SUPERPAVE GUARD RAIL WIDENING SECTION
TYPICAL SECTION NO. 1
RIPRAP TYPICAL SECTION
TYPICAL SECTION ANDMISCELLANEOUS DETAILS
TBSC GUARD RAIL WIDENING SECTION
TYPICAL SECTION NO. 2
STA. 120+00.00 TO STA. 124+86.89 EW-132 CRL
STA. 126+27.11 TO STA. 130+50.00 EW-132 CRLSTA. 34+10.00 TO STA. 36+48.72 NS-289 CRL
RIPRAP DITCH DETAIL
STAKING DIAGRAM
ROADWAY PAY QUANTITIES
BRIDGE "A" PAY QUANTITIES
CONSTRUCTION PAY QUANTITIES
STAKING PAY QUANTITIES
TRAFFIC PAY QUANTITIES
SUMMARY OF PAY QUANTITIESAND GENERAL NOTES
SUMMARY OF SIGNSSUMMARY OF DRIVES
SUMMARY OF DRAINAGE STRUCTURES SUMMARY OF FENCING
GUARDRAIL BENDING DETAIL
STATION AND OFFSETTABLE EW-132
SUMMARY OF GUARDRAILS
STATION AND OFFSETTABLE NS-289
SUMMARY TABLES ANDMISCELLANEOUS DETAILS
X
XXX
XXX
TUG
OH
EO
HE
OHE OHE OHE OHE OHE OHE OHE OHE
TUG TUG TUG TUG TUG TUG
TUG
TUG
OH
EO
HE
X
X
X
X
NE/4 SEC 8, T-7-N, R-6-W
SE/4 SEC 5, T-7-N, R-6-W
NW/4 SEC 9,
SW/4 SEC 4, T-7-N, R-6-W
T-7-N, R-6-W
STA. 124+86.89BEG. BRIDGE "A"
ELEVATION1" = 10'
PLANCONTOUR INTERVAL = 1'
STA. 126+27.11END BRIDGE "A"
LOAD AND RESISTANCE FACTOR DESIGN DATA
ABUTMENT FOUNDATION DATAABUTMENTS: HP 12X53 PILING ABUTMENTS NO. 1 & 2
BRIDGE "A" GENERAL PLANAND ELEVATION
HYDRAULIC DATA
125+00 126+00
125+
00
126+
00
BRIDGE "A" PAY QUANTITIES
AIR VENT DETAILS
EXPANSION JOINT OPENING
X
XXX
XXX
G
OH
E
OHE OHE OHE OHE OHE OHE OHE OHE
TUG TUG TUG TUG TUG TUG
TUG
TUG
OH
E
X
X
X
X
SW/4 SEC 4, T-7-N, R-6-W
ELEVATION1" = 10'
PLANCONTOUR INTERVAL = 1'
BRIDGE "A" GEOTECHNICALINFORMATION
125+00 126+00
125+
00
126+
00
BORING B-2PENETROMETER RESULTS
BORING B-1
STA. 124+86.89BEG. BRIDGE "A"
STA. 126+27.11END BRIDGE "A"
NOTE:THIS SHEET SHOULD BE USED IN CONJUNCTION WITH A DRAINAGE MAP THATILLUSTRATES THE DRAINAGE PATTERNS/PATHWAYS AND RECEIVING WATERSFOR THIS PROJECT. THIS SHEET SHOULD ALSO BE USED WITH THE EROSIONCONTROL SUMMARIES, PAY ITEMS, & NOTES.
STORM WATER MANAGEMENTPLAN
A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) IS REQUIRED TO COMPLY WITH THEOKLAHOMA POLLUTION DISCHARGE ELIMINATION SYSTEM (OPDES) REGULATIONS. THIS PLAN ISINITIATED DURING THE DESIGN PHASE, CONFIRMED IN THE PRE-WORK MEETINGS AND AVAILABLEON THE JOB SITE ALONG WITH COPIES OF THE NOTICE OF INTENT (NOI) FORM AND PERMITCERTIFICATE THAT HAVE BEEN FILED WITH THE OKLAHOMA DEPARTMENT OF ENVIRONMENTALQUALITY (ODEQ). THE PLAN MUST BE KEPT CURRENT WITH UP-TO-DATE AMENDMENTS DURINGTHE PROGRESSION OF THE PROJECT. ALL CONTRACTOR OFF-SITE OPERATIONS ASSOCIATED WITHTHE PROJECT MUST BE DOCUMENTED IN THE SWPPP, I.E., BORROW PITS, WORK ROADS, DISPOSALSITES, ASPHALT/CONCRETE PLANTS, ETC. THE BASIC GOAL OF STORM WATER MANAGEMENT IS TOIMPROVE WATER QUALITY BY REDUCING POLLUTANTS IN STORM WATER DISCHARGES. RUNOFFFROM CONSTRUCTION SITES HAS A POTENTIAL FOR POLLUTION DUE TO EXPOSED SOILS ANDTHE PRESENCE OF HAZARDOUS MATERIALS USED IN THE CONSTRUCTION PROCESS. THEPREVENTION OF SOIL EROSION, CONTAINMENT OF HAZARDOUS MATERIALS AND/OR THEINTERCEPTION OF THESE POLLUTANTS BEFORE LEAVING THE CONSTRUCTION SITE ARE THE BESTPRACTICES FOR CONTROLLING STORM WATER POLLUTION.
PROPER MANAGEMENT AND DISPOSAL OF HAZARDOUS WASTE MATERIALS IS REQUIRED. THECONTRACTOR IS RESPONSIBLE FOR FOLLOWING MANUFACTURER'S RECOMMENDATIONS, STATE ANDFEDERAL REGULATIONS TO ENSURE CORRECT HANDLING, DISPOSAL, SPILL PREVENTION AND CLEANUPMEASURES. EXAMPLES INCLUDE BUT ARE NOT LIMITED TO: PAINTS, ACIDS, CLEANING SOLVENTS,CHEMICAL ADDITIVES, CONCRETE CURING COMPOUNDS AND CONTAMINATED SOILS.
PROPER MANAGEMENT AND DISPOSAL OF CONSTRUCTION WASTE MATERIAL IS REQUIRED BY THECONTRACTOR. MATERIALS INCLUDE STOCKPILES, SURPLUS, DEBRIS AND ALL OTHER BY-PRODUCTSFROM THE CONSTRUCTION PROCESS. PRACTICES INCLUDE DISPOSAL, PROPER MATERIALS HANDLING,SPILL PREVENTION AND CLEANUP MEASURES. CONTROLS AND PRACTICES SHALL MEET THEREQUIREMENTS OF ALL FEDERAL, STATE AND LOCAL AGENCIES.
ALL EROSION AND SEDIMENT CONTROLS WILL BE MAINTAINED IN GOOD WORKING ORDER FROMTHE BEGINNING OF CONSTRUCTION UNTIL AN ACCEPTABLE VEGETATIVE COVER IS ESTABLISHED.INSPECTION BY THE CONTRACTOR AND ANY NECESSARY REPAIRS SHALL BE PERFORMED ONCE EVERY7 CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT GREATER THAN 0.5 INCH ASRECORDED BY A NON-FREEZING RAIN GAUGE TO BE LOCATED ON SITE. POTENTIALLY ERODIBLEAREAS, DRAINAGEWAYS, MATERIAL STORAGE, STRUCTURAL DEVICES, CONSTRUCTION ENTRANCES ANDEXITS ALONG WITH EROSION AND SEDIMENT CONTROL LOCATIONS ARE EXAMPLES OF SITES THATNEED TO BE INSPECTED.
BONDING REQUIREMENTSFINAL CLEANING UPCONTRACTOR'S RESPONSIBILITY FOR WORKENVIRONMENTAL PROTECTIONSTORAGE AND HANDLING OF MATERIALLAWS, RULES AND REGULATIONS TO BE OBSERVEDSTORM WATER MANAGEMENTMANAGEMENT OF EROSION, SEDIMENTATION AND STORM WATER POLLUTION PREVENTION AND CONTROLTEMPORARY SEDIMENT CONTROL
103.05104.10104.12104.13106.08107.01107.20
220221
"ODEQ GENERAL PERMIT (OKR10) FOR STORM WATER DISCHARGES FROM CONSTRUCTION ACTIVITIES WITHIN THESTATE OF OKLAHOMA." ODEQ, WATER QUALITY DIVISION, SEPTEMBER 13, 2017.
HAUL ROADS DAMPENED FOR DUST CONTROL
LOADED HAUL TRUCKS TO BE COVERED WITH TARPAULIN
EXCESS DIRT ON ROAD REMOVED DAILY
STABILIZED CONSTRUCTION EXIT
TEMPORARY SILT FENCE
TEMPORARY SILT DIKES
TEMPORARY FIBER LOG
DIVERSION, INTERCEPTOR OR PERIMETER DIKES
DIVERSION, INTERCEPTOR OR PERIMETER SWALES
ROCK FILTER DAMS
TEMPORARY SLOPE DRAIN
PAVED DITCH W/ DITCH LINER PROTECTION
TEMPORARY DIVERSION CHANNELS
TEMPORARY SEDIMENT BASINS
TEMPORARY SEDIMENT TRAPS
TEMPORARY SEDIMENT FILTERS
TEMPORARY SEDIMENT REMOVAL
RIP RAP
INLET SEDIMENT FILTER
TEMPORARY BRUSH SEDIMENT BARRIERS
SANDBAG BERMS
TEMPORARY STREAM CROSSINGS
NOTE: TEMPORARY EROSION CONTROL METHODS MUST BE USED ONALL DISTURBED AREAS WHERE CONSTRUCTION ACTIVITIES HAVE CEASEDFOR OVER 14 DAYS. METHODS USED WILL BE AS SHOWN ON PLANS,OR AS DIRECTED BY THE ENGINEER.
TEMPORARY SEEDING
PERMANENT SODDING, SPRIGGING OR SEEDING
VEGETATIVE MULCHING
SOIL RETENTION BLANKET
PRESERVATION OF EXISTING VEGETATION
XX
X
XXXXXXXX
XXXXXXXX
X
X
X X X X X
X X
NW/4 SEC 9, T-7-N, R-6-W
NE/4 SEC 8, T-7-N, R-6-W
SW/4 SEC 4, T-7-N, R-6-WSE/4 SEC 5, T-7-N, R-6-W
120+
00
125+
00
130+
00
120+
00
125+
00
130+
00
X
X
X
LEGENDEROSION CONTROL QUANTITIES
EROSION CONTROL PLAN
XX
X
XXXXXX
XXXXXX
TUG
TUG
OH
EO
HE
OH
E
X
X
X X X X X X X
X X XOHE OHE OHE OHE OHE OHE OHE OHE OHE OHE OHE
TUG TUG TUG TUG TUG TUG
TUGTUG TUG TUG TUG
120+
00
125+
00
130+
00
120+
00
125+
00
130+
00
OH
EO
HE
OH
E
X
X
X
E-W 132
STA
. 120
+00.
00B
EGIN
J/P
284
71(0
4)3.
96' L
T. C
L. S
UR
VEY
HYDRAULIC DATA
STA
. 130
+50.
00EN
D J
/P 2
8471
(04)
=STA
130
+50.
00 C
L. S
UR
VEY
3.49
' LT.
X
X
X
X
X
X
X
X
X
X X
X
X
NW/4 SEC 9, T-7-N, R-6-W
NE/4 SEC 8, T-7-N, R-6-W
SW/4 SEC 4, T-7-N, R-6-W
SE/4 SEC 5, T-7-N, R-6-W
X
X
X
OHE
OHE
OHE
OHE
OHE
OHE
TUG
TUG
TUG
TUG
OH
E
OH
E
OH
E
OH
E
TUG
TUG
TUG
TUG
NW
125+00
130+00
125+00
130+00
34+1
0
35+0
036
+00
N-S 289
STA
. 34+
10.0
0B
EGIN
NS-
289
SEC
TIO
N L
INE
RET
UR
N3.
85' R
T. N
S-28
9 C
L. S
UR
VEY
STA
. 36+
48.7
2EN
D N
S-28
9 SE
CTI
ON
LIN
E R
ETU
RN
= 36
+33.
79 6
6.80
' RT.
NS-
289
CL.
SU
RVE
Y
XX
XX
XX
XX
X
XX
XX
XX
XX
X
X X X X X
XX
XX
XX
X X X X
X X X
X
X
X
X
XX
X X X X X X X
XX
XXXX
STA. 152+85.41FOUND 1/2" IRON PIN W/1326 CAP
S/4 COR. SEC 4, T-7-N, R-6-WSTA. 126+41.15 & STA. 36+40.99
FOUND 1/2" IRON PIN W/ CAP OBLITERATEDSW COR. SEC 4, T-7-N, R-6-W
STA. 100+00.00SET 5/8" IRON PIN W/CA 32 CAP
N/4 COR. SEC 8, T-7-N, R-6-W
STA. 10+00.00FOUND 1/2" IRON PIN W/ BRUNT PLS 1407 CAP
W/4 COR. SEC 9, T-7-N, R-6-W
LANDTIES
119+50
119+50
120+00
120+00
120+50
120+50
STA. 120+00.00BEGIN J/P 28471(04)3.96' LT. CL. SURVEY
121+00
121+00
121+50
121+50
122+00
122+00
122+50
122+50
123+00
123+00
123+50
123+50
124+00
124+00
124+50
124+50
124+59
124+59
STA 124+58.63BEGIN WING WALL RIGHT
124+73
124+73
125+34
125+34
125+80
125+80
STA 124+73.16BEGIN WING WALL LEFT
STA 124+86.89BEGIN BRIDGE "A"
BKFC BKWL
STA 126+27.11END BRIDGE "A"
BKFC BKWL
126+41
126+41
126+55
126+55
127+00
127+00
F.G. = 1118.13F.G. = 1118.13
STA 126+40.85END WING WALL RIGHT
STA 126+55.38END WING WALL LEFT
127+08
127+08
127+50
127+50
128+00
128+00
128+34
128+34
128+50
128+50
129+00
129+00
129+50
129+50
130+00
130+00
130+50
130+50
STA. 130+50.00END J/P 28471(04)
=STA 130+50.00 3.49' LT. CL. SURVEY
131+00
131+00
34+10
34+10
34+50
34+50
35+00
35+00
STA. 34+10.00BEGIN NS-289 SECTION LINE RAMP
3.85' RT. CL SURVEY
35+50
35+50
36+00
36+00
36+
15
36+
15
36+49
36+49
STA. 36+48.72 NS-289 SECTION LINE RAMPMEET AND MATCH CRL
= 36+33.79 66.80' RT CL. SURVEY