.70 + 3.20 x 1.50 + 0.50 x 2.90 = 45.82 cum

    2 2

    Return wall 4 3.00 + 2.25 x 1.50 + 0.50 x 2.90 = 30.45 cum

    2 2

    total 89.55 cum

    for 1 Nos = 89.60 cum

    6

    for slabe 1 x 8.09 x 1.60 12.94 sqm

    for 1 Nos = 13.00 cum

    7

    side of slabe 2 x 8.09 x 0.35 = 5.70 sqm

    side of slabe 2 x 1 60 x 0 35 = 1 10 sqm

    R.R stone masonry (using R.R.stone

    where 75% stones to be not less than 15 in

    size in any directon and weighing not less

    than 23kg.)in superstrucuture including

    curing all leads of construction materials &

    all taxes and with initial lift \delift of 5m

    from ground level etc complete in cement

    sand mortar 1:5

    Side shuttring including proping

    etc.complete (to achive finish 2)for block

    joints of foundation stillins basins, buckets

    aprons etc. (non suspeted horizentally laidmass concrete)

    Centring shuttring for slabs, beams, lintels,

    coloumns troughs, with or without caps and

    base including proping and removing.

  • 7/28/2019 Super+Passes++in+Masonry+Section

    6/20

    10

    for parapet wall 2 x 21.0 x 1.00 + 0.50 x 1.50 = 47.10 cum

    2for 1 Nos = 47.10 cum

    11

    Length of slabe = 9.6 m

    width of slabe = 1.60 m

    Depth of slabe = 0.3 m

    (As per IRC SP 20) for clear span 2.00m

    main crank bars bottom (cross) # x 9.60 / 0.085 = 114 = 289 x 0.888 257

    bottom plain bars (cross) # x 1.60 / 0.25 = 6 = 58 x 0.785 45

    top bars (cross) # x 9.60 / 0.30 = 32 = 74 x 0.785 58

    top bars (long) # x 1.60 / 0.30 = 5 = 48 x 0.785 38

    Botttom bars (long) # x 1.60 / 0.30 = 5 = 48 x 0.785 38

    435

    5% for cutting wastage 22

    Total weight (kg.)= 457

    Total weight (T) = 0.46

    for 1 Nos = 0.50 ton12

    Tot

    al

    wei

    Couresd stone / kharanja masonry (using

    hammer dressed stone to be not less than

    20 cm in any direction and at least 50 %

    stone to be more than 23 cm in depth ) for

    superstructure (upto 0.5m thickness)

    including curing etc.including all leads of all

    construction matarials complete.in cement

    sand mortar1:5

    galleries, arch covers, bed plates, sluice

    capstan bases etc.

    lengthweight/

    m= x

    2.54

    9.60

    Nos.

    Total weight (kg) =

    9.60

    Cement concrete (1:2:4) M-15 well mixed

    and laid in - position complete including all

    leads of all construction materials

    including curing and finishing having well

    9.60

    2.30

    number required

    length

    of cc

    c/c

    space=

    Supply of M S .reinforcement including

    labour charges for bending binding and

    placing in position all reinfocement as per

    drawing including cost of binding wire and

    all leads and lifts using.tor or ribed barsTota

    l

    leng

    i

  • 7/28/2019 Super+Passes++in+Masonry+Section

    7/20

    for parapet wall 4 x 21.00 x 1.50 = 126.00 sqm

    for parapet end wall 4 x 1 x 1.50 = 3.98 sqm

    Total 129.98 sqm

    for 1 Nos = 130.00 cum

    15

    50 % of item no 1 118.00 cum

    (Rate as per irrigation BSR2006Ch 5/8c)

    Rehandling of excaveted matrial inlcuding

    loading unloading and dressing within inial

    lead of 50 m and lift 1.5 m with cost of

    dewatering wherever required and all

    applicable taxes and lavies etc. complete

    in all respect mixed strata muck.

    cement sand mortar 1:3

  • 7/28/2019 Super+Passes++in+Masonry+Section

    8/20

  • 7/28/2019 Super+Passes++in+Masonry+Section

    9/20

  • 7/28/2019 Super+Passes++in+Masonry+Section

    10/20

    NAME OF WORK:- 0 0

    (BSR 2008)

    Sno Perticulars Qty Rate Unit Amount

    1

    Hard soil mixed with kankar /boulder morrum 59.00 47.00 p /cum 2773.00(Rate as per irrigation BSR2008 Ch 5/1c) cum

    2

    (Rate as per irrigation BSR2008 Ch 5/2 )

    B. E/w in D/R rock 59.00 78.00 p /cum 4602.00cum

    C.H/R not required blasting 59.00 121.00 p /cum 7139.00

    cum

    D. E/w in phylites &other rock requaring nominal blasting 59.00 166.00 p /cum 9794.00

    cum

    3

    (a) Maximum size up to 20mm 34.00 2105.00 p /cum 71570.00

    (Rate as per irrigation BSR2008 Ch 7/6d) cum

    4

    Cement concrete (1:3:6) M-10 well mixed and laid in -

    position complete including all leads of all construction

    materials including curing and finishing having well

    graded broken stone aggregate of

    R R stone masonry (using R R stone where 75% stones

    GOVERNMENT OF RAJASTHAN

    WATER RESOURCES DEPARTMENT

    GARARDA IRRGATION PROJECT

    Earth work in excavation including loading disposal and

    dressing of excavate rock with in initial leads of 50m

    and lift 1.5 m in dry and moist including dressing of

    excavated area, dewatering wherever required and all

    applicable taxes and levies etc. complete in all respect

    Earth work in excavation including loading disposal and

    dressing of excavate earth with in initial leads of 50m

    and lift 1.5 m in dry and moist including dressing of

    excavated area, dewatering wherever required and all

    applicable taxes and levies etc. complete in all respect

  • 7/28/2019 Super+Passes++in+Masonry+Section

    11/20

    7

    13.80 90.00 P sqm 1242.00

    sqm

    (Rate as per irrigation BSR2008 Ch 10/1b)

    8

    (a) Maximum size up to 20mm 7.00 2951.00 p /cum 20657.00

    (Rate as per irrigation BSR2008 Ch 7/4d) cum

    9

    7.00 111.00 p /cum 777.00

    (Rate as per irrigation BSR2008 Ch 10/11b)

    cum

    10

    47.10 2003.00 p /cum 94342.00

    cum

    11

    (As per IRC SP 20) for clear span 2.00m 500.00 55.00 P /Kg 27500.00

    kg

    Side shuttring including proping etc.complete (to achive

    finish F2 Top or intermidiate bed platein between

    masonry of piers,abutments sluice well etc.

    Cement concrete (1:1.5:3) M-10 well mixed and laid in -

    position complete including all leads of all construction

    materials including curing and finishing having well

    graded broken stone aggregate of

    Extra labour charges for obstructration in laying andplacing the reinforced cement concrete due to

    reinforcement.

    (b) Colomns, Slabs, Cantilevers projections staircase,

    lintels , beams, chajjas, Retaining walls, piers,

    abutments, galleries, arch covers, bed plates, sluice

    capstan bases etc.

    Couresd stone / kharanja masonry (using hammer

    dressed stone to be not less than 20 cm in any directionand at least 50 % stone to be more than 23 cm in depth

    ) for superstructure (upto 0.5m thickness) including

    curing etc.including all leads of all construction matarials

    complete.in cement sand mortar1:5

    Supply of M S .reinforcement including labour charges

    for bending binding and placing in position all

    reinfocement as per drawing including cost of bindingwire and all leads and lifts using.tor or ribed bars

  • 7/28/2019 Super+Passes++in+Masonry+Section

    12/20

    118.00 29.00 p /cum 3422.00

    (Rate as per irrigation BSR2006Ch 5/8c)

    Total 576775.00

    3 % contengency 17303.25

    594078.25

    Say Rs. 5.95 lacs

    applicable taxes and lavies etc. complete in all respect

    mixed strata muck.

    G total

  • 7/28/2019 Super+Passes++in+Masonry+Section

    13/20

    0 0

    1 NIT No. 7/2008-09 S.No.32

    2 NIT Amount Rs. 0 lacs

    3 Earnest money 1.Regd. Contractor @1/2%Rs. 0.00

    2.Other Contractor @ 2%Rs. 0.00

    4 Tender cost Rs. 200

    5 Date of Selling Tender 15.09.08 to 22.09.08

    6 Date of Receiving Tender 24.09.08 upto 3.00 PM

    7 Date of Opening Tender 24.09.08 At 4.00 PM

    8 Time of completion 4 Month9 B.S.R. Irrigation BSR 2008

    Sno. Item Qty Rate Unit Amount

    1

    59.00 47.00 p /cum 2773.00

    Hard soil mixed with kankar /boulder morrum cum

    2

    B. E/w in D/R rock 59.00 78.00 p /cum 4602.00

    cum

    C.H/R not required blasting 59.00 121.00 p /cum 7139.00

    cum

    D E/w in phylites &other rock requaring nominal blasting 59 00 166 00 p /cum 9794 00

    SCHEDULE "G"

    Earth work in excavation including loading disposal and

    dressing of excavate earth with in initial leads of 50m

    and lift 1.5 m in dry and moist including dressing of

    excavated area, dewatering wherever required and all

    applicable taxes and levies etc. complete in all respect

    Earth work in excavation including loading disposal and

    dressing of excavate rock with in initial leads of 50m

    and lift 1.5 m in dry and moist including dressing of

    excavated area, dewatering wherever required and all

    applicable taxes and levies etc. complete in all respect

  • 7/28/2019 Super+Passes++in+Masonry+Section

    14/20

    89.60 1660.00 p /cum 148736.00

    cum

    6

    13.00 131.00 P sqm 1703.00

    sqm

    7

    13.80 90.00 P sqm 1242.00

    sqm

    8

    (a) Maximum size up to 20mm 7.00 2951.00 p /cum 20657.00

    cum

    9

    7.00 111.00 p /cum 777.00

    cum

    10

    47.10 2003.00 p /cum 94342.00

    cum

    11 Supply of M S reinforcement including labour charges

    Centring shuttring for slabs, beams, lintels, coloumns

    troughs, with or without caps and base including

    proping and removing.

    Side shuttring including proping etc.complete (to achive

    finish F2 Top or intermidiate bed platein between

    masonry of piers,abutments sluice well etc.

    Cement concrete (1:1.5:3) M-10 well mixed and laid in -position complete including all leads of all construction

    materials including curing and finishing having well

    graded broken stone aggregate of

    Extra labour charges for obstructration in laying and

    placing the reinforced cement concrete due to

    reinforcement.

    (b) Colomns, Slabs, Cantilevers projections staircase,lintels , beams, chajjas, Retaining walls, piers,

    abutments, galleries, arch covers, bed plates, sluice

    capstan bases etc.

    Couresd stone / kharanja masonry (using hammer

    dressed stone to be not less than 20 cm in any direction

    and at least 50 % stone to be more than 23 cm in depth

    ) for superstructure (upto 0.5m thickness) including

    curing etc.including all leads of all construction

    matarials complete.in cement sand mortar1:5

    taxes and with initial lift \delift of 5m from ground level

    etc complete in cement sand mortar 1:5

  • 7/28/2019 Super+Passes++in+Masonry+Section

    15/20

    sqm

    15

    118.00 29.00 p /cum 3422.00

    Total 576775.00

    Rehandling of excaveted matrial inlcuding loading

    unloading and dressing within inial lead of 50 m and lift

    1.5 m with cost of dewatering wherever required and all

    applicable taxes and lavies etc. complete in all respect

    mixed strata muck.

  • 7/28/2019 Super+Passes++in+Masonry+Section

    16/20

    62 nos main bars Distribution bars 86 nos main bars Distribution bars

    12mm F 120 c/c 8mm F 160 c/c 12mm F 85 c/c 10mm F 250 c/c

    Wearing coat 75mm thicko o o o o o o o o o o o o

    o o o o o o o o o o o o o o o o o o o o o o

    Cross section of culvert

    60 nos main bars Distribution bars 1.50 m span 2.00 m span

    16mm F 125 c/c 10mm F 175 c/c

    71 nos main bars Distribution bars

    16mm F 105 c/c 12mm F 200 c/co o o o o o o o

    o o o o o o o o o o o o o o o o

    o o o o o o o o o o

    o o o o o o o o o o o o o o o o o o

    3.00 m span

    4.00 m span

    53 nos main bars Distribution bars 65 nos main bars Distribution bars

    20mm F 140 c/c 12mm F 175 c/c 20mm F 115 c/c 12mm F 150 c/c

    o o o o o o o o o o o o o o o o o o o o o o

    o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o

    5.00 m span 6.00 m spanNOTES:-

    1 Concrete:- M-25 2 Steel:- HSDY as per IS-1786 3 Cover:- 20mmat bottom & 40mm at side

    4 In 1.5M, 2.0M &3.0M span only one Bar is to be crankedin each side in four bars in all other span crank alternative bars.

    5 All bars cranked one end onl these are placed ith crank on left side and right side alternati el

    450

    7500 450

    6600

    416

    300 3001500

    150 1256

    150

    150

    300

    375

    150

    2000 300160 1960

    210 240

    1688

    130 1575

    300

    150

    150 2508

    150

    506220 2810

    300

    3330150

    370300 3000 300

    150 4040

    150

    150

    4000 300

    590290 3650

    430 480

    4840

    890

    400 400400 5000

    790320 4570

    150

    6000 400400 5360

  • 7/28/2019 Super+Passes++in+Masonry+Section

    17/20

    93 nos main bars Distribution bars

    20mm F 90 c/c 12mm F 125 c/c

    o o o o o o o o o o o o

    o o o o o o o o o o o o o o o o o o o o o o o o

    8.00 m span

    62 nos main bars Distribution bars25mm F 120 c/c 12mm F 110 c/c

    o o o o o o o o o o o o o o o o o o o o o o o o o o

    o o o o o o o o o o o o o o o o o o o o o o o o o o

    10.00 m span

    600

    400 8000 400

    150 6680

    150

    400 10000 400

    1120520 7280

    150 8400

    1260670 8990

    150

    750

  • 7/28/2019 Super+Passes++in+Masonry+Section

    18/20

    1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

    1.5 0.21 0.3 12 120 375 130 1575 8 160 10 300 10 300 1256

    2 0.24 0.3 12 85 415 160 1960 10 250 10 300 10 300 1688

    3 0.3 0.3 16 125 506 220 2810 10 175 10 300 10 300 2508

    4 0.37 0.3 16 105 590 290 3650 12 200 10 300 10 300 3330

    5 0.43 0.4 20 140 790 320 4570 12 175 10 300 10 300 4040

    6 0.48 0.4 20 115 890 400 5360 12 150 10 300 10 300 4840

    8 0.6 0.4 20 90 1120 520 7280 12 125 10 300 10 300 6680

    10 0.75 0.4 25 120 12 670 7280 12 125 10 300 10 300 8400

    bottom

    (mm)

    Dia

    meter of

    bars

    (mm)

    top steel where main not available

    center

    Length

    Top reinfrocement

    x - side

    Dia meter

    of bars

    (mm)

    Center

    to center

    distance

    (mm)

    Bed blok

    length(m)

    Main Reinforcement

    LengthDia

    meter of

    bars

    (mm)

    Center to

    center

    distance

    (mm)

    y - side

    top

    porsion

    (mm)

    crank

    (mm)

    Dia meter

    of bars

    (mm)

    Center to

    center

    distance

    (mm)

    Center

    to

    center

    distance

    Span

    (M)

    Bottonm reinforcement

    y - sidex - side

    thickness

    of slab

    (m)

  • 7/28/2019 Super+Passes++in+Masonry+Section

    19/20

  • 7/28/2019 Super+Passes++in+Masonry+Section