Craig Cahill
Access To Date
• Three separate supplementary events since the embargo was lifted in December 2007.
• Gwydir river starting 6th January 2008.• Carole creek starting 22nd January 2008.• Complete system starting 5th February 2008
(This includes Gil Gil creek).
Gwydir River January 2008
• Localised rain event U/S of Gravesend.• Available flow to be shared 2607ML.• 8% announcement made from Boolooroo Weir
to Caithness on the Lower Gwydir.• 1255ML announced 1021ML pumped.
Carole Creek January 2008
• Localised rain event and inflow from Marshall ponds.
• Available flow to be shared 2100ML.• 3% announcement made from Midkin to
Cleveland.• 920ML announced 918ML pumped.
Complete System Announcement
• General falls across whole valley with isolated heavy rainfall.
• Total Flow Volume
Gravesend inflow 60,187ML
Gil Gil Creek inflow 18,077ML
Marshall Ponds inflow 6,353ML
Mehi River inflow 6,175ML
Total Flow 90,792ML
Complete System Announcement
• Available flow to be shared
Total Flow Volume 90,792ML
3T Rule 6,000ML
D/S Orders 1,764ML
Available flow to be shared 83,028ML
50% Consumptive share 41,514ML
Total Supplementary extracted 40,301ML
Over Pumping debited to other accounts
1,392ML
Total Pumping 41,693ML
Complete System Announcement’s
Gwydir RiverCopeton to Boolooroo Weir
25%
Boollooroo Weir to Wandoona 15%
Mehi RiverTareelaroi Weir to Combadello Weir
25%
Combadello Weir to Myambla 15%
Moomin CreekCombadello Weir to Alma Bridge
15%
Downstream Alma Bridge 17%
Complete System Announcement’s
Carole CreekBoolooroo Weir to Midkin South
23%
Midkin to Windmill 27%
Brigalows to Dodds 29%
Bullamon to Medgun 48%
Gil Gil CreekByra to Cleveland
100%
Determining Section Announcements
• Forecast volume of event and shape of hydrograph.
• Assess if there is surplus to requirements.• Determine what section is next on the three
year rolling average, while considering deliverability, event volume, shape of hydrograph and past announcements.
Principals of Three year Rolling Average
• Announcements are made based on opportunity to access supplementary flows.
• To share opportunity across all section as equitable as possible, based only on when flows are available.
Summary of Announcements made from 30th June 2005 to 5th Feb 2008
Gwydir Valley Supplementary Access Granted Expressed as a Percentage of Supplementary Access Limit
0
50
100
150
200
250
300
350
0 10 20 30 40Water Users (Stream Order)
Cu
mu
lati
ve A
nn
ou
ncem
en
ts (
%)
MEHI MOOMI N CAROLE GWYDI R
Summary of Announcements made from 30th June 2005 to 17th March 2008
Gwydir Valley Supplementary Access Granted Expressed as a Percentage of Supplementary Access Limit
0
50
100
150
200
250
300
350
400
450
500
0 10 20 30 40Water Users (Stream Order)
Cu
mu
lati
ve A
nn
ou
ncem
en
ts (
%) MEHI MOOMI N CAROLE GWYDI R